{"id":103388,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/acumatica\/programacao-producao\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"programacao-producao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/","title":{"rendered":"O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? <span class=\"hl\">Classic e Optimized APS face ao SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Apenas ao n\u00edvel do planeamento agregado. O Advanced Planning and Scheduling (APS) do Acumatica Manufacturing Edition funciona como Rough Cut Planning, n\u00e3o como programa\u00e7\u00e3o detalhada que respeita a capacidade real das m\u00e1quinas e das pessoas. O Classic APS reserva centros de trabalho, m\u00e1quinas e ferramentas em blocos de tempo fixos e planeia com capacidade ilimitada as ordens cuja conclus\u00e3o ultrapassa os 120 dias (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">fonte<\/a>). O motor Optimized, introduzido na vers\u00e3o 2026 R2 e ainda experimental, programa apenas centros de trabalho. As f\u00e1bricas que precisam de respeitar a disponibilidade real de cada m\u00e1quina, pessoa, ferramenta e material, com horas exatas ao longo de todo o horizonte, utilizam o SkyPlanner APS em conjunto com o Acumatica.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-acumatica-aps-works-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona o Acumatica APS, passo a passo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ativar um dos motores<\/h3>\n\n\n<p>O APS \u00e9 uma funcionalidade do grupo Manufacturing em <strong>Enable\/Disable Features (CS100000)<\/strong>. Na vers\u00e3o 2026 R2 existem duas op\u00e7\u00f5es: <strong>Advanced Planning and Scheduling (Classic)<\/strong> e <strong>Advanced Planning and Scheduling (Optimized)<\/strong>. Para a segunda, a instru\u00e7\u00e3o \u00e9 &#8220;select the Advanced Planning and Scheduling (Optimized) check box under Experimental Features.&#8221; (selecionar a caixa Advanced Planning and Scheduling (Optimized) em Experimental Features). O Acumatica \u00e9 expl\u00edcito: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (Os dois motores APS n\u00e3o podem estar ativos ao mesmo tempo.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Dados mestre de capacidade<\/h3>\n\n\n<p>A capacidade come\u00e7a a ser definida em <strong>Work Calendar (CS209000)<\/strong>: dias de trabalho, horas de in\u00edcio e de fim e pausas. Cada centro de trabalho em <strong>Work Centers (AM207000)<\/strong> tem um ou mais turnos, cada um com o seu calend\u00e1rio. Segundo o Acumatica: &#8220;The daily capacity for a work center is the total number of working hours for all shifts.&#8221; (A capacidade di\u00e1ria de um centro de trabalho \u00e9 o total de horas de trabalho de todos os turnos.)<\/p>\n\n\n<p>O campo <strong>Basis for Capacity<\/strong> determina a base de c\u00e1lculo da dura\u00e7\u00e3o:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Crew Size<\/strong> e <strong>Efficiency<\/strong> do turno, nos centros de trabalho cuja capacidade depende da m\u00e3o de obra<\/li>\n\n\n<li><strong>Machines (AM204500)<\/strong>, com calend\u00e1rio e efici\u00eancia pr\u00f3prios, nos centros de trabalho cuja capacidade depende das m\u00e1quinas<\/li>\n\n<\/ul>\n\n\n<p>Tamb\u00e9m \u00e9 poss\u00edvel programar ferramentas em <strong>Tools (AM205500)<\/strong>. Em <strong>Production Preferences (AM102000)<\/strong>, define-se o <strong>Block Size<\/strong> e se o APS deve considerar as m\u00e1quinas e as ferramentas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. As opera\u00e7\u00f5es s\u00e3o definidas na BOM<\/h3>\n\n\n<p>O Acumatica n\u00e3o tem dados mestre separados para as gamas operat\u00f3rias. As opera\u00e7\u00f5es s\u00e3o definidas em <strong>Bill of Material (AM208000)<\/strong>. Cada opera\u00e7\u00e3o inclui:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operation ID<\/strong> e <strong>Work Center<\/strong><\/li>\n\n\n<li><strong>Setup