{"id":101249,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101249"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"programacao-producao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/","title":{"rendered":"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Epicor Kinetic<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? <span class=\"hl\">Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Sim, o Epicor Kinetic inclui de origem programa\u00e7\u00e3o da produ\u00e7\u00e3o. Em termos gerais, este conceito descreve uma programa\u00e7\u00e3o que respeita a capacidade realmente dispon\u00edvel das m\u00e1quinas e do pessoal. O m\u00f3dulo Scheduling and Resource Management programa a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel. Um m\u00f3dulo separado, Advanced Planning and Scheduling (APS), permite trabalhar com mais de duas restri\u00e7\u00f5es e acrescenta programa\u00e7\u00e3o baseada nas capacidades dos recursos e regras de otimiza\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>H\u00e1 tr\u00eas limita\u00e7\u00f5es na utiliza\u00e7\u00e3o di\u00e1ria. \u00c9 preciso ativar a capacidade finita em v\u00e1rios locais, o m\u00f3dulo base suporta no m\u00e1ximo duas restri\u00e7\u00f5es por opera\u00e7\u00e3o e a otimiza\u00e7\u00e3o das prepara\u00e7\u00f5es pertence ao APS.<\/p>\n\n\n<p>O SkyPlanner APS funciona em paralelo com o Kinetic e respeita automaticamente a capacidade finita de cada centro de trabalho, sem necessidade de uma licen\u00e7a APS. A programa\u00e7\u00e3o abrange equipas de operadores, ferramentas partilhadas, materiais em stock e de encomendas de compra por receber, bem como mudan\u00e7as de produ\u00e7\u00e3o que dependem da sequ\u00eancia. O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-epicor-kinetic-schedules-capacity-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como o Epicor Kinetic programa a capacidade, passo a passo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Kinetic tem tr\u00eas n\u00edveis de planeamento. O <strong>MRP<\/strong> (que inclui Forecasting e MPS) planeia os materiais. O <strong>Scheduling and Resource Management<\/strong> \u00e9 um m\u00f3dulo separado que programa as tarefas nos recursos. O <strong>APS<\/strong> \u00e9 um m\u00f3dulo adicional que a Epicor descreve como &#8220;an extension to Scheduling&#8221; (uma extens\u00e3o do Scheduling). (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Brochura da Epicor<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Tarefas e m\u00e9todo de fabrico<\/h3>\n\n\n<p>A Epicor designa uma ordem de produ\u00e7\u00e3o por <strong>Job<\/strong>. Cada tarefa assenta num m\u00e9todo de fabrico: uma lista de materiais (BOM) e uma lista de opera\u00e7\u00f5es que define a gama operat\u00f3ria. Cada opera\u00e7\u00e3o remete para uma <strong>Capability<\/strong>, um <strong>Resource Group<\/strong> ou um <strong>Resource<\/strong>. No f\u00f3rum Epicor User Help, os utilizadores experientes concordam que a escolha de uma compet\u00eancia exclui as outras duas op\u00e7\u00f5es, embora seja poss\u00edvel indicar um recurso espec\u00edfico dentro de um grupo. A brochura da Epicor apresenta a funcionalidade <strong>Automated Scheduling by Capability<\/strong>, na qual o motor escolhe o recurso individual, como parte do APS. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">f\u00f3rum<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Recursos: capacidade finita ou infinita, um a um<\/h3>\n\n\n<p>A capacidade \u00e9 definida nos recursos (m\u00e1quinas, pessoas, ferramentas), que se organizam em grupos de recursos. Cada grupo pode conter qualquer n\u00famero de recursos, e o sistema atribui o recurso concreto conforme a disponibilidade. Cada recurso tem o seu pr\u00f3prio calend\u00e1rio, capacidade, tempo de espera e tempo de movimenta\u00e7\u00e3o.<\/p>\n\n\n<p>A capacidade finita \u00e9 uma op\u00e7\u00e3o definida recurso a recurso. No f\u00f3rum, a resolu\u00e7\u00e3o de problemas come\u00e7a pela caixa de sele\u00e7\u00e3o &#8220;Finite&#8221; do recurso. A brochura da Epicor indica: &#8220;Define each resource with either finite or infinite capacity. When a piece of the schedule is moved, the resource is rescheduled according to its type.