{"id":103118,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/mrpeasy\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"mrpeasy","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/","title":{"rendered":"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ MRPeasy<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para MRPeasy: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o MRPeasy que re\u00fane, de uma s\u00f3 vez, todas as ordens de fabrico em aberto num \u00fanico plano, respeitando a capacidade real das m\u00e1quinas e dos operadores. Tem em conta cada centro de trabalho, operador, ferramenta e material, e o Autopilot reprograma automaticamente a produ\u00e7\u00e3o sempre que h\u00e1 altera\u00e7\u00f5es.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre o SkyPlanner e o MRPeasy \u00e9 bidirecional: o SkyPlanner recebe ordens de fabrico, gamas operat\u00f3rias, centros de trabalho e artigos, e devolve as datas planeadas e o progresso. Durante a implementa\u00e7\u00e3o, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o do MRPeasy.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O plano completo, n\u00e3o uma ordem de cada vez.<\/p>\n\n\n<p class=\"fx-pain__b\">O MRPeasy coloca cada nova ordem de fabrico no primeiro intervalo livre. O motor Arcturus do SkyPlanner define a sequ\u00eancia de todas as ordens em aberto numa s\u00f3 execu\u00e7\u00e3o, de acordo com a prioridade, a data de entrega e o material.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de entrega que pode prometer.<\/p>\n\n\n<p class=\"fx-pain__b\">A data de conclus\u00e3o de cada ordem de fabrico \u00e9 calculada a partir do plano de toda a f\u00e1brica, que j\u00e1 inclui todas as outras ordens. A equipa comercial responde aos clientes com base nesse plano, e n\u00e3o na ordem que, por acaso, foi introduzida primeiro.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ordens urgentes que passam mesmo \u00e0 frente.<\/p>\n\n\n<p class=\"fx-pain__b\">Atribua Fast Track ou uma prioridade mais alta a uma ordem e o motor desloca as restantes tarefas para lhe dar espa\u00e7o. Ningu\u00e9m precisa de arrastar dez ordens \u00e0 m\u00e3o no gr\u00e1fico de Gantt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica em caso de avaria.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para, um material se atrasa ou uma tarefa termina mais cedo, o Autopilot reprograma automaticamente a produ\u00e7\u00e3o. Os bloqueios e as prioridades que definiu continuam a ser respeitados, e o Running Time Lock mant\u00e9m as tarefas j\u00e1 iniciadas no mesmo lugar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de prepara\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos e de vermelho para azul, 60. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipas partilhadas sem conflitos.<\/p>\n\n\n<p class=\"fx-pain__b\">Uma matriz ou um dispositivo de fixa\u00e7\u00e3o em utiliza\u00e7\u00e3o num centro de trabalho nunca \u00e9 reservado noutro. Uma tarefa que precisa de tr\u00eas operadores fica atribu\u00edda a tr\u00eas pessoas com disponibilidade nos seus turnos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiais verificados a cada altera\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas de compra por receber sempre que o plano muda. Uma tarefa que depende de uma entrega de um fornecedor \u00e9 programada para depois da data dessa entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real, e essa informa\u00e7\u00e3o \u00e9 enviada para o MRPeasy.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem os fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de equipamentos de seguran\u00e7a para coberturas da Piristeel, em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tornou mais f\u00e1cil identificar estrangulamentos e trouxe clareza \u00e0 gest\u00e3o da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Diretor de Produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para coberturas e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano, e a programa\u00e7\u00e3o da produ\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/piristeel\/\">Ler o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-mrpeasy-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o MRPeasy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O MRPeasy envia o trabalho.<\/strong> O SkyPlanner recebe ordens de fabrico, gamas operat\u00f3rias, grupos de centros de trabalho, centros de trabalho, artigos, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria o plano e mant\u00e9m-no atualizado.<\/strong> O motor Arcturus programa todas as opera\u00e7\u00f5es em todos os centros de trabalho em segundos e reprograma-as \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e o progresso regressam ao MRPeasy.