{"id":101159,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101159"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do SAP S\/4HANA <span class=\"hl\">com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia mostra aos parceiros SAP, \u00e0s equipas de TI e aos respons\u00e1veis por compras t\u00e9cnicas como o SkyPlanner APS se liga ao SAP S\/4HANA. O SkyPlanner integra-se com o S\/4HANA nos dois sentidos atrav\u00e9s das APIs OData disponibilizadas oficialmente pela SAP:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, capacidade dos centros de trabalho, exist\u00eancias e encomendas de compra em aberto.<\/li>\n\n\n<li>Envia de volta as datas de in\u00edcio planeadas para cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Os registos de tempo dos operadores s\u00e3o lan\u00e7ados como confirma\u00e7\u00f5es de ordens de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es \u00e0 programa\u00e7\u00e3o assim que ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com trabalhos programados nos v\u00e1rios centros de trabalho e uma lista de ordens por baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O S\/4HANA mant\u00e9m os materiais, as listas de materiais (BOM), as gamas operat\u00f3rias, as ordens de produ\u00e7\u00e3o, as exist\u00eancias e o c\u00e1lculo de custos. Durante a implementa\u00e7\u00e3o inicial, a equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com a configura\u00e7\u00e3o do seu S\/4HANA e presta assist\u00eancia ap\u00f3s a entrada em produ\u00e7\u00e3o. Para conhecer a justifica\u00e7\u00e3o econ\u00f3mica, consulte a <a href=\"\/pt-pt\/integracoes\/erp\/sap-s4hana\/\">p\u00e1gina de programa\u00e7\u00e3o da produ\u00e7\u00e3o com SAP S\/4HANA<\/a>. Para saber o que o S\/4HANA programa por si s\u00f3, leia <a href=\"\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/\">O SAP S\/4HANA permite a programa\u00e7\u00e3o da produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e das equipas?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Op\u00e7\u00f5es de integra\u00e7\u00e3o com o SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O S\/4HANA disponibiliza a integra\u00e7\u00e3o atrav\u00e9s de servi\u00e7os OData oficiais, listados no SAP Business Accelerator Hub (api.sap.com). A integra\u00e7\u00e3o para programa\u00e7\u00e3o utiliza servi\u00e7os OData V2. Os IDocs e as BAPIs continuam a existir, mas este guia utiliza as APIs OData oficiais.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Autentica\u00e7\u00e3o por edi\u00e7\u00e3o<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Instala\u00e7\u00e3o local e Private Edition.<\/strong> Os servi\u00e7os s\u00e3o ativados no SAP Gateway com a transa\u00e7\u00e3o <code>\/IWFND\/MAINT_SERVICE<\/code>. O utilizador da integra\u00e7\u00e3o precisa dos objetos de autoriza\u00e7\u00e3o correspondentes, por exemplo, <code>C_AFRU_AWK<\/code> para confirma\u00e7\u00f5es, <code>C_AFKO_AWK<\/code> para os itens de movimento de mercadorias lan\u00e7ados com essas confirma\u00e7\u00f5es e <code>M_PLAF_ORG<\/code> para ordens planeadas.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Os servi\u00e7os s\u00f3 s\u00e3o disponibilizados atrav\u00e9s de acordos de comunica\u00e7\u00e3o. Seguindo a <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">configura\u00e7\u00e3o de comunica\u00e7\u00e3o de entrada da SAP<\/a>, crie um utilizador de comunica\u00e7\u00e3o, um sistema de comunica\u00e7\u00e3o e um acordo de comunica\u00e7\u00e3o na aplica\u00e7\u00e3o <strong>Communication Arrangements<\/strong>, com base num cen\u00e1rio de comunica\u00e7\u00e3o SAP (<code>SAP_COM_xxxx<\/code>). O cen\u00e1rio define quais os servi\u00e7os disponibilizados e os m\u00e9todos de autentica\u00e7\u00e3o dispon\u00edveis:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; baseada em tokens: fluxos bearer OAuth, SAML ou OpenID Connect, com propaga\u00e7\u00e3o da identidade para um utilizador de neg\u00f3cio &#8211; certificado de cliente &#8211; autentica\u00e7\u00e3o b\u00e1sica com um utilizador t\u00e9cnico de comunica\u00e7\u00e3o<\/p>\n\n\n<p>A SAP recomenda a autentica\u00e7\u00e3o por token ou certificado.<\/p>\n\n\n<p>Do lado do SkyPlanner, a integra\u00e7\u00e3o \u00e9 feita atrav\u00e9s de uma REST API com autentica\u00e7\u00e3o por token de API, documentada em Swagger\/OpenAPI (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). O middleware trata assim da autentica\u00e7\u00e3o SAP de um lado e do token de API do SkyPlanner do outro.