{"id":103060,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/monday\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"monday","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/","title":{"rendered":"SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ monday.com<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para monday.com: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes que gerem encomendas no monday.com. Respeita a capacidade real das m\u00e1quinas e do pessoal, com uma programa\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material. Os quadros mant\u00eam-se onde a equipa trabalha, mas a programa\u00e7\u00e3o por tr\u00e1s deles passa finalmente a corresponder \u00e0 realidade.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o monday.com nos dois sentidos: recebe os itens das encomendas, com quantidades, datas de entrega e estados, e devolve \u00e0s suas colunas o in\u00edcio e o fim previstos, o centro de trabalho e o progresso. A equipa SkyPlanner configura a integra\u00e7\u00e3o com os seus quadros durante a implementa\u00e7\u00e3o inicial.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Dos c\u00edrculos vermelhos do Workload a um plano que cabe na capacidade dispon\u00edvel.<\/p>\n\n\n<p class=\"fx-pain__b\">O monday.com mostra quem est\u00e1 sobrecarregado. O SkyPlanner atribui cada tarefa a uma m\u00e1quina e a um turno com capacidade dispon\u00edvel, para que a sobrecarga nunca chegue ao ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada m\u00e1quina com o seu calend\u00e1rio.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada centro de trabalho tem os seus pr\u00f3prios turnos, paragens para manuten\u00e7\u00e3o, horas extraordin\u00e1rias e aus\u00eancias. A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com turnos dispon\u00edveis, e uma matriz em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservada noutra.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Prazos de entrega baseados na programa\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada item de encomenda no seu quadro recebe uma data de conclus\u00e3o prevista com base na capacidade real. A equipa comercial responde aos clientes com base no plano, n\u00e3o numa barra do Timeline que apenas reflete o que se espera conseguir.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica de encomendas urgentes.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou entra uma encomenda urgente no quadro, o Autopilot reprograma automaticamente em fun\u00e7\u00e3o das altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os bloqueios e as prioridades que definiu continuam a comandar a programa\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner sabe quanto tempo demora a mudar de um produto para outro numa m\u00e1quina, em ambos os sentidos. Passar de azul para vermelho pode demorar 30 minutos e de vermelho para azul 60. Por isso, o motor sequencia as tarefas de modo a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Materiais verificados antes do arranque.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas a fornecedores por receber. Uma tarefa que aguarda uma entrega \u00e9 programada para depois da data de entrega, em vez de ficar parada na m\u00e1quina.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner desempenha um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegaram aos 98%, e a programa\u00e7\u00e3o precisa agora de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, na nave de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span>ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cControlamos a produ\u00e7\u00e3o de outra forma e a nossa compreens\u00e3o da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-monday-com-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o monday.com<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>As encomendas ficam no monday.com.<\/strong> Os itens de encomenda do seu quadro de produ\u00e7\u00e3o s\u00e3o enviados para o SkyPlanner com o produto, a quantidade, a data de entrega, a prioridade e o estado.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em cada centro de trabalho em segundos e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e o progresso regressam ao seu quadro.<\/strong> O in\u00edcio e o fim previstos s\u00e3o registados numa coluna Timeline e o centro de trabalho numa coluna pr\u00f3pria. O progresso registado pelos operadores atualiza a coluna Status.<\/li>\n\n<\/ol>\n\n\n<p>A integra\u00e7\u00e3o utiliza a GraphQL API e os webhooks do pr\u00f3prio monday.com, pelo que a sua equipa mant\u00e9m os quadros e as automatiza\u00e7\u00f5es. Como cada empresa organiza os seus quadros no monday.com de forma diferente, a equipa SkyPlanner faz a correspond\u00eancia entre as colunas durante a implementa\u00e7\u00e3o inicial e presta apoio \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em funcionamento. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro monday.com ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>A correspond\u00eancia entre colunas, os webhooks e o envio dos dados atualizados para o monday.com s\u00e3o explicados no <a href=\"\/pt-pt\/integracoes\/erp\/monday\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do monday.com para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-monday-com-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Que dados passam entre o monday.com e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>monday.com<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Item no quadro de produ\u00e7\u00e3o (colunas Name, Numbers, Date, Status)<\/td><td>Encomenda com produto, quantidade, data de entrega e prioridade<\/td><td>Entrada<\/td><\/tr><tr><td>Subitens ou quadro ligado atrav\u00e9s de Connect Boards<\/td><td>Etapas do processo por encomenda<\/td><td>Entrada<\/td><\/tr><tr><td>Item num quadro de produtos ou de exist\u00eancias<\/td><td>Produtos, materiais e exist\u00eancias<\/td><td>Entrada<\/td><\/tr><tr><td>Quadro de encomendas a fornecedores com data de entrega prevista<\/td><td>Material a receber na respetiva data de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>Coluna Timeline<\/td><td>In\u00edcio e fim previstos<\/td><td>Retorno<\/td><\/tr><tr><td>Coluna Status, Dropdown ou Text<\/td><td>Centro de trabalho e progresso da tarefa<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Os calend\u00e1rios das m\u00e1quinas, os tempos de prepara\u00e7\u00e3o, as ferramentas e as m\u00e1quinas alternativas s\u00e3o geridos no SkyPlanner, porque os quadros do monday.com n\u00e3o os guardam como dados utiliz\u00e1veis na programa\u00e7\u00e3o.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-monday-com-s-gantt-and-workload-views-cover\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que oferecem as vistas Gantt e Workload do monday.com e o que acrescenta o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O monday.com \u00e9 uma plataforma de gest\u00e3o do trabalho, n\u00e3o uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o. Desenha barras de Gantt a partir das datas introduzidas pelas pessoas e assinala um recurso com uma cor quando a carga ultrapassa a sua capacidade. O pr\u00f3prio centro de ajuda do monday.com explica o que isto significa:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O Workload mostra a sobrecarga; cabe a uma pessoa resolv\u00ea-la.<\/strong> A vista permite ver &#8220;who is over their capacity and assign upcoming tasks accordingly.&#8221; (quem ultrapassou a sua capacidade e atribuir as pr\u00f3ximas tarefas em conformidade). Nada desloca automaticamente o trabalho para um intervalo livre. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/360010166559-Resource-management-with-Workload\">monday.com<\/a>)<\/li>\n\n\n<li><strong>As depend\u00eancias ajustam datas, n\u00e3o a capacidade.<\/strong> O modo Flexible &#8220;ensures no overlap between the dates of items that are dependent on one another.&#8221; (garante que n\u00e3o h\u00e1 sobreposi\u00e7\u00e3o entre as datas de itens que dependem uns dos outros). Duas encomendas independentes podem continuar a ser atribu\u00eddas \u00e0 mesma m\u00e1quina \u00e0 mesma hora. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/360007402599-Dependencies-on-monday-com\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Os hor\u00e1rios est\u00e3o associados a pessoas.<\/strong> A documenta\u00e7\u00e3o explica: &#8220;work schedule defines which days and hours a resource works each week,&#8221; (um hor\u00e1rio de trabalho define os dias e as horas em que um recurso trabalha em cada semana). Esse hor\u00e1rio est\u00e1 associado a utilizadores e equipas. Um turno de m\u00e1quina ou um per\u00edodo de manuten\u00e7\u00e3o n\u00e3o tem um registo pr\u00f3prio. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/36305176145682-Managing-resource-schedules-and-time-off\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Sem gamas operat\u00f3rias, prepara\u00e7\u00f5es ou materiais.<\/strong> Os quadros n\u00e3o t\u00eam gama operat\u00f3ria, tempo de prepara\u00e7\u00e3o, lista de materiais nem verifica\u00e7\u00e3o de exist\u00eancias.