{"id":103178,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/proalpha\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proalpha","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/","title":{"rendered":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para proALPHA: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para proALPHA que respeita a capacidade real das m\u00e1quinas e das pessoas e programa cada m\u00e1quina, operador, ferramenta e material. Os respons\u00e1veis pelo planeamento deixam de refazer o plano em Excel, e o Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o Proalpha nos dois sentidos: recebe ordens de fabrico, opera\u00e7\u00f5es, recursos, pe\u00e7as e exist\u00eancias e devolve as datas planeadas das opera\u00e7\u00f5es, as m\u00e1quinas atribu\u00eddas e as confirma\u00e7\u00f5es dos operadores. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o do Proalpha.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O plano em Excel deixa de ser necess\u00e1rio.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o fica num \u00fanico local, criada a partir das suas ordens de fabrico do Proalpha. Todos trabalham com o mesmo plano, em vez de dependerem da folha de c\u00e1lculo ou do caderno do respons\u00e1vel pelo planeamento.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada recurso tem limites de capacidade.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o de m\u00e1quinas, pessoas e ferramentas tem em conta os turnos, as aus\u00eancias e as horas extraordin\u00e1rias reais de cada recurso. Um dispositivo de fixa\u00e7\u00e3o em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos turnos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner guarda o tempo de prepara\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. A passagem de azul para vermelho pode demorar 30 minutos e de vermelho para azul 60. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiais verificados antes de come\u00e7ar.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner programa a produ\u00e7\u00e3o com base nas exist\u00eancias e nas encomendas a fornecedores por receber. Uma tarefa que aguarda uma entrega do fornecedor \u00e9 programada a partir da data de entrega, em vez de ficar parada na m\u00e1quina.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante altera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para, chega uma encomenda urgente ou o trabalho termina mais cedo, o Autopilot reprograma automaticamente. As posi\u00e7\u00f5es que fixou e as prioridades que definiu continuam a ser respeitadas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas no telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. As confirma\u00e7\u00f5es s\u00e3o enviadas de volta para a ordem de fabrico no Proalpha.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o na Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel que a equipa comercial pode consultar<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 uma base s\u00f3lida e fiabilidade a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem pr\u00f3prios para contacto com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o que demoravam uma hora ou mais passam a ter resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Leia o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, na nave de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span>ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cControlamos a produ\u00e7\u00e3o de outra forma e a nossa compreens\u00e3o da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proalpha-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Proalpha envia o trabalho.<\/strong> As ordens de fabrico em aberto (Fertigungsauftr\u00e4ge), com as respetivas opera\u00e7\u00f5es, recursos e tempos de prepara\u00e7\u00e3o e processamento, s\u00e3o enviadas para o SkyPlanner, juntamente com as pe\u00e7as e as exist\u00eancias.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em cada centro de trabalho em segundos e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas, as m\u00e1quinas e as confirma\u00e7\u00f5es s\u00e3o devolvidas.<\/strong> O in\u00edcio e o fim planeados de cada opera\u00e7\u00e3o, o recurso atribu\u00eddo e as confirma\u00e7\u00f5es dos operadores s\u00e3o enviados de volta para a ordem de fabrico no Proalpha.