{"id":102799,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/acumatica\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"acumatica","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/","title":{"rendered":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Acumatica: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica Manufacturing Edition. Respeita a capacidade e a disponibilidade reais de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material, a cada momento e em todo o horizonte de planeamento. O APS do pr\u00f3prio Acumatica faz planeamento agregado. A programa\u00e7\u00e3o com capacidade finita \u00e9 executada atrav\u00e9s do formul\u00e1rio Rough Cut Planning, e o Classic APS planeia com capacidade infinita todas as ordens cuja conclus\u00e3o esteja prevista para al\u00e9m de 120 dias (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">fonte<\/a>). Com o SkyPlanner, v\u00ea onde e quando \u00e9 executada cada opera\u00e7\u00e3o, e o Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner integra-se com o Acumatica nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, centros de trabalho, m\u00e1quinas, ferramentas, artigos de stock e encomendas a fornecedores, e devolve as datas planeadas das opera\u00e7\u00f5es e os registos de trabalho realizado. Durante a implementa\u00e7\u00e3o, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o do Acumatica.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A capacidade de cada recurso \u00e9 respeitada, sempre.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada centro de trabalho, m\u00e1quina, pessoa e ferramenta tem uma programa\u00e7\u00e3o realista, que considera turnos, aus\u00eancias e horas extraordin\u00e1rias. Uma tarefa que exige tr\u00eas operadores \u00e9 atribu\u00edda a tr\u00eas pessoas com disponibilidade nos respetivos turnos. Um molde em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservado para outra.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos custos nas mudan\u00e7as de produto.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de mudan\u00e7a entre cada par de produtos, nos dois sentidos. Na produ\u00e7\u00e3o alimentar, esse tempo pode depender de um alerg\u00e9nio: passar de um produto sem alerg\u00e9nios para um que os cont\u00e9m n\u00e3o exige limpeza; no sentido inverso, \u00e9 necess\u00e1ria uma limpeza completa. O motor ordena as tarefas de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de entrega que pode garantir.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o mostra, com meses de anteced\u00eancia, quando cada ordem de produ\u00e7\u00e3o ficar\u00e1 realmente conclu\u00edda. Assim, pode indicar prazos aos clientes com base no plano.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante urg\u00eancias e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega uma encomenda urgente, o Autopilot reprograma a produ\u00e7\u00e3o. Os bloqueios e as prioridades que definiu continuam a ser respeitados.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O in\u00edcio \u00e9 planeado em fun\u00e7\u00e3o da disponibilidade de material, n\u00e3o das ruturas de stock.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica o stock e as encomendas a fornecedores por receber. Uma tarefa que aguarda uma entrega de um fornecedor \u00e9 programada para depois da data dessa entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea a sua fila de tarefas.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o realiza. O escrit\u00f3rio acompanha o progresso em tempo real, e os registos de trabalho realizado s\u00e3o enviados para o Acumatica.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova lista de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Leia o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o na Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel que a equipa comercial pode consultar<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 uma base s\u00f3lida e fiabilidade a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem pr\u00f3prios para contacto com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o que demoravam uma hora ou mais passam a ter resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Leia o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de fiabilidade das entregas desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1-nos visibilidade sobre a capacidade e torna o planeamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produ\u00e7\u00e3o qu\u00edmica e alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas tem sido de 100% desde que o SkyPlanner come\u00e7ou a ser utilizado, em 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/opes-corporation\/\">Leia o testemunho da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-acumatica-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Acumatica envia o trabalho.