<\/strong> As datas planeadas e o progresso s\u00e3o enviados para cada ordem de fabrico no MRPeasy, para que as equipas comerciais e de compras vejam o mesmo plano que o ch\u00e3o de f\u00e1brica.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner j\u00e1 foi integrado com o MRPeasy em projetos de clientes. A integra\u00e7\u00e3o utiliza a REST API do MRPeasy, pelo que n\u00e3o \u00e9 instalado nada no MRPeasy. Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es ao plano assim que ocorrem, e as ordens novas ou alteradas s\u00e3o recolhidas do MRPeasy atrav\u00e9s de consultas a intervalos curtos. Cada f\u00e1brica utiliza o MRPeasy de forma diferente. Por isso, durante a implementa\u00e7\u00e3o, a equipa SkyPlanner faz o mapeamento das suas gamas operat\u00f3rias, grupos de centros de trabalho e fluxo de ordens, e presta apoio \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/p>\n\n\n<p>O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu consultor MRPeasy ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>Os endpoints, o mapeamento de campos, os limites de pedidos e o envio de dados de volta ao MRPeasy s\u00e3o abordados no <a href=\"\/pt-pt\/integracoes\/erp\/mrpeasy\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do MRPeasy para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-mrpeasy-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o MRPeasy programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O MRPeasy programa as opera\u00e7\u00f5es respeitando a capacidade dispon\u00edvel dos centros de trabalho. F\u00e1-lo ordem a ordem, pela sequ\u00eancia em que s\u00e3o introduzidas. O <a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/production-schedule\/\">manual do utilizador do MRPeasy<\/a> explica claramente o que acontece a seguir:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Primeiro intervalo livre.<\/strong> &#8220;By default, the software schedules the Manufacturing Order to the first available time.&#8221; (Por predefini\u00e7\u00e3o, o software programa a ordem de fabrico para o primeiro hor\u00e1rio dispon\u00edvel.)<\/li>\n\n\n<li><strong>Uma ordem muda, as restantes ficam.<\/strong> &#8220;The software will only reschedule the manufacturing order which has been dragged to a new time, other manufacturing orders will not be rescheduled.&#8221; (O software s\u00f3 reprograma a ordem de fabrico arrastada para um novo hor\u00e1rio; as restantes n\u00e3o s\u00e3o reprogramadas.)<\/li>\n\n\n<li><strong>Sem verifica\u00e7\u00e3o de materiais no gr\u00e1fico de Gantt.<\/strong> Ao arrastar uma ordem, &#8220;The software will not check for material availability.&#8221; (O software n\u00e3o verifica a disponibilidade de materiais.)<\/li>\n\n\n<li><strong>As paragens n\u00e3o deslocam o trabalho.<\/strong> &#8220;Setting an idle time does not reschedule works automatically which were previously planned for the idle time.&#8221; (Definir um per\u00edodo de paragem n\u00e3o reprograma automaticamente o trabalho previsto para esse per\u00edodo.)<\/li>\n\n<\/ul>\n\n\n<p>A programa\u00e7\u00e3o regressiva exige o plano Enterprise, e o MRPeasy indica que &#8220;Material lead times are ignored when backward scheduling is used.&#8221; (Os prazos de aprovisionamento dos materiais s\u00e3o ignorados na programa\u00e7\u00e3o regressiva.) O tempo de prepara\u00e7\u00e3o \u00e9 um valor fixo por opera\u00e7\u00e3o da gama operat\u00f3ria, independentemente do que foi produzido antes. Assim, cada ordem urgente, avaria ou atraso numa entrega obriga o planeador a reordenar as ordens manualmente. Cada limita\u00e7\u00e3o \u00e9 explicada em <a href=\"\/pt-pt\/integracoes\/erp\/mrpeasy\/programacao-producao\/\">O MRPeasy permite programar a produ\u00e7\u00e3o segundo a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-mrpeasy-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que dados circulam entre o MRPeasy e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>MRPeasy<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Item, Product group, Unit of measurement<\/td><td>Produtos e materiais<\/td><td>Entrada<\/td><\/tr><tr><td>BOM, BOM multin\u00edvel<\/td><td>Estrutura do produto, subprodutos<\/td><td>Entrada<\/td><\/tr><tr><td>Opera\u00e7\u00f5es da gama operat\u00f3ria: Setup time, Cycle time, Capacity<\/td><td>Etapas do processo, tempos de prepara\u00e7\u00e3o, tarefas em lote<\/td><td>Entrada<\/td><\/tr><tr><td>Workstation group, Workstation, Productivity<\/td><td>Grupos de centros de trabalho, centros de trabalho, efici\u00eancias<\/td><td>Entrada<\/td><\/tr><tr><td>Work hours, Holidays, Idle time<\/td><td>Turnos e aus\u00eancias<\/td><td>Entrada<\/td><\/tr><tr><td>Manufacturing Order com opera\u00e7\u00f5es e data de entrega<\/td><td>Ordens e tarefas<\/td><td>Entrada<\/td><\/tr><tr><td>Lotes em stock, invent\u00e1rio, Purchase Order<\/td><td>Exist\u00eancias e materiais por