&#8221; (Defina cada recurso com capacidade finita ou infinita. Quando se desloca uma parte da programa\u00e7\u00e3o, o recurso \u00e9 reprogramado de acordo com o seu tipo.) \u00c9 assim que o Kinetic permite a abordagem h\u00edbrida habitual: capacidade finita nos estrangulamentos e infinita nos restantes recursos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. O horizonte de capacidade finita<\/h3>\n\n\n<p>O <strong>Finite Load Horizon<\/strong> limita at\u00e9 que ponto no futuro a programa\u00e7\u00e3o ajusta as opera\u00e7\u00f5es \u00e0 capacidade dispon\u00edvel. A Epicor descreve-o como um limite temporal ou uma data-limite &#8220;for finitely scheduling load on the resource.&#8221; (para programar a carga do recurso respeitando a sua capacidade.) Para l\u00e1 desse limite, as opera\u00e7\u00f5es s\u00e3o carregadas sem limites de capacidade. Os utilizadores do f\u00f3rum definem o horizonte no recurso, no grupo de recursos e em <strong>Site Maintenance<\/strong>, no separador <strong>Planning<\/strong>.<\/p>\n\n\n<p>Al\u00e9m disso, cada ferramenta de programa\u00e7\u00e3o tem a sua pr\u00f3pria caixa de sele\u00e7\u00e3o de capacidade finita. Basta n\u00e3o ativar a op\u00e7\u00e3o num destes n\u00edveis para a programa\u00e7\u00e3o ser feita com capacidade infinita. Numa resposta do f\u00f3rum a uma pergunta sobre a capacidade finita n\u00e3o funcionar, l\u00ea-se: &#8220;Be sure the site maintenance &gt; planning tab has a finite horizon value filled in also.&#8221; (Certifique-se de que tamb\u00e9m est\u00e1 preenchido um valor para o horizonte de capacidade finita em Site Maintenance &gt; Planning.) (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">f\u00f3rum<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Scheduling Blocks, Setup Grouping e Dual Resource Constraints<\/h3>\n\n\n<p>Os <strong>Scheduling Blocks<\/strong> permitem modelar necessidades peri\u00f3dicas de prepara\u00e7\u00e3o, como as trocas de ferramentas. O <strong>Setup Grouping<\/strong> agrupa o trabalho segundo crit\u00e9rios definidos por si para simplificar as prepara\u00e7\u00f5es.<\/p>\n\n\n<p>As <strong>Dual Resource Constraints<\/strong> permitem que uma opera\u00e7\u00e3o reserve um recurso secund\u00e1rio, uma ferramenta ou um trabalhador, al\u00e9m do recurso principal, na programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel. O exemplo cl\u00e1ssico \u00e9 uma m\u00e1quina que exige um operador certificado.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Global Scheduling<\/h3>\n\n\n<p>O <strong>Global Scheduling<\/strong> executa a programa\u00e7\u00e3o de toda a f\u00e1brica. O texto de ajuda indica que aplica &#8220;scheduling on all jobs that are eligible for Global Scheduling&#8221; (programa\u00e7\u00e3o a todas as tarefas eleg\u00edveis para Global Scheduling) e calcula os dias de atraso a partir da data de in\u00edcio da programa\u00e7\u00e3o global. A prioridade de programa\u00e7\u00e3o das tarefas influencia a sequ\u00eancia. Tamb\u00e9m \u00e9 poss\u00edvel programar uma \u00fanica tarefa em <strong>Job Entry<\/strong>, deixar o MRP programar as tarefas que cria e programar para a frente ou para tr\u00e1s. Os utilizadores do f\u00f3rum consultam as afeta\u00e7\u00f5es de recursos programadas na tabela <strong>ResourceTimeUsed<\/strong>, excluindo os registos de simula\u00e7\u00e3o. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">f\u00f3rum<\/a>, <a href=\"https:\/\/www.epiusers.help\/t\/query-scheduling-board-data\/79381\">f\u00f3rum<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Os quadros de programa\u00e7\u00e3o<\/h3>\n\n\n<p>Os respons\u00e1veis pelo planeamento trabalham em tr\u00eas quadros do tipo Gantt, com a fun\u00e7\u00e3o de arrastar e largar:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Quadro<\/th><th>Utiliza\u00e7\u00e3o<\/th><\/tr><\/thead><tbody><tr><td>Job Scheduling Board<\/td><td>Deslocar e bloquear as opera\u00e7\u00f5es de uma tarefa<\/td><\/tr><tr><td>Resource