{"id":103569,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/ifs-cloud\/programacao-producao\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"programacao-producao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/","title":{"rendered":"O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ IFS Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? <span class=\"hl\">Shop Order Scheduling, MSO e SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O IFS Cloud programa as ordens de fabrico e faz o planeamento das necessidades de capacidade (CRP) pressupondo capacidade ilimitada. A programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas existe, mas \u00e9 uma funcionalidade separada: Manufacturing Scheduling and Optimization (MSO), com o motor IFS PSO, ou o mais antigo Advanced Planning Board (APB). As f\u00e1bricas que querem <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programar a produ\u00e7\u00e3o respeitando todas as restri\u00e7\u00f5es<\/a> sem adicionar o MSO utilizam o SkyPlanner APS em conjunto com o IFS Cloud.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-ifs-cloud-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como o IFS Cloud planeia a capacidade, passo a passo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Centros de trabalho e recursos<\/h3>\n\n\n<p>A capacidade \u00e9 definida no <strong>Work Center<\/strong> e nos respetivos <strong>Work Center Resources<\/strong>, que representam uma m\u00e1quina ou um local f\u00edsico. Cada centro de trabalho tem <strong>Calendar<\/strong>, <strong>Utilization<\/strong>, <strong>Efficiency<\/strong> e <strong>Validity Periods<\/strong>. O campo <strong>Scheduling Capacity<\/strong> \u00e9 definido como Finite ou Infinite.<\/p>\n\n\n<p>A capacidade \u00e9 calculada na caixa de di\u00e1logo <strong>Calculate Work Center Resource Capacity<\/strong>. As pessoas s\u00e3o representadas em <strong>Labor Classes<\/strong>, com pessoas associadas a cada classe de m\u00e3o de obra. As ferramentas s\u00e3o representadas em <strong>Manufacturing Tools<\/strong>, com exemplares e grupos de ferramentas. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Estruturas de produto e gamas operat\u00f3rias<\/h3>\n\n\n<p>A lista de materiais corresponde \u00e0 <strong>Product Structure<\/strong>, com um cabe\u00e7alho, alternativas e linhas de estrutura. A <strong>Routing<\/strong> cont\u00e9m gamas operat\u00f3rias alternativas e <strong>Routing Operations<\/strong>. Segundo a IFS: &#8220;All time information entered for operations (such as setup time, move time, and efficiency) affects operation scheduling.&#8221; (Toda a informa\u00e7\u00e3o de tempos introduzida nas opera\u00e7\u00f5es, como o tempo de prepara\u00e7\u00e3o, o tempo de movimenta\u00e7\u00e3o e a efici\u00eancia, afeta a programa\u00e7\u00e3o das opera\u00e7\u00f5es.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutRoutings.htm\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MRP, CRP e ordens de fabrico<\/h3>\n\n\n<p>O MRP e o planeamento diretor da produ\u00e7\u00e3o criam <strong>Shop Orders<\/strong> planeadas. Uma ordem de fabrico passa por estados como planeada, lan\u00e7ada, reservada, iniciada e fechada. Cada <strong>Shop Order Operation<\/strong> cont\u00e9m os tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o de m\u00e1quina e m\u00e3o de obra, o n\u00famero de pessoas da equipa, um <strong>Preferred Resource<\/strong>, a sobreposi\u00e7\u00e3o de opera\u00e7\u00f5es e os blocos de opera\u00e7\u00f5es.<\/p>\n\n\n<p>O CRP mostra a carga que estas ordens imp\u00f5em aos centros de trabalho. N\u00e3o a limita. A IFS \u00e9 expl\u00edcita: &#8220;Operations scheduled with CRP and shop order are always scheduled infinite.&#8221; (As opera\u00e7\u00f5es programadas com CRP e ordens de fabrico s\u00e3o sempre programadas pressupondo capacidade ilimitada.