<\/li>\n\n<\/ol>\n\n\n<p>A escrita de dados no Proalpha utiliza as pr\u00f3prias REST APIs do Proalpha, dispon\u00edveis no Proalpha API Portal: setWorkOrderOperationDates, changeWorkOrderOperationResource e operationDataEntry. Cada f\u00e1brica estrutura o Proalpha de forma diferente. Por isso, durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner estabelece a correspond\u00eancia dos seus recursos e ordens de fabrico e, ap\u00f3s a entrada em produ\u00e7\u00e3o, presta apoio \u00e0 integra\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro Proalpha ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As interfaces, a correspond\u00eancia entre campos e as regras que definem qual o sistema respons\u00e1vel por cada dado est\u00e3o descritas no <a href=\"\/pt-pt\/integracoes\/erp\/proalpha\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o proALPHA para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-proalpha-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dados trocados entre o proALPHA e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>proALPHA<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Pe\u00e7a (Teil)<\/td><td>Produtos e materiais<\/td><td>Entrada<\/td><\/tr><tr><td>Ordem de fabrico (Fertigungsauftrag) com quantidade e data-limite<\/td><td>Ordem e tarefas com data-limite e prioridade<\/td><td>Entrada<\/td><\/tr><tr><td>Opera\u00e7\u00f5es da ordem de fabrico com tempos previstos de prepara\u00e7\u00e3o e processamento<\/td><td>Etapas do processo com tempos de prepara\u00e7\u00e3o e dura\u00e7\u00f5es<\/td><td>Entrada<\/td><\/tr><tr><td>Recursos, grupos de recursos e grupos de recursos alternativos<\/td><td>Centros de trabalho, grupos de centros de trabalho e centros de trabalho alternativos<\/td><td>Entrada<\/td><\/tr><tr><td>Calend\u00e1rios dos recursos<\/td><td>Turnos, aus\u00eancias e n\u00edveis de efici\u00eancia<\/td><td>Entrada<\/td><\/tr><tr><td>Exist\u00eancias por \u00e1rea MRP<\/td><td>Exist\u00eancias de materiais<\/td><td>Entrada<\/td><\/tr><tr><td>Encomendas a fornecedores com data de entrega<\/td><td>Materiais a receber na respetiva data de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>In\u00edcio e fim planeados de cada opera\u00e7\u00e3o<\/td><td>Retorno<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Centro de trabalho atribu\u00eddo pela programa\u00e7\u00e3o<\/td><td>Retorno<\/td><\/tr><tr><td>operationDataEntry<\/td><td>Tempos e quantidades registados pelos operadores<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Durante a implementa\u00e7\u00e3o inicial, s\u00e3o configurados no SkyPlanner a matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, as ferramentas como recursos e o n\u00famero de operadores por tarefa.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proalpha-aps-and-finite-capacity-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proalpha APS e programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Proalpha inclui o seu pr\u00f3prio APS no Proalpha Production. O fornecedor descreve-o da seguinte forma:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O APS como n\u00facleo.<\/strong> &#8220;APS (Advanced Planning and Scheduling) is the core of Proalpha Production.&#8221; (O APS \u00e9 o n\u00facleo do Proalpha Production.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/modules\/production\/\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Planeamento otimizado de v\u00e1rios recursos.<\/strong> O APS &#8220;allows optimized resource planning according to managerial targets such as delivery reliability and cycle times.&#8221; (permite otimizar o planeamento dos recursos de acordo com objetivos de gest\u00e3o, como a fiabilidade das entregas e os tempos de ciclo.) Uma opera\u00e7\u00e3o pode utilizar qualquer n\u00famero de recursos com disponibilidade sincronizada.<\/li>\n\n\n<li><strong>Planeamento autom\u00e1tico das ordens.<\/strong> Num caso de cliente do Proalpha, o APS planeia e sequencia as ordens automaticamente: &#8220;automatisch geplant und eingetaktet&#8221; (planeadas e sequenciadas automaticamente). (<a href=\"https:\/\/www.proalpha.com\/de\/proalpha-referenzen\/dickert\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Possibilidade de ajustes manuais.<\/strong> &#8220;Finite planning allows manual changes to the sequence in which orders are processed on short notice.&#8221; (O planeamento com capacidade real permite alterar manualmente, a curto prazo, a sequ\u00eancia de processamento das ordens.)<\/li>\n\n\n<li><strong>Modelos de processo em vez de roteiros.