{"id":102828,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/dynamics-365-scm\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"dynamics-365-scm","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/","title":{"rendered":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Dynamics 365 Supply Chain Management: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Microsoft Dynamics 365 Supply Chain Management que respeita a capacidade real das m\u00e1quinas e das pessoas. Em todo o horizonte de programa\u00e7\u00e3o, considera os limites de cada ordem de produ\u00e7\u00e3o, recurso, operador, ferramenta e material em cada momento. O D365 s\u00f3 considera parcialmente a capacidade finita. O Planning Optimization s\u00f3 respeita esses limites dentro do horizonte de capacidade definido. A Microsoft recomenda n\u00e3o utilizar a capacidade finita quando a capacidade varia com os turnos (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">fonte<\/a>), e a programa\u00e7\u00e3o de tarefas reserva capacidade para uma ordem de cada vez (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). O SkyPlanner programa todas as ordens em conjunto, e o Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o Dynamics 365 Supply Chain Management nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es de roteiro, recursos, produtos lan\u00e7ados e encomendas de compra, e devolve as datas programadas e os recursos atribu\u00eddos. Durante a implementa\u00e7\u00e3o inicial, a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu Supply Chain Management.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Toda a f\u00e1brica num \u00fanico programa de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o de tarefas do D365 SCM encaixa as ordens de produ\u00e7\u00e3o uma a uma na capacidade ainda n\u00e3o reservada. O SkyPlanner programa todas as ordens em aberto em conjunto, de acordo com a capacidade real. Assim, a primeira ordem a ser programada deixa de ficar, por defeito, com os melhores hor\u00e1rios.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Turnos que contam a s\u00e9rio.<\/p>\n\n\n<p class=\"fx-pain__b\">A capacidade de cada m\u00e1quina e de cada pessoa \u00e9 limitada pelos turnos reais, pelas aus\u00eancias e pelas horas extraordin\u00e1rias. \u00c9 precisamente quando a capacidade depende dos turnos que a Microsoft desaconselha a utiliza\u00e7\u00e3o da capacidade finita no planeamento principal. O SkyPlanner foi concebido para essa situa\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar de azul para vermelho pode demorar 30 minutos, e de vermelho para azul, 60. O motor sequencia as tarefas de forma a perder o m\u00ednimo de tempo em prepara\u00e7\u00f5es.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipas partilhadas sem sobreposi\u00e7\u00e3o de reservas.<\/p>\n\n\n<p class=\"fx-pain__b\">Um molde em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. Uma tarefa que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade nos respetivos turnos. Quando um recurso est\u00e1 ocupado, o trabalho passa para outra m\u00e1quina ou pessoa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Programa\u00e7\u00e3o que respeita a disponibilidade de materiais.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas de compra por receber. Uma tarefa que depende de uma entrega de um fornecedor \u00e9 programada para depois dessa data de entrega, em vez de ficar parada no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ordens urgentes reprogramadas em segundos.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega uma ordem urgente, o Autopilot reprograma automaticamente a produ\u00e7\u00e3o. Os bloqueios e as prioridades que definiu continuam a ser respeitados, e os respons\u00e1veis pelo planeamento ajustam as tarefas num diagrama de Gantt interativo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador consulta as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem as empresas industriais sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrico de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abrange todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no pavilh\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span>ordens de trabalho programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um controlo diferente da produ\u00e7\u00e3o, e o nosso conhecimento da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de trabalho s\u00e3o programadas automaticamente, e toda a organiza\u00e7\u00e3o tem uma vis\u00e3o da produ\u00e7\u00e3o em tempo real.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o da Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos uma base fi\u00e1vel para todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem aptos para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o que demoravam uma hora ou mais recebem resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-dynamics-365-supply-chain-management-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Dynamics 365 Supply Chain Management<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Supply Chain Management envia o trabalho.