{"id":101368,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101368"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"programacao-producao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/","title":{"rendered":"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? <span class=\"hl\">MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Na programa\u00e7\u00e3o padr\u00e3o de ordens de fabrico, o Sage X3 n\u00e3o respeita os limites reais de capacidade das m\u00e1quinas e do pessoal. \u00c9 essa lacuna que o SkyPlanner APS preenche na programa\u00e7\u00e3o da produ\u00e7\u00e3o. O X3 planeia os materiais com o MRP e define as datas das ordens de fabrico com Scheduling (FUNMAUTJ). A equipa de suporte da Sage no Reino Unido descreve esta fun\u00e7\u00e3o como uma ferramenta de programa\u00e7\u00e3o com capacidade infinita: programa &#8220;each work order independently&#8221; (cada ordem de fabrico de forma independente) e n\u00e3o escalona as ordens em fun\u00e7\u00e3o da carga dos recursos.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel \u00e9 uma camada separada. A Sage disponibiliza o Production Scheduler para instala\u00e7\u00e3o local ou a interface gen\u00e9rica Finite scheduler (GFS) para liga\u00e7\u00e3o ao Sage X3 Web Scheduling ou a uma ferramenta de programa\u00e7\u00e3o de terceiros. As f\u00e1bricas que precisam de <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programar a produ\u00e7\u00e3o respeitando a capacidade real<\/a> de todas as m\u00e1quinas, pessoas e ferramentas utilizam o SkyPlanner APS em conjunto com o X3.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sage-x3-plans-and-schedules-production-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como o Sage X3 planeia e programa a produ\u00e7\u00e3o, passo a passo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. A capacidade \u00e9 definida nos centros de trabalho<\/h3>\n\n\n<p>A capacidade \u00e9 definida no centro de trabalho (fun\u00e7\u00e3o <strong>GESMWS<\/strong>, tabela WORKSTATIO). Estes s\u00e3o os campos relevantes para a programa\u00e7\u00e3o:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Structure<\/strong> (TWD): a estrutura semanal que define o regime de turnos.<\/li>\n\n\n<li><strong>No. of resources<\/strong> (WSTNBR): o n\u00famero de recursos de que uma opera\u00e7\u00e3o precisa no centro de trabalho. O exemplo da Sage \u00e9 um centro de trabalho de m\u00e3o de obra que requer tr\u00eas pessoas.<\/li>\n\n\n<li><strong>% efficiency<\/strong> (EFF) e <strong>Shrinkage in %<\/strong> (SHR), que ajustam os tempos da gama operat\u00f3ria.<\/li>\n\n\n<li><strong>Work center type<\/strong> (WSTTYP): m\u00e1quina, m\u00e3o de obra ou subcontrata\u00e7\u00e3o.<\/li>\n\n\n<li>Uma caixa de sele\u00e7\u00e3o <strong>Constraint<\/strong> e um separador Replacement com o seu pr\u00f3prio campo <strong>Work center type<\/strong> (RPLWSTTYP) para centros de trabalho alternativos, cada um com uma prioridade.<\/li>\n\n\n<li>Uma grelha de varia\u00e7\u00f5es de capacidade com datas de in\u00edcio e de fim, motivo, estrutura e n\u00famero de recursos aplic\u00e1veis \u00e0 varia\u00e7\u00e3o, para altera\u00e7\u00f5es tempor\u00e1rias de turnos ou per\u00edodos de paragem.<\/li>\n\n<\/ul>\n\n\n<p>O separador Load divide a carga em Firm, Planned, MRP e MPS. Assim, o respons\u00e1vel pelo planeamento consegue distinguir o que j\u00e1 est\u00e1 confirmado do que ainda \u00e9 uma sugest\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. O MRP gera as sugest\u00f5es<\/h3>\n\n\n<p>O MRP (<strong>FUNMRP<\/strong>) equilibra o abastecimento e a procura por data de refer\u00eancia e local de armazenamento. Analisa encomendas de clientes, materiais das ordens de fabrico, encomendas de compra, ordens de fabrico, ordens de subcontrata\u00e7\u00e3o e transfer\u00eancias. Depois, gera sugest\u00f5es de ordens de fabrico e de encomendas de compra. Os campos Suggestion type, Reorder quantity e Splitting da ficha artigo-estabelecimento determinam o resultado.