{"id":103720,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/infor-m3\/guia-de-integracao\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do Infor M3 <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do Infor M3 mostra a parceiros e equipas de TI como ligar o Infor M3 ao SkyPlanner APS. A integra\u00e7\u00e3o entre o SkyPlanner e o Infor M3 funciona nos dois sentidos:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>O SkyPlanner recebe artigos, estruturas de produto, centros de trabalho, ordens de fabrico e encomendas de compra.<\/li>\n\n\n<li>As datas e horas de in\u00edcio e fim planeadas s\u00e3o enviadas de volta para as opera\u00e7\u00f5es das ordens de fabrico.<\/li>\n\n\n<li>Os registos dos operadores s\u00e3o enviados de volta atrav\u00e9s de PMS070MI Report operation.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Cronograma de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implementa\u00e7\u00e3o inicial, a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu M3 e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia destina-se aos parceiros e programadores que participam nesse processo ou que desenvolvem as suas pr\u00f3prias integra\u00e7\u00f5es com a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-m3-interfaces-skyplanner-uses\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">As interfaces do M3 que o SkyPlanner utiliza<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Infor M3 disponibiliza quatro camadas de integra\u00e7\u00e3o, cada uma com uma fun\u00e7\u00e3o neste contexto.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>M3 API (programas MI) no ION API Gateway.<\/strong> Cada programa MI corresponde a uma chamada REST: <code>https:\/\/{ionapi-host}\/{tenant}\/M3\/m3api-rest\/v2\/execute\/{program}\/{transaction}<\/code>. Utilize a v2. Esta vers\u00e3o acrescenta par\u00e2metros de empresa, divis\u00e3o e formato de data e devolve um payload diferente do da v1. O PMS100MI abrange as ordens de fabrico e o PMS070MI abrange o registo de opera\u00e7\u00f5es. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/industry_content_fashion\/vmw1731577228531.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n\n<li><strong>API de consulta Compass no Infor Data Fabric.<\/strong> Permite leituras SQL de tabelas replicadas do M3, como MITMAS, MWOHED e MWOOPE. O Compass funciona de forma ass\u00edncrona: submeta uma tarefa, consulte periodicamente o seu estado e obtenha p\u00e1ginas de resultados com at\u00e9 100.000 linhas ou 10 MB. \u00c9 adequado para a carga inicial de dados mestre, n\u00e3o para a sincroniza\u00e7\u00e3o em tempo real. (<a href=\"https:\/\/docs.infor.com\/inforos\/2026.x\/en-us\/useradminlib_cloud\/datafabrug\/uan1631199548644.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n\n<li><strong>ION BODs.<\/strong> O M3 BOD Processor publica os BODs ativados por entidade contabil\u00edstica. Os BODs de entrada incluem Process ProductionOrder, Sync e Process BillOfMaterials, Process ItemMaster e Sync InventoryCount. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/cnw1511966505258.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n\n<li><strong>M3 Event Hub.<\/strong> Uma infraestrutura de publica\u00e7\u00e3o e subscri\u00e7\u00e3o para eventos ao n\u00edvel das tabelas, como altera\u00e7\u00f5es ao cabe\u00e7alho e \u00e0s opera\u00e7\u00f5es das ordens de fabrico. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/szt1602149359647.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>As especifica\u00e7\u00f5es da MI API encontram-se no cat\u00e1logo ION API de cada tenant, em Available APIs, com Swagger para cada programa. Quando falta uma transa\u00e7\u00e3o no cat\u00e1logo padr\u00e3o, o XtendM3 permite acrescentar um programa MI personalizado e o Metadata Publisher permite criar APIs de listagem personalizadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Registe o SkyPlanner como aplica\u00e7\u00e3o autorizada no ION API com OAuth 2.0. Utilize uma aplica\u00e7\u00e3o de servi\u00e7o de backend com uma conta de servi\u00e7o, para que a integra\u00e7\u00e3o funcione sem uma sess\u00e3o de utilizador nominativo. O ION API aplica as pol\u00edticas de limita\u00e7\u00e3o de chamadas e de seguran\u00e7a do tenant a cada chamada. (<a href=\"https:\/\/developer.infor.com\/?p=1587\">Portal de programadores da Infor<\/a>)<\/p>\n\n\n<p>Do lado do SkyPlanner, a autentica\u00e7\u00e3o na REST API utiliza um token de API (SkyPlanner Settings &gt; API). A API est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> explica as primeiras chamadas passo a passo.