<\/strong> O SkyPlanner recebe as ordens de produ\u00e7\u00e3o com as respetivas opera\u00e7\u00f5es, centros de trabalho, m\u00e1quinas, ferramentas, turnos, artigos de stock e encomendas a fornecedores.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em segundos e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e os registos de trabalho realizado regressam ao Acumatica.<\/strong> As datas planeadas de in\u00edcio e fim s\u00e3o devolvidas \u00e0s opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o no Acumatica, e a ordem \u00e9 fixada para que o Acumatica mantenha essas datas. O trabalho registado d\u00e1 origem a lan\u00e7amentos de m\u00e3o de obra e de movimenta\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p>O Acumatica continua a ser o seu sistema de registo de refer\u00eancia. Os artigos de stock, as listas de materiais, o MRP, as compras e o c\u00e1lculo de custos mant\u00eam-se onde est\u00e3o. O SkyPlanner fica respons\u00e1vel por uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O SkyPlanner liga-se atrav\u00e9s da REST API baseada em contratos do pr\u00f3prio Acumatica, utilizando os endpoints Manufacturing e Default, pelo que n\u00e3o \u00e9 instalado qualquer componente na sua inst\u00e2ncia do Acumatica. Cada f\u00e1brica utiliza o Acumatica de forma diferente. Por isso, durante a implementa\u00e7\u00e3o, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o e assegura o suporte ap\u00f3s a entrada em funcionamento. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro Acumatica ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As entidades, o mapeamento de dados e as regras de escrita de dados no Acumatica est\u00e3o descritos no <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Acumatica para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-acumatica-schedules-and-what-skyplanner-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Acumatica programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Advanced Planning and Scheduling (APS) do Acumatica Manufacturing Edition faz planeamento agregado, n\u00e3o programa\u00e7\u00e3o detalhada que respeite a capacidade real dos recursos. No Classic APS, executa-se o formul\u00e1rio Rough Cut Planning (AM501000) para as ordens selecionadas (<a href=\"https:\/\/help.myob.com.au\/advanced\/Docs\/Published\/UserGuide\/MFG_APS_GeneralInfo.html\">fonte<\/a>). Na vers\u00e3o 2026 R2, o APS passa a disponibilizar dois motores, e <a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">o Acumatica afirma<\/a>: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (Os dois motores APS n\u00e3o podem estar ativados em simult\u00e2neo.) A pr\u00f3pria documenta\u00e7\u00e3o do Acumatica define os limites:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O Classic APS s\u00f3 respeita a capacidade finita durante 120 dias.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (No APS, o sistema utiliza planeamento com capacidade infinita para as ordens de produ\u00e7\u00e3o cuja data de fim ultrapasse esse horizonte.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">fonte<\/a>)<\/li>\n\n\n<li><strong>O Classic APS reserva blocos de tempo fixos.<\/strong> &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (As opera\u00e7\u00f5es s\u00e3o sempre programadas em blocos cont\u00edguos, excluindo as horas n\u00e3o laborais e as pausas previstas.)<\/li>\n\n\n<li><strong>O novo motor Optimized deixa de considerar m\u00e1quinas e ferramentas.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (O Optimized APS programa centros de trabalho, em vez de considerar m\u00e1quinas individuais, ferramentas ou a disponibilidade de materiais.) Est\u00e1 listado em Experimental Features. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">fonte<\/a>)<\/li>\n\n\n<li><strong>Sem sequencia\u00e7\u00e3o por propriedades do produto.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (O motor n\u00e3o utiliza os valores dos atributos para determinar a sequ\u00eancia de programa\u00e7\u00e3o das opera\u00e7\u00f5es.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Na produ\u00e7\u00e3o di\u00e1ria, a m\u00e3o de obra \u00e9 representada pela dimens\u00e3o e efici\u00eancia da equipa num turno do centro de trabalho, n\u00e3o por pessoas identificadas. O tempo de prepara\u00e7\u00e3o \u00e9 um valor fixo por opera\u00e7\u00e3o, independentemente do que foi produzido antes. Para reprogramar, \u00e9 necess\u00e1rio executar um processo atrav\u00e9s de Rough Cut Planning ou APS Maintenance Process. O resultado \u00e9 um plano agregado: dimens\u00e3o das equipas em vez de pessoas, um \u00fanico tempo de prepara\u00e7\u00e3o por opera\u00e7\u00e3o e capacidade finita apenas durante 120 dias.