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. O Infinite Scheduler das ordens de fabrico<\/h3>\n\n\n<p>O Infinite Scheduler atribui datas a cada opera\u00e7\u00e3o. Tem em conta o calend\u00e1rio do centro de trabalho, a utiliza\u00e7\u00e3o, a efici\u00eancia das opera\u00e7\u00f5es e dos recursos, os tempos de espera e transporte, a sobreposi\u00e7\u00e3o, as opera\u00e7\u00f5es em paralelo e o Preferred Resource. Programa para a frente ou para tr\u00e1s e seleciona &#8220;the least loaded resource for the work center.&#8221; (o recurso com menor carga do centro de trabalho).<\/p>\n\n\n<p>Segundo a documenta\u00e7\u00e3o, &#8220;always treats each shop order as if it is the only one in the system, with few constraints on resources and capacity.&#8221; (trata sempre cada ordem de fabrico como se fosse a \u00fanica no sistema, com poucas restri\u00e7\u00f5es de recursos e capacidade). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSOInfiniteScheduling.htm\">fonte<\/a>) Duas ordens de fabrico podem ficar programadas para a mesma m\u00e1quina \u00e0 mesma hora.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Primeira op\u00e7\u00e3o para respeitar a capacidade: MSO e Smart Manufacturing Planning Board<\/h3>\n\n\n<p>O MSO &#8220;is a solution designed to generate finite production schedules by optimizing the use of manufacturing resource constraints.&#8221; (\u00e9 uma solu\u00e7\u00e3o concebida para gerar programas de produ\u00e7\u00e3o que respeitam a capacidade real, otimizando a utiliza\u00e7\u00e3o dos recursos de fabrico sujeitos a restri\u00e7\u00f5es). Segundo a documenta\u00e7\u00e3o, &#8220;leverages the IFS PSO (Planning, Scheduling, and Optimization) engine.&#8221; (utiliza o motor IFS PSO \u2014 Planning, Scheduling, and Optimization). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">fonte<\/a>) Trata os centros de trabalho, as classes de m\u00e3o de obra e as ferramentas como restri\u00e7\u00f5es de programa\u00e7\u00e3o e s\u00f3 programa uma opera\u00e7\u00e3o quando a quantidade necess\u00e1ria de material est\u00e1 dispon\u00edvel. Considera tamb\u00e9m os tempos de prepara\u00e7\u00e3o espec\u00edficos de cada artigo, as prioridades das ordens de fabrico, os calend\u00e1rios dos recursos e os trabalhos de manuten\u00e7\u00e3o. No modo autom\u00e1tico, reprograma sempre que necess\u00e1rio, por exemplo, quando \u00e9 criada uma nova ordem de fabrico.<\/p>\n\n\n<p>Configura\u00e7\u00e3o em resumo:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Defini\u00e7\u00e3o<\/th><th>Fun\u00e7\u00e3o<\/th><\/tr><\/thead><tbody><tr><td>Finite Scheduling Basic Data<\/td><td>Ativa a funcionalidade na unidade; &#8220;the dataset must be activated&#8221; (o conjunto de dados tem de ser ativado)<\/td><\/tr><tr><td>Modo<\/td><td>Programa\u00e7\u00e3o manual ou autom\u00e1tica<\/td><\/tr><tr><td>Time Horizon (Days), Scheduling Start Time<\/td><td>O intervalo de tempo abrangido pela programa\u00e7\u00e3o do MSO<\/td><\/tr><tr><td>Use Setup Matrices for Scheduling<\/td><td>Tempos de prepara\u00e7\u00e3o espec\u00edficos de cada artigo<\/td><\/tr><tr><td>Exempt Labor, Exempt Tools, Exempt Shop Order Types<\/td><td>Restri\u00e7\u00f5es que o MSO ignora<\/td><\/tr><tr><td>MSO Advanced Parameters<\/td><td>Um modelo padr\u00e3o com valores predefinidos validados; altera\u00e7\u00f5es: &#8220;For modification by PSO\/MSO SMEs only&#8221; (s\u00f3 podem ser efetuadas por especialistas nestas \u00e1reas)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Na ordem de fabrico, <strong>Need Date<\/strong> define a data de refer\u00eancia para calcular o atraso, <strong>Earliest Start Date<\/strong> \u00e9 &#8220;a hard time constraint&#8221; (uma restri\u00e7\u00e3o temporal obrigat\u00f3ria) e <strong>Priority Category<\/strong> contribui para a pontua\u00e7\u00e3o de prioridade do MSO. Os planeadores trabalham no <strong>Smart Manufacturing Planning Board<\/strong>, com as p\u00e1ginas Gantt de Resources e Operations, fun\u00e7\u00f5es de arrastar e largar, divis\u00e3o de opera\u00e7\u00f5es e otimiza\u00e7\u00e3o seletiva. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSmartManufacturingPlanningBoard.htm\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Segunda op\u00e7\u00e3o para respeitar a capacidade: Advanced Planning Board<\/h3>\n\n\n<p>O APB, j\u00e1 conhecido do IFS Applications 10, utiliza Constraint Based Scheduling (CBS). Segundo a documenta\u00e7\u00e3o, &#8220;allows you to perform finite scheduling of shop orders on sites that have enabled the use of the APB in scheduling basic data.&#8221; (permite programar ordens de fabrico respeitando a capacidade real nas unidades que ativaram a utiliza\u00e7\u00e3o do APB nos dados de base da programa\u00e7\u00e3o). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutCBSSchedulingTheory.htm\">fonte<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que continua a caber ao planeador<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacidade ilimitada por defeito.<\/strong> A programa\u00e7\u00e3o das ordens de fabrico e o CRP nunca verificam a capacidade para o conjunto das ordens. Para respeitar a capacidade real, \u00e9 necess\u00e1rio configurar o MSO ou o APB separadamente (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">Acerca dos centros de trabalho<\/a>).<\/li>\n\n\n<li><strong>O MSO exige acesso separado.<\/strong> Segundo a documenta\u00e7\u00e3o, &#8220;is available for customers with access to Manufacturing Scheduling and Optimization.&#8221; (est\u00e1 dispon\u00edvel para clientes com acesso ao Manufacturing Scheduling and Optimization). As unidades com instala\u00e7\u00e3o h\u00edbrida ou alojada precisam de um IFS.ai Activation Pass. As unidades na nuvem precisam de &#8220;PSO sizing and purchase of PSO Cloud Service&#8221; (dimensionamento do PSO e aquisi\u00e7\u00e3o do PSO Cloud Service) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">MSO 26R2<\/a>).<\/li>\n\n\n<li><strong>Nos servi\u00e7os da plataforma IFS.ai, o MSO \u00e9 manual e o consumo \u00e9 medido.<\/strong> &#8220;Automatic scheduling mode is not available for users on the IFS.ai-based platform services.&#8221; (O modo de programa\u00e7\u00e3o autom\u00e1tica n\u00e3o est\u00e1 dispon\u00edvel para utilizadores dos servi\u00e7os da plataforma baseada em IFS.ai.) Os utilizadores &#8220;must have a number of dedicated tokens on hand to do a finite schedule or to do a simulation in MSO&#8221; (t\u00eam de dispor de um determinado n\u00famero de tokens dedicados para executar uma programa\u00e7\u00e3o que respeite a capacidade real ou uma simula\u00e7\u00e3o no MSO) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">MSO 26R1<\/a>). O modo autom\u00e1tico n\u00e3o est\u00e1 dispon\u00edvel em unidades com instala\u00e7\u00e3o h\u00edbrida ou alojada que utilizem um IFS.ai Activation Pass (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">MSO 26R2<\/a>).<\/li>\n\n\n<li><strong>Os par\u00e2metros avan\u00e7ados s\u00e3o para especialistas.<\/strong> A IFS fornece um modelo padr\u00e3o e recomenda vivamente que se mantenham os valores predefinidos. As altera\u00e7\u00f5es est\u00e3o reservadas a especialistas em PSO e MSO.<\/li>\n\n\n<li><strong>Limita\u00e7\u00f5es documentadas do MSO.<\/strong> &#8220;MSO schedules the first operation on a work center using a setup matrix without a setup time.&#8221; (O MSO programa sem tempo de prepara\u00e7\u00e3o a primeira opera\u00e7\u00e3o num centro de trabalho que utiliza uma matriz de prepara\u00e7\u00e3o.) &#8220;Parallel shop order operations are not considered for optimization in a compressed manner.&#8221; (As opera\u00e7\u00f5es paralelas das ordens de fabrico n\u00e3o s\u00e3o consideradas para otimiza\u00e7\u00e3o com compress\u00e3o dos tempos.) Com Exempt Labor, &#8220;operations that have only labor time and no machine time will remain untouched.&#8221; (as opera\u00e7\u00f5es que tenham apenas tempo de m\u00e3o de obra e nenhum tempo de m\u00e1quina permanecem inalteradas).<\/li>\n\n\n<li><strong>Horizonte curto.