Scheduling Board<\/td><td>Consultar e reordenar a carga de um recurso ou grupo<\/td><\/tr><tr><td>Multi-Resource Scheduling Board<\/td><td>Comparar v\u00e1rios recursos e transferir trabalho entre eles<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>As ferramentas de apoio incluem um modo de <strong>simula\u00e7\u00e3o<\/strong>, o <strong>Change Impact Informer<\/strong>, o <strong>Overload Informer<\/strong>, o bloqueio de tarefas e alertas de atrasos e de disponibilidade de materiais. A grelha <strong>Related Materials<\/strong> apresenta os materiais sujeitos a restri\u00e7\u00f5es, com a respetiva encomenda de compra, tarefa e lead time. No ch\u00e3o de f\u00e1brica, os operadores registam o trabalho atrav\u00e9s de <strong>Start Activity<\/strong> e <strong>Labor Entry<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. O que o APS acrescenta<\/h3>\n\n\n<p>O APS mant\u00e9m o mesmo motor e acrescenta:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Mais de duas restri\u00e7\u00f5es.<\/strong> Segundo a Epicor: &#8220;The Advanced Planning and Scheduling module provides the ability to use more than two resource constraints.&#8221; (O m\u00f3dulo Advanced Planning and Scheduling permite utilizar mais de duas restri\u00e7\u00f5es de recursos.)<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o com Capability e Dependent Capability.<\/strong><\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o com Minimum WIP<\/strong> e <strong>Balanced Optimization<\/strong>, que considera a prioridade, a folga e a prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Optimization Rules<\/strong> por recurso, al\u00e9m de programa\u00e7\u00e3o baseada em cad\u00eancias e dimens\u00f5es.<\/li>\n\n\n<li><strong>Unlimited What-If<\/strong> e <strong>capable-to-promise<\/strong> no m\u00f3dulo Order Management.<\/li>\n\n\n<li><strong>Multi-Plant Communication<\/strong> e materiais tratados como restri\u00e7\u00e3o obrigat\u00f3ria, com calend\u00e1rios de fornecedores.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-kinetic-s-native-scheduling-leaves-work-to\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que a programa\u00e7\u00e3o nativa do Kinetic deixa a cargo de quem planeia<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Duas restri\u00e7\u00f5es sem APS.<\/strong> O m\u00f3dulo base suporta um recurso principal e um secund\u00e1rio. Para considerar em simult\u00e2neo uma m\u00e1quina, dois operadores, um dispositivo de fixa\u00e7\u00e3o e um material, \u00e9 necess\u00e1ria a licen\u00e7a APS. (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Brochura da Epicor<\/a>)<\/li>\n\n\n<li><strong>\u00c9 f\u00e1cil configurar mal os limites de capacidade.<\/strong> A op\u00e7\u00e3o e o horizonte s\u00e3o definidos no recurso, no grupo de recursos, em Site Maintenance e em cada ferramenta. As datas no Kinetic podem respeitar ou ignorar os limites de capacidade, consoante a execu\u00e7\u00e3o que as gerou. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">f\u00f3rum<\/a>)<\/li>\n\n\n<li><strong>Prepara\u00e7\u00f5es por agrupamento; otimiza\u00e7\u00e3o no APS.<\/strong> O Global Scheduling baseia-se na prioridade das tarefas e nos dias de atraso. Os Scheduling Blocks e o Setup Grouping gerem as prepara\u00e7\u00f5es no m\u00f3dulo base. J\u00e1 a <strong>Balanced Optimization<\/strong>, que considera em conjunto a prioridade, o tempo de folga e o tempo de prepara\u00e7\u00e3o, \u00e9 uma funcionalidade do APS. A Bluesky ERP, parceira da Epicor, acrescenta que os resultados dependem de tempos de opera\u00e7\u00e3o e lead times de compra corretos, bem como do encerramento das tarefas. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li><strong>O replaneamento depende de uma pessoa ou de uma execu\u00e7\u00e3o.<\/strong> O plano muda quando algu\u00e9m executa o Global Scheduling, reprograma uma tarefa em Job Entry ou arrasta trabalho num quadro. Quando uma m\u00e1quina para, o respons\u00e1vel pelo planeamento tem de iniciar uma dessas a\u00e7\u00f5es. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">f\u00f3rum<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-epicor-kinetic-s-native-scheduling-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando a programa\u00e7\u00e3o nativa do Epicor Kinetic \u00e9 suficiente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Mantenha o Kinetic Scheduling, ou adquira uma licen\u00e7a APS, se a maioria destas condi\u00e7\u00f5es se verificar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Uma ou poucas unidades fabris, com recursos organizados em grupos e calend\u00e1rios que refletem os turnos reais.<\/li>\n\n\n<li>Gamas operat\u00f3rias maioritariamente normalizadas e respons\u00e1veis pelo planeamento que aceitam os resultados das regras de prioridade do Global Scheduling e fazem os ajustes finais no Job Scheduling Board.<\/li>\n\n\n<li>Press\u00e3o sobre a capacidade concentrada em poucos estrangulamentos. Na programa\u00e7\u00e3o da produ\u00e7\u00e3o, tenha em conta a capacidade dispon\u00edvel desses recursos e mantenha os restantes com capacidade ilimitada. \u00c9 precisamente o que a Bluesky ERP recomenda quando a configura\u00e7\u00e3o de base j\u00e1 funciona. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li>J\u00e1 disp\u00f5e de uma licen\u00e7a APS, mant\u00e9m os lead times e os tempos padr\u00e3o corretos, encerra as tarefas atempadamente e tem um administrador que conhece o motor.<\/li>\n\n\n<li>Precisa de capable-to-promise no m\u00f3dulo Order Management.<\/li>\n\n<\/ul>\n\n\n<p>Se este \u00e9 o seu caso, configure corretamente todos os n\u00edveis de capacidade finita e mantenha os dados corretos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando precisa de uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Procure alternativas \u00e0s ferramentas nativas quando:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Nunca foi adquirida uma licen\u00e7a de Scheduling and Resource Management ou de APS, ou estes m\u00f3dulos nunca foram configurados, e os respons\u00e1veis pelo planeamento trabalham em Excel a partir das datas do MRP.<\/li>\n\n\n<li>Precisa de mais de duas restri\u00e7\u00f5es, mas n\u00e3o quer avan\u00e7ar com um projeto APS.<\/li>\n\n\n<li>O plano muda v\u00e1rias vezes por turno e pretende que seja recalculado automaticamente, sem esperar pela pr\u00f3xima execu\u00e7\u00e3o ou por algu\u00e9m que arraste tarefas no quadro.<\/li>\n\n\n<li>O tempo de mudan\u00e7a de produ\u00e7\u00e3o depende do que foi produzido antes e pretende que a sequ\u00eancia seja escolhida a partir de uma matriz de tempos de prepara\u00e7\u00e3o.<\/li>\n\n\n<li>As tarefas exigem uma equipa de operadores ou um dispositivo de fixa\u00e7\u00e3o partilhado entre m\u00e1quinas.<\/li>\n\n\n<li>Os operadores devem poder consultar a sua fila de tarefas num tablet e confirmar o trabalho realizado, atualizando o plano.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Quatro formas de programar a produ\u00e7\u00e3o com o Kinetic<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Quadros de programa\u00e7\u00e3o do Kinetic.<\/strong> Os respons\u00e1veis pelo planeamento ajustam uma programa\u00e7\u00e3o gerada pelo Kinetic. Adequam-se a uma f\u00e1brica com poucos estrangulamentos e um plano que raramente muda.<\/li>\n\n\n<li><strong>Kinetic Scheduling com APS.<\/strong> O Global Scheduling \u00e9 executado periodicamente. Adequa-se a f\u00e1bricas com licen\u00e7a APS e um administrador que afina o motor.<\/li>\n\n\n<li><strong>Solu\u00e7\u00f5es APS para grandes empresas.<\/strong> Um sistema de planeamento separado, implementado atrav\u00e9s de um projeto longo. Adequado a grandes equipas de planeamento que trabalham com v\u00e1rias unidades e disp\u00f5em de especialistas internos.<\/li>\n\n\n<li><strong>APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica.<\/strong> SkyPlanner APS: programa\u00e7\u00e3o autom\u00e1tica da produ\u00e7\u00e3o que respeita a capacidade de cada recurso, reprograma\u00e7\u00e3o com Autopilot e confirma\u00e7\u00f5es em dispositivos m\u00f3veis. Adequado a pequenas e m\u00e9dias f\u00e1bricas com Kinetic que querem um programa atualizado pelo qual o ch\u00e3o de f\u00e1brica se possa orientar.