Time<\/strong>, <strong>Run Time<\/strong>, <strong>Machine Time<\/strong><\/li>\n\n\n<li><strong>Queue Time<\/strong>, <strong>Finish Time<\/strong> e <strong>Move Time<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Ao criar uma ordem de produ\u00e7\u00e3o, as opera\u00e7\u00f5es s\u00e3o copiadas para essa ordem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Programar a ordem de produ\u00e7\u00e3o<\/h3>\n\n\n<p>Cada ordem de produ\u00e7\u00e3o tem um <strong>Scheduling Method<\/strong>:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>M\u00e9todo<\/th><th>Como funciona<\/th><\/tr><\/thead><tbody><tr><td>Finish On<\/td><td>Programa para tr\u00e1s a partir da data de restri\u00e7\u00e3o<\/td><\/tr><tr><td>Start On<\/td><td>Programa para a frente a partir da data de restri\u00e7\u00e3o<\/td><\/tr><tr><td>User Dates<\/td><td>Utiliza as datas de in\u00edcio e de fim introduzidas manualmente<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">5. Rough Cut Planning: executar a programa\u00e7\u00e3o com limites de capacidade<\/h3>\n\n\n<p>No Classic APS, executa-se o <strong>Rough Cut Planning (AM501000)<\/strong> para as ordens selecionadas. A sequ\u00eancia de carregamento \u00e9 fixa: primeiro <strong>Dispatch Priority<\/strong> (&#8220;One (1) is the highest priority and ten (10) is the lowest&#8221; (Um (1) \u00e9 a prioridade mais alta e dez (10) a mais baixa)), depois a data de restri\u00e7\u00e3o e, por fim, o n\u00famero da ordem de produ\u00e7\u00e3o. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">fonte<\/a>)<\/p>\n\n\n<p>A programa\u00e7\u00e3o da produ\u00e7\u00e3o respeita a capacidade e a carga atual dos centros de trabalho, m\u00e1quinas e ferramentas. &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (As opera\u00e7\u00f5es s\u00e3o sempre programadas em blocos cont\u00edguos, excluindo as horas n\u00e3o \u00fateis e as pausas previstas.) Os blocos s\u00e3o de 5, 10, 15, 30 ou 60 minutos. A disponibilidade dos materiais \u00e9 verificada, salvo se o tipo de ordem ou o artigo em stock excluir essa verifica\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Rever e manter a programa\u00e7\u00e3o<\/h3>\n\n\n<p>O planeador trabalha no <strong>Production Schedule Board (AM215555)<\/strong>. Este apresenta as ordens por centro de trabalho e m\u00e1quina e permite alterar datas de restri\u00e7\u00e3o e prioridades, bem como fixar a programa\u00e7\u00e3o. O <strong>APS Maintenance Process (AM512000)<\/strong> volta a executar a programa\u00e7\u00e3o periodicamente.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. O motor Optimized (2026 R2, experimental)<\/h3>\n\n\n<p>O motor Optimized &#8220;calculates production dates with minute-level precision.&#8221; (calcula as datas de produ\u00e7\u00e3o com precis\u00e3o ao minuto). A cada centro de trabalho \u00e9 atribu\u00eddo um <strong>Work Center Scheduling Method<\/strong>: Finite ou Infinite. A op\u00e7\u00e3o Finite reserva &#8220;the remaining available capacity during the work center&#8217;s finite scheduling time fence,&#8221; (a capacidade dispon\u00edvel restante dentro do horizonte em que o centro de trabalho respeita os limites de capacidade), definido entre 1 e 999 dias. &#8220;A production order can include both finite and infinite work centers.&#8221; (Uma ordem de produ\u00e7\u00e3o pode incluir centros de trabalho com capacidade limitada e ilimitada.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Scheduling-Production-Orders?contentId=uGA1DJYAmrgLBcx6_ArzHA\">fonte<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que continua a depender do planeador<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O Classic assume capacidade ilimitada ap\u00f3s 120 dias.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (No APS, o sistema utiliza planeamento com capacidade ilimitada para ordens de produ\u00e7\u00e3o cuja data de conclus\u00e3o ultrapassa esse prazo.) A partir desse ponto, as datas resultam apenas da dura\u00e7\u00e3o das opera\u00e7\u00f5es.