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-event-hub-bods-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dete\u00e7\u00e3o de altera\u00e7\u00f5es: Event Hub, BODs e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O M3 pode enviar altera\u00e7\u00f5es automaticamente, mas \u00e9 necess\u00e1rio configurar esse envio do lado da Infor:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>O <strong>Event Hub<\/strong> publica apenas eventos com um subscritor ativo. O ION Enterprise Connector (IEC) subscreve-os atrav\u00e9s de um canal EventHub Subscriber.<\/li>\n\n\n<li>Os <strong>BODs<\/strong> t\u00eam de ser ativados por entidade contabil\u00edstica no BOD Processor, o que exige a fun\u00e7\u00e3o M3EC-Administrator. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/bka1516953041992.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Se o envio autom\u00e1tico ainda n\u00e3o estiver configurado, consulte periodicamente as transa\u00e7\u00f5es de listagem do PMS100MI ou execute consultas Compass com base nas marcas temporais de altera\u00e7\u00e3o.<\/p>\n\n\n<p>Os webhooks do pr\u00f3prio SkyPlanner permitem que o envio de dados de volta ao M3 seja acionado por eventos desde o primeiro dia.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do Infor M3 (interface)<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Artigo, MMS001 (MITMAS via Compass, programas MI de artigos)<\/td><td>Produtos e materiais<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Cabe\u00e7alho da estrutura de produto em PDS001, materiais em PDS002<\/td><td>Estrutura de produto, subprodutos, materiais<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Opera\u00e7\u00f5es em PDS002: n\u00famero da opera\u00e7\u00e3o, centro de trabalho, tempos de prepara\u00e7\u00e3o e de execu\u00e7\u00e3o<\/td><td>Etapas do processo com tempos de prepara\u00e7\u00e3o e de execu\u00e7\u00e3o<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Centro de trabalho em PDS010, capacidade di\u00e1ria em PDS015<\/td><td>Centros de trabalho, grupos de centros de trabalho, efici\u00eancias<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, raramente<\/td><\/tr><tr><td>Ordem de fabrico PMS100 (MWOHED), PMS100MI<\/td><td>Ordens com datas de entrega e quantidades<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub ou consultas peri\u00f3dicas<\/td><\/tr><tr><td>Opera\u00e7\u00f5es das ordens de fabrico (MWOOPE)<\/td><td>Tarefas por opera\u00e7\u00e3o<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub ou consultas peri\u00f3dicas<\/td><\/tr><tr><td>Saldos de stock<\/td><td>Stock por material<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>Linhas de encomendas de compra com datas de entrega<\/td><td>Material a receber, dispon\u00edvel na data de entrega<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Consultas de hora a hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e fim planeados por opera\u00e7\u00e3o da ordem de fabrico<\/td><td>Tarefas programadas no Gantt<\/td><td>SkyPlanner \u2192 M3<\/td><td>A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, via webhook do SkyPlanner<\/td><\/tr><tr><td>PMS070MI Report operation: tempo de prepara\u00e7\u00e3o, tempo de execu\u00e7\u00e3o, quantidade<\/td><td>Registos de tempos e quantidades dos operadores<\/td><td>SkyPlanner \u2192 M3<\/td><td>Por confirma\u00e7\u00e3o ou por turno<\/td><\/tr><tr><td>Dados de restri\u00e7\u00f5es do SkyPlanner<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas como recursos de capacidade finita, operadores por tarefa, centros de trabalho alternativos<\/td><td>Geridos no SkyPlanner<\/td><td>Configurados durante a implementa\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modelos de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestre.<\/strong> Leia artigos, estruturas de produto, opera\u00e7\u00f5es e centros de trabalho em massa atrav\u00e9s do Compass. Defina criteriosamente a correspond\u00eancia de cada centro de trabalho com um centro de trabalho ou grupo de centros de trabalho do SkyPlanner. Um centro de trabalho que represente tr\u00eas m\u00e1quinas em paralelo passa a tr\u00eas centros de trabalho se pretender program\u00e1-las separadamente.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens.<\/strong> Leia as ordens de fabrico lan\u00e7adas e as respetivas opera\u00e7\u00f5es a partir de PMS100MI ou MWOOPE, bem como o stock e as linhas de encomendas de compra em aberto. O SkyPlanner considera o material encomendado dispon\u00edvel na data de entrega da encomenda de compra e atualiza o stock quando esta \u00e9 marcada como Delivered. Ao programar a produ\u00e7\u00e3o, verifica tanto o material encomendado como o stock.<\/p>\n\n\n<p>Programe apenas ordens de fabrico firmes. As ordens de fabrico planeadas (PMS170) s\u00e3o geradas novamente pelo MRP, e o M3 recalcula a sua carga a cada replaneamento.<\/p>\n\n\n<p><strong>3. Envio da programa\u00e7\u00e3o de volta ao M3.