<\/p>\n\n\n<p>No Classic APS, a verifica\u00e7\u00e3o de materiais funciona numa l\u00f3gica de tudo ou nada. Quando est\u00e1 ativa, todos os materiais t\u00eam de estar dispon\u00edveis na quantidade total antes de a ordem ser programada. As ordens s\u00e3o carregadas uma ap\u00f3s outra, numa sequ\u00eancia fixa: primeiro a prioridade de execu\u00e7\u00e3o, depois a data de restri\u00e7\u00e3o e, por fim, o n\u00famero da ordem de produ\u00e7\u00e3o. Para obter uma sequ\u00eancia diferente, o planeador tem de alterar as prioridades e voltar a executar o processo.<\/p>\n\n\n<p>Cada etapa e cada limite s\u00e3o explicados em <a href=\"\/pt-pt\/integracoes\/erp\/acumatica\/programacao-producao\/\">O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real dos recursos?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"acumatica-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O Acumatica hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Acumatica APS<\/th><th>Acumatica com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Horizonte com capacidade finita<\/td><td>Planeamento agregado: o Classic s\u00f3 respeita a capacidade finita nas ordens com conclus\u00e3o dentro de 120 dias; para al\u00e9m disso, considera capacidade infinita<\/td><td>Respeita a capacidade e a disponibilidade reais de cada m\u00e1quina, pessoa, ferramenta e material, a cada momento e em todo o horizonte<\/td><\/tr><tr><td>Recursos<\/td><td>Classic: centros de trabalho, m\u00e1quinas e ferramentas; Optimized: apenas centros de trabalho<\/td><td>Centros de trabalho, m\u00e1quinas, pessoas e ferramentas, todos com capacidade finita<\/td><\/tr><tr><td>M\u00e3o de obra<\/td><td>Dimens\u00e3o e efici\u00eancia da equipa por turno<\/td><td>Operadores identificados individualmente, com turnos, aus\u00eancias e horas extraordin\u00e1rias<\/td><\/tr><tr><td>Sequencia\u00e7\u00e3o<\/td><td>Prioridade de execu\u00e7\u00e3o, seguida da data de restri\u00e7\u00e3o e do n\u00famero da ordem<\/td><td>O motor sequencia por prioridades, prazos e prepara\u00e7\u00f5es<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Tempo de prepara\u00e7\u00e3o fixo por opera\u00e7\u00e3o<\/td><td>Matriz de tempos de transi\u00e7\u00e3o: menor tempo total de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Materiais<\/td><td>Classic: todos os materiais dispon\u00edveis na totalidade, ou a ordem fica \u00e0 espera<\/td><td>Exist\u00eancias e encomendas de compra em aberto, por data de entrega<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Executar Rough Cut Planning ou APS Maintenance Process<\/td><td>O Autopilot replaneia toda a f\u00e1brica respeitando as suas prioridades<\/td><\/tr><tr><td>Vista do planeador<\/td><td>Production Schedule Board: alterar datas e prioridades<\/td><td>Gantt interativo: mova tarefas sem perder a coer\u00eancia do plano<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Registos em Labor, Move e Materials no Acumatica<\/td><td>Os operadores consultam a sua fila de tarefas e registam o trabalho no telem\u00f3vel ou tablet<\/td><\/tr><tr><td>Arranque<\/td><td>APS &#8220;subject to licensing&#8221; (sujeito a licenciamento); Optimized \u00e9 experimental<\/td><td>As suas pr\u00f3prias ordens programadas no per\u00edodo experimental de 30 dias; em produ\u00e7\u00e3o em poucas semanas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-acumatica\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Acumatica APS \u00e9 uma ferramenta de planeamento aproximado: executa o Rough Cut Planning, respeita a capacidade dispon\u00edvel durante 120 dias, representa a m\u00e3o de obra pelo n\u00famero de elementos da equipa e usa um tempo de prepara\u00e7\u00e3o por opera\u00e7\u00e3o. A possibilidade de o utilizar depende da sua licen\u00e7a. O Acumatica afirma que &#8220;Advanced planning and scheduling is subject to licensing&#8221; (o planeamento e a programa\u00e7\u00e3o avan\u00e7ados est\u00e3o sujeitos a licenciamento) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">fonte<\/a>). Faz parte do Manufacturing Edition, e o seu novo motor Optimized \u00e9 uma funcionalidade experimental da vers\u00e3o 2026 R2. Uma vez ativado, distribui as ordens de acordo com o n\u00famero de elementos da equipa, seguindo uma ordem fixa de prioridades. O planeador tem de voltar a execut\u00e1-lo ap\u00f3s cada altera\u00e7\u00e3o. Uma f\u00e1brica que deixa de trabalhar com folhas de c\u00e1lculo precisa de uma programa\u00e7\u00e3o que se mantenha atualizada e chegue aos operadores. Em qualquer dos casos, os dados do Acumatica continuam a ser a refer\u00eancia.