{"id":103208,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/proshop-erp\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proshop-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/","title":{"rendered":"SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ ProShop ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para ProShop ERP: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para ProShop que respeita a capacidade real das m\u00e1quinas e das equipas. Permite \u00e0s oficinas de maquina\u00e7\u00e3o programar cada m\u00e1quina, operador, ferramenta e material. Pode ver que opera\u00e7\u00e3o de cada ordem de fabrico \u00e9 executada, em que m\u00e1quina e a que hora. Quando a produ\u00e7\u00e3o muda, o Autopilot reprograma automaticamente.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o ProShop nos dois sentidos. Recebe Work Orders com as respetivas opera\u00e7\u00f5es, Parts, Work Cells, Users, Tools e Purchase Orders. Devolve as datas planeadas e os tempos registados. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o do ProShop.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-shop\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua f\u00e1brica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u00c9 o motor que define a sequ\u00eancia, n\u00e3o o respons\u00e1vel pelo planeamento.<\/p>\n\n\n<p class=\"fx-pain__b\">O Arcturus atribui cada opera\u00e7\u00e3o de uma ordem de fabrico a uma m\u00e1quina e a uma hora espec\u00edficas, otimizando todo o plano em segundos. Os prazos de entrega, a prioridade do cliente e o Fast Track determinam a sequ\u00eancia. O respons\u00e1vel pelo planeamento deixa de ordenar manualmente a lista de cada c\u00e9lula de trabalho.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A prepara\u00e7\u00e3o acompanha a sequ\u00eancia real.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de tarefas, nos dois sentidos. Passar de alum\u00ednio para a\u00e7o inoxid\u00e1vel pode exigir uma limpeza r\u00e1pida, enquanto a passagem de a\u00e7o inoxid\u00e1vel para alum\u00ednio exige uma limpeza completa. As tarefas que partilham um dispositivo de fixa\u00e7\u00e3o ou material s\u00e3o executadas consecutivamente, e o motor escolhe a sequ\u00eancia com o menor tempo total de prepara\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">M\u00e1quinas, pessoas e ferramentas t\u00eam limites de capacidade.<\/p>\n\n\n<p class=\"fx-pain__b\">Uma tarefa de cinco eixos que exija um preparador de m\u00e1quinas e um operador fica programada para uma altura em que ambos tenham disponibilidade no turno. Um dispositivo de fixa\u00e7\u00e3o ou uma ferramenta em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho passa para uma m\u00e1quina ou pessoa alternativa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os atrasos de material deixam de comprometer o plano.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas de compra pendentes de rece\u00e7\u00e3o de cada pe\u00e7a. Uma tarefa que aguarde material em barra \u00e9 programada para depois da data de entrega, evitando preparar a m\u00e1quina para depois ter de desfazer a prepara\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante urg\u00eancias e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma \u00e1rvore principal avaria ou chega uma tarefa urgente, o Autopilot reprograma a produ\u00e7\u00e3o. O Running Time Lock mant\u00e9m fixo o trabalho das pr\u00f3ximas horas, para n\u00e3o perturbar o ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os operadores veem a sua lista de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real, e cabe-lhe decidir se os tempos reais s\u00e3o enviados de volta para o ProShop.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para coberturas da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tornou os estrangulamentos mais vis\u00edveis e a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Diretor de Produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para coberturas e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano, e a programa\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/piristeel\/\">Ler o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-geral<\/b><br>KJH-Comp \u00b7 Constru\u00e7\u00e3o mec\u00e2nica em chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proshop-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O ProShop envia o trabalho.