<\/p>\n\n\n<p>As datas s\u00e3o calculadas a partir dos lead times. A data de fim de uma ordem de fabrico sugerida corresponde \u00e0 data da necessidade menos o lead time do controlo de qualidade. A data de in\u00edcio \u00e9 a data de fim menos o lead time de produ\u00e7\u00e3o, ou menos o tempo da gama operat\u00f3ria se o c\u00e1lculo do artigo se basear nessa gama. Se a data de in\u00edcio for anterior \u00e0 data de processamento, o X3 utiliza a data de processamento.<\/p>\n\n\n<p>A capacidade ocupa uma \u00fanica linha na ajuda do MRP: &#8220;An appropriate MRP setup is used, in parallel with the MRP process, to generate a workload.&#8221; (\u00c9 utilizada uma configura\u00e7\u00e3o adequada do MRP, em paralelo com o processo MRP, para gerar uma carga de trabalho.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNMRP.htm\">Ajuda do Sage X3, FUNMRP<\/a>) Uma carga de trabalho, n\u00e3o uma verifica\u00e7\u00e3o de capacidade.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Scheduling (FUNMAUTJ) define as datas das opera\u00e7\u00f5es<\/h3>\n\n\n<p>Scheduling sequencia as opera\u00e7\u00f5es de cada ordem de fabrico a partir da respetiva gama operat\u00f3ria (<strong>GESROU<\/strong>), para a frente ou para tr\u00e1s, consoante as datas pedidas na ordem. As datas de in\u00edcio e de fim s\u00e3o registadas nas opera\u00e7\u00f5es da ordem de fabrico (MFGOPE), e o campo Scheduling status no cabe\u00e7alho (MFGHEAD) passa a Scheduled.<\/p>\n\n\n<p>A equipa de suporte da Sage no Reino Unido explica esta l\u00f3gica no seu guia de programa\u00e7\u00e3o da V12: &#8220;The function schedules each work order independently.&#8221; (A fun\u00e7\u00e3o programa cada ordem de fabrico de forma independente.) E acrescenta: &#8220;It does not delay or stagger work orders based on overall resource load.&#8221; (N\u00e3o adia nem escalona as ordens de fabrico em fun\u00e7\u00e3o da carga global dos recursos.) (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>) Dez ordens que passam pela mesma c\u00e9lula CNC recebem todas as suas datas ideais, independentemente da capacidade real da c\u00e9lula.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loads mostra a sobrecarga; o respons\u00e1vel pelo planeamento resolve-a<\/h3>\n\n\n<p><strong>Loads<\/strong> (<strong>CONSMWK<\/strong>) compara a carga com a capacidade por centro de trabalho e per\u00edodo. <strong>Recalculate the loads<\/strong> (<strong>FUNMIWL<\/strong>, Manufacturing &gt; Batch processes) recalcula os dados de carga. Uma barra vermelha indica que a carga do centro de trabalho excede a capacidade nesse per\u00edodo. Cabe depois ao respons\u00e1vel pelo planeamento reprogramar ou retirar ordens da programa\u00e7\u00e3o no <strong>Planning workbench<\/strong>, transferir opera\u00e7\u00f5es para um centro de trabalho livre ou escalonar as ordens manualmente.<\/p>\n\n\n<p>O X3 mostra o problema. Uma pessoa resolve-o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. A programa\u00e7\u00e3o da produ\u00e7\u00e3o \u00e9 uma camada adicional<\/h3>\n\n\n<p>A Sage oferece duas op\u00e7\u00f5es, ambas ativadas atrav\u00e9s de c\u00f3digos de atividade:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (c\u00f3digo de atividade POPS com Active selecionado, fun\u00e7\u00e3o FUNPSSCH). Uma ferramenta de planeamento que apresenta a programa\u00e7\u00e3o das ordens de fabrico &#8220;in the form of a Gantt chart&#8221; (sob a forma de um diagrama de Gantt). O c\u00f3digo de atividade separado <strong>Finite Capacity<\/strong> ativa o modo que respeita a capacidade dispon\u00edvel nas fun\u00e7\u00f5es de programa\u00e7\u00e3o da produ\u00e7\u00e3o. As ordens de fabrico s\u00e3o enviadas atrav\u00e9s de Submit for scheduling.<\/li>\n\n\n<li><strong>Generic Finite scheduler interface<\/strong> (c\u00f3digo de atividade <strong>GFS<\/strong>). Uma interface gen\u00e9rica desenvolvida pela Sage que liga o X3, na nuvem ou instalado localmente, ao <strong>Sage X3 Web Scheduling<\/strong>, a ferramenta adicional de programa\u00e7\u00e3o da Sage, ou a uma ferramenta de programa\u00e7\u00e3o web de um fornecedor independente de software. O X3 controla esta liga\u00e7\u00e3o atrav\u00e9s de Submit for scheduling, Resubmit for scheduling e Remove from scheduling (Manufacturing &gt; Finite scheduler).