<\/strong> O Proalpha &#8220;completely dispenses with bills of materials and routings for production planning&#8221; (dispensa por completo as listas de materiais e os roteiros no planeamento da produ\u00e7\u00e3o) e planeia com base em modelos de processo dos produtos.<\/li>\n\n\n<li><strong>Necessidade de dados em tempo real.<\/strong> A recolha de dados de produ\u00e7\u00e3o &#8220;enables precise advanced planning and scheduling (APS).&#8221; (permite um planeamento e uma programa\u00e7\u00e3o precisos com APS.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/processes\/plant-data-collection-pdc\">Proalpha<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Essa otimiza\u00e7\u00e3o depende de modelos de processo rigorosos, calend\u00e1rios dos recursos e dados do ch\u00e3o de f\u00e1brica em tempo real, configurados num projeto Proalpha. O pr\u00f3prio Dr. Markus Berg, do Proalpha, considera as confirma\u00e7\u00f5es em papel introduzidas ao fim de semana &#8220;f\u00fcr eine APS-Planung zu ungenau&#8221; (demasiado imprecisas para o planeamento com APS) (<a href=\"https:\/\/it-production.com\/produktionsmanagement\/interview-markus-berg-proalpha\/\">IT&amp;Production<\/a>). As f\u00e1bricas sem essa configura\u00e7\u00e3o continuam a planear em Excel, em paralelo com o ERP. O SkyPlanner programa m\u00e1quinas, pessoas, ferramentas, materiais e mudan\u00e7as de s\u00e9rie em simult\u00e2neo, num \u00fanico motor, com reprograma\u00e7\u00e3o pelo Autopilot e uma integra\u00e7\u00e3o configurada pela equipa SkyPlanner. Durante o per\u00edodo de avalia\u00e7\u00e3o, estas f\u00e1bricas obt\u00eam uma programa\u00e7\u00e3o das suas pr\u00f3prias ordens de fabrico que respeita a capacidade real, com um pre\u00e7o p\u00fablico. Cada passo \u00e9 explicado em <a href=\"\/pt-pt\/integracoes\/erp\/proalpha\/programacao-producao\/\">O proALPHA permite programar a produ\u00e7\u00e3o com capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-skyplanner-adds-to-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o SkyPlanner acrescenta ao proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Proalpha com um plano em Excel<\/th><th>Proalpha com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Plano<\/td><td>Folha de c\u00e1lculo mantida por um respons\u00e1vel pelo planeamento<\/td><td>Uma \u00fanica programa\u00e7\u00e3o atualizada a partir das ordens de fabrico do Proalpha<\/td><\/tr><tr><td>Capacidade<\/td><td>Verificada a olho<\/td><td>Capacidade real de cada m\u00e1quina, pessoa e ferramenta, tendo em conta os turnos<\/td><\/tr><tr><td>Sequ\u00eancia<\/td><td>Reordenada manualmente<\/td><td>Programa\u00e7\u00e3o de cada opera\u00e7\u00e3o em segundos<\/td><\/tr><tr><td>Mudan\u00e7as de s\u00e9rie<\/td><td>Experi\u00eancia do respons\u00e1vel pelo planeamento<\/td><td>Tarefas ordenadas para minimizar o tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Ferramentas e equipas<\/td><td>Geridas separadamente<\/td><td>Disponibilidade real das ferramentas; atribui\u00e7\u00e3o de todos os operadores necess\u00e1rios a cada tarefa<\/td><\/tr><tr><td>Materiais<\/td><td>Verificados pelo respons\u00e1vel pelo planeamento<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias ou quando chegam as entregas<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Plano refeito ap\u00f3s cada imprevisto<\/td><td>O Autopilot reprograma respeitando as suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Confirma\u00e7\u00f5es em papel ou num terminal<\/td><td>Lista de tarefas do operador e registo do trabalho no telem\u00f3vel ou tablet<\/td><\/tr><tr><td>Envio de dados de volta para o Proalpha<\/td><td>Datas introduzidas manualmente no Proalpha<\/td><td>Datas, recursos e confirma\u00e7\u00f5es via REST<\/td><\/tr><tr><td>Arranque<\/td><td>Projeto Proalpha, sem tabela de pre\u00e7os p\u00fablica<\/td><td>As suas pr\u00f3prias ordens de fabrico programadas durante o per\u00edodo de avalia\u00e7\u00e3o gratuito<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o para proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Al\u00e9m da configura\u00e7\u00e3o do projeto descrita acima, a Proalpha recorre aos seus pr\u00f3prios consultores para afinar o APS: na KWM, &#8220;Production planning was optimized remotely together with Proalpha consultants&#8221; (O planeamento da produ\u00e7\u00e3o foi otimizado remotamente em conjunto com os consultores da Proalpha) (<a href=\"https:\/\/www.proalpha.com\/en\/references\/kwm-weisshaar-gmbh\">Proalpha<\/a>). A Proalpha n\u00e3o publica pre\u00e7os; a sua p\u00e1gina de pre\u00e7os responde &#8220;Das kommt darauf an&#8221; (Depende) (<a href=\"https:\/\/www.proalpha.com\/de\/preis\">Proalpha<\/a>). Uma <a href=\"\/pt-pt\/software-de-programacao-da-producao-para-medias-empresas\/\">f\u00e1brica de m\u00e9dia dimens\u00e3o<\/a> que hoje planeia em Excel obt\u00e9m mais depressa, com SkyPlanner, um programa de produ\u00e7\u00e3o utiliz\u00e1vel que respeita a capacidade real das m\u00e1quinas e das pessoas. Em qualquer dos casos, o Proalpha continua a ser o sistema principal.