<\/strong> O SkyPlanner recebe Work Orders com as respetivas opera\u00e7\u00f5es e tempos previstos, Parts, registos de Work Order BOM, Work Cells, Users, Tools, Fixtures e Purchase Orders.<\/li>\n\n\n<li><strong>O SkyPlanner cria o programa de produ\u00e7\u00e3o e mant\u00e9m-no atualizado.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em segundos e reprograma-a \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e os tempos registados s\u00e3o devolvidos.<\/strong> As datas planeadas de in\u00edcio e fim s\u00e3o enviadas para as ordens de fabrico no ProShop, e os tempos dos operadores podem ser enviados para o ProShop Time Tracking.<\/li>\n\n<\/ol>\n\n\n<p>O ProShop continua a ser o seu sistema de refer\u00eancia para os dados. A or\u00e7amenta\u00e7\u00e3o, as ordens de fabrico, as instru\u00e7\u00f5es visuais de trabalho, a qualidade, as exist\u00eancias, as compras e o apuramento de custos por tarefa mant\u00eam-se onde est\u00e3o. O SkyPlanner fica respons\u00e1vel por uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O SkyPlanner l\u00ea os dados do ProShop atrav\u00e9s da ProShop GraphQL API em <code>\/api\/graphql<\/code>, com autentica\u00e7\u00e3o por OAuth 2.0 Authorization, criada pelo administrador do ProShop em System Config &gt; Manage Authorizations. As altera\u00e7\u00f5es s\u00e3o recolhidas atrav\u00e9s da Recently Updated Records API, com filtros para ordens de fabrico, c\u00e9lulas de trabalho, encomendas de compra e registos de tempos. As datas planeadas s\u00e3o devolvidas atrav\u00e9s de GraphQL, com \u00e2mbito de escrita em workorders. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o ao programa de produ\u00e7\u00e3o assim que ocorre, e a frequ\u00eancia de sincroniza\u00e7\u00e3o com o ProShop \u00e9 definida para cada oficina.<\/p>\n\n\n<p>Cada oficina utiliza o ProShop de forma diferente. Por isso, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e presta apoio ap\u00f3s a entrada em funcionamento. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em fun\u00e7\u00e3o dos seus processos e necessidades. O seu consultor ProShop ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As consultas, os \u00e2mbitos de acesso, o mapeamento de dados e as regras de escrita de dados no ProShop est\u00e3o descritos no <a href=\"\/pt-pt\/integracoes\/erp\/proshop-erp\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o ProShop para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-proshop-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o ProShop programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O ProShop tem programa\u00e7\u00e3o pr\u00f3pria, organizada em torno de Work Cells, que respeita a capacidade de cada c\u00e9lula de trabalho. A documenta\u00e7\u00e3o do ProShop explica como funciona:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>As horas s\u00e3o definidas por c\u00e9lula de trabalho.<\/strong> &#8220;Any machine tool, workbench, equipment, or even person can be assigned as a workcell. Once assigned as a workcell, the number and timing of available hours per day can be managed using the schedule.&#8221; (Qualquer m\u00e1quina-ferramenta, bancada, equipamento ou mesmo pessoa pode ser definido como c\u00e9lula de trabalho. O programa permite depois gerir o n\u00famero e a distribui\u00e7\u00e3o das horas dispon\u00edveis por dia.) (<a href=\"https:\/\/proshoperp.com\/wp-content\/uploads\/2025\/06\/ProShop_ModuleFlyer.pdf.pdf\">folheto dos m\u00f3dulos<\/a>)<\/li>\n\n\n<li><strong>As dura\u00e7\u00f5es baseiam-se em estimativas.<\/strong> &#8220;Estimated set-up and cycle times are used to calculate job duration on the schedule.&#8221; (Os tempos estimados de prepara\u00e7\u00e3o e de ciclo s\u00e3o usados para calcular a dura\u00e7\u00e3o das tarefas no programa de produ\u00e7\u00e3o.) (<a href=\"https:\/\/proshoperp.com\/blog\/better-shop-floor-scheduling\/\">blogue do ProShop<\/a>)<\/li>\n\n\n<li><strong>A oficina define a prioridade.