<\/li>\n\n<\/ul>\n\n\n<p>O X3 tamb\u00e9m calcula uma data <strong>Earliest start<\/strong> por opera\u00e7\u00e3o com base na disponibilidade dos componentes (First Date of Material Availability, FDMA). Transmite essa data ao Production Scheduler ou a uma ferramenta de programa\u00e7\u00e3o web como restri\u00e7\u00e3o. A programa\u00e7\u00e3o padr\u00e3o, por si s\u00f3, n\u00e3o a utiliza: a ajuda de Work order afirma que &#8220;The Sage X3 scheduling process does not consider component availability when determining operation start dates.&#8221; (O processo de programa\u00e7\u00e3o do Sage X3 n\u00e3o tem em conta a disponibilidade dos componentes ao determinar as datas de in\u00edcio das opera\u00e7\u00f5es.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sage-x3-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Os limites do Sage X3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita.<\/strong> O guia de suporte da Sage afirma que resolver as sobrecargas &#8220;would require finite capacity scheduling or manual adjustment&#8221; (exigiria programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeitasse a capacidade dispon\u00edvel ou um ajuste manual). (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>)<\/li>\n\n\n<li><strong>Os dados de carga ficam desatualizados.<\/strong> Ao adicionar um turno ou alterar um calend\u00e1rio, &#8220;existing load buckets won&#8217;t automatically adjust&#8221; (os valores de carga existentes por per\u00edodo n\u00e3o se ajustam automaticamente) at\u00e9 executar Recalculate the loads. Por predefini\u00e7\u00e3o, a consulta mostra apenas as ordens programadas; as sugest\u00f5es do MRP s\u00f3 aparecem com o c\u00f3digo de consulta ALL. (mesma fonte)<\/li>\n\n\n<li><strong>O Production Scheduler s\u00f3 est\u00e1 dispon\u00edvel para instala\u00e7\u00f5es locais.<\/strong> &#8220;Production Scheduler is only available for on-premises instances of Sage X3.&#8221; (O Production Scheduler s\u00f3 est\u00e1 dispon\u00edvel para inst\u00e2ncias do Sage X3 instaladas localmente.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/OBJ\/ACV_POPS.htm\">Ajuda do Sage X3 V12, POPS<\/a>) A p\u00e1gina da V11 vai mais longe: &#8220;Production Scheduler is not available for new Sage X3 installations.&#8221; (O Production Scheduler n\u00e3o est\u00e1 dispon\u00edvel para novas instala\u00e7\u00f5es do Sage X3.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/11\/en-US\/OBJ\/ACV_POPS.htm\">Ajuda do Sage X3 V11<\/a>)<\/li>\n\n\n<li><strong>O Production Scheduler tem limita\u00e7\u00f5es documentadas.<\/strong> A Sage indica que as seguintes funcionalidades n\u00e3o est\u00e3o atualmente dispon\u00edveis (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSSCH.htm\">Ajuda do Sage X3, FUNPSSCH<\/a>):<\/li>\n\n<\/ul>\n\n\n<p>&#8211; otimiza\u00e7\u00e3o dos tempos de prepara\u00e7\u00e3o com base em v\u00e1rios par\u00e2metros do artigo e numa matriz de prepara\u00e7\u00e3o &#8211; liga\u00e7\u00f5es entre ordens de produ\u00e7\u00e3o &#8211; programa\u00e7\u00e3o de v\u00e1rios recursos atrav\u00e9s da sincroniza\u00e7\u00e3o de opera\u00e7\u00f5es paralelas &#8211; listas de recursos utiliz\u00e1veis com diferentes ritmos de produ\u00e7\u00e3o<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>As ordens de fabrico ficam bloqueadas durante a otimiza\u00e7\u00e3o.<\/strong> Uma ordem de fabrico enviada para o Production Scheduler passa ao estado <strong>Being optimized<\/strong>, e &#8220;You cannot modify the work order at these statuses.&#8221; (N\u00e3o \u00e9 poss\u00edvel alterar a ordem de fabrico nestes estados.) A ordem permanece bloqueada at\u00e9 ser retirada da programa\u00e7\u00e3o. (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSMOPT.htm\">Ajuda do Sage X3, FUNPSMOPT<\/a>)<\/li>\n\n\n<li><strong>A interface avan\u00e7ada GFS exige um recurso por opera\u00e7\u00e3o.<\/strong> A ajuda de No. of resources diz: &#8220;You must set this field to 1 if you are using the generic Finite scheduler advanced interface.&#8221; (Tem de definir este campo como 1 se utilizar a interface avan\u00e7ada gen\u00e9rica Finite scheduler.) A raz\u00e3o indicada \u00e9: &#8220;Sage X3 Web Scheduling cannot optimize production times when multiple resources are assigned to a work center.