{"id":106069,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/quickbooks-online\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"quickbooks-online","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/","title":{"rendered":"SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ QuickBooks Online<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para QuickBooks Online: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento para o QuickBooks Online que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das equipas. Transforma os or\u00e7amentos aceites e as encomendas num programa para cada m\u00e1quina, operador, ferramenta e material. O QuickBooks mant\u00e9m os clientes, produtos, faturas e a contabilidade. O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o que o software de contabilidade n\u00e3o tem, e o Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o QuickBooks Online nos dois sentidos. Recebe clientes, produtos e servi\u00e7os, or\u00e7amentos aceites, encomendas a fornecedores e funcion\u00e1rios. Devolve a data de expedi\u00e7\u00e3o prevista, as faturas das encomendas conclu\u00eddas, as horas registadas e os movimentos de stock. A equipa SkyPlanner configura a integra\u00e7\u00e3o com a sua empresa no QuickBooks durante a implementa\u00e7\u00e3o inicial.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Um plano para cada m\u00e1quina, n\u00e3o uma lista de or\u00e7amentos em aberto.<\/p>\n\n\n<p class=\"fx-pain__b\">No QuickBooks, um or\u00e7amento aceite \u00e9 um documento de venda. O motor Arcturus do SkyPlanner transforma cada um em tarefas nos centros de trabalho onde ser\u00e3o executadas, com hor\u00e1rios concretos, num diagrama de Gantt interativo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de expedi\u00e7\u00e3o que pode cumprir.<\/p>\n\n\n<p class=\"fx-pain__b\">A data de conclus\u00e3o de cada encomenda \u00e9 calculada a partir da carga de cada m\u00e1quina e pessoa. Antes de enviar um or\u00e7amento, pode ver que a quinadora est\u00e1 ocupada durante duas semanas, enquanto a soldadura est\u00e1 livre.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Turnos \u00e0 medida da sua f\u00e1brica.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada centro de trabalho e cada pessoa tem os seus pr\u00f3prios turnos, f\u00e9rias, aus\u00eancias e turnos extraordin\u00e1rios. Acrescente um turno de s\u00e1bado no gargalo e as datas s\u00e3o ajustadas de imediato.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de prepara\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos, e de vermelho para azul, 60. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipas partilhadas sem conflitos.<\/p>\n\n\n<p class=\"fx-pain__b\">Um dispositivo de fixa\u00e7\u00e3o em uso numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com turnos dispon\u00edveis.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante encomendas urgentes e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Atribua Fast Track ou uma prioridade mais alta a uma ordem, e o motor abre espa\u00e7o para ela. Quando uma m\u00e1quina para, o Autopilot reprograma a produ\u00e7\u00e3o, e o Running Time Lock mant\u00e9m as tarefas j\u00e1 iniciadas no seu lugar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material verificado antes de come\u00e7ar o trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner consulta o stock e as encomendas a fornecedores em aberto no QuickBooks. Uma tarefa que aguarda uma entrega de um fornecedor \u00e9 programada para depois da chegada do material.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O trabalho conclu\u00eddo segue diretamente para fatura\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">Os operadores registam o trabalho num telem\u00f3vel ou tablet com Mobile Confirmations ou Production Timer. Quando uma encomenda fica conclu\u00edda, a fatura e as horas j\u00e1 est\u00e3o no QuickBooks.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem os fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Menos<\/b><span>paragens por falta de material<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO valor que o SkyPlanner nos traz \u00e9 ser uma ferramenta que funciona no dia a dia, sobretudo para definir datas de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, respons\u00e1vel pelo planeamento da produ\u00e7\u00e3o<\/b><br>Eskomatic \u00b7 Maquina\u00e7\u00e3o por subcontrata\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">A programa\u00e7\u00e3o autom\u00e1tica da carga permite definir datas de entrega mais precisas, e as paragens de produ\u00e7\u00e3o por falta de material diminu\u00edram acentuadamente.