<\/p>\n\n\n<h3 class=\"wp-block-heading\">APIs para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Servi\u00e7o<\/th><th>Entidades e a\u00e7\u00f5es utilizadas<\/th><th>Finalidade<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; a\u00e7\u00f5es <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Ordens, opera\u00e7\u00f5es, componentes, PRTs, estado e grava\u00e7\u00e3o da programa\u00e7\u00e3o no SAP<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>Centros de trabalho, categorias de capacidade, intervalos e turnos<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Gamas operat\u00f3rias padr\u00e3o para planear antes da cria\u00e7\u00e3o das ordens<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>Estrutura de produto multin\u00edvel<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Materiais (designados Product na API). A SAP recomenda agora a API Product (Version 2) para a maioria das entidades de produto<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>Resultados do MRP Live antes da convers\u00e3o<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Stock por centro e local de armazenamento, para determinar a disponibilidade de materiais<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Encomendas de compra em aberto para materiais a receber<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; a\u00e7\u00f5es <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Confirma\u00e7\u00f5es e movimentos de mercadorias do ch\u00e3o de f\u00e1brica<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Na API de ordens de produ\u00e7\u00e3o, as opera\u00e7\u00f5es s\u00e3o identificadas pela combina\u00e7\u00e3o de <code>OrderInternalBillOfOperations<\/code> e <code>OrderIntBillOfOperationsItem<\/code>, e n\u00e3o pelo n\u00famero da opera\u00e7\u00e3o que o planeador v\u00ea. A a\u00e7\u00e3o <code>GetConfProposal<\/code> da API de confirma\u00e7\u00f5es identifica a mesma opera\u00e7\u00e3o atrav\u00e9s de <code>OrderID<\/code> e <code>OrderOperation<\/code>. Guarde as chaves internas e o n\u00famero da opera\u00e7\u00e3o no SkyPlanner desde o primeiro carregamento.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Eventos<\/h3>\n\n\n<p>O S\/4HANA gera os <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">eventos de neg\u00f3cio<\/a> <strong>Production Order Created<\/strong> e <strong>Production Order Changed<\/strong>, com <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code> e <code>ProductionPlant<\/code> no payload. O payload cont\u00e9m apenas chaves, pelo que a integra\u00e7\u00e3o volta a ler a ordem e as suas opera\u00e7\u00f5es. O evento Changed \u00e9 gerado a cada altera\u00e7\u00e3o da ordem; aplique um mecanismo de debounce para agrupar eventos sucessivos. No sentido inverso, os webhooks do SkyPlanner enviam notifica\u00e7\u00f5es em tempo real quando a programa\u00e7\u00e3o ou o estado de uma tarefa muda.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Come\u00e7ar com ficheiros<\/h3>\n\n\n<p>Para o teste, exporte as ordens de produ\u00e7\u00e3o e os centros de trabalho dos relat\u00f3rios de listagem do S\/4HANA para Excel ou CSV e importe-os para o SkyPlanner. Assim, pode validar a programa\u00e7\u00e3o antes de se alterar o Gateway ou os acordos de comunica\u00e7\u00e3o.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados: do SAP S\/4HANA para o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Entidade \/ endpoint do S\/4HANA<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (material)<\/td><td>Produto ou material<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carregamento inicial, seguido de atualiza\u00e7\u00f5es incrementais agendadas<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Estrutura de produto, subprodutos<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carregamento inicial, seguido de atualiza\u00e7\u00f5es agendadas<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>Centro de trabalho<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carregamento inicial e a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Capacidade e turnos<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carregamento inicial, seguido de atualiza\u00e7\u00f5es agendadas<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Etapas do processo e tempos padr\u00e3o<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carregamento inicial, seguido de atualiza\u00e7\u00f5es