receber<\/td><td>Entrada<\/td><\/tr><tr><td>Data de entrega e campos personalizados de Manufacturing Order<\/td><td>In\u00edcio e conclus\u00e3o planeados e progresso<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"mrpeasy-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">MRPeasy hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>MRPeasy<\/th><th>MRPeasy com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Sequencia\u00e7\u00e3o<\/td><td>Primeiro intervalo livre, pela ordem de introdu\u00e7\u00e3o<\/td><td>Todas as ordens em aberto ordenadas por prioridade e data de entrega<\/td><\/tr><tr><td>Ordens urgentes<\/td><td>Apenas nos intervalos livres<\/td><td>O Fast Track desloca outras tarefas para criar espa\u00e7o<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Cada ordem \u00e9 arrastada manualmente<\/td><td>O Autopilot reprograma toda a f\u00e1brica<\/td><\/tr><tr><td>Mudan\u00e7as de produto<\/td><td>Tempo de prepara\u00e7\u00e3o fixo por opera\u00e7\u00e3o<\/td><td>Matriz de tempos de transi\u00e7\u00e3o para minimizar o tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Ferramentas e equipas<\/td><td>Apenas os hor\u00e1rios de funcionamento dos centros de trabalho<\/td><td>Respeita a disponibilidade das ferramentas e programa tarefas com v\u00e1rios operadores<\/td><\/tr><tr><td>Materiais<\/td><td>Sem verifica\u00e7\u00e3o ao mover ordens no Gantt<\/td><td>Exist\u00eancias e encomendas de compra por receber verificadas a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Iniciar, pausar e concluir cada opera\u00e7\u00e3o<\/td><td>Fila de tarefas do operador, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-mrpeasy\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o para o MRPeasy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A programa\u00e7\u00e3o do pr\u00f3prio MRPeasy adequa-se a uma pequena unidade de produ\u00e7\u00e3o com poucos estrangulamentos, onde as ordens s\u00e3o introduzidas pela sequ\u00eancia em que devem ser executadas. Para outras necessidades, h\u00e1 quatro op\u00e7\u00f5es a considerar: usar apenas o MRPeasy, programar em folhas de c\u00e1lculo alimentadas por exporta\u00e7\u00f5es CSV, usar ferramentas gen\u00e9ricas de automatiza\u00e7\u00e3o para notifica\u00e7\u00f5es ou optar por um APS na nuvem que devolve os dados ao MRPeasy.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Escolha o SkyPlanner quando as novas prioridades exigem reordenar as ordens existentes,<\/strong> e n\u00e3o apenas preencher intervalos livres.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando o seu planeador passa horas por dia a arrastar ordens<\/strong> ap\u00f3s avarias e atrasos nas entregas.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando os tempos de mudan\u00e7a de produto dependem da sequ\u00eancia.<\/strong> A matriz de tempos de transi\u00e7\u00e3o determina essa sequ\u00eancia.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as ferramentas e equipas partilhadas determinam o que pode ser produzido a seguir.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando quer ter a programa\u00e7\u00e3o de volta no MRPeasy,<\/strong> e n\u00e3o numa folha de c\u00e1lculo \u00e0 parte.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando os operadores devem trabalhar a partir da sua pr\u00f3pria fila de tarefas<\/strong> no telem\u00f3vel ou tablet.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie centros de trabalho, pessoas e turnos no SkyPlanner ou importe-os. Pode contar com apoio na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de fabrico.<\/strong> Exporte artigos, listas de materiais, gamas operat\u00f3rias e ordens de fabrico em aberto das vistas de lista do MRPeasy para CSV. Importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o MRPeasy.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais. Tamb\u00e9m utiliza outro sistema? Veja todas as <a href=\"\/pt-pt\/integracoes\/erp\/\">integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipas e se integra com o MRPeasy nos dois sentidos: recebe ordens de fabrico, gamas operat\u00f3rias, centros de trabalho e artigos e devolve datas planeadas e dados de progresso. A programa\u00e7\u00e3o respeita os limites de cada centro de trabalho, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o, que tem em conta o sentido de cada mudan\u00e7a, ordena as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O MRPeasy permite programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel?<\/summary>\n<p class=\"sp-faq__a\">Sim, ordem a ordem. O MRPeasy coloca cada nova ordem de fabrico no primeiro intervalo livre do centro de trabalho, e deslocar uma ordem n\u00e3o altera as restantes. O SkyPlanner APS ordena todas as ordens em aberto em conjunto e refaz o plano automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar alguma coisa no MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em paralelo com o MRPeasy, e liga-se atrav\u00e9s da REST API do MRPeasy. O SkyPlanner j\u00e1 foi integrado com o MRPeasy em projetos de clientes.