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner em vez do Acumatica APS quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pretende uma programa\u00e7\u00e3o que respeite a capacidade real, n\u00e3o um planeamento aproximado.<\/strong> A disponibilidade de cada m\u00e1quina, pessoa, ferramenta e material \u00e9 limitada em cada momento de todo o horizonte de planeamento, incluindo as ordens para al\u00e9m dos 120 dias.<\/li>\n\n\n<li><strong>O plano depende de operadores espec\u00edficos, n\u00e3o do n\u00famero de elementos da equipa.<\/strong> Os turnos, as aus\u00eancias e as tarefas com v\u00e1rios operadores s\u00e3o programados por pessoa.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o determinam o volume produzido.<\/strong> A matriz de tempos de transi\u00e7\u00e3o ordena as sequ\u00eancias de alerg\u00e9nios, cores ou materiais de forma a minimizar o tempo de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>\u00c9 necess\u00e1rio verificar m\u00e1quinas, ferramentas e materiais em conjunto.<\/strong> Todas as restri\u00e7\u00f5es s\u00e3o consideradas numa \u00fanica programa\u00e7\u00e3o atualizada, sem ter de escolher um motor.<\/li>\n\n\n<li><strong>O plano muda v\u00e1rias vezes por semana.<\/strong> O Autopilot replaneia a cada altera\u00e7\u00e3o, o Running Time Lock fixa as tarefas das pr\u00f3ximas horas e as novas datas s\u00e3o enviadas para o Acumatica.<\/li>\n\n\n<li><strong>Os operadores devem trabalhar a partir da sua pr\u00f3pria fila de tarefas.<\/strong> O Mobile Confirmations disponibiliza a programa\u00e7\u00e3o no telem\u00f3vel ou tablet, e o trabalho registado \u00e9 enviado para o Acumatica.<\/li>\n\n\n<li><strong>Pretende resultados em poucas semanas.<\/strong> As suas pr\u00f3prias ordens s\u00e3o programadas durante o per\u00edodo experimental de 30 dias, e a equipa do SkyPlanner configura a integra\u00e7\u00e3o e presta assist\u00eancia.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o per\u00edodo experimental gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie centros de trabalho, m\u00e1quinas, pessoas e turnos no SkyPlanner, ou importe-os. Est\u00e1 dispon\u00edvel apoio \u00e0 configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens.<\/strong> Exporte as ordens de produ\u00e7\u00e3o em aberto e as respetivas opera\u00e7\u00f5es de uma Generic Inquiry do Acumatica para Excel. Importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o Acumatica.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta assist\u00eancia ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> A fatura\u00e7\u00e3o \u00e9 mensal. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar per\u00edodo experimental gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas e se integra com o Acumatica nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, centros de trabalho, m\u00e1quinas, ferramentas, artigos de stock e encomendas de compra, e devolve as datas planeadas das opera\u00e7\u00f5es e o trabalho registado. A programa\u00e7\u00e3o respeita os limites de disponibilidade de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de transi\u00e7\u00e3o, que considera o sentido de cada mudan\u00e7a, sequencia as tarefas para minimizar o tempo de prepara\u00e7\u00e3o. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, e o per\u00edodo experimental gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Acumatica permite programar a produ\u00e7\u00e3o respeitando a capacidade real?<\/summary>\n<p class=\"sp-faq__a\">Apenas ao n\u00edvel do planeamento aproximado. O Advanced Planning and Scheduling do Manufacturing Edition \u00e9 executado atrav\u00e9s do Rough Cut Planning. O Classic APS planeia as ordens que terminam para al\u00e9m dos 120 dias sem limites de capacidade, e o motor experimental Optimized programa apenas os centros de trabalho. O SkyPlanner APS programa cada m\u00e1quina, pessoa, ferramenta e material respeitando a sua disponibilidade real em todo o horizonte de planeamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar algo no Acumatica?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em paralelo com o Acumatica, e liga-se atrav\u00e9s da REST API padr\u00e3o do Acumatica, baseada em contratos. A integra\u00e7\u00e3o autentica-se atrav\u00e9s de uma aplica\u00e7\u00e3o ligada que regista no Acumatica.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Acumatica Manufacturing Edition?