agendadas<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (libertada ou criada)<\/td><td>Ordem com data de entrega<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Quase em tempo real, por evento Created\/Changed, ou por consulta peri\u00f3dica agendada<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>Tarefa (etapa do processo num centro de trabalho)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Juntamente com a ordem<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (recursos\/ferramentas de produ\u00e7\u00e3o)<\/td><td>Ferramentas, programadas como recursos partilhados com capacidade finita<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Juntamente com a ordem<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Necessidades de materiais e stock<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Atualiza\u00e7\u00f5es agendadas, com intervalo acordado na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): quantidade em aberto e data de entrega da linha de remessa<\/td><td>Encomendas de compra \/ materiais a receber com data de entrega prevista<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Atualiza\u00e7\u00f5es agendadas, com intervalo acordado na defini\u00e7\u00e3o do \u00e2mbito<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (opcional)<\/td><td>Ordens planeadas antes da convers\u00e3o<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Ap\u00f3s cada execu\u00e7\u00e3o do MRP Live<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (in\u00edcio da opera\u00e7\u00e3o, programa\u00e7\u00e3o para a frente)<\/td><td>Programa\u00e7\u00e3o<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>A cada altera\u00e7\u00e3o da programa\u00e7\u00e3o, via webhook<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (quantidade boa, refugo, atividades)<\/td><td>Registos de tempo e quantidades<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Por evento de registo ou em lote<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Padr\u00f5es de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carregamento de dados mestre.<\/strong> Carregue os materiais, as listas de materiais (BOM), os centros de trabalho com os respetivos intervalos de capacidade e turnos, e as gamas operat\u00f3rias. Nesta fase, decida qual dos sistemas gere os turnos. Uma divis\u00e3o que funciona: o calend\u00e1rio da f\u00e1brica fica no S\/4HANA, enquanto os padr\u00f5es detalhados de turnos, as aus\u00eancias e as horas extraordin\u00e1rias ficam no SkyPlanner, onde os respons\u00e1veis pelo planeamento os alteram diariamente.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens.<\/strong> Subscreva os eventos Production Order Created\/Changed ou, se os eventos de neg\u00f3cio n\u00e3o estiverem configurados, consulte periodicamente <code>A_ProductionOrder_2<\/code> com base na data e hora da altera\u00e7\u00e3o. Filtre por centro, tipo de ordem e estado. Envie as ordens assim que forem criadas para que o SkyPlanner possa planear antecipadamente e liberte-as no S\/4HANA (<code>ReleaseOrder<\/code> ou <code>ReleaseOperation<\/code>) depois de o SkyPlanner as programar.<\/p>\n\n\n<p><strong>3. Grava\u00e7\u00e3o da programa\u00e7\u00e3o no SAP.<\/strong> Quando um webhook do SkyPlanner comunica uma altera\u00e7\u00e3o da programa\u00e7\u00e3o, a integra\u00e7\u00e3o chama <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> em <code>API_PRODUCTION_ORDER_2_SRV<\/code> para cada opera\u00e7\u00e3o alterada. Envia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code> e <code>OrderIntBillOfOperationsItem<\/code> como chaves<\/li>\n\n\n<li><code>OpSchedulingMode<\/code> F (para a frente), com o in\u00edcio definido pelo SkyPlanner em <code>OpSchedldStartDate<\/code> e <code>OpSchedldStartTime<\/code><\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> DISP (despacho) e o valor obrigat\u00f3rio M em <code>OpSchedulingStrategy<\/code><\/li>\n\n\n<li>o ETag em <code>if-match<\/code><\/li>\n\n<\/ul>\n\n\n<p>Todas as opera\u00e7\u00f5es de uma ordem s\u00e3o enviadas num \u00fanico conjunto de altera\u00e7\u00f5es, pela sequ\u00eancia definida no SkyPlanner, para que o S\/4HANA aplique a programa\u00e7\u00e3o completa da ordem numa s\u00f3 chamada. O modo K nunca \u00e9 utilizado: mant\u00e9m as datas originais das opera\u00e7\u00f5es e ignora as datas enviadas.