<\/strong> &#8220;The machine schedule can provide a view into your existing pipeline, order of priority for active jobs, job status, and capacity planning features.&#8221; (O programa das m\u00e1quinas permite visualizar o trabalho em carteira, a ordem de prioridade das tarefas ativas e o estado das tarefas, e disponibiliza funcionalidades de planeamento da capacidade.) (<a href=\"https:\/\/proshoperp.com\/blog\/better-shop-floor-scheduling\/\">blogue do ProShop<\/a>)<\/li>\n\n\n<li><strong>As pessoas reagem aos alertas.<\/strong> Sobre a programa\u00e7\u00e3o, o ProShop afirma: &#8220;automatically updates to reflect actual progress. Adjust priorities and manage bottlenecks proactively, not reactively.&#8221; (Atualiza-se automaticamente para refletir o progresso real. Ajuste as prioridades e gira os estrangulamentos de forma proativa, n\u00e3o reativa.) (<a href=\"https:\/\/proshoperp.com\/product\/mes\/\">ProShop MES<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>\u00c9 uma base s\u00f3lida para acompanhar a produ\u00e7\u00e3o. Mas continua a ser o respons\u00e1vel pelo planeamento a decidir a sequ\u00eancia em cada m\u00e1quina. Cada tarefa tem um \u00fanico tempo estimado de prepara\u00e7\u00e3o, independentemente do trabalho anterior, e cada c\u00e9lula de trabalho corresponde a uma m\u00e1quina ou a uma pessoa, n\u00e3o \u00e0s duas em conjunto. O SkyPlanner acrescenta o motor: sequencia\u00e7\u00e3o autom\u00e1tica que considera m\u00e1quinas, operadores, ferramentas e materiais, prepara\u00e7\u00e3o dependente da sequ\u00eancia e reprograma\u00e7\u00e3o cont\u00ednua.<\/p>\n\n\n<p>Cada etapa e campo de prepara\u00e7\u00e3o s\u00e3o explicados em <a href=\"\/pt-pt\/integracoes\/erp\/proshop-erp\/programacao-producao\/\">O ProShop permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proshop-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O ProShop hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programa\u00e7\u00e3o no ProShop (Work Cells)<\/th><th>ProShop com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Horas dispon\u00edveis por c\u00e9lula de trabalho, com hor\u00e1rios de turnos<\/td><td>Capacidade real de cada m\u00e1quina, pessoa e ferramenta, com turnos reais, aus\u00eancias e horas extraordin\u00e1rias<\/td><\/tr><tr><td>Sequ\u00eancia<\/td><td>Ordem de prioridade por m\u00e1quina definida pela oficina<\/td><td>O Arcturus define automaticamente a sequ\u00eancia de todas as opera\u00e7\u00f5es em segundos<\/td><\/tr><tr><td>Prepara\u00e7\u00f5es<\/td><td>Tempo estimado de prepara\u00e7\u00e3o por tarefa<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o: mudan\u00e7as de produ\u00e7\u00e3o distintas em cada sentido, com o menor tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Pessoas<\/td><td>Uma pessoa pode constituir uma c\u00e9lula de trabalho<\/td><td>Operadores e m\u00e1quinas programados em conjunto; atribui\u00e7\u00e3o dos operadores necess\u00e1rios a tarefas que exigem v\u00e1rias pessoas<\/td><\/tr><tr><td>Ferramentas e dispositivos de fixa\u00e7\u00e3o<\/td><td>Acompanhamento em Tools, Fixtures e RTAs<\/td><td>Ferramentas e dispositivos de fixa\u00e7\u00e3o programados como recursos partilhados com disponibilidade limitada<\/td><\/tr><tr><td>Materiais<\/td><td>Indicadores de compras por cores no programa de produ\u00e7\u00e3o<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias dispon\u00edveis ou chegam os materiais encomendados<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O programa atualiza-se com o progresso; o respons\u00e1vel pelo planeamento ajusta as prioridades<\/td><td>O Autopilot reprograma toda a oficina, respeitando as prioridades e os bloqueios definidos<\/td><\/tr><tr><td>Alternativas<\/td><td>Opera\u00e7\u00e3o associada \u00e0 sua c\u00e9lula de trabalho<\/td><td>Utiliza\u00e7\u00e3o de centros de trabalho e pessoas alternativas quando os recursos principais est\u00e3o ocupados<\/td><\/tr><tr><td>Vista de