<\/li>\n\n\n<li><strong>O Optimized n\u00e3o considera m\u00e1quinas, ferramentas nem materiais.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (O Optimized APS programa centros de trabalho, sem considerar m\u00e1quinas individuais, ferramentas ou a disponibilidade dos materiais.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">fonte<\/a>) Com este motor ativo, os ecr\u00e3s de programa\u00e7\u00e3o de m\u00e1quinas e ferramentas n\u00e3o est\u00e3o dispon\u00edveis.<\/li>\n\n\n<li><strong>N\u00e3o h\u00e1 sequencia\u00e7\u00e3o pelas propriedades do produto.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (O motor n\u00e3o utiliza os valores dos atributos para determinar a sequ\u00eancia das opera\u00e7\u00f5es.) O Setup Time \u00e9 um valor fixo por opera\u00e7\u00e3o, independentemente do que foi produzido antes.<\/li>\n\n\n<li><strong>As opera\u00e7\u00f5es n\u00e3o s\u00e3o divididas para contornar capacidade j\u00e1 reservada.<\/strong> No Optimized, &#8220;the engine does not split the operation around capacity already reserved by another operation.&#8221; (o motor n\u00e3o divide a opera\u00e7\u00e3o para contornar capacidade j\u00e1 reservada por outra opera\u00e7\u00e3o). Tamb\u00e9m &#8220;does not consider fixed manufacturing lead times during scheduling.&#8221; (n\u00e3o considera prazos de fabrico fixos durante a programa\u00e7\u00e3o). (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">fonte<\/a>)<\/li>\n\n\n<li><strong>A m\u00e3o de obra resume-se \u00e0 dimens\u00e3o da equipa.<\/strong> As pessoas s\u00e3o representadas pela dimens\u00e3o e efici\u00eancia da equipa num turno do centro de trabalho, n\u00e3o como operadores identificados, com os seus pr\u00f3prios turnos e aus\u00eancias.<\/li>\n\n\n<li><strong>Os materiais t\u00eam de estar todos dispon\u00edveis.<\/strong> Quando o Classic verifica os materiais, todos t\u00eam de estar dispon\u00edveis na totalidade.<\/li>\n\n\n<li><strong>As ordens fixadas n\u00e3o mudam.<\/strong> &#8220;When you run finite scheduling of production orders, the system does not reschedule the firmed production orders.&#8221; (Ao executar a programa\u00e7\u00e3o de ordens de produ\u00e7\u00e3o com limites de capacidade, o sistema n\u00e3o reprograma as ordens de produ\u00e7\u00e3o fixadas.)<\/li>\n\n\n<li><strong>A reprograma\u00e7\u00e3o exige executar um processo; n\u00e3o reage \u00e0s altera\u00e7\u00f5es.<\/strong> \u00c9 necess\u00e1rio executar o Rough Cut Planning ou o APS Maintenance Process.<\/li>\n\n<\/ul>\n\n\n<p>O Acumatica d\u00e1 o nome certo ao seu processo de programa\u00e7\u00e3o com limites de capacidade: Rough Cut Planning. Usar a dimens\u00e3o das equipas em vez de pessoas individuais, um tempo de prepara\u00e7\u00e3o por opera\u00e7\u00e3o e capacidade ilimitada ap\u00f3s 120 dias resulta num plano agregado, n\u00e3o numa programa\u00e7\u00e3o para o ch\u00e3o de f\u00e1brica que respeite a capacidade real.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-acumatica-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando a programa\u00e7\u00e3o nativa do Acumatica \u00e9 suficiente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Classic APS \u00e9 suficiente quando:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>O horizonte de planeamento \u00e9 bastante inferior a 120 dias.<\/li>\n\n\n<li>A m\u00e3o de obra \u00e9 gerida em conjunto e a dimens\u00e3o da equipa por turno representa-a bem.<\/li>\n\n\n<li>Os tempos de prepara\u00e7\u00e3o pouco dependem do produto fabricado anteriormente.<\/li>\n\n\n<li>As prioridades e as datas de restri\u00e7\u00e3o traduzem o que o planeador pretende.<\/li>\n\n\n<li>A reprograma\u00e7\u00e3o peri\u00f3dica \u00e9 suficiente para acompanhar o ritmo das altera\u00e7\u00f5es.