<\/p>\n\n\n<p>O SkyPlanner calcula a dura\u00e7\u00e3o das opera\u00e7\u00f5es a partir dos mesmos valores padr\u00e3o das gamas operat\u00f3rias e das mesmas f\u00f3rmulas de capacidade dos centros de trabalho que o S\/4HANA utiliza. Por isso, a data de fim que o S\/4HANA calcula a partir da data de in\u00edcio enviada fica alinhada com o plano do SkyPlanner. Ap\u00f3s cada conjunto de altera\u00e7\u00f5es, a integra\u00e7\u00e3o volta a ler as opera\u00e7\u00f5es e assinala qualquer diverg\u00eancia nas datas, para que o respons\u00e1vel pelo planeamento a veja antes do turno seguinte.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es do ch\u00e3o de f\u00e1brica.<\/strong> Cada registo de tempo de Mobile Confirmations ou de Production Timer d\u00e1 origem a uma confirma\u00e7\u00e3o no S\/4HANA. O webhook do SkyPlanner desencadeia um envio de <code>ProdnOrdConf2<\/code> com a quantidade boa, o refugo e os tempos de atividade. A integra\u00e7\u00e3o chama primeiro <code>GetConfProposal<\/code>, para que o S\/4HANA proponha quantidades, atividades, datas e dados de pessoal. <code>GetGdsMvtProposal<\/code> prop\u00f5e os movimentos de mercadorias.<\/p>\n\n\n<p><strong>Material a receber.<\/strong> As encomendas de compra em aberto fazem parte da sincroniza\u00e7\u00e3o de entrada. O SkyPlanner considera que o material encomendado estar\u00e1 dispon\u00edvel na data de entrega prevista da encomenda de compra. Os trabalhos que aguardam componentes comprados s\u00e3o programados para o dia em que o material chega, em vez de ficarem bloqueados pelas exist\u00eancias atuais.<\/p>\n\n\n<p>O S\/4HANA continua a ser o sistema de refer\u00eancia para as rece\u00e7\u00f5es: quando \u00e9 lan\u00e7ada uma entrada de mercadorias, as exist\u00eancias aumentam e a quantidade em aberto da posi\u00e7\u00e3o da encomenda de compra diminui. A sincroniza\u00e7\u00e3o seguinte atualiza as exist\u00eancias no SkyPlanner e marca uma encomenda de compra totalmente recebida como Delivered; ap\u00f3s uma rece\u00e7\u00e3o parcial, a quantidade ainda em aberto mant\u00e9m-se como prevista para rece\u00e7\u00e3o na data da respetiva linha de remessa. O tratamento das encomendas de compra no SkyPlanner est\u00e1 descrito na <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o do SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>5. Regras de responsabilidade pelos dados.<\/strong> O S\/4HANA gere as quantidades, a BOM, a gama operat\u00f3ria, o c\u00e1lculo de custos e o estado. O SkyPlanner gere a sequ\u00eancia, a atribui\u00e7\u00e3o aos centros de trabalho e as datas das opera\u00e7\u00f5es. Nunca permita que ambos escrevam no mesmo campo. Se os respons\u00e1veis pelo planeamento continuarem a deslocar opera\u00e7\u00f5es no Capacity Scheduling Board, decida o que prevalece. Ou a sincroniza\u00e7\u00e3o seguinte das ordens transfere essa altera\u00e7\u00e3o para o SkyPlanner, ou esse centro de trabalho fica fora do \u00e2mbito do SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que inclui o projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do acompanhamento inicial, mesmo em grandes empresas. A maioria das f\u00e1bricas come\u00e7a com o teste gratuito de 30 dias, usando exporta\u00e7\u00f5es CSV ou Excel, para validar a programa\u00e7\u00e3o com os seus pr\u00f3prios dados antes de iniciar o trabalho com as APIs. O projeto S\/4HANA abrange depois:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Defini\u00e7\u00e3o do \u00e2mbito:<\/strong> f\u00e1bricas, tipos de ordem, edi\u00e7\u00e3o e modelo de autentica\u00e7\u00e3o, e o sistema respons\u00e1vel por cada campo.<\/li>\n\n\n<li><strong>Acesso SAP:<\/strong> ativa\u00e7\u00e3o do servi\u00e7o Gateway ou de um acordo de comunica\u00e7\u00e3o, bem como os utilizadores t\u00e9cnicos e os objetos de autoriza\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Mapeamento de dados mestre:<\/strong> categorias de capacidade dos centros de trabalho, intervalos e turnos, correspond\u00eancia entre os valores padr\u00e3o das gamas operat\u00f3rias e as dura\u00e7\u00f5es no SkyPlanner, e unidades de medida.<\/li>\n\n\n<li><strong>Carregamento inicial:<\/strong> materiais, listas de materiais (BOM), gamas operat\u00f3rias e centros de trabalho com as respetivas capacidades.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens e encomendas de compra:<\/strong> ordens de produ\u00e7\u00e3o e opera\u00e7\u00f5es atrav\u00e9s de eventos Created\/Changed ou de consultas peri\u00f3dicas; exist\u00eancias e encomendas de compra em aberto segundo uma periodicidade definida.