planeamento<\/td><td>Programa das m\u00e1quinas com previs\u00e3o de cumprimento dos prazos<\/td><td>Gantt interativo: mova tarefas sem perder a coer\u00eancia do plano<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Time Tracking no ProShop<\/td><td>Os operadores veem a sua lista de tarefas e registam o trabalho no telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"proshop-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Compara\u00e7\u00e3o de software e complementos de programa\u00e7\u00e3o para ProShop<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando se adequa<\/th><\/tr><\/thead><tbody><tr><td>Programa\u00e7\u00e3o no ProShop (Work Cells)<\/td><td>Programa\u00e7\u00e3o no pr\u00f3prio ProShop: horas por c\u00e9lula de trabalho, prioridade por m\u00e1quina e previs\u00e3o de cumprimento dos prazos<\/td><td>As prioridades raramente mudam e as prepara\u00e7\u00f5es n\u00e3o dependem da sequ\u00eancia<\/td><\/tr><tr><td>Plataformas de monitoriza\u00e7\u00e3o de m\u00e1quinas<\/td><td>Dados da \u00e1rvore principal e dos ciclos, com uma vista da programa\u00e7\u00e3o das ordens de fabrico do ProShop<\/td><td>O objetivo \u00e9 obter dados de utiliza\u00e7\u00e3o das m\u00e1quinas<\/td><\/tr><tr><td>Software de programa\u00e7\u00e3o da produ\u00e7\u00e3o instalado localmente, que respeita a capacidade real das m\u00e1quinas e das pessoas<\/td><td>Software de programa\u00e7\u00e3o instalado localmente, alimentado por ficheiros exportados em Excel ou CSV<\/td><td>Um planeador faz a programa\u00e7\u00e3o numa sess\u00e3o de trabalho, com exporta\u00e7\u00f5es peri\u00f3dicas de ficheiros<\/td><\/tr><tr><td>APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica (SkyPlanner)<\/td><td>Programa\u00e7\u00e3o autom\u00e1tica que respeita a capacidade de cada m\u00e1quina, pessoa e ferramenta e a disponibilidade de materiais, com integra\u00e7\u00e3o bidirecional com o ProShop<\/td><td>A sequ\u00eancia determina as datas de entrega e o plano muda diariamente<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez da programa\u00e7\u00e3o do ProShop quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O planeador passa horas a ordenar as listas das c\u00e9lulas de trabalho.<\/strong> O ProShop apresenta a &#8220;order of priority for active jobs&#8221; (ordem de prioridade das tarefas ativas) definida pela f\u00e1brica. O Arcturus cria toda a sequ\u00eancia em segundos e refaz essa sequ\u00eancia a cada altera\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O tempo de prepara\u00e7\u00e3o depende do trabalho anterior.<\/strong> O ProShop calcula a dura\u00e7\u00e3o com base nos &#8220;estimated set-up and cycle times&#8221; (tempos estimados de prepara\u00e7\u00e3o e de ciclo). A matriz de tempos de prepara\u00e7\u00e3o regista o tempo de mudan\u00e7a de produ\u00e7\u00e3o para cada par de tarefas, nos dois sentidos, e ordena as tarefas de modo a minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>As m\u00e1quinas e os operadores limitam a produ\u00e7\u00e3o em conjunto.<\/strong> No ProShop, uma c\u00e9lula de trabalho \u00e9 uma m\u00e1quina ou uma pessoa. O SkyPlanner reserva a m\u00e1quina, os operadores e o dispositivo de fixa\u00e7\u00e3o para a mesma opera\u00e7\u00e3o e atribui as pessoas necess\u00e1rias \u00e0s tarefas que exigem v\u00e1rias pessoas.<\/li>\n\n\n<li><strong>Surgem trabalhos urgentes e avarias todos os dias.<\/strong> O ProShop indica aos planeadores que devem &#8220;adjust priorities and manage bottlenecks&#8221; (ajustar prioridades e gerir estrangulamentos). O Autopilot reprograma automaticamente e o Running Time Lock mant\u00e9m est\u00e1vel a programa\u00e7\u00e3o das pr\u00f3ximas horas.<\/li>\n\n\n<li><strong>Os materiais determinam o que pode come\u00e7ar.<\/strong> As tarefas s\u00e3o programadas para quando o material estiver dispon\u00edvel em stock ou chegar atrav\u00e9s das encomendas a fornecedores.<\/li>\n\n\n<li><strong>Pretende um \u00fanico pre\u00e7o mensal.