<\/li>\n\n<\/ul>\n\n\n<p>Por isso, o respons\u00e1vel pelo planeamento tem de mover os itens manualmente sempre que chega uma encomenda urgente. Todas estas limita\u00e7\u00f5es s\u00e3o explicadas em <a href=\"\/pt-pt\/integracoes\/erp\/monday\/programacao-producao\/\">O monday.com permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"monday-com-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O monday.com hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>monday.com<\/th><th>monday.com com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Sobrecarga assinalada a cores<\/td><td>Respeita a capacidade de cada m\u00e1quina, pessoa e ferramenta, com os respetivos turnos<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>Datas introduzidas manualmente<\/td><td>Programa\u00e7\u00e3o ao n\u00edvel da opera\u00e7\u00e3o em segundos<\/td><\/tr><tr><td>M\u00e1quinas<\/td><td>Representadas por uma coluna ou uma pessoa<\/td><td>Centros de trabalho com calend\u00e1rios pr\u00f3prios e alternativas<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>N\u00e3o s\u00e3o modeladas<\/td><td>Tarefas sequenciadas para minimizar o tempo de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Materiais<\/td><td>Quadros separados, sem verifica\u00e7\u00e3o<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias ou chegam as entregas<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Itens movidos manualmente<\/td><td>O Autopilot reprograma respeitando as suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Estado alterado no quadro<\/td><td>Os operadores consultam a sua fila de tarefas no telem\u00f3vel ou tablet<\/td><\/tr><tr><td>A sua equipa<\/td><td>Trabalha no monday.com<\/td><td>Continua a trabalhar no monday.com, com datas realistas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-monday-com\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma ferramenta de programa\u00e7\u00e3o para o monday.com<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>As vistas Gantt e Workload do pr\u00f3prio monday.com s\u00e3o adequadas para uma pequena unidade com poucas m\u00e1quinas, tarefas de uma s\u00f3 etapa e um respons\u00e1vel pelo planeamento que conhece o gargalo. Para necessidades mais exigentes, os compradores comparam quatro grupos de solu\u00e7\u00f5es. As aplica\u00e7\u00f5es de Gantt e de gest\u00e3o de recursos acrescentam vistas aos quadros. Os sistemas MRP ligam-se atrav\u00e9s de ferramentas de automatiza\u00e7\u00e3o. As solu\u00e7\u00f5es APS para grandes empresas exigem uma equipa de planeamento. O SkyPlanner enquadra-se nas solu\u00e7\u00f5es APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Escolha o SkyPlanner quando as tarefas t\u00eam v\u00e1rias etapas e passam por v\u00e1rias m\u00e1quinas<\/strong> e a vista Workload fica vermelha todas as semanas.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as mudan\u00e7as de produ\u00e7\u00e3o determinam quanto consegue produzir.<\/strong> O SkyPlanner sequencia as tarefas para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as ferramentas partilhadas, as equipas e os turnos das m\u00e1quinas determinam o que pode ser produzido a seguir.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando a chegada dos materiais determina que tarefa pode come\u00e7ar.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando o plano muda v\u00e1rias vezes por semana.<\/strong> O Autopilot refaz a programa\u00e7\u00e3o e envia as novas datas para o seu quadro.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando pretende continuar a usar o monday.com<\/strong> para gerir encomendas, vendas e estados, acrescentando-lhe o motor de programa\u00e7\u00e3o que lhe falta.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Configure a sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas encomendas.<\/strong> Exporte o seu quadro de produ\u00e7\u00e3o do monday.com para Excel, importe-o e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o monday.com.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional com os seus quadros e presta apoio ap\u00f3s a entrada em funcionamento.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho, ou cancelar, a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o para o monday.com?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e dos operadores e se integra com o monday.com nos dois sentidos. Recebe os itens das encomendas com as quantidades, os prazos de entrega e o estado, e devolve \u00e0s suas colunas as datas de in\u00edcio e fim planeadas, o centro de trabalho e o progresso. A capacidade de cada m\u00e1quina, operador e ferramenta, bem como a disponibilidade de cada material, \u00e9 limitada. O SkyPlanner guarda os tempos de mudan\u00e7a de produ\u00e7\u00e3o entre produtos nos dois sentidos e ordena as tarefas para minimizar o tempo de prepara\u00e7\u00e3o. O Autopilot refaz automaticamente a programa\u00e7\u00e3o quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O monday.com permite programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O monday.com mostra na vista Workload quando a carga de uma pessoa ou recurso excede a sua capacidade, cabendo ao planeador reatribuir o trabalho manualmente. N\u00e3o distribui tarefas pelos per\u00edodos dispon\u00edveis das m\u00e1quinas. O SkyPlanner APS acrescenta uma <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> para toda a f\u00e1brica que respeita a capacidade dispon\u00edvel e devolve as datas aos seus quadros.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O monday.com permite programar o trabalho das m\u00e1quinas?