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o da programa\u00e7\u00e3o no SAP:<\/strong> <code>ScheduleProductionOrderOperation<\/code> com gest\u00e3o de ETags e uma fila de novas tentativas.<\/li>\n\n\n<li><strong>Confirma\u00e7\u00f5es do ch\u00e3o de f\u00e1brica:<\/strong> registos de tempo lan\u00e7ados como confirma\u00e7\u00f5es <code>ProdnOrdConf2<\/code>.<\/li>\n\n\n<li><strong>Testes em paralelo com o plano atual:<\/strong> a programa\u00e7\u00e3o do SkyPlanner funciona em paralelo com o nivelamento existente at\u00e9 os respons\u00e1veis pelo planeamento confiarem nela.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pontos cr\u00edticos no SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A grava\u00e7\u00e3o no SAP exige uma chamada de a\u00e7\u00e3o com um ETag.<\/strong> O m\u00e9todo documentado para programar uma opera\u00e7\u00e3o \u00e9 <code>ScheduleProductionOrderOperation<\/code>, e n\u00e3o um PATCH em <code>A_ProductionOrderOperation_2<\/code>. O modo F programa para a frente a partir de um in\u00edcio e o modo B para tr\u00e1s a partir de um fim, enquanto K e S mant\u00eam as datas existentes e ignoram as datas enviadas. O ETag em <code>if-match<\/code> \u00e9 constru\u00eddo a partir de <code>LastChangeDateTime<\/code> da ordem (YYYYMMDDHHMMSS), pelo que qualquer altera\u00e7\u00e3o \u00e0 ordem o torna desatualizado. Implemente uma leitura antes de cada escrita e uma fila de novas tentativas.<\/li>\n\n\n<li><strong>A capacidade n\u00e3o est\u00e1 no cabe\u00e7alho do centro de trabalho.<\/strong> A capacidade dispon\u00edvel resulta da categoria de capacidade (001 m\u00e1quina, 002 m\u00e3o de obra), do calend\u00e1rio de f\u00e1brica e dos intervalos e turnos que se sobrep\u00f5em a esse calend\u00e1rio. As f\u00f3rmulas de capacidade convertem os valores padr\u00e3o da gama operat\u00f3ria em necessidades de prepara\u00e7\u00e3o, processamento e desmontagem. Leia <code>A_WorkCenterCapacityInterval_2<\/code> e as entidades de turnos, e acorde como converter as f\u00f3rmulas em dura\u00e7\u00f5es no SkyPlanner.<\/li>\n\n\n<li><strong>Os valores padr\u00e3o precisam de ser revistos.<\/strong> As gamas operat\u00f3rias mantidas para c\u00e1lculo de custos cont\u00eam frequentemente tempos m\u00e9dios de prepara\u00e7\u00e3o ou tempos de prepara\u00e7\u00e3o imputados \u00e0 categoria de capacidade errada.<\/li>\n\n\n<li><strong>As regras de confirma\u00e7\u00e3o s\u00e3o rigorosas.<\/strong> A SAP recomenda chamadas em lote para lan\u00e7amentos em massa. Cada conjunto de altera\u00e7\u00f5es \u00e9 aplicado na totalidade ou n\u00e3o \u00e9 aplicado: um \u00fanico registo de tempos inv\u00e1lido bloqueia os restantes lan\u00e7amentos desse conjunto. Os cancelamentos num lote t\u00eam de ser executados pela ordem inversa de <code>ConfirmationCount<\/code>. N\u00e3o \u00e9 poss\u00edvel misturar tipos de confirma\u00e7\u00e3o numa mesma ordem, lan\u00e7ar movimentos de mercadorias sem uma confirma\u00e7\u00e3o ou confirmar opera\u00e7\u00f5es cujos pontos de acionamento exijam uma caixa de di\u00e1logo.<\/li>\n\n\n<li><strong>Verifique se o PP\/DS est\u00e1 ativo.<\/strong> O PP\/DS integrado requer a atividade de Customizing <strong>Activate Advanced Planning and Scheduling<\/strong> e o SAP HANA integrated liveCache. A SAP comercializa-o como um produto separado, <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Quando est\u00e1 ativo, decida, para cada material, quem faz a programa\u00e7\u00e3o: os materiais assinalados para planeamento avan\u00e7ado ficam a cargo do PP\/DS. A SAP tamb\u00e9m indica, relativamente \u00e0 API de ordens planeadas: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (Esta API n\u00e3o permite a integra\u00e7\u00e3o autom\u00e1tica com esse sistema.)<\/li>\n\n\n<li><strong>Unidades de medida.<\/strong> As quantidades das opera\u00e7\u00f5es, as quantidades de base das gamas operat\u00f3rias e as unidades de confirma\u00e7\u00e3o podem ser diferentes. Fa\u00e7a a convers\u00e3o explicitamente com base na unidade da opera\u00e7\u00e3o, n\u00e3o na unidade de base do material.<\/li>\n\n\n<li><strong>Diferen\u00e7as entre edi\u00e7\u00f5es.