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando precisa de uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite a capacidade real<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Acumatica APS j\u00e1 n\u00e3o responde \u00e0s suas necessidades quando se verificam v\u00e1rias destas situa\u00e7\u00f5es:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Os operadores individuais, os seus turnos e as suas aus\u00eancias condicionam o plano tanto como as m\u00e1quinas.<\/li>\n\n\n<li>O tempo de mudan\u00e7a de produ\u00e7\u00e3o depende da sequ\u00eancia: alerg\u00e9nios, cores, materiais ou ferramentas.<\/li>\n\n\n<li>\u00c9 necess\u00e1rio verificar em conjunto as m\u00e1quinas, as ferramentas e os materiais.<\/li>\n\n\n<li>A carteira de encomendas ou os acordos-quadro estendem-se para al\u00e9m de 120 dias.<\/li>\n\n\n<li>As encomendas urgentes e as avarias obrigam a refazer o plano v\u00e1rias vezes por semana.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">O que procurar<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Respeitar a capacidade real de todos os recursos em simult\u00e2neo:<\/strong> centros de trabalho, m\u00e1quinas, pessoas e ferramentas.<\/li>\n\n\n<li><strong>Uma matriz de tempos de prepara\u00e7\u00e3o:<\/strong> tempos de mudan\u00e7a de produ\u00e7\u00e3o entre produtos que dependem da sequ\u00eancia e diferem consoante o sentido da mudan\u00e7a.<\/li>\n\n\n<li><strong>Ferramentas como recursos partilhados de capacidade limitada<\/strong>, para que o mesmo dispositivo de fixa\u00e7\u00e3o nunca seja atribu\u00eddo a duas m\u00e1quinas ao mesmo tempo.<\/li>\n\n\n<li><strong>Tarefas com v\u00e1rios operadores<\/strong>, respeitando o turno de cada pessoa.<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o que considere os materiais<\/strong>, verificando o stock e as encomendas a fornecedores por data de entrega.<\/li>\n\n\n<li><strong>M\u00e1quinas e pessoal alternativos<\/strong> que o motor utilize efetivamente.<\/li>\n\n\n<li><strong>Edi\u00e7\u00e3o visual no Gantt<\/strong>, em que deslocar uma tarefa mant\u00e9m a coer\u00eancia das restantes.<\/li>\n\n\n<li><strong>Reprograma\u00e7\u00e3o autom\u00e1tica<\/strong> quando o progresso da produ\u00e7\u00e3o ou as encomendas mudam.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o dos resultados sem conflitos<\/strong> nas opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o do Acumatica, com as ordens fixadas para que o Acumatica APS n\u00e3o substitua as datas.<\/li>\n\n<\/ul>\n\n\n<p>As op\u00e7\u00f5es dividem-se em quatro grupos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O APS do pr\u00f3prio Acumatica<\/strong> permite programar a carga respeitando a capacidade dispon\u00edvel num \u00fanico sistema, com as limita\u00e7\u00f5es acima. O Acumatica indica que &#8220;Advanced planning and scheduling is subject to licensing&#8221; (o planeamento e a programa\u00e7\u00e3o avan\u00e7ados est\u00e3o sujeitos a licenciamento) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">fonte<\/a>). Para incorporar altera\u00e7\u00f5es, o planeador tem de voltar a execut\u00e1-lo.<\/li>\n\n\n<li><strong>Os complementos de programa\u00e7\u00e3o integrados nos ecr\u00e3s do Acumatica<\/strong> alargam as funcionalidades do quadro de programa\u00e7\u00e3o, que continua a ser gerido pelo planeador.<\/li>\n\n\n<li><strong>As solu\u00e7\u00f5es APS empresariais<\/strong> s\u00e3o ligadas atrav\u00e9s de um projeto de implementa\u00e7\u00e3o e geridas por uma equipa dedicada ao planeamento.<\/li>\n\n\n<li><strong>O APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica<\/strong>, categoria em que se insere o SkyPlanner, programa automaticamente todos os recursos em paralelo com o Acumatica e coloca o programa de produ\u00e7\u00e3o nas m\u00e3os dos operadores.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde se enquadra o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner APS foi concebido precisamente para colmatar estas lacunas. A capacidade de cada centro de trabalho, pessoa e ferramenta \u00e9 respeitada em todo o horizonte de programa\u00e7\u00e3o. O motor Arcturus AI cria o programa ao n\u00edvel das opera\u00e7\u00f5es em segundos, definindo a sequ\u00eancia com base na prioridade da tarefa, na data de conclus\u00e3o, na prioridade do cliente, no Fast Track e nas Dynamic Priorities.