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">O que procurar<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Um modelo alinhado com o Kinetic.<\/strong> Tarefas, opera\u00e7\u00f5es, grupos de recursos, recursos e compet\u00eancias. Uma ferramenta que ignora o campo Capability atribui o trabalho ao recurso errado.<\/li>\n\n\n<li><strong>Restri\u00e7\u00f5es tratadas em detalhe.<\/strong> Turnos, aus\u00eancias e horas extraordin\u00e1rias por recurso; v\u00e1rios operadores na mesma tarefa; ferramentas que n\u00e3o podem estar em dois locais ao mesmo tempo; tempos de prepara\u00e7\u00e3o dependentes da sequ\u00eancia; recursos alternativos quando o principal est\u00e1 indispon\u00edvel.<\/li>\n\n\n<li><strong>Disponibilidade de materiais.<\/strong> Verifica\u00e7\u00e3o dos materiais da tarefa, das quantidades de artigos em armaz\u00e9m e das entregas previstas nas ordens de compra face ao in\u00edcio de cada opera\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Reprograma\u00e7\u00e3o em tempo real.<\/strong> O plano \u00e9 atualizado quando a produ\u00e7\u00e3o ou as encomendas mudam, sem esperar pela pr\u00f3xima execu\u00e7\u00e3o completa.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o de dados atrav\u00e9s do pr\u00f3prio motor de programa\u00e7\u00e3o do Kinetic.<\/strong> As datas das opera\u00e7\u00f5es devem passar por <strong>Erp.BO.ScheduleEngineSvc<\/strong> (MoveJobItem, ChangeResource), bloqueando-se a tarefa em seguida. As confirma\u00e7\u00f5es devem ser lan\u00e7adas como registos de m\u00e3o de obra atrav\u00e9s de <strong>Erp.BO.LaborSvc<\/strong>.<\/li>\n\n\n<li><strong>Um caminho de integra\u00e7\u00e3o claro.<\/strong> A <a href=\"https:\/\/www.epicor.com\/en\/products\/enterprise-resource-planning-erp\/epicor-kinetic\/tools-and-technology\/open-rest-api\/\">REST API do Kinetic<\/a> controla cada integra\u00e7\u00e3o atrav\u00e9s de chaves API e \u00e2mbitos de acesso. Por isso, o \u00e2mbito tem de incluir todos os servi\u00e7os e m\u00e9todos que a ferramenta de programa\u00e7\u00e3o invoca. As leituras habituais utilizam <strong>Erp.BO.JobEntrySvc<\/strong>, <strong>Erp.BO.ResourceGroupSvc<\/strong> e Business Activity Queries (BAQs).<\/li>\n\n\n<li><strong>Regras de responsabilidade.<\/strong> Defina qual dos sistemas controla as datas das opera\u00e7\u00f5es, para que o Global Scheduling n\u00e3o substitua o plano externo.<\/li>\n\n\n<li><strong>Um teste com os seus pr\u00f3prios dados<\/strong> antes de qualquer trabalho de integra\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde se enquadra o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner APS funciona na nuvem em conjunto com o Epicor Kinetic e colmata cada uma das lacunas acima. O Kinetic mant\u00e9m o MRP, as tarefas e o c\u00e1lculo de custos. O SkyPlanner assume a programa\u00e7\u00e3o detalhada das opera\u00e7\u00f5es e mant\u00e9m-na atualizada, para que o respons\u00e1vel pelo planeamento deixe de reordenar as tarefas manualmente.<\/p>\n\n\n<p>Escolha o SkyPlanner quando:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O limite de duas restri\u00e7\u00f5es impede-o de avan\u00e7ar.<\/strong> O motor Arcturus re\u00fane centros de trabalho, pessoas, ferramentas e materiais num \u00fanico programa de produ\u00e7\u00e3o, criado em segundos e que respeita a capacidade dispon\u00edvel. Uma ferramenta em utiliza\u00e7\u00e3o num centro de trabalho fica indispon\u00edvel em todos os outros.<\/li>\n\n\n<li><strong>As v\u00e1rias configura\u00e7\u00f5es de capacidade finita continuam a falhar.<\/strong> No SkyPlanner, a capacidade de cada centro de trabalho \u00e9 limitada pelos seus turnos. N\u00e3o h\u00e1 caixas de sele\u00e7\u00e3o por ferramenta nem horizontes a alinhar.<\/li>\n\n\n<li><strong>As tarefas exigem uma equipa.<\/strong> Uma tarefa pode ter v\u00e1rios operadores em simult\u00e2neo no mesmo centro de trabalho, respeitando os turnos, f\u00e9rias, aus\u00eancias e horas extraordin\u00e1rias reais de cada um. Quando uma pessoa ou m\u00e1quina est\u00e1 indispon\u00edvel, o motor transfere o trabalho para centros de trabalho e pessoal alternativos.