<\/strong> As ordens de produ\u00e7\u00e3o confirmadas e lan\u00e7adas, com as respetivas opera\u00e7\u00f5es de roteiro e linhas de BOM, s\u00e3o transferidas para o SkyPlanner, juntamente com os recursos, calend\u00e1rios, exist\u00eancias e encomendas de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus programa todas as opera\u00e7\u00f5es em segundos, considerando o conjunto dos recursos, e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas regressam ao Supply Chain Management.<\/strong> As datas e horas de in\u00edcio e fim programadas e o recurso escolhido s\u00e3o devolvidos \u00e0 ordem de produ\u00e7\u00e3o e \u00e0s respetivas opera\u00e7\u00f5es de roteiro. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o assim que ocorre.<\/li>\n\n<\/ol>\n\n\n<p>O Supply Chain Management continua a ser o seu sistema de registo de refer\u00eancia. Mant\u00e9m os produtos lan\u00e7ados, as BOM, os roteiros, o Planning Optimization, as compras, as exist\u00eancias e o c\u00e1lculo de custos. O SkyPlanner gere a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do Dynamics 365 SCM<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Produtos lan\u00e7ados<\/td><td>Produtos e materiais<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Lista de materiais, linhas da BOM de produ\u00e7\u00e3o<\/td><td>Estrutura do produto, subprodutos<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Roteiro, opera\u00e7\u00f5es de roteiro, propriedades das opera\u00e7\u00f5es<\/td><td>Etapas do processo com tempos de prepara\u00e7\u00e3o e execu\u00e7\u00e3o<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Recursos, grupos de recursos, capacidades<\/td><td>Centros de trabalho, grupos de centros de trabalho, efici\u00eancias<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Calend\u00e1rios de trabalho<\/td><td>Turnos<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es de roteiro, tarefas de roteiro<\/td><td>Ordens e tarefas com datas de entrega<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Exist\u00eancias, linhas de encomendas de compra<\/td><td>Exist\u00eancias e materiais por receber<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>In\u00edcio e fim programados, recurso<\/td><td>Datas planeadas da opera\u00e7\u00e3o e centro de trabalho<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><tr><td>Di\u00e1rio de fichas de roteiro<\/td><td>Horas e quantidades registadas<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>O SkyPlanner liga-se \u00e0s entidades de dados padr\u00e3o do Supply Chain Management atrav\u00e9s do endpoint OData REST, com autentica\u00e7\u00e3o por registo de aplica\u00e7\u00e3o no Microsoft Entra ID. N\u00e3o \u00e9 necess\u00e1rio instalar qualquer suplemento. Cada f\u00e1brica utiliza o D365 SCM de forma diferente, pelo que a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, tendo em conta o seu processo e as suas necessidades. O seu parceiro Dynamics ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>Consulte as entidades, as regras de atualiza\u00e7\u00e3o dos dados no ERP e os problemas a evitar no <a href=\"\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do Dynamics 365 SCM para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"job-scheduling-planning-optimization-and-finite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Programa\u00e7\u00e3o de tarefas, Planning Optimization e programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O D365 SCM s\u00f3 considera parcialmente a capacidade finita. O Planning Optimization respeita os limites de capacidade dentro de um horizonte definido, mas considera a capacidade infinita para al\u00e9m desse horizonte. A programa\u00e7\u00e3o de tarefas reserva capacidade finita, mas para uma ordem de cada vez, utilizando a capacidade que n\u00e3o foi j\u00e1 reservada por ordens anteriores (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). A <a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">pr\u00f3pria documenta\u00e7\u00e3o da Microsoft<\/a> estabelece estes limites:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O planeamento principal com capacidade finita pressup\u00f5e uma capacidade fixa.<\/strong> Para o planeamento principal, a Microsoft aconselha: &#8220;If your capacity can change as requirements change (for example, when you&#8217;re working with shifts), you shouldn&#8217;t use finite capacity functionality.&#8221; (Se a capacidade puder variar em fun\u00e7\u00e3o das necessidades, por exemplo, quando trabalha por turnos, n\u00e3o deve utilizar a funcionalidade de capacidade finita.)<\/li>\n\n\n<li><strong>A capacidade s\u00f3 \u00e9 finita dentro de um intervalo de tempo.