<\/strong> A partir de 199 \u20ac por m\u00eas, com utilizadores ilimitados e integra\u00e7\u00e3o bidirecional configurada e acompanhada pela equipa SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo experimental gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua f\u00e1brica.<\/strong> Crie m\u00e1quinas, pessoas, turnos e ferramentas no SkyPlanner ou importe as c\u00e9lulas de trabalho do ProShop. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de fabrico.<\/strong> Exporte as ordens de fabrico em aberto e as respetivas opera\u00e7\u00f5es do Advanced Search do ProShop para Excel, importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o ProShop.<\/strong> O seu administrador do ProShop cria a Authorization e a equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais, veja as <a href=\"\/pt-pt\/funcionalidades\/\">funcionalidades<\/a> ou explore <a href=\"\/pt-pt\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar per\u00edodo experimental gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o ProShop?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas e se integra com o ProShop nos dois sentidos: recebe Work Orders com as respetivas opera\u00e7\u00f5es, Parts, Work Cells, Users, Tools e Purchase Orders e devolve as datas planeadas e os tempos registados. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que distingue o sentido de cada mudan\u00e7a ordena as tarefas para minimizar o tempo total de prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e o per\u00edodo de avalia\u00e7\u00e3o gratuita dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O ProShop permite programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel?<\/summary>\n<p class=\"sp-faq__a\">Sim, ao n\u00edvel da c\u00e9lula de trabalho. Cada c\u00e9lula de trabalho, seja uma m\u00e1quina, uma bancada, um equipamento ou uma pessoa, tem horas dispon\u00edveis por dia e hor\u00e1rios de turnos. A dura\u00e7\u00e3o das tarefas \u00e9 calculada a partir dos tempos estimados de prepara\u00e7\u00e3o e de ciclo. A f\u00e1brica define a ordem de prioridade por m\u00e1quina. O SkyPlanner APS acrescenta a sequencia\u00e7\u00e3o autom\u00e1tica, considerando em conjunto m\u00e1quinas, operadores, ferramentas e materiais, com prepara\u00e7\u00f5es que dependem da sequ\u00eancia.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar a programa\u00e7\u00e3o do ProShop ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando a sequ\u00eancia determina as datas de entrega. A programa\u00e7\u00e3o do ProShop mostra a prioridade, o estado e as previs\u00f5es de cumprimento dos prazos, e os planeadores ajustam as prioridades manualmente. O SkyPlanner otimiza todo o plano em segundos, planeia as mudan\u00e7as de produ\u00e7\u00e3o com uma matriz de tempos de prepara\u00e7\u00e3o que distingue o sentido de cada mudan\u00e7a, reserva operadores, ferramentas e dispositivos de fixa\u00e7\u00e3o em conjunto com as m\u00e1quinas e reprograma automaticamente com o Autopilot. O ProShop continua a ser o sistema de refer\u00eancia para as ordens de fabrico, a qualidade e o c\u00e1lculo de custos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que software de programa\u00e7\u00e3o da produ\u00e7\u00e3o se integra com o ProShop?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o ProShop nos dois sentidos atrav\u00e9s da API GraphQL do ProShop. O SkyPlanner l\u00ea ordens de fabrico, opera\u00e7\u00f5es, pe\u00e7as, c\u00e9lulas de trabalho e encomendas a fornecedores com uma Authorization OAuth 2.0 cujo \u00e2mbito abrange esses m\u00f3dulos. Deteta as altera\u00e7\u00f5es atrav\u00e9s da Recently Updated Records API e devolve as datas planeadas e os tempos atrav\u00e9s de GraphQL.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o ProShop?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, funciona como complemento. O ProShop mant\u00e9m a gest\u00e3o de or\u00e7amentos, ordens de fabrico, instru\u00e7\u00f5es de trabalho, qualidade, stocks, compras e custos por trabalho. O SkyPlanner programa as suas ordens de fabrico de acordo com a capacidade real e devolve as datas ao ProShop.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o ProShop?