<\/li>\n\n\n<li><strong>As encomendas urgentes t\u00eam de passar \u00e0 frente.<\/strong> Fast Track, Dynamic Priorities e a prioridade do cliente antecipam o trabalho urgente. Running Time Lock mant\u00e9m a tarefa em curso no seu lugar e Bulldozer adia as tarefas a jusante. Os respons\u00e1veis pelo planeamento continuam a poder deslocar tarefas num diagrama de Gantt interativo, enquanto o motor mant\u00e9m a coer\u00eancia do restante programa.<\/li>\n\n\n<li><strong>O plano n\u00e3o pode esperar pela pr\u00f3xima execu\u00e7\u00e3o.<\/strong> O Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o e s\u00f3 refaz o plano quando \u00e9 necess\u00e1rio. As suas regras, bloqueios e prioridades continuam a comandar o processo.<\/li>\n\n\n<li><strong>Os componentes comprados determinam a data de in\u00edcio.<\/strong> A programa\u00e7\u00e3o verifica o stock e as ordens de compra por receber. O material de uma ordem de compra em aberto no Kinetic \u00e9 considerado dispon\u00edvel na data prevista de entrega, e o stock \u00e9 atualizado quando a ordem \u00e9 marcada como Delivered.<\/li>\n\n\n<li><strong>As mudan\u00e7as de produ\u00e7\u00e3o dependem da sequ\u00eancia.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o guarda o tempo de mudan\u00e7a entre pares de produtos, com tempos diferentes em cada sentido quando necess\u00e1rio (de azul para vermelho 30 minutos, de vermelho para azul 60). A ferramenta de programa\u00e7\u00e3o escolhe a sequ\u00eancia que exige menos prepara\u00e7\u00e3o, sem um projeto de otimiza\u00e7\u00e3o APS.<\/li>\n\n\n<li><strong>O plano tem de chegar ao ch\u00e3o de f\u00e1brica.<\/strong> Os operadores consultam a sua fila de tarefas e registam o trabalho num telem\u00f3vel ou tablet com Mobile Confirmations, Production Timer e Quick Log Mode. O trabalho registado \u00e9 enviado para o Kinetic como registos de m\u00e3o de obra.<\/li>\n\n\n<li><strong>Quer estar em funcionamento em poucas semanas.<\/strong> A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de integra\u00e7\u00e3o inicial.<\/li>\n\n<\/ul>\n\n\n<p>Comece com uma exporta\u00e7\u00e3o CSV das suas tarefas e recursos no <a href=\"\/pt-pt\/avaliacao\/\">teste gratuito de 30 dias<\/a> (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). Veja o seu pr\u00f3prio programa de produ\u00e7\u00e3o, que respeita a capacidade dispon\u00edvel, antes de qualquer trabalho de integra\u00e7\u00e3o. Depois, os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, fatura\u00e7\u00e3o mensal e cancelamento a qualquer momento. Recebe antecipadamente um or\u00e7amento para a integra\u00e7\u00e3o, adaptado ao seu processo e \u00e0s suas necessidades, juntamente com o seu plano, para conhecer o custo total antes de come\u00e7ar.<\/p>\n\n\n<p>O SkyPlanner integra-se com o Kinetic nos dois sentidos. As tarefas, opera\u00e7\u00f5es, recursos e entregas programadas de encomendas de compra s\u00e3o recebidos atrav\u00e9s da REST API do Kinetic e de BAQs. As datas planeadas das opera\u00e7\u00f5es s\u00e3o enviadas de volta atrav\u00e9s do motor de programa\u00e7\u00e3o do Kinetic (<code>ScheduleEngineSvc.MoveJobItem<\/code>), e os registos de m\u00e3o de obra atrav\u00e9s de <code>LaborSvc<\/code>. Os webhooks enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o \u00e0 medida que ocorrem. Cada f\u00e1brica utiliza o Kinetic de forma diferente, desde as gamas operat\u00f3rias baseadas em capacidades at\u00e9 \u00e0s personaliza\u00e7\u00f5es de BPM. Por isso, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua instala\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O seu parceiro Epicor ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>), bastando uma chave de API. A documenta\u00e7\u00e3o do produto est\u00e1 dispon\u00edvel publicamente na <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o do SkyPlanner<\/a>.