<\/strong> A IFS posiciona o MSO para a programa\u00e7\u00e3o detalhada de curto prazo e remete para o CRP, o MRP e o planeamento diretor da produ\u00e7\u00e3o para horizontes mais longos.<\/li>\n\n\n<li><strong>O APB s\u00f3 planeia o que estiver carregado.<\/strong> Segundo a documenta\u00e7\u00e3o, &#8220;only considers the constraints placed by shop orders and resources that are actually loaded to the APB at a given time.&#8221; (considera apenas as restri\u00e7\u00f5es impostas pelas ordens de fabrico e pelos recursos efetivamente carregados no APB num dado momento).<\/li>\n\n<\/ul>\n\n\n<p>Na pr\u00e1tica, as f\u00e1bricas que utilizam a programa\u00e7\u00e3o padr\u00e3o convivem com opera\u00e7\u00f5es sobrepostas, altera\u00e7\u00f5es manuais da sequ\u00eancia e um plano paralelo em Excel, exportado do IFS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-ifs-cloud-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando basta a programa\u00e7\u00e3o nativa do IFS Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A programa\u00e7\u00e3o padr\u00e3o das ordens de fabrico, em conjunto com o CRP, \u00e9 suficiente quando:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A f\u00e1brica tem capacidade dispon\u00edvel e os verdadeiros estrangulamentos s\u00e3o raros.<\/li>\n\n\n<li>As gamas operat\u00f3rias s\u00e3o curtas e est\u00e1veis e o planeamento \u00e9 semanal.<\/li>\n\n\n<li>Um supervisor define a sequ\u00eancia na m\u00e1quina.<\/li>\n\n\n<li>As ferramentas partilhadas, as equipas e a chegada dos materiais n\u00e3o determinam a sequ\u00eancia do trabalho.<\/li>\n\n<\/ul>\n\n\n<p>O MSO \u00e9 adequado para uma unidade que adquire acesso ao MSO e a respetiva implementa\u00e7\u00e3o em PSO ou IFS.ai, e programa a produ\u00e7\u00e3o a curto prazo no IFS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando precisa de uma ferramenta que programe dentro da capacidade real<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A programa\u00e7\u00e3o padr\u00e3o j\u00e1 n\u00e3o chega quando se verificam v\u00e1rias destas situa\u00e7\u00f5es:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Os prazos prometidos n\u00e3o s\u00e3o cumpridos, embora o CRP parecesse estar em ordem.<\/li>\n\n\n<li>O tempo de mudan\u00e7a de produ\u00e7\u00e3o depende do produto fabricado anteriormente.<\/li>\n\n\n<li>As pessoas, os turnos e as aus\u00eancias condicionam o plano tanto como as m\u00e1quinas.<\/li>\n\n\n<li>Os moldes, as matrizes ou os dispositivos de fixa\u00e7\u00e3o s\u00e3o partilhados entre m\u00e1quinas.<\/li>\n\n\n<li>A disponibilidade de materiais determina que ordem de fabrico pode arrancar.<\/li>\n\n\n<li>As encomendas urgentes e as avarias obrigam a refazer o plano v\u00e1rias vezes por semana.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">O que procurar<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Respeito pela capacidade real de todos os recursos em simult\u00e2neo<\/strong>, e n\u00e3o apenas de um subconjunto carregado num quadro de planeamento.<\/li>\n\n\n<li><strong>Uma matriz de tempos de prepara\u00e7\u00e3o<\/strong>: tempos de mudan\u00e7a de produ\u00e7\u00e3o entre produtos que dependem da sequ\u00eancia e s\u00e3o assim\u00e9tricos, utilizados para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Ferramentas tratadas como recursos partilhados com capacidade limitada<\/strong>, para que um molde nunca esteja em duas m\u00e1quinas ao mesmo tempo.<\/li>\n\n\n<li><strong>Tarefas com v\u00e1rios operadores<\/strong>: uma tarefa que precisa de v\u00e1rias pessoas recebe essa afeta\u00e7\u00e3o, respeitando o turno de cada uma.<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o que tem em conta os materiais<\/strong>, verificando as exist\u00eancias e as encomendas de compra por receber.<\/li>\n\n\n<li><strong>Reprograma\u00e7\u00e3o autom\u00e1tica<\/strong> quando o progresso da produ\u00e7\u00e3o ou as encomendas mudam, sem uma quota de tokens por execu\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Reenvio de dados para o IFS sem complica\u00e7\u00f5es<\/strong>, atrav\u00e9s das proje\u00e7\u00f5es OData do pr\u00f3prio IFS, com responsabilidade claramente definida pelas datas das opera\u00e7\u00f5es.