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/eskomatic\/\">Leia o testemunho da Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo para manter a fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Constru\u00e7\u00e3o mec\u00e2nica em chapa e fabrico por subcontrata\u00e7\u00e3o<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o precisa agora de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Leia o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-quickbooks-online-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o QuickBooks Online<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O QuickBooks envia o trabalho.<\/strong> O SkyPlanner recebe clientes, produtos e servi\u00e7os com as quantidades em stock, or\u00e7amentos aceites, encomendas a fornecedores em aberto e funcion\u00e1rios. Cada or\u00e7amento aceite transforma-se numa ordem de produ\u00e7\u00e3o com a respetiva data de entrega.<\/li>\n\n\n<li><strong>O SkyPlanner cria o programa e mant\u00e9m-no atualizado.<\/strong> Basta definir uma vez no SkyPlanner as etapas de fabrico, os centros de trabalho e os tempos de prepara\u00e7\u00e3o de cada produto. O motor Arcturus programa ent\u00e3o todas as tarefas em todas as m\u00e1quinas em segundos e reprograma quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O trabalho conclu\u00eddo regressa ao QuickBooks.<\/strong> O SkyPlanner regista a data de conclus\u00e3o prevista no campo da data de expedi\u00e7\u00e3o do or\u00e7amento. Quando uma encomenda fica conclu\u00edda, cria uma fatura associada ao or\u00e7amento, lan\u00e7a as horas registadas como registos de tempo e regista os produtos acabados e os materiais consumidos atrav\u00e9s de um ajuste de invent\u00e1rio.<\/li>\n\n<\/ol>\n\n\n<p>A integra\u00e7\u00e3o utiliza a QuickBooks Online Accounting API da Intuit com OAuth 2.0, pelo que n\u00e3o \u00e9 instalado nada no QuickBooks. Os webhooks do QuickBooks comunicam a cria\u00e7\u00e3o e altera\u00e7\u00e3o de clientes, or\u00e7amentos, artigos e encomendas a fornecedores, e os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es ao programa \u00e0 medida que ocorrem. Cada f\u00e1brica configura os seus produtos, or\u00e7amentos e invent\u00e1rio de forma diferente no QuickBooks. Por isso, a equipa SkyPlanner faz o mapeamento dos seus dados durante a implementa\u00e7\u00e3o inicial e presta apoio \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/p>\n\n\n<p>O pre\u00e7o da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu QuickBooks ProAdvisor, parceiro de integra\u00e7\u00e3o ou equipa de desenvolvimento tamb\u00e9m pode criar a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Os endpoints, o mapeamento de campos e as regras de escrita de dados no QuickBooks est\u00e3o no <a href=\"\/pt-pt\/integracoes\/erp\/quickbooks-online\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do QuickBooks Online para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-quickbooks-online-schedules-and-what-skypla\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o QuickBooks Online programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O QuickBooks Online \u00e9 um software de contabilidade. Os seus planos permitem acompanhar produtos, or\u00e7amentos, faturas, encomendas a fornecedores e horas. Nos planos Plus e Advanced, os artigos de invent\u00e1rio t\u00eam uma quantidade em stock. Nenhum dos planos inclui m\u00e1quinas, roteiros de fabrico ou ordens de produ\u00e7\u00e3o, pelo que o QuickBooks Online n\u00e3o faz o planeamento do ch\u00e3o de f\u00e1brica.<\/p>\n\n\n<p>A Intuit disponibiliza funcionalidades de fabrico num \u00fanico produto. A ajuda da Intuit indica: &#8220;Manufacturing features are currently available in Intuit Enterprise Suite.&#8221; (As funcionalidades de fabrico est\u00e3o atualmente dispon\u00edveis no Intuit Enterprise Suite.) (<a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/inventory-account\/understand-production-costs-using-manufacturing\/L4FBrL1Ip_US_en_US\">fonte<\/a>) Nesse produto, uma ordem de fabrico funciona assim:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Um produto e uma quantidade.<\/strong> Seleciona um artigo composto de invent\u00e1rio e a quantidade a fabricar.<\/li>\n\n\n<li><strong>Duas datas.<\/strong> A instru\u00e7\u00e3o \u00e9 &#8220;select a production Start date and Required by date.&#8221; (selecionar uma data de in\u00edcio da produ\u00e7\u00e3o e uma data-limite de conclus\u00e3o).<\/li>\n\n\n<li><strong>Componentes da lista de materiais.