<\/p>\n\n\n<p>Saiba como os sistemas se ligam na <a href=\"\/pt-pt\/integracoes\/erp\/epicor-kinetic\/\">p\u00e1gina do Epicor Kinetic<\/a> ou consulte diretamente os detalhes t\u00e9cnicos no <a href=\"\/pt-pt\/integracoes\/erp\/epicor-kinetic\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o<\/a>. Para analisar connosco os seus pr\u00f3prios recursos e tarefas do Kinetic, <a href=\"\/pt-pt\/vendas-de-contacto\/\">agende uma demonstra\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas todas as semanas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos do planeamento da produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de tarefas chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos da f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Produ\u00e7\u00e3o farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses que abrange todos os centros de trabalho demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o na Fredman Operations, junto a uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 uma base s\u00f3lida e fiabilidade a todo o planeamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem pr\u00f3prios para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o da programa\u00e7\u00e3o que demoravam uma hora ou mais recebem agora resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Epicor Kinetic permite a programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O m\u00f3dulo Scheduling and Resource Management programa a produ\u00e7\u00e3o respeitando a capacidade de cada recurso dentro de um horizonte definido. O APS \u00e9 uma extens\u00e3o separada para trabalhar com mais de duas restri\u00e7\u00f5es e para otimiza\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Preciso do m\u00f3dulo APS para programar a produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel no Kinetic?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. A programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel, com uma restri\u00e7\u00e3o secund\u00e1ria, funciona no Scheduling and Resource Management. Precisa do APS para mais de duas restri\u00e7\u00f5es, programa\u00e7\u00e3o baseada em compet\u00eancias, Minimum WIP e capable-to-promise. A Epicor n\u00e3o publica pre\u00e7os de tabela para nenhum dos m\u00f3dulos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Porque \u00e9 que o Kinetic programa com capacidade infinita quando configurei capacidade finita?<\/summary>\n<p class=\"sp-faq__a\">Normalmente, falta configurar um dos n\u00edveis. Verifique a op\u00e7\u00e3o Finite no recurso e a caixa de sele\u00e7\u00e3o de capacidade finita na ferramenta que executou. Depois, verifique o horizonte de capacidade finita no recurso, no grupo de recursos e no separador Planning de Site Maintenance.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Epicor Kinetic tem um diagrama de Gantt para programa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. Os pain\u00e9is Job Scheduling Board, Resource Scheduling Board e Multi-Resource Scheduling Board apresentam diagramas do tipo Gantt, com arrastar e largar, modo de simula\u00e7\u00e3o de cen\u00e1rios e bloqueio de tarefas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que restri\u00e7\u00f5es pode o SkyPlanner acrescentar \u00e0s duas do Kinetic?<\/summary>\n<p class=\"sp-faq__a\">V\u00e1rios operadores na mesma tarefa, ferramentas como recursos partilhados cuja disponibilidade \u00e9 limitada e materiais em stock ou previstos em ordens de compra por receber. Tamb\u00e9m utiliza centros de trabalho e pessoal alternativos e uma matriz de tempos de prepara\u00e7\u00e3o para mudan\u00e7as de produ\u00e7\u00e3o dependentes da sequ\u00eancia, tudo no mesmo programa de produ\u00e7\u00e3o, respeitando a capacidade dispon\u00edvel.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner APS pode funcionar com o Epicor Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Sim. O SkyPlanner integra-se com o Kinetic nos dois sentidos: recebe tarefas, opera\u00e7\u00f5es e recursos e envia de volta as datas planeadas atrav\u00e9s de <code>ScheduleEngineSvc<\/code> e os registos de m\u00e3o de obra atrav\u00e9s de <code>LaborSvc<\/code>. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o REST v2 de acordo com a sua instala\u00e7\u00e3o do Kinetic. Consulte o <a href=\"\/pt-pt\/integracoes\/erp\/epicor-kinetic\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a p\u00f4r o SkyPlanner APS a funcionar com o Kinetic?