<\/li>\n\n<\/ul>\n\n\n<p>As op\u00e7\u00f5es dividem-se em quatro grupos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A programa\u00e7\u00e3o padr\u00e3o do IFS Cloud<\/strong> define as datas das ordens de fabrico no IFS sem limitar a capacidade.<\/li>\n\n\n<li><strong>O IFS MSO<\/strong> programa m\u00e1quinas, m\u00e3o de obra, ferramentas e materiais respeitando a capacidade dispon\u00edvel. \u00c9 um m\u00f3dulo com acesso separado, que funciona sobre o motor PSO.<\/li>\n\n\n<li><strong>As solu\u00e7\u00f5es APS empresariais<\/strong> s\u00e3o ligadas atrav\u00e9s de um projeto de implementa\u00e7\u00e3o e geridas por uma equipa de planeamento.<\/li>\n\n\n<li><strong>As solu\u00e7\u00f5es APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica<\/strong>, categoria em que se insere o SkyPlanner, programam automaticamente todos os recursos em paralelo com o IFS Cloud e colocam a programa\u00e7\u00e3o nas m\u00e3os dos operadores.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde se enquadra o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner APS preenche estas lacunas. Cada centro de trabalho tem capacidade limitada e todas as ordens de fabrico disputam a mesma capacidade. O motor Arcturus AI cria a programa\u00e7\u00e3o ao n\u00edvel das opera\u00e7\u00f5es em segundos e define a sequ\u00eancia de acordo com as suas prioridades e prazos.<\/p>\n\n\n<p>A sua matriz de tempos de prepara\u00e7\u00e3o guarda o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos, e o motor escolhe a sequ\u00eancia que exige menos prepara\u00e7\u00e3o. As ferramentas s\u00e3o recursos partilhados de capacidade limitada e uma tarefa pode exigir v\u00e1rios operadores em simult\u00e2neo. Quando uma m\u00e1quina ou uma pessoa n\u00e3o est\u00e1 dispon\u00edvel, o motor transfere o trabalho para as alternativas que definir.<\/p>\n\n\n<p>A programa\u00e7\u00e3o em fun\u00e7\u00e3o dos materiais simula as exist\u00eancias futuras com base no stock e nas encomendas de compra a receber, para que o trabalho s\u00f3 seja planeado para quando houver material dispon\u00edvel. O Running Time Lock mant\u00e9m as tarefas em curso nas posi\u00e7\u00f5es programadas.<\/p>\n\n\n<p>O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o, respeitando os bloqueios e as prioridades que definir. Os planeadores ajustam as tarefas num diagrama de Gantt interativo e os operadores registam o trabalho no telem\u00f3vel ou tablet com o Mobile Confirmations.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner em vez do IFS MSO se<\/strong> est\u00e1 a deixar as folhas de c\u00e1lculo e procura uma programa\u00e7\u00e3o que respeite a capacidade dispon\u00edvel e funcione por si:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>As ordens de fabrico sobrep\u00f5em-se nas m\u00e1quinas partilhadas e o CRP s\u00f3 mostra a sobrecarga depois de esta ocorrer.<\/li>\n\n\n<li>As mudan\u00e7as de produ\u00e7\u00e3o, as ferramentas partilhadas ou as tarefas que exigem v\u00e1rios operadores determinam o que pode ser executado a seguir.<\/li>\n\n\n<li>O plano tem de ser atualizado a cada altera\u00e7\u00e3o. O Autopilot f\u00e1-lo automaticamente, sem uma quota de tokens por execu\u00e7\u00e3o e sem ficar limitado ao modo manual.<\/li>\n\n\n<li>A equipa comercial precisa de datas que respeitem a capacidade dispon\u00edvel com meses de anteced\u00eancia, para al\u00e9m do horizonte de curto prazo do MSO.<\/li>\n\n\n<li>Quer reunir todas as restri\u00e7\u00f5es num \u00fanico motor, a um pre\u00e7o publicado, sem acrescentar acesso ao MSO, um PSO Cloud Service ou um IFS.ai Activation Pass, e sem par\u00e2metros reservados a especialistas em PSO.<\/li>\n\n<\/ul>\n\n\n<p>Durante o per\u00edodo de teste, ver\u00e1 as suas pr\u00f3prias ordens de fabrico programadas de acordo com a capacidade dispon\u00edvel. A entrada em produ\u00e7\u00e3o acontece num prazo de semanas ap\u00f3s o in\u00edcio do processo de integra\u00e7\u00e3o inicial.