<\/strong> Fora do intervalo de capacidade finita, o planeamento principal considera a capacidade infinita. A Microsoft salienta: &#8220;a single-day time fence is probably too low for most manufacturers.&#8221; (Um intervalo de apenas um dia \u00e9 provavelmente demasiado curto para a maioria dos fabricantes.)<\/li>\n\n\n<li><strong>Ordem a ordem.<\/strong> A programa\u00e7\u00e3o de tarefas programa cada ordem de produ\u00e7\u00e3o para a frente ou para tr\u00e1s, em fun\u00e7\u00e3o das reservas existentes, e seleciona os recursos pelo lead time mais curto ou pela prioridade. A prepara\u00e7\u00e3o \u00e9 contabilizada como tempo da opera\u00e7\u00e3o, e a programa\u00e7\u00e3o de tarefas gere, no m\u00e1ximo, 32 recursos por opera\u00e7\u00e3o. O planeamento principal pode sequenciar ordens planeadas por atributos do produto, como a cor e o tamanho (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/master-plans\">fonte<\/a>).<\/li>\n\n\n<li><strong>O gr\u00e1fico de Gantt permite ajustes manuais.<\/strong> Os respons\u00e1veis pelo planeamento programam tarefas selecionadas a partir de um menu, organizam as tarefas num recurso e reatribuem-nas a outro recurso. Arrastar e largar permite mover uma tarefa de cada vez, dentro do mesmo recurso. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Para l\u00e1 desse intervalo, e sempre que os turnos alteram a capacidade, o planeamento principal do D365 \u00e9 apenas um plano aproximado. O SkyPlanner programa em conjunto todas as ordens, m\u00e1quinas, pessoas, ferramentas, materiais e mudan\u00e7as de produ\u00e7\u00e3o num \u00fanico motor, respeitando a capacidade dispon\u00edvel em todo o horizonte. O Autopilot replaneia automaticamente quando a produ\u00e7\u00e3o muda. Saiba todos os detalhes em <a href=\"\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/programacao-producao\/\">O Dynamics 365 SCM permite programar a produ\u00e7\u00e3o com capacidade finita?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"dynamics-365-scm-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dynamics 365 SCM: hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programa\u00e7\u00e3o de s\u00e9rie do D365 SCM<\/th><th>D365 SCM com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>\u00c2mbito<\/td><td>Ordens de produ\u00e7\u00e3o programadas uma a uma, em fun\u00e7\u00e3o das reservas existentes<\/td><td>Todas as ordens de produ\u00e7\u00e3o programadas em conjunto, em segundos<\/td><\/tr><tr><td>Capacidade<\/td><td>Parcialmente finita: o planeamento principal s\u00f3 respeita a capacidade dentro de um intervalo de tempo e n\u00e3o quando esta varia com os turnos; a programa\u00e7\u00e3o de tarefas trata uma ordem de cada vez<\/td><td>Limites de capacidade de cada m\u00e1quina, pessoa, ferramenta e material respeitados em cada momento, com os turnos e as aus\u00eancias reais, em todo o horizonte<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Tempo de prepara\u00e7\u00e3o por opera\u00e7\u00e3o; sequencia\u00e7\u00e3o de ordens planeadas por atributos<\/td><td>Tarefas sequenciadas para minimizar o tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Ferramentas e equipas<\/td><td>Ferramentas e trabalhadores reservados ordem a ordem<\/td><td>Ferramentas partilhadas e tarefas com v\u00e1rios operadores programadas em conjunto para todas as ordens<\/td><\/tr><tr><td>Materiais<\/td><td>Disponibilidade limitada de materiais considerada por ordem<\/td><td>As tarefas come\u00e7am quando h\u00e1 exist\u00eancias ou quando chegam as entregas previstas<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O respons\u00e1vel pelo planeamento reprograma as ordens e ajusta as tarefas no gr\u00e1fico de Gantt<\/td><td>O Autopilot replaneia toda a f\u00e1brica, respeitando as suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica<\/td><td>Mobile Confirmations: os operadores consultam a sua fila de tarefas e registam o trabalho no telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-dynamics-365-scm\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o para o Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Para uma <a href=\"\/pt-pt\/software-de-programacao-da-producao-para-medias-empresas\/\">f\u00e1brica de m\u00e9dia dimens\u00e3o<\/a> que est\u00e1 a deixar as folhas de c\u00e1lculo, a escolha est\u00e1 entre a programa\u00e7\u00e3o de tarefas do D365 com o Planning Optimization e o SkyPlanner. O D365 respeita a capacidade dentro de um intervalo de tempo e trata uma ordem de cada vez. O SkyPlanner oferece uma programa\u00e7\u00e3o que respeita a capacidade de toda a f\u00e1brica. <strong>Escolha o SkyPlanner em vez da programa\u00e7\u00e3o de tarefas do D365 e do Planning Optimization quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Todas as ordens de produ\u00e7\u00e3o disputam os mesmos recursos.