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-o. O Acumatica continua a gerir os artigos de stock, as listas de materiais, o MRP, as compras, o invent\u00e1rio, o c\u00e1lculo de custos e as finan\u00e7as. O SkyPlanner programa as suas ordens de produ\u00e7\u00e3o de acordo com a capacidade real e devolve as datas ao Acumatica.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Acumatica APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Escolha o SkyPlanner se pretende uma programa\u00e7\u00e3o que respeite a capacidade real, em vez de um planeamento aproximado. No Acumatica, a programa\u00e7\u00e3o com limites de capacidade \u00e9 executada atrav\u00e9s do Rough Cut Planning, e o Classic APS n\u00e3o limita a capacidade para al\u00e9m dos 120 dias. O APS est\u00e1 sujeito a licenciamento, representa a m\u00e3o de obra pelo n\u00famero de elementos da equipa, usa um tempo de prepara\u00e7\u00e3o fixo por opera\u00e7\u00e3o e recalcula quando um planeador executa o Rough Cut Planning ou o APS Maintenance Process. O SkyPlanner programa cada m\u00e1quina, pessoa, ferramenta e material respeitando a sua disponibilidade real em cada momento de todo o horizonte de planeamento. Sequencia as mudan\u00e7as de produ\u00e7\u00e3o com uma matriz de tempos de transi\u00e7\u00e3o que considera o sentido de cada mudan\u00e7a, replaneia automaticamente com o Autopilot e disponibiliza a cada operador a sua fila de tarefas no telem\u00f3vel ou tablet. Entra em produ\u00e7\u00e3o em poucas semanas, a partir de 199 \u20ac por m\u00eas, com um per\u00edodo experimental de 30 dias com os seus pr\u00f3prios dados. Se o APS continuar ativo, o SkyPlanner fixa cada ordem que programa, e a programa\u00e7\u00e3o do Acumatica com limites de capacidade n\u00e3o reprograma ordens fixadas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o Acumatica?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em conjunto com o plano escolhido e de acordo com o seu processo e as suas necessidades, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipa mapeia os seus centros de trabalho, m\u00e1quinas e opera\u00e7\u00f5es da BOM, estabelece a liga\u00e7\u00e3o \u00e0s ordens de produ\u00e7\u00e3o e encomendas de compra e envia as datas planeadas de volta para o Acumatica. Antes da entrada em produ\u00e7\u00e3o, tudo \u00e9 testado por compara\u00e7\u00e3o com o seu plano atual.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o Acumatica?<\/summary>\n<p class=\"sp-faq__a\">Sim. O per\u00edodo experimental de 30 dias utiliza uma exporta\u00e7\u00e3o para Excel de uma Generic Inquiry do Acumatica. Pode ver uma <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o que respeita a capacidade real<\/a> antes de se iniciar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica Manufacturing Edition. Respeita a capacidade e a disponibilidade reais de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material, a cada &#8230; <a title=\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102799","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o com capacidade real, integra\u00e7\u00e3o bidirecional; cada m\u00e1quina, pessoa, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o com capacidade real, integra\u00e7\u00e3o bidirecional; cada m\u00e1quina, pessoa, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/\",\"name\":\"Acumatica: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o com capacidade real, integra\u00e7\u00e3o bidirecional; cada m\u00e1quina, pessoa, ferramenta e material. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/acumatica\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","description":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o com capacidade real, integra\u00e7\u00e3o bidirecional; cada m\u00e1quina, pessoa, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas","og_description":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o com capacidade real, integra\u00e7\u00e3o bidirecional; cada m\u00e1quina, pessoa, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/","name":"Acumatica: integra\u00e7\u00e3o APS e programa\u00e7\u00e3o com capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o com capacidade real, integra\u00e7\u00e3o bidirecional; cada m\u00e1quina, pessoa, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/acumatica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e pessoas O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica Manufacturing Edition. Respeita a capacidade e a disponibilidade reais de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material, a cada&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=102799"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/102799\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=102799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}