<\/strong> Para cada opera\u00e7\u00e3o que o motor programou ou deslocou, o SkyPlanner grava o in\u00edcio e o fim planeados na opera\u00e7\u00e3o da ordem de fabrico. A chamada utiliza uma transa\u00e7\u00e3o M3 MI para opera\u00e7\u00f5es de ordens de fabrico do cat\u00e1logo do seu tenant, ou um programa MI do XtendM3 se a sua configura\u00e7\u00e3o o exigir. O M3 continua a gerir as quantidades, o estado e o c\u00e1lculo de custos.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es no ch\u00e3o de f\u00e1brica.<\/strong> Os operadores registam o trabalho com SkyPlanner Mobile Confirmations ou Production Timer. O SkyPlanner envia o tempo de prepara\u00e7\u00e3o, o tempo de execu\u00e7\u00e3o e a quantidade atrav\u00e9s de PMS070MI Report operation e utiliza Confirm ou Close operation quando a etapa est\u00e1 conclu\u00edda. A Infor afirma que &#8220;it is important that every operation is reported,&#8221; (\u00e9 importante que todas as opera\u00e7\u00f5es sejam registadas), o que mant\u00e9m a carga do M3 alinhada com o progresso no SkyPlanner. (<a href=\"https:\/\/developer.infor.com\/pms070mi-740845\/pms070mi-manufacturing-order-report-operation\">PMS070MI<\/a>)<\/p>\n\n\n<p>Escolha um \u00fanico canal de registo por opera\u00e7\u00e3o. Registar a mesma opera\u00e7\u00e3o no SkyPlanner e no PMS070 do M3 duplica as quantidades.<\/p>\n\n\n<p><strong>5. Regras de responsabilidade e resolu\u00e7\u00e3o de conflitos.<\/strong> Documente-as antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Artigos, estruturas de produto, quantidades, estado das ordens de fabrico<\/td><td>Infor M3<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, in\u00edcio e fim, atribui\u00e7\u00e3o a centros de trabalho<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas, operadores por tarefa, alternativas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos e aus\u00eancias<\/td><td>Um \u00fanico sistema, escolhido na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td>Registo de opera\u00e7\u00f5es<\/td><td>M3, com dados enviados pelo SkyPlanner atrav\u00e9s de PMS070MI<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A principal fonte de conflitos \u00e9 a pr\u00f3pria l\u00f3gica de datas do M3. A carga &#8220;is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8221; (\u00e9 gerada automaticamente quando uma ordem de fabrico ou uma ordem de fabrico planeada \u00e9 criada ou replaneada). Trate uma ordem de fabrico replaneada como uma nova vers\u00e3o, volte a sincroniz\u00e1-la e deixe o SkyPlanner refazer a programa\u00e7\u00e3o. O Autopilot refaz a programa\u00e7\u00e3o automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. O SkyPlanner n\u00e3o precisa do M3 Scheduling Workbench; se tiver uma licen\u00e7a do SWB, atribua ao SkyPlanner a gest\u00e3o das datas das opera\u00e7\u00f5es para evitar que um sistema sobrescreva as datas definidas pelo outro.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas habituais do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial. Antes disso, pode usar os seus pr\u00f3prios dados na avalia\u00e7\u00e3o gratuita de 30 dias. Exporte artigos, centros de trabalho e MOs em aberto do M3 com a sua extra\u00e7\u00e3o habitual em Excel ou Compass e importe-os em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Levantamento com o administrador do M3.<\/strong> Confirme o tipo de instala\u00e7\u00e3o, o tenant da ION API, as transa\u00e7\u00f5es MI do seu cat\u00e1logo, a empresa e a divis\u00e3o.<\/li>\n\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras que determinam qual o sistema respons\u00e1vel por cada dado, as frequ\u00eancias de sincroniza\u00e7\u00e3o e o canal de comunica\u00e7\u00e3o dos registos de produ\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o da ION API.<\/strong> Registe a aplica\u00e7\u00e3o autorizada e a conta de servi\u00e7o, primeiro no tenant de testes.<\/li>\n\n\n<li><strong>Carregamento inicial.<\/strong> Carregue artigos, estruturas de produto, opera\u00e7\u00f5es e centros de trabalho atrav\u00e9s do Compass.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens.<\/strong> Sincronize MOs, opera\u00e7\u00f5es de MO, exist\u00eancias e encomendas de compra por consulta peri\u00f3dica. Acrescente o Event Hub quando estiver pronto.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Configure a matriz de tempos de prepara\u00e7\u00e3o e mudan\u00e7a, as ferramentas, os operadores por tarefa e os centros de trabalho alternativos.<\/li>\n\n\n<li><strong>Escrita de dados no M3 e registos de produ\u00e7\u00e3o.<\/strong> Envie as datas das opera\u00e7\u00f5es para o M3 e use PMS070MI para os registos dos operadores.<\/li>\n\n\n<li><strong>Funcionamento em paralelo e entrada em produ\u00e7\u00e3o.<\/strong> Use o SkyPlanner em paralelo com o plano atual, corrija os dados mestre e, em seguida, ative a escrita de dados no M3.