<\/strong> O estado Planned reserva-os, e a conclus\u00e3o da ordem abre um formul\u00e1rio de fabrico para registar as quantidades e os custos finais.<\/li>\n\n\n<li><strong>Servi\u00e7os como linha de custo.<\/strong> O custo dos servi\u00e7os e dos componentes n\u00e3o sujeitos a controlo de stock \u00e9 calculado &#8220;based on actual rates entered on the build assembly page.&#8221; (com base nos valores reais introduzidos na p\u00e1gina de fabrico do conjunto).<\/li>\n\n\n<li><strong>Um n\u00edvel.<\/strong> &#8220;Multi level bill of materials with sub assemblies aren&#8217;t supported in Intuit Enterprise Suite.&#8221; (O Intuit Enterprise Suite n\u00e3o suporta listas de materiais multin\u00edvel com subconjuntos.) (<a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/sales-orders\/learn-manufacturing-orders-assemblies\/L7ffspckB_US_en_US\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Isto \u00e9 c\u00e1lculo de custos e reserva de componentes. N\u00e3o inclui opera\u00e7\u00f5es, centros de trabalho nem capacidade, pelo que nada verifica se uma m\u00e1quina ou uma pessoa est\u00e1 dispon\u00edvel na data de in\u00edcio. Cada passo \u00e9 explicado em <a href=\"\/pt-pt\/integracoes\/erp\/quickbooks-online\/programacao-producao\/\">O QuickBooks permite programar a produ\u00e7\u00e3o?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"quickbooks-online-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O QuickBooks Online hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QuickBooks Online<\/th><th>QuickBooks Online com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Carteira de encomendas<\/td><td>Or\u00e7amentos aceites e faturas<\/td><td>Cada encomenda dividida em tarefas num cronograma por centro de trabalho<\/td><\/tr><tr><td>Capacidade<\/td><td>N\u00e3o modelada<\/td><td>Cada m\u00e1quina, pessoa e ferramenta com os seus pr\u00f3prios turnos<\/td><\/tr><tr><td>Roteiros de fabrico<\/td><td>N\u00e3o inclu\u00eddos<\/td><td>Etapas de fabrico, centros de trabalho e tempos de prepara\u00e7\u00e3o por produto<\/td><\/tr><tr><td>Sequencia\u00e7\u00e3o<\/td><td>O planeador decide em papel ou numa folha de c\u00e1lculo<\/td><td>O motor sequencia todas as encomendas em aberto por prioridade e data de entrega<\/td><\/tr><tr><td>Mudan\u00e7as de s\u00e9rie<\/td><td>N\u00e3o modeladas<\/td><td>Matriz de tempos de mudan\u00e7a, com o menor tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Quadro branco e telefonemas<\/td><td>O Autopilot reprograma toda a f\u00e1brica<\/td><\/tr><tr><td>Materiais<\/td><td>Quantidade em stock por artigo<\/td><td>Stock e encomendas a fornecedores por receber verificados a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Fichas de acompanhamento em papel<\/td><td>Fila de tarefas com hor\u00e1rios, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>Fatura\u00e7\u00e3o<\/td><td>Fatura introduzida manualmente ap\u00f3s a conclus\u00e3o da tarefa<\/td><td>Fatura e registo de horas criados a partir do trabalho conclu\u00eddo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-quickbooks-online-and-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que dados circulam entre o QuickBooks Online e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QuickBooks Online<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Cliente<\/td><td>Cliente, prioridade de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>Item (Inventory, NonInventory, Service) com QtyOnHand<\/td><td>Produtos e materiais, stock<\/td><td>Entrada<\/td><\/tr><tr><td>Estimate (aceite) com linhas e data de expedi\u00e7\u00e3o<\/td><td>Encomenda com data de entrega e tarefas por linha<\/td><td>Entrada<\/td><\/tr><tr><td>PurchaseOrder (em aberto) com linhas<\/td><td>Material a receber<\/td><td>Entrada<\/td><\/tr><tr><td>Employee<\/td><td>Pessoal<\/td><td>Entrada<\/td><\/tr><tr><td>Estimate ShipDate<\/td><td>Conclus\u00e3o prevista<\/td><td>Retorno<\/td><\/tr><tr><td>Invoice associada ao or\u00e7amento<\/td><td>Encomenda conclu\u00edda<\/td><td>Retorno<\/td><\/tr><tr><td>TimeActivity (colaborador, cliente, artigo de servi\u00e7o, horas)<\/td><td>Mobile Confirmations, registos de tempo<\/td><td>Retorno<\/td><\/tr><tr><td>InventoryAdjustment<\/td><td>Entrada de produtos acabados, materiais consumidos<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"quickbooks-online-scheduling-software-and-add-on\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando se adequa<\/th><\/tr><\/thead><tbody><tr><td>Apenas QuickBooks, ou ordens de fabrico do Intuit Enterprise Suite<\/td><td>Or\u00e7amentos, faturas e exist\u00eancias no QuickBooks; no Intuit