<\/p>\n\n\n<p>A sua matriz de tempos de prepara\u00e7\u00e3o regista o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos, com base nas propriedades dos produtos. O motor escolhe a sequ\u00eancia que exige menos tempo de prepara\u00e7\u00e3o. As ferramentas s\u00e3o recursos partilhados com capacidade limitada, e v\u00e1rias pessoas podem trabalhar na mesma tarefa em simult\u00e2neo. Quando a m\u00e1quina ou a pessoa principal n\u00e3o est\u00e1 dispon\u00edvel, o motor transfere o trabalho para m\u00e1quinas ou pessoas alternativas.<\/p>\n\n\n<p>A programa\u00e7\u00e3o em fun\u00e7\u00e3o dos materiais simula as exist\u00eancias futuras a partir do stock atual e das encomendas de compra por receber. O material encomendado \u00e9 considerado dispon\u00edvel na data de entrega. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o, respeitando os bloqueios e as prioridades definidos. Os operadores consultam a sua fila de tarefas e registam o trabalho no telem\u00f3vel ou tablet com Mobile Confirmations, Production Timer e Quick Log Mode.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner em vez do Acumatica APS quando<\/strong> estiver a deixar as folhas de c\u00e1lculo e quiser um programa de produ\u00e7\u00e3o que se mantenha atualizado, em vez de mais um processo para executar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Precisa de uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite a capacidade real, n\u00e3o de um planeamento aproximado: cada m\u00e1quina, pessoa, ferramenta e material tem de estar dispon\u00edvel no momento exato.<\/li>\n\n\n<li>A disponibilidade da m\u00e3o de obra, e n\u00e3o apenas a dimens\u00e3o da equipa, limita o plano, e cada pessoa tem os seus pr\u00f3prios turnos e aus\u00eancias.<\/li>\n\n\n<li>Os tempos de mudan\u00e7a de produ\u00e7\u00e3o dependem da sequ\u00eancia, ou as ferramentas partilhadas determinam o que pode ser produzido a seguir.<\/li>\n\n\n<li>\u00c9 necess\u00e1rio verificar em conjunto a disponibilidade de m\u00e1quinas, ferramentas e materiais, sem ter de escolher entre dois motores.<\/li>\n\n\n<li>A carteira de encomendas estende-se para l\u00e1 de 120 dias e todas as datas t\u00eam de respeitar a capacidade dispon\u00edvel.<\/li>\n\n\n<li>O plano muda v\u00e1rias vezes por semana e uma execu\u00e7\u00e3o peri\u00f3dica do APS n\u00e3o consegue acompanhar as altera\u00e7\u00f5es. O Autopilot reprograma a cada altera\u00e7\u00e3o.<\/li>\n\n\n<li>Os operadores precisam de consultar a sua fila de tarefas e registar o trabalho num telem\u00f3vel ou tablet, com os registos enviados para o Acumatica.<\/li>\n\n<\/ul>\n\n\n<p>A entrada em funcionamento ocorre em poucas semanas ap\u00f3s o in\u00edcio do processo de implementa\u00e7\u00e3o. A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e assegura o respetivo suporte.<\/p>\n\n\n<p>Comece com uma exporta\u00e7\u00e3o para Excel a partir de uma Generic Inquiry do Acumatica no <a href=\"\/pt-pt\/avaliacao\/\">teste gratuito de 30 dias<\/a> (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). Depois, os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em conjunto com o plano escolhido, de acordo com o seu processo e as suas necessidades.<\/p>\n\n\n<p>O SkyPlanner integra-se com o Acumatica nos dois sentidos atrav\u00e9s da REST API baseada em contratos. A equipa do SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o, e o seu parceiro ou os seus programadores podem trabalhar com a <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> documentada. Consulte a p\u00e1gina <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/\">SkyPlanner para Acumatica<\/a>, o <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Acumatica<\/a> ou todas as <a href=\"\/pt-pt\/integracoes\/erp\/\">integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Especialista em Cadeia de Abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrico de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e a cria\u00e7\u00e3o de um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora apenas um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Menos<\/b><span>paragens por falta de materiais<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO valor que o SkyPlanner nos traz \u00e9 ser uma ferramenta que funciona no dia a dia, sobretudo para definir datas de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, Respons\u00e1vel pelo Planeamento da Produ\u00e7\u00e3o<\/b><br>Eskomatic \u00b7 Maquina\u00e7\u00e3o por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A programa\u00e7\u00e3o autom\u00e1tica da carga permite definir datas de entrega mais precisas, e as paragens de produ\u00e7\u00e3o por falta de materiais diminu\u00edram acentuadamente.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/eskomatic\/\">Ler o testemunho da Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Acumatica tem uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim, ao n\u00edvel do planeamento aproximado. O Manufacturing Edition programa as ordens de produ\u00e7\u00e3o para a frente ou para tr\u00e1s, e o APS acrescenta o Rough Cut Planning e o Production Schedule Board. O Classic APS planeia com capacidade infinita as ordens cuja conclus\u00e3o fica para l\u00e1 de 120 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 a diferen\u00e7a entre o Classic e o Optimized APS?<\/summary>\n<p class=\"sp-faq__a\">O Classic reserva centros de trabalho, m\u00e1quinas e ferramentas em blocos fixos de 5 a 60 minutos. O Optimized calcula as datas ao minuto e permite definir, por centro de trabalho, um horizonte em que a capacidade \u00e9 respeitada, mas programa apenas centros de trabalho. O Optimized \u00e9 uma funcionalidade experimental na vers\u00e3o 2026 R2, e s\u00f3 pode estar ativo um motor de cada vez.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Acumatica APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Escolha o SkyPlanner se pretende uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite a capacidade real, em vez de um plano aproximado. No Acumatica, a programa\u00e7\u00e3o que respeita a capacidade \u00e9 feita pelo Rough Cut Planning. O Classic APS considera capacidade infinita para l\u00e1 de 120 dias, a m\u00e3o de obra \u00e9 representada pela dimens\u00e3o da equipa, o tempo de prepara\u00e7\u00e3o \u00e9 fixo por opera\u00e7\u00e3o e o APS est\u00e1 sujeito a licenciamento. O SkyPlanner programa cada m\u00e1quina, pessoa, ferramenta e material segundo a disponibilidade no momento exato, ao longo de todo o horizonte. Utiliza uma matriz de tempos de prepara\u00e7\u00e3o com tempos de mudan\u00e7a de produ\u00e7\u00e3o distintos em cada sentido, e o Autopilot reprograma a cada altera\u00e7\u00e3o relevante. A entrada em funcionamento ocorre em poucas semanas, com pre\u00e7os a partir de 199 \u20ac por m\u00eas e um teste de 30 dias com os seus pr\u00f3prios dados.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Acumatica permite gerir tempos de prepara\u00e7\u00e3o dependentes da sequ\u00eancia?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O campo Setup Time tem um valor fixo em cada opera\u00e7\u00e3o da BOM, e o motor Optimized n\u00e3o utiliza os valores dos atributos para definir a sequ\u00eancia das opera\u00e7\u00f5es. O SkyPlanner APS utiliza uma matriz de tempos de prepara\u00e7\u00e3o com os tempos de mudan\u00e7a de produ\u00e7\u00e3o entre pares de produtos: por exemplo, de azul para vermelho, 30 minutos, e de vermelho para azul, 60. O motor ordena as tarefas de forma a minimizar esses tempos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Acumatica programa o trabalho de operadores individuais?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. A m\u00e3o de obra \u00e9 modelada pela dimens\u00e3o e efici\u00eancia da equipa no turno de um centro de trabalho. O SkyPlanner programa o trabalho de cada pessoa com os seus pr\u00f3prios turnos, aus\u00eancias e horas extraordin\u00e1rias, e atribui v\u00e1rios operadores \u00e0 mesma tarefa quando esta o exige.