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que ter em conta numa integra\u00e7\u00e3o com o Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>N\u00e3o existe um objeto de gama operat\u00f3ria.<\/strong> As opera\u00e7\u00f5es est\u00e3o na estrutura do produto (PDS002) e na MO, como opera\u00e7\u00f5es de MO. N\u00e3o procure uma API de gamas operat\u00f3rias.<\/li>\n\n\n<li><strong>Estruturas sem opera\u00e7\u00f5es.<\/strong> Uma estrutura de produto precisa de pelo menos uma opera\u00e7\u00e3o. Caso contr\u00e1rio, o M3 n\u00e3o gera carga e o SkyPlanner n\u00e3o recebe nenhuma tarefa.<\/li>\n\n\n<li><strong>As op\u00e7\u00f5es de capacidade finita do M3 entram em conflito com o plano externo.<\/strong> A op\u00e7\u00e3o PDS010 e as defini\u00e7\u00f5es de gargalos em CRS786 alteram as datas calculadas pelo pr\u00f3prio M3. Mantenha os centros de trabalho com capacidade infinita no M3 e deixe o SkyPlanner gerir os limites reais de capacidade.<\/li>\n\n\n<li><strong>Especifica\u00e7\u00f5es da API pr\u00f3prias de cada tenant.<\/strong> As respostas de v1 e v2 s\u00e3o diferentes, e os nomes das transa\u00e7\u00f5es variam consoante o cat\u00e1logo e as extens\u00f5es XtendM3. Use v2 com par\u00e2metros expl\u00edcitos de empresa e divis\u00e3o.<\/li>\n\n\n<li><strong>O envio autom\u00e1tico de altera\u00e7\u00f5es n\u00e3o est\u00e1 ativo por predefini\u00e7\u00e3o.<\/strong> O Event Hub precisa de um subscritor e os BODs t\u00eam de ser ativados por entidade contabil\u00edstica. Acorde quem configura o ION e o IEC ou comece pela consulta peri\u00f3dica.<\/li>\n\n\n<li><strong>Limita\u00e7\u00e3o de pedidos e pagina\u00e7\u00e3o.<\/strong> A ION API limita os pedidos de acordo com a pol\u00edtica do tenant, e o Compass devolve, no m\u00e1ximo, 100 000 linhas ou 10 MB por p\u00e1gina. Consulte apenas as altera\u00e7\u00f5es, em vez de voltar a carregar todos os dados.<\/li>\n\n\n<li><strong>O M3 n\u00e3o \u00e9 o CloudSuite Industrial.<\/strong> O CSI usa APIs IDO; o M3 usa programas MI. Identifique os objetos do M3 em todas as especifica\u00e7\u00f5es.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura a integra\u00e7\u00e3o com o Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipa do SkyPlanner configura a integra\u00e7\u00e3o durante o acompanhamento inicial e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/strong> Cada f\u00e1brica usa o M3 de forma diferente, e \u00e9 na configura\u00e7\u00e3o que se aplica esse conhecimento.<\/li>\n\n\n<li><strong>O seu parceiro Infor M3 pode desenvolver a integra\u00e7\u00e3o ou participar no projeto.<\/strong> O parceiro conhece o seu tenant, as extens\u00f5es XtendM3 e a configura\u00e7\u00e3o do ION. O SkyPlanner disponibiliza a REST API, documenta\u00e7\u00e3o Swagger\/OpenAPI e webhooks.<\/li>\n\n\n<li><strong>Os seus pr\u00f3prios programadores podem desenvolver a integra\u00e7\u00e3o<\/strong> com a mesma REST API e um token de API. Basta um token de API para come\u00e7ar, e a equipa do SkyPlanner presta apoio quando necess\u00e1rio. A equipa interna de TI da Laboratory &amp; Allied desenvolveu a integra\u00e7\u00e3o com o seu ERP em grande parte de forma aut\u00f3noma, com a ajuda do SkyPlanner.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner est\u00e1 dispon\u00edvel a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, juntamente com o seu plano, de acordo com os seus processos e necessidades. Assim, conhece o custo total antes de come\u00e7ar. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, saiba o que o planeamento do pr\u00f3prio M3 permite fazer em <a href=\"\/pt-pt\/integracoes\/erp\/infor-m3\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o no Infor M3 com limites reais de capacidade<\/a>, veja a apresenta\u00e7\u00e3o geral na <a href=\"\/pt-pt\/integracoes\/erp\/infor-m3\/\">p\u00e1gina do Infor M3<\/a> e conhe\u00e7a outros sistemas na <a href=\"\/pt-pt\/integracoes\/erp\/\">\u00e1rea de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar avalia\u00e7\u00e3o gratuita<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, diretor de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abranja todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner desempenha um papel decisivo para manter a fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Constru\u00e7\u00e3o mec\u00e2nica em chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas subiu de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o passou a precisar de apenas um supervisor, em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que API do Infor M3 usa o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Usa a M3 API no ION API Gateway, invocando programas MI como PMS100MI e PMS070MI atrav\u00e9s de REST com OAuth 2.0. O Compass, no Infor Data Fabric, trata das leituras em massa, e o Event Hub ou os ION BODs enviam as altera\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quem desenvolve a integra\u00e7\u00e3o com o Infor M3?