<\/p>\n\n\n<p><strong>Escolha SkyPlanner em vez de Proalpha APS quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Atualmente, faz o planeamento em Excel<\/strong> e quer ter as suas pr\u00f3prias ordens de fabrico programadas de acordo com a capacidade real em poucas semanas, sem esperar pela conclus\u00e3o de um projeto de planeamento.<\/li>\n\n\n<li><strong>Quer testar primeiro com dados reais,<\/strong> durante o per\u00edodo de avalia\u00e7\u00e3o de 30 dias, antes de tomar qualquer decis\u00e3o sobre licen\u00e7as ou projetos.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o determinam quanto consegue produzir.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o ordena as tarefas para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>As ferramentas partilhadas e as tarefas que exigem v\u00e1rios operadores determinam o que pode avan\u00e7ar a seguir.<\/strong><\/li>\n\n\n<li><strong>A chegada dos materiais determina que tarefa pode come\u00e7ar.<\/strong> O stock e as encomendas de compra condicionam o in\u00edcio de cada opera\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O plano muda todos os dias.<\/strong> O Autopilot refaz a programa\u00e7\u00e3o a cada altera\u00e7\u00e3o, sem que um planeador tenha de iniciar o c\u00e1lculo, e envia as novas datas para o Proalpha.<\/li>\n\n\n<li><strong>Os operadores devem trabalhar a partir da sua pr\u00f3pria fila de tarefas<\/strong> num telem\u00f3vel ou tablet, com as confirma\u00e7\u00f5es registadas no Proalpha.<\/li>\n\n\n<li><strong>Quer que a configura\u00e7\u00e3o e o suporte da integra\u00e7\u00e3o fiquem a cargo de outra equipa.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o e assegura o seu funcionamento ap\u00f3s a entrada em produ\u00e7\u00e3o, com um pre\u00e7o p\u00fablico a partir de 199 \u20ac por m\u00eas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie a avalia\u00e7\u00e3o gratuita.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de fabrico.<\/strong> Exporte do Proalpha as ordens de fabrico em aberto e as respetivas opera\u00e7\u00f5es para CSV ou Excel. Importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Proalpha.<\/strong> A equipa SkyPlanner configura a integra\u00e7\u00e3o bidirecional de acordo com o seu sistema e presta suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes na p\u00e1gina de <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> e conhe\u00e7a os outros ERP na <a href=\"\/pt-pt\/integracoes\/erp\/\">p\u00e1gina de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar avalia\u00e7\u00e3o gratuita<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Proalpha?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas e se integra com o Proalpha nos dois sentidos: recebe ordens de fabrico, opera\u00e7\u00f5es, recursos, artigos e stock e devolve as datas planeadas das opera\u00e7\u00f5es, as atribui\u00e7\u00f5es de m\u00e1quinas e as confirma\u00e7\u00f5es dos operadores. A capacidade de cada m\u00e1quina, operador e ferramenta e a disponibilidade de cada material s\u00e3o limitadas. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada mudan\u00e7a ordena as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot refaz automaticamente a programa\u00e7\u00e3o quando a produ\u00e7\u00e3o muda. O pre\u00e7o come\u00e7a nos 199 \u20ac por m\u00eas e o per\u00edodo de avalia\u00e7\u00e3o gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O proALPHA permite programar a produ\u00e7\u00e3o de acordo com a capacidade real?<\/summary>\n<p class=\"sp-faq__a\">Sim. O Proalpha APS otimiza planos que envolvem v\u00e1rios recursos em fun\u00e7\u00e3o de objetivos como a fiabilidade das entregas e os tempos de ciclo, e o Feinplanung permite aos planeadores ajustar a sequ\u00eancia manualmente. Requer modelos de processo bem definidos e dados em tempo real do ch\u00e3o de f\u00e1brica. O SkyPlanner APS programa todas as m\u00e1quinas, pessoas, ferramentas e materiais num \u00fanico motor na nuvem, com reprograma\u00e7\u00e3o pelo Autopilot, um pre\u00e7o p\u00fablico e um per\u00edodo de avalia\u00e7\u00e3o com as suas pr\u00f3prias ordens de fabrico.