Enterprise Suite, ordens de fabrico com uma lista de materiais e duas datas<\/td><td>H\u00e1 uma ou duas m\u00e1quinas e uma pessoa sabe a sequ\u00eancia do trabalho<\/td><\/tr><tr><td>Sistemas de gest\u00e3o de exist\u00eancias e MRP que sincronizam com o QuickBooks (por exemplo, Katana, MRPeasy, Fishbowl Manufacturing, Autodesk Fusion Operations)<\/td><td>Um segundo sistema para exist\u00eancias, listas de materiais e ordens de fabrico, que envia faturas de venda, faturas de fornecedores e custos para o QuickBooks<\/td><td>Pretende passar a gest\u00e3o de exist\u00eancias e encomendas do QuickBooks para outro sistema<\/td><\/tr><tr><td>APS na nuvem ligado por API (SkyPlanner APS)<\/td><td>Uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas, l\u00ea as encomendas do QuickBooks e devolve os dados do trabalho conclu\u00eddo<\/td><td>O QuickBooks continua a ser o seu sistema, mas as m\u00e1quinas e as pessoas precisam de um plano de trabalho concreto.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Se j\u00e1 utiliza um MRP em conjunto com o QuickBooks, o SkyPlanner programa a produ\u00e7\u00e3o a partir dos dados desse sistema. Consulte as p\u00e1ginas do <a href=\"\/pt-pt\/integracoes\/erp\/katana\/\">Katana<\/a> e do <a href=\"\/pt-pt\/integracoes\/erp\/mrpeasy\/\">MRPeasy<\/a>.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner para QuickBooks Online quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pretende manter o QuickBooks tal como est\u00e1.<\/strong> O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o e mant\u00e9m a contabilidade, os artigos e a fatura\u00e7\u00e3o onde est\u00e3o.<\/li>\n\n\n<li><strong>V\u00e1rias m\u00e1quinas disputam as mesmas encomendas,<\/strong> e a sequ\u00eancia de trabalho s\u00f3 existe na cabe\u00e7a de algu\u00e9m.<\/li>\n\n\n<li><strong>As mudan\u00e7as de s\u00e9rie determinam quanto produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o guarda um tempo para cada par de produtos, em cada sentido, e escolhe a sequ\u00eancia com menor tempo de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Os operadores, os dispositivos de fixa\u00e7\u00e3o e os materiais condicionam o plano tanto como as m\u00e1quinas.<\/strong> A capacidade limitada de todos os recursos \u00e9 respeitada em simult\u00e2neo, e as tarefas que exigem v\u00e1rios operadores recebem as pessoas de que precisam.<\/li>\n\n\n<li><strong>Pretende faturar o trabalho conclu\u00eddo sem voltar a introduzir dados.<\/strong> As faturas e as horas chegam ao QuickBooks assim que os operadores confirmam a tarefa.<\/li>\n\n\n<li><strong>Pretende um pre\u00e7o claro.<\/strong> A partir de 199 \u20ac por m\u00eas, com a integra\u00e7\u00e3o bidirecional or\u00e7amentada antecipadamente e com suporte da equipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie centros de trabalho, pessoas, turnos e etapas do processo no SkyPlanner, ou importe-os. Est\u00e1 dispon\u00edvel apoio na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas encomendas.<\/strong> Exporte os clientes, os produtos e os or\u00e7amentos em aberto do QuickBooks para Excel ou CSV, importe-os e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o QuickBooks Online.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta suporte ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho, ou cancelar, a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais, ou leia o <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">guia de programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade limitada<\/a>. Tamb\u00e9m utiliza outro sistema? Consulte <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas e se integra com o QuickBooks Online nos dois sentidos. Recebe clientes, artigos, or\u00e7amentos aceites, encomendas a fornecedores e colaboradores. Devolve a data de expedi\u00e7\u00e3o prevista, as faturas das encomendas conclu\u00eddas, os registos de horas e os ajustes de exist\u00eancias. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o, que distingue o sentido de cada mudan\u00e7a de produto, ordena as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o QuickBooks Online atrav\u00e9s da Accounting API da Intuit, com OAuth 2.0 e webhooks do QuickBooks. A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a configura\u00e7\u00e3o inicial. Sistemas de gest\u00e3o de exist\u00eancias e MRP como Katana, MRPeasy e Fishbowl tamb\u00e9m sincronizam com o QuickBooks. Se utilizar um destes sistemas, o SkyPlanner pode programar a produ\u00e7\u00e3o a partir dos seus dados.