&#8221; (O Sage X3 Web Scheduling n\u00e3o consegue otimizar os tempos de produ\u00e7\u00e3o quando est\u00e3o atribu\u00eddos v\u00e1rios recursos a um centro de trabalho.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/GESMWS.htm\">Ajuda do Sage X3, GESMWS<\/a>) Uma opera\u00e7\u00e3o que precise de uma equipa de tr\u00eas pessoas n\u00e3o consegue transmitir essa necessidade \u00e0 ferramenta de programa\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sage-x3-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando o planeamento nativo do Sage X3 \u00e9 suficiente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Muitas f\u00e1bricas que utilizam o Sage X3 n\u00e3o precisam de uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite os limites de capacidade.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>S\u00e3o os materiais, n\u00e3o as m\u00e1quinas, que ditam o ritmo.<\/strong> Nas f\u00e1bricas com produ\u00e7\u00e3o para stock ou produ\u00e7\u00e3o repetitiva, o verdadeiro risco \u00e9 comprar tarde. Listas de materiais, gamas operat\u00f3rias, lead times, dimensionamento de lotes e stocks de seguran\u00e7a bem definidos no MRP resolvem a maior parte do problema.<\/li>\n\n\n<li><strong>Basta ter visibilidade da carga.<\/strong> Uma consulta semanal de Loads e alguns ajustes manuais no Planning workbench s\u00e3o suficientes para a f\u00e1brica cumprir os prazos.<\/li>\n\n\n<li><strong>J\u00e1 disp\u00f5e do Production Scheduler instalado localmente.<\/strong> Se precisa de sequenciar opera\u00e7\u00f5es num Gantt, sem matrizes de prepara\u00e7\u00e3o, liga\u00e7\u00f5es entre ordens ou opera\u00e7\u00f5es paralelas sincronizadas, esta ferramenta d\u00e1 resposta.<\/li>\n\n\n<li><strong>J\u00e1 utiliza o Web Scheduling<\/strong> com No. of resources definido como 1 e o plano corresponde \u00e0 realidade do ch\u00e3o de f\u00e1brica.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Quatro formas de programar a produ\u00e7\u00e3o com o Sage X3<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Quadros de planeamento no cliente X3:<\/strong> Planning workbench e Loads, ou um quadro com fun\u00e7\u00f5es de arrastar e largar nos ecr\u00e3s do X3. S\u00e3o adequados quando a visibilidade da carga e os ajustes manuais bastam para a f\u00e1brica cumprir os prazos.<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o da produ\u00e7\u00e3o da pr\u00f3pria Sage, respeitando a capacidade dispon\u00edvel:<\/strong> Production Scheduler instalado localmente ou Sage X3 Web Scheduling atrav\u00e9s da interface GFS, com No. of resources definido como 1.<\/li>\n\n\n<li><strong>Solu\u00e7\u00f5es APS empresariais:<\/strong> solu\u00e7\u00f5es de planeamento de grande dimens\u00e3o, implementadas por um integrador num projeto de v\u00e1rios meses, para f\u00e1bricas com um departamento de planeamento pr\u00f3prio.<\/li>\n\n\n<li><strong>APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica:<\/strong> o SkyPlanner APS programa todos os centros de trabalho, operadores, ferramentas e materiais em segundos, com os operadores a utilizarem um telem\u00f3vel ou tablet. \u00c9 adequado para fabricantes que utilizam o X3 e querem ter o sistema em funcionamento em poucas semanas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando precisa de uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li>Loads aparece a vermelho na maioria das semanas e trabalhar no Planning workbench tornou-se uma ocupa\u00e7\u00e3o a tempo inteiro.<\/li>\n\n\n<li>As datas prometidas s\u00e3o calculadas a partir dos lead times, pelo que as vendas e a produ\u00e7\u00e3o discordam sobre o que \u00e9 realista.<\/li>\n\n\n<li>As mudan\u00e7as de produ\u00e7\u00e3o determinam o volume produzido, mas a programa\u00e7\u00e3o padr\u00e3o do X3 n\u00e3o sequencia as tarefas para as reduzir.<\/li>\n\n\n<li>As tarefas precisam de v\u00e1rios operadores em simult\u00e2neo ou partilham ferramentas e dispositivos de fixa\u00e7\u00e3o entre m\u00e1quinas.