<\/strong> O <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> mostra que a tabela de planeamento cl\u00e1ssica CM21\/CM22 est\u00e1 a ser substitu\u00edda por Manage Work Center Capacity, Capacity Scheduling Table e Capacity Scheduling Board. A Public Edition s\u00f3 disponibiliza APIs atrav\u00e9s de cen\u00e1rios de comunica\u00e7\u00e3o, e as vers\u00f5es dos servi\u00e7os que oferece podem diferir das dispon\u00edveis em instala\u00e7\u00f5es locais. A API de gamas operat\u00f3rias n\u00e3o permite eliminar gamas operat\u00f3rias nem atualizar atribui\u00e7\u00f5es de materiais. Durante a defini\u00e7\u00e3o do \u00e2mbito, a equipa SkyPlanner fixa as vers\u00f5es dos servi\u00e7os para o sistema de cada cliente, usando a entrada do API Business Accelerator Hub correspondente a essa vers\u00e3o.<\/li>\n\n\n<li><strong>Restri\u00e7\u00f5es que as gamas operat\u00f3rias n\u00e3o contemplam.<\/strong> Mantenha no SkyPlanner as mudan\u00e7as de produ\u00e7\u00e3o dependentes da sequ\u00eancia, os conflitos de ferramentas e as opera\u00e7\u00f5es com v\u00e1rios operadores, em vez de os incluir nos valores padr\u00e3o das gamas operat\u00f3rias. A matriz de tempos de prepara\u00e7\u00e3o cont\u00e9m os tempos de mudan\u00e7a de produ\u00e7\u00e3o por par de produtos. As ferramentas dos PRTs da ordem s\u00e3o recursos de capacidade finita, utiliz\u00e1veis num \u00fanico centro de trabalho de cada vez, e uma opera\u00e7\u00e3o pode exigir v\u00e1rias pessoas em simult\u00e2neo.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura a integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os pontos cr\u00edticos acima explicam por que raz\u00e3o a configura\u00e7\u00e3o \u00e9 o trabalho central. Cada f\u00e1brica utiliza o S\/4HANA de forma diferente: os tipos de ordem, as categorias de capacidade, os valores padr\u00e3o das gamas operat\u00f3rias, os user exits e a edi\u00e7\u00e3o influenciam o mapeamento.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A equipa SkyPlanner configura a integra\u00e7\u00e3o<\/strong> de acordo com a configura\u00e7\u00e3o do seu S\/4HANA durante a implementa\u00e7\u00e3o inicial, utilizando as APIs oficiais do S\/4HANA e a API REST e os webhooks do SkyPlanner. Presta assist\u00eancia \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em produ\u00e7\u00e3o. Esta \u00e9 a op\u00e7\u00e3o padr\u00e3o e d\u00e1-lhe um \u00fanico respons\u00e1vel pela ferramenta de programa\u00e7\u00e3o e pela liga\u00e7\u00e3o ao S\/4HANA.<\/li>\n\n\n<li><strong>O seu parceiro SAP<\/strong> pode, em alternativa, desenvolver a integra\u00e7\u00e3o com base na documenta\u00e7\u00e3o Swagger\/OpenAPI do SkyPlanner e no conhecimento dos seus tipos de ordem e da sua configura\u00e7\u00e3o Basis.<\/li>\n\n\n<li><strong>Os seus pr\u00f3prios programadores<\/strong> podem desenvolver a integra\u00e7\u00e3o diretamente ou recorrer ao SAP Integration Suite ou ao SAP BTP, utilizando a REST API documentada, a autentica\u00e7\u00e3o por token de API e os webhooks (<a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a>). Basta uma chave de API para come\u00e7ar, e a equipa do SkyPlanner interv\u00e9m quando os programadores precisam de ajuda.<\/li>\n\n<\/ul>\n\n\n<p>O SkyPlanner j\u00e1 funciona em conjunto com a SAP: a equipa interna de TI da Laboratory &amp; Allied ligou o SAP Business One on HANA ao SkyPlanner, com a ajuda da equipa SkyPlanner. A documenta\u00e7\u00e3o das funcionalidades est\u00e1 dispon\u00edvel publicamente na <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o do SkyPlanner<\/a>.<\/p>\n\n\n<p>Seja qual for a op\u00e7\u00e3o escolhida, valide primeiro a programa\u00e7\u00e3o no teste gratuito de 30 dias (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). A integra\u00e7\u00e3o \u00e9 depois desenvolvida para um plano em que os seus respons\u00e1veis pelo planeamento j\u00e1 confiam. Ap\u00f3s o teste, os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e fatura\u00e7\u00e3o mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, em fun\u00e7\u00e3o do seu processo e das suas necessidades, juntamente com o seu plano, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n\n\n<p>Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a>, as <a href=\"\/pt-pt\/funcionalidades\/\">funcionalidades<\/a> e os <a href=\"\/pt-pt\/historias-de-clientes\/\">testemunhos de clientes<\/a> para ter uma vis\u00e3o completa.