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-o. O MRPeasy continua a gerir artigos, listas de materiais, gamas operat\u00f3rias, stocks, compras, vendas e contabilidade. O SkyPlanner programa as suas ordens de fabrico de acordo com a capacidade real e devolve as datas e os dados de progresso.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa utilizar o SkyPlanner em conjunto com o MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Uma f\u00e1brica com 20 centros de trabalho paga 499 \u20ac por m\u00eas, independentemente do n\u00famero de utilizadores do MRPeasy. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente, de acordo com o seu processo e as suas necessidades, juntamente com o plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que plano do MRPeasy \u00e9 necess\u00e1rio para a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A integra\u00e7\u00e3o em produ\u00e7\u00e3o utiliza a REST API do MRPeasy, inclu\u00edda no plano Unlimited. O teste funciona com qualquer plano do MRPeasy, pois utiliza ficheiros CSV exportados das vistas de lista do MRPeasy.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa estabelece a correspond\u00eancia entre os grupos de centros de trabalho e as gamas operat\u00f3rias dos dois sistemas, liga as ordens de fabrico e as encomendas de compra e devolve as datas planeadas. Tudo \u00e9 testado por compara\u00e7\u00e3o com o seu plano atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar primeiro o SkyPlanner com os nossos dados do MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">Sim. Exporte gamas operat\u00f3rias, centros de trabalho e ordens de fabrico em aberto para CSV e importe-os durante o teste. Antes de iniciar qualquer trabalho de integra\u00e7\u00e3o, pode ver uma <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o<\/a> que respeita a capacidade real das m\u00e1quinas e das equipas.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ MRPeasy SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o MRPeasy que re\u00fane, de uma s\u00f3 vez, todas as ordens de fabrico em aberto num \u00fanico plano, respeitando a capacidade real das m\u00e1quinas e dos operadores. Tem &#8230; <a title=\"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/\" aria-label=\"Leia mais sobre SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103118","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MRPeasy: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para MRPeasy: integra\u00e7\u00e3o bidirecional, capacidade real de cada centro, operador, ferramenta e material na programa\u00e7\u00e3o. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para MRPeasy: integra\u00e7\u00e3o bidirecional, capacidade real de cada centro, operador, ferramenta e material na programa\u00e7\u00e3o. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/mrpeasy\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/mrpeasy\\\/\",\"name\":\"MRPeasy: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para MRPeasy: integra\u00e7\u00e3o bidirecional, capacidade real de cada centro, operador, ferramenta e material na programa\u00e7\u00e3o. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/mrpeasy\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/mrpeasy\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/mrpeasy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MRPeasy: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para MRPeasy: integra\u00e7\u00e3o bidirecional, capacidade real de cada centro, operador, ferramenta e material na programa\u00e7\u00e3o. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real","og_description":"SkyPlanner APS para MRPeasy: integra\u00e7\u00e3o bidirecional, capacidade real de cada centro, operador, ferramenta e material na programa\u00e7\u00e3o. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/","name":"MRPeasy: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para MRPeasy: integra\u00e7\u00e3o bidirecional, capacidade real de cada centro, operador, ferramenta e material na programa\u00e7\u00e3o. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/mrpeasy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ MRPeasy SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o segundo a capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o MRPeasy que re\u00fane, de uma s\u00f3 vez, todas as ordens de fabrico em aberto num \u00fanico plano, respeitando a capacidade real das m\u00e1quinas e dos operadores. Tem&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103118"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103118\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}