<\/li>\n\n\n<li>Utiliza o Sage X3 na cloud, pelo que o Production Scheduler, dispon\u00edvel apenas para instala\u00e7\u00f5es locais, n\u00e3o \u00e9 uma op\u00e7\u00e3o.<\/li>\n\n\n<li>As encomendas urgentes e as avarias obrigam a refazer o plano manualmente, muitas vezes no Excel.<\/li>\n\n\n<li>Os operadores precisam da sua pr\u00f3pria fila de tarefas, n\u00e3o de uma lista impressa de ordens de fabrico.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">O que procurar<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Respeito pela capacidade dispon\u00edvel de cada recurso, turno e pessoa<\/strong>, tendo em conta aus\u00eancias e horas extraordin\u00e1rias.<\/li>\n\n\n<li><strong>Prepara\u00e7\u00f5es dependentes da sequ\u00eancia<\/strong>: uma matriz de tempos de prepara\u00e7\u00e3o em que passar de A para B pode demorar mais do que de B para A, e um motor que escolhe a sequ\u00eancia com menos tempo de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Ferramentas e equipas como restri\u00e7\u00f5es<\/strong>: uma ferramenta partilhada reservada para uma \u00fanica m\u00e1quina de cada vez e opera\u00e7\u00f5es que exigem v\u00e1rios operadores em simult\u00e2neo.<\/li>\n\n\n<li><strong>Verifica\u00e7\u00e3o dos materiais na programa\u00e7\u00e3o<\/strong>, com base no stock e nas encomendas de compra em aberto, com as respetivas datas de entrega previstas.<\/li>\n\n\n<li><strong>M\u00e1quinas e pessoal alternativos<\/strong>, bem como produtos com v\u00e1rios n\u00edveis, geridos pelo motor e n\u00e3o pelo planeador.<\/li>\n\n\n<li><strong>Replaneamento sem nova execu\u00e7\u00e3o manual<\/strong> quando se regista atividade numa ordem de fabrico ou chega uma nova encomenda, sem ter de executar a programa\u00e7\u00e3o em separado.<\/li>\n\n\n<li><strong>Responsabilidades bem definidas na integra\u00e7\u00e3o com o X3<\/strong>: que sistema gere as datas, como s\u00e3o tratadas as ordens de fabrico bloqueadas e que dados s\u00e3o devolvidos (datas das opera\u00e7\u00f5es, estado e acompanhamento da produ\u00e7\u00e3o).<\/li>\n\n\n<li><strong>Uma solu\u00e7\u00e3o compat\u00edvel com o seu tipo de instala\u00e7\u00e3o.<\/strong> O X3 na cloud n\u00e3o permite acesso direto ao sistema de ficheiros nem \u00e0 base de dados, pelo que o sistema de programa\u00e7\u00e3o tem de comunicar atrav\u00e9s da API GraphQL, de servi\u00e7os web ou de um servi\u00e7o alojado de transfer\u00eancia de ficheiros.<\/li>\n\n\n<li><strong>Rapidez na obten\u00e7\u00e3o de resultados<\/strong>: um teste com os seus pr\u00f3prios dados antes de qualquer projeto de integra\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde entra o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner APS \u00e9 uma solu\u00e7\u00e3o de programa\u00e7\u00e3o da produ\u00e7\u00e3o na cloud que respeita a capacidade real das m\u00e1quinas e do pessoal. Em conjunto com o Sage X3, colmata cada uma das lacunas acima:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Uma programa\u00e7\u00e3o sempre atualizada.<\/strong> O motor Arcturus AI cria em segundos uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel, e o Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o. Sem executar o passo Recalculate the loads em separado, nem deixar sobrecargas para o planeador resolver manualmente.<\/li>\n\n\n<li><strong>Equipas e alternativas sem alterar o modelo.<\/strong> V\u00e1rios operadores podem trabalhar no mesmo centro de trabalho em simult\u00e2neo, pelo que uma opera\u00e7\u00e3o com tr\u00eas pessoas continua a ser uma \u00fanica opera\u00e7\u00e3o. As m\u00e1quinas em paralelo s\u00e3o centros de trabalho reunidos num grupo, cada um com a sua efici\u00eancia. Quando a m\u00e1quina ou a pessoa principal n\u00e3o est\u00e1 dispon\u00edvel, o motor transfere as tarefas para alternativas ou reparte uma tarefa por v\u00e1rias m\u00e1quinas ou pessoas.<\/li>\n\n\n<li><strong>A matriz de prepara\u00e7\u00e3o indicada como indispon\u00edvel no Production Scheduler.<\/strong> Uma matriz de tempos de prepara\u00e7\u00e3o guarda os tempos de mudan\u00e7a de produ\u00e7\u00e3o entre produtos em fun\u00e7\u00e3o da sequ\u00eancia (de azul para vermelho 30 min, de vermelho para azul 60 min), e o motor escolhe a sequ\u00eancia com menos tempo de prepara\u00e7\u00e3o. Os tempos de prepara\u00e7\u00e3o e desmontagem tamb\u00e9m s\u00e3o modelados.