<\/p>\n\n\n<p>Comece com uma exporta\u00e7\u00e3o das suas ordens de fabrico para Excel no <a href=\"\/pt-pt\/avaliacao\/\">teste gratuito de 30 dias<\/a> (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n\n\n<p>O SkyPlanner integra-se com o IFS Cloud nos dois sentidos atrav\u00e9s das proje\u00e7\u00f5es OData do IFS. A equipa SkyPlanner configura a integra\u00e7\u00e3o durante a fase inicial e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Consulte a p\u00e1gina <a href=\"\/pt-pt\/integracoes\/erp\/ifs-cloud\/\">SkyPlanner para IFS Cloud<\/a>, o <a href=\"\/pt-pt\/integracoes\/erp\/ifs-cloud\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o IFS Cloud<\/a> ou descubra outros sistemas na <a href=\"\/pt-pt\/integracoes\/erp\/\">\u00e1rea de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos do planeamento da produ\u00e7\u00e3o em folhas de Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90% e a cria\u00e7\u00e3o de um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo em manter a fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produ\u00e7\u00e3o qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas manteve-se nos 100% durante todo o per\u00edodo de utiliza\u00e7\u00e3o do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Ler o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 a diferen\u00e7a entre o IFS MSO e o PSO?<\/summary>\n<p class=\"sp-faq__a\">O PSO (Planning and Scheduling Optimization) \u00e9 o motor de programa\u00e7\u00e3o do IFS, tamb\u00e9m comercializado para a programa\u00e7\u00e3o de servi\u00e7os no terreno. O MSO (Manufacturing Scheduling and Optimization) \u00e9 a solu\u00e7\u00e3o de programa\u00e7\u00e3o da produ\u00e7\u00e3o que funciona sobre o motor PSO. Na documenta\u00e7\u00e3o da vers\u00e3o 26R2, chama-se IFS.ai Manufacturing Scheduling and Optimization.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O MSO est\u00e1 inclu\u00eddo no IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">A documenta\u00e7\u00e3o do IFS indica que o MSO est\u00e1 dispon\u00edvel para clientes com acesso ao m\u00f3dulo. A implementa\u00e7\u00e3o exige um IFS.ai Activation Pass em instala\u00e7\u00f5es h\u00edbridas ou alojadas, ou o dimensionamento do PSO e a aquisi\u00e7\u00e3o de um PSO Cloud Service na nuvem. Nos servi\u00e7os da plataforma IFS.ai, o MSO funciona em modo manual e consome tokens.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O IFS Cloud pode programar m\u00e3o de obra e ferramentas respeitando a capacidade dispon\u00edvel?<\/summary>\n<p class=\"sp-faq__a\">No MSO, sim: os centros de trabalho, as categorias de m\u00e3o de obra e as ferramentas s\u00e3o tratados como restri\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o, salvo se estiver ativada a op\u00e7\u00e3o Exempt Labor ou Exempt Tools. A programa\u00e7\u00e3o padr\u00e3o das ordens de fabrico n\u00e3o limita a utiliza\u00e7\u00e3o das categorias de m\u00e3o de obra nem das ferramentas entre ordens. O SkyPlanner programa pessoas, turnos, aus\u00eancias e ferramentas partilhadas respeitando a capacidade dispon\u00edvel em cada execu\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O IFS Cloud gere tempos de prepara\u00e7\u00e3o que dependem da sequ\u00eancia?<\/summary>\n<p class=\"sp-faq__a\">O MSO permite faz\u00ea-lo atrav\u00e9s de matrizes de prepara\u00e7\u00e3o, embora programe a primeira opera\u00e7\u00e3o num centro de trabalho sem tempo de prepara\u00e7\u00e3o. A programa\u00e7\u00e3o padr\u00e3o utiliza o tempo de prepara\u00e7\u00e3o definido na opera\u00e7\u00e3o da gama operat\u00f3ria. A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner guarda os tempos de mudan\u00e7a de produ\u00e7\u00e3o entre pares de produtos, por exemplo, 30 minutos de azul para vermelho e 60 de vermelho para azul.