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O QuickBooks Online permite programar a produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. Os planos do QuickBooks Online n\u00e3o incluem m\u00e1quinas, roteiros de fabrico nem ordens de produ\u00e7\u00e3o. O Intuit Enterprise Suite acrescenta ordens de fabrico com uma lista de materiais, uma data de in\u00edcio e uma data-limite, mas n\u00e3o inclui opera\u00e7\u00f5es nem capacidade. O SkyPlanner APS acrescenta a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Temos de substituir o QuickBooks por um ERP para programar a produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona em conjunto com o QuickBooks Online. O QuickBooks mant\u00e9m os clientes, os artigos, os or\u00e7amentos, as faturas, as compras e a contabilidade. O SkyPlanner programa o trabalho de acordo com a capacidade real e devolve os dados do trabalho conclu\u00eddo para fatura\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa utilizar o SkyPlanner em conjunto com o QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Uma f\u00e1brica com 10 centros de trabalho paga 299 \u20ac por m\u00eas. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente, de acordo com o seu processo e as suas necessidades, juntamente com o plano. Assim, conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De que plano do QuickBooks Online precisamos?<\/summary>\n<p class=\"sp-faq__a\">Os planos QuickBooks Online Plus e Advanced permitem consultar os n\u00edveis de exist\u00eancias, segundo a <a href=\"https:\/\/quickbooks.intuit.com\/pricing\/\">p\u00e1gina de pre\u00e7os da Intuit<\/a>, e tamb\u00e9m incluem <a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/purchase-orders\/create-send-purchase-orders-quickbooks-online\/L2mVpjOoq_US_en_US\">encomendas a fornecedores<\/a>. Para ligar o SkyPlanner, inicie sess\u00e3o no QuickBooks e autorize o acesso no ecr\u00e3 OAuth 2.0 da Intuit.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa configura os centros de trabalho e as etapas do processo, liga os or\u00e7amentos e as encomendas a fornecedores e ativa o envio de faturas e horas para o QuickBooks. Tudo \u00e9 testado com base no seu plano atual antes da entrada em funcionamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar primeiro o SkyPlanner com os nossos dados do QuickBooks?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o teste, importe os seus produtos e or\u00e7amentos em aberto a partir de uma exporta\u00e7\u00e3o do QuickBooks. Pode ver a programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o, respeitando a capacidade real das m\u00e1quinas e das pessoas, antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ QuickBooks Online SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes O SkyPlanner APS \u00e9 um complemento para o QuickBooks Online que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das equipas. Transforma os or\u00e7amentos aceites e as encomendas num programa para cada m\u00e1quina, operador, ferramenta e material. &#8230; <a title=\"SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/\" aria-label=\"Leia mais sobre SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106069","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QuickBooks: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/quickbooks-online\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/quickbooks-online\\\/\",\"name\":\"QuickBooks: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/quickbooks-online\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/quickbooks-online\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/quickbooks-online\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QuickBooks: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes","og_description":"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/","name":"QuickBooks: integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/quickbooks-online\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ QuickBooks Online SkyPlanner APS para QuickBooks Online: programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes O SkyPlanner APS \u00e9 um complemento para o QuickBooks Online que programa a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das equipas. Transforma os or\u00e7amentos aceites e as encomendas num programa para cada m\u00e1quina, operador, ferramenta e material.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106069","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=106069"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/106069\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=106069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}