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Posso testar o SkyPlanner antes de o integrar com o Acumatica?<\/summary>\n<p class=\"sp-faq__a\">Sim. Exporte as ordens de produ\u00e7\u00e3o em aberto, as opera\u00e7\u00f5es e os centros de trabalho de uma Generic Inquiry do Acumatica para Excel e importe-os durante o teste de 30 dias. N\u00e3o \u00e9 necess\u00e1rio cart\u00e3o de cr\u00e9dito. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, <a href=\"\/pt-pt\/avaliacao\/\">inicie o teste<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Acumatica Cloud ERP O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS Apenas ao n\u00edvel do planeamento agregado. O Advanced Planning and Scheduling (APS) do Acumatica Manufacturing Edition funciona como Rough Cut Planning, n\u00e3o como programa\u00e7\u00e3o detalhada que respeita a capacidade real &#8230; <a title=\"O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/\" aria-label=\"Leia mais sobre O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102799,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103388","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o? Guia APS<\/title>\n<meta name=\"description\" content=\"Acumatica APS tem limites: Classic ignora capacidade ap\u00f3s 120 dias; Optimized s\u00f3 abrange centros de trabalho. Quando precisa de APS que respeite a capacidade.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Acumatica APS tem limites: Classic ignora capacidade ap\u00f3s 120 dias; Optimized s\u00f3 abrange centros de trabalho. Quando precisa de APS que respeite a capacidade.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/programacao-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/programacao-producao\\\/\",\"name\":\"Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o? Guia APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Acumatica APS tem limites: Classic ignora capacidade ap\u00f3s 120 dias; Optimized s\u00f3 abrange centros de trabalho. Quando precisa de APS que respeite a capacidade.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/programacao-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/programacao-producao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/programacao-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o? Guia APS","description":"Acumatica APS tem limites: Classic ignora capacidade ap\u00f3s 120 dias; Optimized s\u00f3 abrange centros de trabalho. Quando precisa de APS que respeite a capacidade.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS","og_description":"Acumatica APS tem limites: Classic ignora capacidade ap\u00f3s 120 dias; Optimized s\u00f3 abrange centros de trabalho. Quando precisa de APS que respeite a capacidade.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/","name":"Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o? Guia APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Acumatica APS tem limites: Classic ignora capacidade ap\u00f3s 120 dias; Optimized s\u00f3 abrange centros de trabalho. Quando precisa de APS que respeite a capacidade.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/"},{"@type":"ListItem","position":5,"name":"O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Acumatica Cloud ERP O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real? Classic e Optimized APS face ao SkyPlanner APS Apenas ao n\u00edvel do planeamento agregado. O Advanced Planning and Scheduling (APS) do Acumatica Manufacturing Edition funciona como Rough Cut Planning, n\u00e3o como programa\u00e7\u00e3o detalhada que respeita a capacidade real&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103388"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103388\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102799"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}