<\/li>\n\n\n<li><strong>Ferramentas como recursos de capacidade finita.<\/strong> Uma ferramenta em utiliza\u00e7\u00e3o num centro de trabalho n\u00e3o \u00e9 programada noutro ao mesmo tempo.<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o em fun\u00e7\u00e3o dos materiais.<\/strong> O motor simula o stock futuro, pelo que o trabalho s\u00f3 \u00e9 planeado para quando os materiais estiverem dispon\u00edveis. O material encomendado \u00e9 considerado dispon\u00edvel na data de entrega da encomenda de compra, e o stock \u00e9 atualizado quando esta \u00e9 marcada como Delivered (<a href=\"\/pt-pt\/docs\/o-que-e-e-como-utilizar-a-funcionalidade-pedidos-de-compra\/\">encomendas de compra na documenta\u00e7\u00e3o do SkyPlanner<\/a>).<\/li>\n\n\n<li><strong>Prioridades e bloqueios sob o seu controlo.<\/strong> A prioridade da tarefa, a prioriza\u00e7\u00e3o pela data de conclus\u00e3o, a prioridade do cliente, o Fast Track e as Dynamic Priorities orientam o motor. O Running Time Lock e o Bulldozer, que adia as tarefas a jusante, mant\u00eam o controlo nas m\u00e3os dos planeadores.<\/li>\n\n\n<li><strong>Execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica.<\/strong> Os operadores consultam a sua fila de tarefas e registam o trabalho no telem\u00f3vel ou tablet com Mobile Confirmations, Production Timer e Quick Log Mode.<\/li>\n\n\n<li><strong>Na cloud, seja qual for a instala\u00e7\u00e3o do X3.<\/strong> O SkyPlanner funciona da mesma forma com o X3 na cloud da Sage ou nos seus pr\u00f3prios servidores.<\/li>\n\n<\/ul>\n\n\n<p><strong>Escolha o SkyPlanner quando precisar de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite a capacidade dispon\u00edvel no X3 na cloud<\/strong> e o Production Scheduler n\u00e3o for uma op\u00e7\u00e3o.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner quando as opera\u00e7\u00f5es exigirem equipas ou m\u00e1quinas alternativas<\/strong> e n\u00e3o quiser for\u00e7ar o campo No. of resources a 1.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner quando quiser reunir o planeamento e o registo de tempos dos operadores numa s\u00f3 ferramenta,<\/strong> com os registos de tempos enviados para o X3 como acompanhamento da produ\u00e7\u00e3o.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner quando quiser ter a programa\u00e7\u00e3o da produ\u00e7\u00e3o a funcionar em semanas, respeitando a capacidade dispon\u00edvel,<\/strong> e n\u00e3o ap\u00f3s um projeto APS de v\u00e1rios meses.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A integra\u00e7\u00e3o com o Sage X3<\/h3>\n\n\n<p>O SkyPlanner integra-se com o Sage X3 nos dois sentidos. As ordens de fabrico (MFGHEAD, MFGOPE), gamas operat\u00f3rias, centros de trabalho, calend\u00e1rios, stock e encomendas de compra em aberto v\u00eam do X3. As datas planeadas das opera\u00e7\u00f5es s\u00e3o devolvidas atrav\u00e9s do servi\u00e7o web Work order (GESMFG), e as horas registadas s\u00e3o enviadas como Production tracking (GESMTK). Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o assim que esta ocorre.<\/p>\n\n\n<p>Cada f\u00e1brica utiliza o X3 \u00e0 sua maneira, pelo que a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua instala\u00e7\u00e3o e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O seu parceiro Sage X3 ou os programadores internos tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API REST documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Basta uma chave de API para come\u00e7ar.<\/p>\n\n\n<p>O X3 continua a ser o seu sistema para MRP, produtos, listas de materiais, gamas operat\u00f3rias, compras e stock.<\/p>\n\n\n<p>Comece por importar um ficheiro CSV durante o per\u00edodo de teste gratuito de 30 dias. Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com os seus processos e necessidades e em conjunto com o seu plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n\n\n<p>Consulte o <a href=\"\/pt-pt\/integracoes\/erp\/sage-x3\/\">SkyPlanner APS para Sage X3<\/a>, o <a href=\"\/pt-pt\/integracoes\/erp\/sage-x3\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Sage X3<\/a> para o mapeamento de dados, as <a href=\"\/pt-pt\/funcionalidades\/\">funcionalidades<\/a> e os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, o nosso planeamento da produ\u00e7\u00e3o passou das folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o permite poupar 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado de tr\u00eas meses para todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o na Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner proporciona uma base s\u00f3lida e fi\u00e1vel para todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem aptos para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o que antes exigiam uma hora ou mais recebem agora resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para coberturas da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>de fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner deu-nos visibilidade para identificar estrangulamentos e tornou a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para coberturas e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano, e a programa\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/piristeel\/\">Ler o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A programa\u00e7\u00e3o no Sage X3 usa capacidade finita ou infinita?<\/summary>\n<p class=\"sp-faq__a\">Na vers\u00e3o standard, usa capacidade infinita. A fun\u00e7\u00e3o Scheduling (FUNMAUTJ) atribui datas a cada ordem de fabrico com base na sua gama operat\u00f3ria, sem escalonar as ordens em fun\u00e7\u00e3o da carga dos recursos. A fun\u00e7\u00e3o Loads (CONSMWK) mostra a sobrecarga, que o planeador resolve manualmente. Para programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel, \u00e9 necess\u00e1rio o Production Scheduler ou um sistema de programa\u00e7\u00e3o ligado atrav\u00e9s da interface GFS.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ainda posso comprar o Sage X3 Production Scheduler?<\/summary>\n<p class=\"sp-faq__a\">Apenas para o X3 com instala\u00e7\u00e3o local, segundo a ajuda da V12. A ajuda da V11 indica que n\u00e3o est\u00e1 dispon\u00edvel para novas instala\u00e7\u00f5es, pelo que o seu parceiro Sage poder\u00e1 confirmar o que \u00e9 comercializado atualmente. Para o Sage X3 na cloud, a via documentada \u00e9 a interface gen\u00e9rica Finite scheduler.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 a diferen\u00e7a entre o Production Scheduler e o Sage X3 Web Scheduling?<\/summary>\n<p class=\"sp-faq__a\">O Production Scheduler \u00e9 a ferramenta de programa\u00e7\u00e3o Gantt integrada para instala\u00e7\u00f5es locais, ativada com o c\u00f3digo de atividade POPS. O Web Scheduling \u00e9 um complemento separado da Sage que funciona atrav\u00e9s da interface gen\u00e9rica Finite scheduler (GFS), compat\u00edvel com o X3 na cloud e com instala\u00e7\u00f5es locais. O Web Scheduling 2023.3.4 acrescentou uma integra\u00e7\u00e3o GraphQL que exige o Sage X3 2024 R1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner APS funciona com o Sage X3?<\/summary>\n<p class=\"sp-faq__a\">Sim. O SkyPlanner integra-se com o Sage X3 nos dois sentidos, tanto na cloud como em instala\u00e7\u00f5es locais. Recebe ordens de fabrico, gamas operat\u00f3rias e centros de trabalho e devolve datas planeadas e dados de acompanhamento da produ\u00e7\u00e3o. Inicie o <a href=\"\/pt-pt\/avaliacao\/\">teste gratuito<\/a> com exporta\u00e7\u00f5es CSV; a equipa do SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Tenho de reconfigurar os meus centros de trabalho para programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel?<\/summary>\n<p class=\"sp-faq__a\">Para a interface gen\u00e9rica Finite scheduler advanced, sim. A Sage exige que o campo No. of resources seja igual a 1 em cada centro de trabalho, pelo que as opera\u00e7\u00f5es que exigem uma equipa perdem essa informa\u00e7\u00e3o. Com o SkyPlanner, n\u00e3o. V\u00e1rios operadores podem trabalhar em simult\u00e2neo no mesmo centro de trabalho, as m\u00e1quinas em paralelo passam a constituir um grupo de centros de trabalho e os centros de trabalho do X3 mant\u00eam-se como est\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Sage X3 sequencia as tarefas para reduzir as mudan\u00e7as de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o na programa\u00e7\u00e3o padr\u00e3o, e o Production Scheduler indica que a otimiza\u00e7\u00e3o com base numa matriz de tempos de prepara\u00e7\u00e3o n\u00e3o est\u00e1 atualmente dispon\u00edvel. A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner guarda os tempos de mudan\u00e7a de produ\u00e7\u00e3o para cada par de produtos, em ambos os sentidos, e o motor sequencia as tarefas de modo a minimizar o tempo total de prepara\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Sage X3 O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS Na programa\u00e7\u00e3o padr\u00e3o de ordens de fabrico, o Sage X3 n\u00e3o respeita os limites reais de capacidade das m\u00e1quinas e do pessoal. \u00c9 essa lacuna que o SkyPlanner APS preenche na programa\u00e7\u00e3o da produ\u00e7\u00e3o. &#8230; <a title=\"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/\" aria-label=\"Leia mais sobre O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100921,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101368","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/title>\n<meta name=\"description\" content=\"No Sage X3, a programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita. A finita exige Production Scheduler ou a interface GFS. Veja o que funciona e quando precisa de APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"No Sage X3, a programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita. A finita exige Production Scheduler ou a interface GFS. Veja o que funciona e quando precisa de APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sage-x3\\\/programacao-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sage-x3\\\/programacao-producao\\\/\",\"name\":\"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"No Sage X3, a programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita. A finita exige Production Scheduler ou a interface GFS. Veja o que funciona e quando precisa de APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sage-x3\\\/programacao-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sage-x3\\\/programacao-producao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sage-x3\\\/programacao-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Sage X3: programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o?","description":"No Sage X3, a programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita. A finita exige Production Scheduler ou a interface GFS. Veja o que funciona e quando precisa de APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS","og_description":"No Sage X3, a programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita. A finita exige Production Scheduler ou a interface GFS. Veja o que funciona e quando precisa de APS.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"20 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/","name":"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"No Sage X3, a programa\u00e7\u00e3o padr\u00e3o \u00e9 de capacidade infinita. A finita exige Production Scheduler ou a interface GFS. Veja o que funciona e quando precisa de APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/programacao-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Sage X3: programa\u00e7\u00e3o da produ\u00e7\u00e3o","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Sage X3 O Sage X3 permite programa\u00e7\u00e3o da produ\u00e7\u00e3o? MRP, cargas, ferramentas de programa\u00e7\u00e3o e SkyPlanner APS Na programa\u00e7\u00e3o padr\u00e3o de ordens de fabrico, o Sage X3 n\u00e3o respeita os limites reais de capacidade das m\u00e1quinas e do pessoal. \u00c9 essa lacuna que o SkyPlanner APS preenche na programa\u00e7\u00e3o da produ\u00e7\u00e3o.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=101368"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101368\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100921"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=101368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}