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas, como uma m\u00e1quina CNC. O n\u00famero de utilizadores \u00e9 ilimitado. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente de acordo com o seu processo e as suas necessidades, em conjunto com o plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa faz o mapeamento das suas c\u00e9lulas de trabalho, opera\u00e7\u00f5es e tempos previstos, liga as ordens de fabrico e as encomendas a fornecedores e devolve as datas planeadas. Tudo \u00e9 testado por compara\u00e7\u00e3o com a programa\u00e7\u00e3o atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funciona com o ProShop na nuvem e com alojamento pr\u00f3prio?<\/summary>\n<p class=\"sp-faq__a\">Sim. Em ambas as op\u00e7\u00f5es, o ProShop funciona no navegador, com a mesma API GraphQL dispon\u00edvel no seu endere\u00e7o do ProShop. Um servidor com alojamento pr\u00f3prio tem de aceitar chamadas HTTPS do SkyPlanner, o que a sua equipa de TI configura durante a defini\u00e7\u00e3o do \u00e2mbito.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o ProShop?<\/summary>\n<p class=\"sp-faq__a\">Sim. A avalia\u00e7\u00e3o de 30 dias utiliza um ficheiro Excel exportado com as suas ordens de fabrico em aberto no ProShop. Pode ver uma <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> da sua pr\u00f3pria f\u00e1brica que respeita a capacidade real das m\u00e1quinas e das pessoas, antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ ProShop ERP SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para ProShop que respeita a capacidade real das m\u00e1quinas e das equipas. Permite \u00e0s oficinas de maquina\u00e7\u00e3o programar cada m\u00e1quina, operador, ferramenta e material. Pode ver que opera\u00e7\u00e3o &#8230; <a title=\"SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/\" aria-label=\"Leia mais sobre SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103208","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ProShop ERP: integra\u00e7\u00e3o APS para programar com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para ProShop ERP: programa cada m\u00e1quina, operador, ferramenta e material com capacidade real. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para ProShop ERP: programa cada m\u00e1quina, operador, ferramenta e material com capacidade real. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proshop-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proshop-erp\\\/\",\"name\":\"ProShop ERP: integra\u00e7\u00e3o APS para programar com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para ProShop ERP: programa cada m\u00e1quina, operador, ferramenta e material com capacidade real. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proshop-erp\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proshop-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proshop-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ProShop ERP: integra\u00e7\u00e3o APS para programar com capacidade real","description":"SkyPlanner APS para ProShop ERP: programa cada m\u00e1quina, operador, ferramenta e material com capacidade real. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para ProShop ERP: programa cada m\u00e1quina, operador, ferramenta e material com capacidade real. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/","name":"ProShop ERP: integra\u00e7\u00e3o APS para programar com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para ProShop ERP: programa cada m\u00e1quina, operador, ferramenta e material com capacidade real. Integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proshop-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ ProShop ERP SkyPlanner APS para ProShop ERP: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para ProShop que respeita a capacidade real das m\u00e1quinas e das equipas. Permite \u00e0s oficinas de maquina\u00e7\u00e3o programar cada m\u00e1quina, operador, ferramenta e material. Pode ver que opera\u00e7\u00e3o&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103208"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103208\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}