<\/strong> Na programa\u00e7\u00e3o de tarefas, define uma data de in\u00edcio ou de fim e executa a programa\u00e7\u00e3o. O motor seleciona ent\u00e3o o recurso com o lead time mais curto, tendo em conta as reservas j\u00e1 efetuadas (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). A primeira ordem programada fica com os melhores hor\u00e1rios. O SkyPlanner programa todas as ordens em conjunto, em segundos.<\/li>\n\n\n<li><strong>Pretende respeitar a capacidade em todo o horizonte, com os turnos reais.<\/strong> O Planning Optimization s\u00f3 respeita a capacidade dentro do intervalo definido, e a Microsoft desaconselha o uso de capacidade finita no planeamento principal quando a capacidade varia com os turnos (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">fonte<\/a>). O SkyPlanner planeia o trabalho de cada m\u00e1quina e pessoa dentro da capacidade dispon\u00edvel, tendo em conta os turnos reais, as horas extraordin\u00e1rias e as aus\u00eancias, em todo o horizonte.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o determinam quanto consegue produzir.<\/strong> Na programa\u00e7\u00e3o de tarefas, a prepara\u00e7\u00e3o \u00e9 um tempo da opera\u00e7\u00e3o que se soma ao tempo de execu\u00e7\u00e3o (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner guarda o tempo de mudan\u00e7a de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos, e sequencia as tarefas para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>As ferramentas partilhadas, as equipas e a chegada dos materiais determinam o que pode ser produzido a seguir.<\/strong> A disponibilidade das ferramentas \u00e9 respeitada, as tarefas que exigem v\u00e1rios operadores recebem todas as pessoas necess\u00e1rias e o trabalho \u00e9 transferido para centros de trabalho alternativos. As tarefas come\u00e7am quando h\u00e1 exist\u00eancias ou quando chegam as entregas previstas.<\/li>\n\n\n<li><strong>O plano muda v\u00e1rias vezes por semana.<\/strong> O Autopilot replaneia automaticamente a cada altera\u00e7\u00e3o relevante, e as novas datas s\u00e3o enviadas de volta para o Supply Chain Management.<\/li>\n\n\n<li><strong>Pretende uma programa\u00e7\u00e3o que respeite a capacidade em poucas semanas.<\/strong> A avalia\u00e7\u00e3o gratuita de 30 dias utiliza os seus pr\u00f3prios dados, os planos come\u00e7am nos 199 \u20ac por m\u00eas e os operadores registam o trabalho com o Mobile Confirmations na mesma ferramenta.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie a avalia\u00e7\u00e3o gratuita.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Configure o modelo da sua produ\u00e7\u00e3o.<\/strong> Crie m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe-os a partir dos seus recursos e calend\u00e1rios. Est\u00e1 dispon\u00edvel apoio na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de produ\u00e7\u00e3o.<\/strong> Exporte as ordens de produ\u00e7\u00e3o em aberto e as opera\u00e7\u00f5es dos roteiros do D365 SCM atrav\u00e9s de um projeto de exporta\u00e7\u00e3o de gest\u00e3o de dados ou do suplemento do Excel. Importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Supply Chain Management.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e assegura o suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais. Encontra outros ERP na <a href=\"\/pt-pt\/integracoes\/erp\/\">p\u00e1gina de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar avalia\u00e7\u00e3o gratuita<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o para o Dynamics 365 Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das pessoas e se integra com o Dynamics 365 Supply Chain Management nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es dos roteiros, recursos, produtos lan\u00e7ados e encomendas de compra, e devolve as datas programadas e os recursos. A disponibilidade de cada recurso, operador, ferramenta e material \u00e9 respeitada, e uma matriz de tempos de prepara\u00e7\u00e3o que distingue o sentido de cada mudan\u00e7a sequencia as tarefas para minimizar a prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, e a avalia\u00e7\u00e3o gratuita dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Dynamics 365 Supply Chain Management permite programar a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das pessoas?<\/summary>\n<p class=\"sp-faq__a\">Apenas em parte. O Planning Optimization s\u00f3 respeita a capacidade dentro do intervalo definido, e a Microsoft desaconselha o uso de capacidade finita no planeamento principal quando os turnos alteram a capacidade. A programa\u00e7\u00e3o de tarefas respeita a capacidade dispon\u00edvel, mas trata uma ordem de cada vez, em fun\u00e7\u00e3o da capacidade j\u00e1 reservada. O SkyPlanner APS acrescenta uma programa\u00e7\u00e3o \u00fanica para todas as ordens, m\u00e1quinas, pessoas, ferramentas e materiais, respeitando a capacidade dispon\u00edvel em todo o horizonte.