<\/p>\n\n\n<p><a href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a> <a href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem as empresas industriais sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos do planeamento da produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de trabalhos chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/customers\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia da produ\u00e7\u00e3o aumentou 90% e a cria\u00e7\u00e3o de um plano otimizado para tr\u00eas meses, que abrange todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/customers\/laboratory-allied\/\">Leia o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para coberturas da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>de fiabilidade das entregas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner deu-nos visibilidade para identificar estrangulamentos e tornou a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Diretor de Produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para coberturas e de drenagem de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas atingiu 99,2% este ano e a programa\u00e7\u00e3o permite poupar at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/customers\/piristeel\/\">Leia o testemunho da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a desbastar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner desempenha um papel decisivo para manter a fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Diretor-Geral<\/b><br>KJH-Comp \u00b7 Metalomec\u00e2nica de chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegaram aos 98% e a programa\u00e7\u00e3o requer agora apenas um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/customers\/kjh-comp\/\">Leia o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como se liga o SkyPlanner APS ao SAP S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS integra-se com o SAP S\/4HANA nos dois sentidos. As ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, gamas operat\u00f3rias, centros de trabalho, stocks e encomendas de compra s\u00e3o recebidos atrav\u00e9s das APIs OData disponibilizadas oficialmente pela SAP. As datas das opera\u00e7\u00f5es s\u00e3o devolvidas atrav\u00e9s de <code>ScheduleProductionOrderOperation<\/code> e as horas registadas s\u00e3o enviadas como confirma\u00e7\u00f5es <code>ProdnOrdConf2<\/code>, por a\u00e7\u00e3o dos webhooks do SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quem desenvolve e mant\u00e9m a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A equipa SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente S\/4HANA durante a fase de implementa\u00e7\u00e3o inicial e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, tendo em conta o seu processo e as suas necessidades. Se o seu parceiro SAP ou os seus pr\u00f3prios programadores desenvolverem a integra\u00e7\u00e3o atrav\u00e9s da REST API, ficam respons\u00e1veis por ela, com o apoio da equipa SkyPlanner sempre que necess\u00e1rio.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como s\u00e3o gravadas as datas das opera\u00e7\u00f5es no S\/4HANA? O sistema mant\u00e9m a sequ\u00eancia?<\/summary>\n<p class=\"sp-faq__a\">Atrav\u00e9s da a\u00e7\u00e3o <code>ScheduleProductionOrderOperation<\/code> em <code>API_PRODUCTION_ORDER_2_SRV<\/code>, no modo de programa\u00e7\u00e3o para a frente, com estado de despacho e a data e hora de in\u00edcio definidas pelo SkyPlanner. As opera\u00e7\u00f5es de cada ordem s\u00e3o enviadas num \u00fanico conjunto de altera\u00e7\u00f5es, pela sequ\u00eancia do SkyPlanner. As dura\u00e7\u00f5es resultam dos mesmos valores padr\u00e3o da gama operat\u00f3ria que o S\/4HANA utiliza. A integra\u00e7\u00e3o volta a ler cada opera\u00e7\u00e3o e assinala qualquer diferen\u00e7a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como chegam as confirma\u00e7\u00f5es ao S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">Os operadores registam o trabalho no SkyPlanner, o que aciona um webhook. A integra\u00e7\u00e3o lan\u00e7a ent\u00e3o uma confirma\u00e7\u00e3o atrav\u00e9s de <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code>, com a quantidade boa, o refugo e os tempos de atividade.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o funciona com o S\/4HANA Cloud Public Edition?<\/summary>\n<p class=\"sp-faq__a\">Sim. O acesso \u00e9 feito atrav\u00e9s de um acordo de comunica\u00e7\u00e3o para os cen\u00e1rios de comunica\u00e7\u00e3o relevantes. Durante a defini\u00e7\u00e3o do \u00e2mbito, a equipa SkyPlanner seleciona a vers\u00e3o da API de ordens de produ\u00e7\u00e3o compat\u00edvel com a sua vers\u00e3o de Public Edition. Nas instala\u00e7\u00f5es locais e na Private Edition, utiliza-se a ativa\u00e7\u00e3o de servi\u00e7os Gateway em alternativa.