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de integra\u00e7\u00e3o inicial. Antes disso, o teste de 30 dias permite programar as suas tarefas reais a partir de uma exporta\u00e7\u00e3o CSV ou Excel. <a href=\"\/pt-pt\/avaliacao\/\">Inicie o teste gratuito<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Epicor Kinetic O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS Sim, o Epicor Kinetic inclui de origem programa\u00e7\u00e3o da produ\u00e7\u00e3o. Em termos gerais, este conceito descreve uma programa\u00e7\u00e3o que respeita a capacidade realmente dispon\u00edvel das m\u00e1quinas e do pessoal. O m\u00f3dulo Scheduling &#8230; <a title=\"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/\" aria-label=\"Leia mais sobre O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100862,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101249","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/title>\n<meta name=\"description\" content=\"Sim. Programa\u00e7\u00e3o da produ\u00e7\u00e3o em Scheduling and Resource Management; APS \u00e9 uma extens\u00e3o separada. Como funciona, limites e quando basta.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Sim. Programa\u00e7\u00e3o da produ\u00e7\u00e3o em Scheduling and Resource Management; APS \u00e9 uma extens\u00e3o separada. Como funciona, limites e quando basta.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/epicor-kinetic\\\/programacao-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/epicor-kinetic\\\/programacao-producao\\\/\",\"name\":\"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Sim. Programa\u00e7\u00e3o da produ\u00e7\u00e3o em Scheduling and Resource Management; APS \u00e9 uma extens\u00e3o separada. Como funciona, limites e quando basta.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/epicor-kinetic\\\/programacao-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/epicor-kinetic\\\/programacao-producao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/epicor-kinetic\\\/programacao-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Epicor Kinetic: programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/epicor-kinetic\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?","description":"Sim. Programa\u00e7\u00e3o da produ\u00e7\u00e3o em Scheduling and Resource Management; APS \u00e9 uma extens\u00e3o separada. Como funciona, limites e quando basta.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS","og_description":"Sim. Programa\u00e7\u00e3o da produ\u00e7\u00e3o em Scheduling and Resource Management; APS \u00e9 uma extens\u00e3o separada. Como funciona, limites e quando basta.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"19 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/","name":"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Sim. Programa\u00e7\u00e3o da produ\u00e7\u00e3o em Scheduling and Resource Management; APS \u00e9 uma extens\u00e3o separada. Como funciona, limites e quando basta.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/programacao-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Epicor Kinetic: programa\u00e7\u00e3o da produ\u00e7\u00e3o","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/epicor-kinetic\/"},{"@type":"ListItem","position":5,"name":"O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Epicor Kinetic O Epicor Kinetic tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Conhe\u00e7a a programa\u00e7\u00e3o nativa, o APS e o SkyPlanner APS Sim, o Epicor Kinetic inclui de origem programa\u00e7\u00e3o da produ\u00e7\u00e3o. Em termos gerais, este conceito descreve uma programa\u00e7\u00e3o que respeita a capacidade realmente dispon\u00edvel das m\u00e1quinas e do pessoal. O m\u00f3dulo Scheduling&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=101249"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101249\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100862"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=101249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}