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Posso testar o SkyPlanner antes de o integrar com o IFS Cloud?<\/summary>\n<p class=\"sp-faq__a\">Sim. Exporte as ordens de fabrico em aberto, as opera\u00e7\u00f5es e os centros de trabalho do IFS Cloud para Excel, importe-os durante o teste de 30 dias e compare a programa\u00e7\u00e3o com o seu plano atual. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, <a href=\"\/pt-pt\/avaliacao\/\">inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ IFS Cloud O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS O IFS Cloud programa as ordens de fabrico e faz o planeamento das necessidades de capacidade (CRP) pressupondo capacidade ilimitada. A programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas &#8230; <a title=\"O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/\" aria-label=\"Leia mais sobre O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102886,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103569","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>O IFS Cloud programa a produ\u00e7\u00e3o dentro da capacidade real?<\/title>\n<meta name=\"description\" content=\"IFS Cloud: ordens e CRP sem limites de capacidade. Respeit\u00e1-los exige MSO com PSO ou APB. Saiba o que fazem, os seus limites e quando precisa de APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"IFS Cloud: ordens e CRP sem limites de capacidade. Respeit\u00e1-los exige MSO com PSO ou APB. Saiba o que fazem, os seus limites e quando precisa de APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/ifs-cloud\\\/programacao-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/ifs-cloud\\\/programacao-producao\\\/\",\"name\":\"O IFS Cloud programa a produ\u00e7\u00e3o dentro da capacidade real?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"IFS Cloud: ordens e CRP sem limites de capacidade. Respeit\u00e1-los exige MSO com PSO ou APB. Saiba o que fazem, os seus limites e quando precisa de APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/ifs-cloud\\\/programacao-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/ifs-cloud\\\/programacao-producao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/ifs-cloud\\\/programacao-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para IFS Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/ifs-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"O IFS Cloud programa a produ\u00e7\u00e3o dentro da capacidade real?","description":"IFS Cloud: ordens e CRP sem limites de capacidade. Respeit\u00e1-los exige MSO com PSO ou APB. Saiba o que fazem, os seus limites e quando precisa de APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS","og_description":"IFS Cloud: ordens e CRP sem limites de capacidade. Respeit\u00e1-los exige MSO com PSO ou APB. Saiba o que fazem, os seus limites e quando precisa de APS.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/","name":"O IFS Cloud programa a produ\u00e7\u00e3o dentro da capacidade real?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"IFS Cloud: ordens e CRP sem limites de capacidade. Respeit\u00e1-los exige MSO com PSO ou APB. Saiba o que fazem, os seus limites e quando precisa de APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/programacao-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para IFS Cloud: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/ifs-cloud\/"},{"@type":"ListItem","position":5,"name":"O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ IFS Cloud O IFS Cloud permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Shop Order Scheduling, MSO e SkyPlanner APS O IFS Cloud programa as ordens de fabrico e faz o planeamento das necessidades de capacidade (CRP) pressupondo capacidade ilimitada. A programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103569","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103569"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103569\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102886"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}