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar a programa\u00e7\u00e3o de tarefas do D365 e o Planning Optimization ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Use o Planning Optimization para o planeamento de materiais e o SkyPlanner para a programa\u00e7\u00e3o que respeita a capacidade dispon\u00edvel. No D365, a capacidade finita \u00e9 apenas parcial. O Planning Optimization s\u00f3 respeita a capacidade dentro do intervalo definido, e a Microsoft desaconselha o planeamento principal com capacidade finita quando os turnos alteram a capacidade. A programa\u00e7\u00e3o de tarefas trata uma ordem de cada vez, em fun\u00e7\u00e3o das reservas existentes, pelo que a primeira ordem programada fica com os melhores hor\u00e1rios. O SkyPlanner programa em conjunto todas as ordens, m\u00e1quinas, pessoas, ferramentas e materiais, com uma matriz de tempos de prepara\u00e7\u00e3o para as mudan\u00e7as de produ\u00e7\u00e3o. O Autopilot replaneia automaticamente a cada altera\u00e7\u00e3o relevante. A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e assegura o suporte, e a solu\u00e7\u00e3o entra em produ\u00e7\u00e3o em poucas semanas. Os planos come\u00e7am nos 199 \u20ac por m\u00eas, com uma avalia\u00e7\u00e3o gratuita de 30 dias que utiliza os seus pr\u00f3prios dados.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar um suplemento no Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em paralelo com o D365 SCM, e liga-se \u00e0s entidades de dados padr\u00e3o deste atrav\u00e9s de OData. O seu administrador regista uma aplica\u00e7\u00e3o no Microsoft Entra ID e associa-a a um utilizador com as fun\u00e7\u00f5es necess\u00e1rias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Planning Optimization ou as funcionalidades de fabrico do D365 SCM?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-os. O Planning Optimization continua a planear os materiais e a propor ordens de produ\u00e7\u00e3o planeadas. O Supply Chain Management mant\u00e9m a gest\u00e3o dos produtos, das BOM, dos roteiros, das compras e do c\u00e1lculo de custos. O SkyPlanner programa as ordens de produ\u00e7\u00e3o firmadas em fun\u00e7\u00e3o da capacidade real e devolve as datas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner destina-se apenas ao Business Central?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O Business Central e o Supply Chain Management s\u00e3o produtos distintos da Microsoft, e o SkyPlanner integra-se com ambos. Esta p\u00e1gina aborda o Supply Chain Management: ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es dos roteiros, recursos e grupos de recursos. O Business Central tem uma <a href=\"\/pt-pt\/integracoes\/erp\/business-central\/\">p\u00e1gina pr\u00f3pria<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o Dynamics 365 SCM?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em fun\u00e7\u00e3o do seu processo e das suas necessidades, juntamente com o plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o inicial, mesmo em grandes empresas. A equipa faz a correspond\u00eancia dos seus recursos e roteiros, liga as ordens de produ\u00e7\u00e3o e as encomendas de compra e configura o envio dos dados de volta para o ERP. Tudo \u00e9 testado face ao seu plano atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes da integra\u00e7\u00e3o com o Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">Sim. A avalia\u00e7\u00e3o de 30 dias utiliza uma exporta\u00e7\u00e3o das suas ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es dos roteiros e recursos. Pode ver uma programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o que respeita a capacidade real antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Microsoft Dynamics 365 Supply Chain Management que respeita a capacidade real das m\u00e1quinas e das pessoas. &#8230; <a title=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102828","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dynamics 365 SCM: integra\u00e7\u00e3o APS para programar com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/\",\"name\":\"Dynamics 365 SCM: integra\u00e7\u00e3o APS para programar com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dynamics 365 SCM: integra\u00e7\u00e3o APS para programar com capacidade real","description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas","og_description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/","name":"Dynamics 365 SCM: integra\u00e7\u00e3o APS para programar com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/dynamics-365-scm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Microsoft Dynamics 365 Supply Chain Management que respeita a capacidade real das m\u00e1quinas e das pessoas.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=102828"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102828\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=102828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}