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>J\u00e1 temos PP\/DS. Precisamos do SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner abrange as f\u00e1bricas e instala\u00e7\u00f5es sem licen\u00e7a de PP\/DS ou sem pessoal dedicado a esse sistema. N\u00e3o requer a ativa\u00e7\u00e3o de op\u00e7\u00f5es de Customizing, liveCache nem um servidor de otimiza\u00e7\u00e3o: do lado do SAP, basta dispor de APIs OData disponibilizadas oficialmente. O motor Arcturus faz a programa\u00e7\u00e3o da produ\u00e7\u00e3o em segundos, respeitando a capacidade real das m\u00e1quinas e das equipas, e o Autopilot reprograma automaticamente quando h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar antes de iniciar a integra\u00e7\u00e3o e quanto tempo demora o projeto?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o per\u00edodo de avalia\u00e7\u00e3o gratuita de 30 dias, importe ordens de produ\u00e7\u00e3o e centros de trabalho a partir de ficheiros exportados do S\/4HANA. Quando a programa\u00e7\u00e3o estiver a funcionar, avance com a integra\u00e7\u00e3o por API. A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de onboarding. Para definir o \u00e2mbito da integra\u00e7\u00e3o no seu ambiente, <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a> ou <a href=\"\/pt-pt\/avaliacao\/\">inicie a avalia\u00e7\u00e3o gratuita<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ SAP S\/4HANA Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o Este guia mostra aos parceiros SAP, \u00e0s equipas de TI e aos respons\u00e1veis por compras t\u00e9cnicas como o SkyPlanner APS se liga ao SAP S\/4HANA. O SkyPlanner integra-se com o S\/4HANA nos dois sentidos atrav\u00e9s &#8230; <a title=\"Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\" aria-label=\"Leia mais sobre Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100802,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101159","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o SAP S\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS e SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, escrita via ScheduleProductionOrderOperation, mapeamento de dados e riscos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS e SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, escrita via ScheduleProductionOrderOperation, mapeamento de dados e riscos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o SAP S\\\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS e SAP S\\\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, escrita via ScheduleProductionOrderOperation, mapeamento de dados e riscos.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para SAP S\\\/4HANA: programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do SAP S\\\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o SAP S\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner","description":"SkyPlanner APS e SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, escrita via ScheduleProductionOrderOperation, mapeamento de dados e riscos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","og_locale":"pt_PT","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o","og_description":"SkyPlanner APS e SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, escrita via ScheduleProductionOrderOperation, mapeamento de dados e riscos.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"21 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o SAP S\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS e SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, escrita via ScheduleProductionOrderOperation, mapeamento de dados e riscos.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para SAP S\/4HANA: programa\u00e7\u00e3o da produ\u00e7\u00e3o","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ SAP S\/4HANA Guia de integra\u00e7\u00e3o do SAP S\/4HANA com o SkyPlanner APS para programa\u00e7\u00e3o da produ\u00e7\u00e3o Este guia mostra aos parceiros SAP, \u00e0s equipas de TI e aos respons\u00e1veis por compras t\u00e9cnicas como o SkyPlanner APS se liga ao SAP S\/4HANA. O SkyPlanner integra-se com o S\/4HANA nos dois sentidos atrav\u00e9s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=101159"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101159\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100802"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=101159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}