<\/summary>\n<p class=\"sp-faq__a\">A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional de acordo com a sua instala\u00e7\u00e3o do M3 durante o acompanhamento inicial e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O seu parceiro M3 ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com a REST API documentada do SkyPlanner. Basta um token de API para come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que API do M3 recebe os registos das opera\u00e7\u00f5es do ch\u00e3o de f\u00e1brica?<\/summary>\n<p class=\"sp-faq__a\">A PMS070MI, com Report operation para registar o tempo de prepara\u00e7\u00e3o, o tempo de execu\u00e7\u00e3o e a quantidade, e Confirm and Close operation para concluir uma etapa. O SkyPlanner envia os registos dos operadores atrav\u00e9s desta API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o funciona com o M3 instalado localmente?<\/summary>\n<p class=\"sp-faq__a\">Sim. O M3 instalado localmente disponibiliza a mesma M3 API. Sem o ION API Gateway, o SkyPlanner liga-se atrav\u00e9s do endpoint local do ION ou do Grid, ou atrav\u00e9s de middleware. A via de liga\u00e7\u00e3o \u00e9 definida no levantamento com o administrador do M3.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro M3 deve propor o M3 Scheduling Workbench ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o cliente pretende uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite a capacidade real das m\u00e1quinas e dos trabalhadores, em vez de um plano aproximado. A pr\u00f3pria Infor recomenda que, na entrada em produ\u00e7\u00e3o do SWB, se comece com capacidade infinita em todos os recursos e se limite apenas a capacidade do gargalo cr\u00edtico (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">documenta\u00e7\u00e3o da Infor<\/a>). A Infor apresenta o SWB como um complemento que os utilizadores abrem a partir do RDWeb ou do menu Iniciar. O SkyPlanner liga-se atrav\u00e9s da mesma M3 API, programa cada recurso dentro dos seus limites de capacidade, replaneia automaticamente e disponibiliza Mobile Confirmations aos operadores, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. A avalia\u00e7\u00e3o gratuita de 30 dias permite usar at\u00e9 20 centros de trabalho com importa\u00e7\u00f5es do M3 em CSV ou Excel, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-pt\/avaliacao\/\">Inicie a avalia\u00e7\u00e3o<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> para definir o \u00e2mbito da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Infor M3 Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do Infor M3 mostra a parceiros e equipas de TI como ligar o Infor M3 ao SkyPlanner APS. A integra\u00e7\u00e3o entre o SkyPlanner e o Infor M3 funciona nos dois sentidos: skyplanner.ai &#8230; <a title=\"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102944,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103720","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3: guia de integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Ligue Infor M3 a SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas para o projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Ligue Infor M3 a SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas para o projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/\",\"name\":\"Infor M3: guia de integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Ligue Infor M3 a SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas para o projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Infor M3: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3: guia de integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o","description":"Ligue Infor M3 a SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas para o projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Ligue Infor M3 a SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas para o projeto.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","name":"Infor M3: guia de integra\u00e7\u00e3o APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Ligue Infor M3 a SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas para o projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Infor M3: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Infor M3 Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do Infor M3 mostra a parceiros e equipas de TI como ligar o Infor M3 ao SkyPlanner APS. A integra\u00e7\u00e3o entre o SkyPlanner e o Infor M3 funciona nos dois sentidos: skyplanner.ai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103720"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103720\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102944"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}