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar Proalpha APS ou SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Escolha SkyPlanner se atualmente faz o planeamento em Excel. O Proalpha APS s\u00f3 planeia bem depois de os modelos de processo, os calend\u00e1rios dos recursos e a recolha de dados PDC em tempo real serem configurados num projeto Proalpha. A Proalpha afina o sistema com os seus pr\u00f3prios consultores, por um pre\u00e7o or\u00e7amentado para cada instala\u00e7\u00e3o. O SkyPlanner programa todas as m\u00e1quinas, pessoas, ferramentas e materiais na nuvem, o Autopilot refaz a programa\u00e7\u00e3o a cada altera\u00e7\u00e3o e os operadores trabalham atrav\u00e9s de Mobile Confirmations. Entra em produ\u00e7\u00e3o em poucas semanas, a partir de 199 \u20ac por m\u00eas, ap\u00f3s um per\u00edodo de avalia\u00e7\u00e3o de 30 dias com as suas pr\u00f3prias ordens de fabrico. N\u00e3o precisa de Proalpha APS para usar SkyPlanner; se estiver ativo, define-se durante a configura\u00e7\u00e3o inicial qual dos sistemas controla as datas das opera\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Proalpha Production?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-o. O Proalpha mant\u00e9m os artigos, os modelos de processo dos produtos, a gest\u00e3o de materiais, as compras e a \u00e1rea financeira. O SkyPlanner programa as ordens de fabrico em aberto de acordo com a capacidade real e devolve datas, recursos e confirma\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar alguma coisa no Proalpha?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem e devolve dados ao Proalpha atrav\u00e9s das REST APIs publicadas pelo Proalpha. As ordens de fabrico chegam ao SkyPlanner atrav\u00e9s das interfaces do seu Proalpha, configuradas durante a implementa\u00e7\u00e3o inicial.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa Proalpha?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente, juntamente com o seu plano, de acordo com os seus processos e necessidades, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa faz a correspond\u00eancia dos seus recursos e ordens de fabrico, liga os dados de stock e das encomendas de compra e ativa o envio de dados de retorno. Tudo \u00e9 testado por compara\u00e7\u00e3o com o seu plano atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o Proalpha?<\/summary>\n<p class=\"sp-faq__a\">Sim. O per\u00edodo de avalia\u00e7\u00e3o de 30 dias usa uma exporta\u00e7\u00e3o em CSV ou Excel das suas ordens de fabrico em aberto no Proalpha. Antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o, pode ver a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o de acordo com a capacidade real<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ proALPHA ERP SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para proALPHA que respeita a capacidade real das m\u00e1quinas e das pessoas e programa cada m\u00e1quina, operador, ferramenta e material. Os respons\u00e1veis pelo planeamento deixam de refazer o plano &#8230; <a title=\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/\" aria-label=\"Leia mais sobre SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103178","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o proALPHA: APS e programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proalpha\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proalpha\\\/\",\"name\":\"Integra\u00e7\u00e3o proALPHA: APS e programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proalpha\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proalpha\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/proalpha\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o proALPHA: APS e programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/","name":"Integra\u00e7\u00e3o proALPHA: APS e programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/proalpha\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ proALPHA ERP SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para proALPHA que respeita a capacidade real das m\u00e1quinas e das pessoas e programa cada m\u00e1quina, operador, ferramenta e material. Os respons\u00e1veis pelo planeamento deixam de refazer o plano&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103178"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103178\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}