<\/summary>\n<p class=\"sp-faq__a\">Apenas como identifica\u00e7\u00e3o. Uma m\u00e1quina pode ser representada numa coluna Status ou como recurso na vista Workload, mas os hor\u00e1rios de trabalho e os per\u00edodos de aus\u00eancia est\u00e3o associados a pessoas e equipas. No SkyPlanner, cada m\u00e1quina tem os seus pr\u00f3prios turnos, paragens para manuten\u00e7\u00e3o, prepara\u00e7\u00f5es e m\u00e1quinas alternativas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O que muda nos nossos quadros do monday.com?<\/summary>\n<p class=\"sp-faq__a\">Muito pouco. O administrador do monday.com autoriza o acesso \u00e0 API uma \u00fanica vez, e basta adicionar uma coluna Timeline e uma coluna de centro de trabalho se o quadro ainda n\u00e3o as tiver. O SkyPlanner funciona na nuvem em paralelo com o monday.com e liga-se a este atrav\u00e9s da sua GraphQL API e de webhooks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o monday.com?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, funciona em conjunto com ele. As encomendas, os clientes, os projetos e os estados continuam no monday.com. O SkyPlanner programa a produ\u00e7\u00e3o de acordo com a capacidade real e devolve as datas planeadas e o progresso ao seu quadro.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa o monday.com?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente de acordo com o seu processo e as suas necessidades, juntamente com o plano escolhido, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa mapeia as colunas dos seus quadros, liga as encomendas e devolve as datas planeadas. Antes da entrada em funcionamento, tudo \u00e9 testado tendo como refer\u00eancia o seu plano atual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de ligar o monday.com?<\/summary>\n<p class=\"sp-faq__a\">Sim. Exporte o seu quadro de produ\u00e7\u00e3o para Excel e importe-o durante o teste de 30 dias. Pode ver a programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o, respeitando a capacidade dispon\u00edvel, antes de se iniciar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ monday.com SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes que gerem encomendas no monday.com. Respeita a capacidade real das m\u00e1quinas e do pessoal, com uma programa\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material. &#8230; <a title=\"SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/\" aria-label=\"Leia mais sobre SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103060","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>monday.com: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para monday.com: programa\u00e7\u00e3o por capacidade real, integra\u00e7\u00e3o bidirecional e plano por m\u00e1quina, turno e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para monday.com: programa\u00e7\u00e3o por capacidade real, integra\u00e7\u00e3o bidirecional e plano por m\u00e1quina, turno e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/monday\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/monday\\\/\",\"name\":\"monday.com: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para monday.com: programa\u00e7\u00e3o por capacidade real, integra\u00e7\u00e3o bidirecional e plano por m\u00e1quina, turno e material. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/monday\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/monday\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/monday\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"monday.com: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real","description":"SkyPlanner APS para monday.com: programa\u00e7\u00e3o por capacidade real, integra\u00e7\u00e3o bidirecional e plano por m\u00e1quina, turno e material. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal","og_description":"SkyPlanner APS para monday.com: programa\u00e7\u00e3o por capacidade real, integra\u00e7\u00e3o bidirecional e plano por m\u00e1quina, turno e material. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/","name":"monday.com: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para monday.com: programa\u00e7\u00e3o por capacidade real, integra\u00e7\u00e3o bidirecional e plano por m\u00e1quina, turno e material. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/monday\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ monday.com SkyPlanner APS para monday.com: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoal O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para fabricantes que gerem encomendas no monday.com. Respeita a capacidade real das m\u00e1quinas e do pessoal, com uma programa\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=103060"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/103060\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=103060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}