{"id":101129,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101129"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"programacao-producao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/","title":{"rendered":"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? <span class=\"hl\">Nivelamento da capacidade, PP\/DS e SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Em termos gerais, a programa\u00e7\u00e3o da produ\u00e7\u00e3o com limites de capacidade organiza o trabalho de acordo com a capacidade efetivamente dispon\u00edvel das m\u00e1quinas e das equipas. No SAP S\/4HANA, h\u00e1 nivelamento manual da capacidade nas funcionalidades base e programa\u00e7\u00e3o autom\u00e1tica no PP\/DS integrado. Na vers\u00e3o standard do S\/4HANA, a programa\u00e7\u00e3o por lead time n\u00e3o considera limites de capacidade. A afeta\u00e7\u00e3o das opera\u00e7\u00f5es nos gargalos respeita a capacidade dispon\u00edvel quando um planeador nivela essas opera\u00e7\u00f5es atrav\u00e9s das aplica\u00e7\u00f5es Fiori de capacidade. O PP\/DS, comercializado como SAP S\/4HANA Manufacturing for planning and scheduling, exige ativa\u00e7\u00e3o, licenciamento e pessoal para o operar.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>As f\u00e1bricas que precisam de incluir todos os recursos na <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>, respeitando a capacidade dispon\u00edvel e sem um projeto PP\/DS, utilizam o SkyPlanner APS em paralelo com o S\/4HANA.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sap-s-4hana-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como o SAP S\/4HANA planeia a produ\u00e7\u00e3o, passo a passo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O S\/4HANA tem dois n\u00edveis de planeamento da capacidade. A maioria das f\u00e1bricas utiliza apenas o primeiro.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. MRP e programa\u00e7\u00e3o por lead time<\/h3>\n\n\n<p>O MRP Live (MD01N) cria ordens planeadas. A programa\u00e7\u00e3o por lead time atribui depois datas \u00e0s opera\u00e7\u00f5es e gera necessidades de capacidade a partir das f\u00f3rmulas do centro de trabalho para prepara\u00e7\u00e3o, processamento e desmontagem. N\u00e3o considera a carga que outras ordens j\u00e1 imp\u00f5em a esse centro de trabalho. O SAP Learning \u00e9 claro: &#8220;The operations are scheduled infinitely. The non-working times of the work centers are taken into account, but not the capacity requirements of other orders&#8221; (As opera\u00e7\u00f5es s\u00e3o programadas com capacidade infinita. S\u00e3o considerados os per\u00edodos n\u00e3o laborais dos centros de trabalho, mas n\u00e3o as necessidades de capacidade de outras ordens) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>). O resultado s\u00e3o centros de trabalho sobrecarregados.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Dados mestre de capacidade dos centros de trabalho<\/h3>\n\n\n<p>A capacidade \u00e9 definida no <strong>Work Center<\/strong>, n\u00e3o na ordem. Um centro de trabalho pode ter v\u00e1rias categorias de capacidade (no exemplo da SAP: 001 M\u00e1quina e 002 M\u00e3o de obra), cada uma com f\u00f3rmulas que convertem os valores standard da gama operat\u00f3ria em necessidades de capacidade. O <strong>Factory Calendar<\/strong> define os dias de trabalho. Para intervalos de tempo espec\u00edficos, podem definir-se valores que substituem a capacidade dispon\u00edvel standard, e as vers\u00f5es de capacidade (standard, m\u00ednima, m\u00e1xima) permitem modelar diferentes regimes de turnos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Avalia\u00e7\u00e3o da capacidade<\/h3>\n\n\n<p>Os planeadores comparam as necessidades com a capacidade dispon\u00edvel na aplica\u00e7\u00e3o <strong>Manage Work Center Capacity<\/strong>. Os respons\u00e1veis de MRP tamb\u00e9m podem fazer esta consulta a partir da lista de stocks\/necessidades. A avalia\u00e7\u00e3o mostra as sobrecargas, mas n\u00e3o desloca nenhuma opera\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Nivelamento da capacidade pelo planeador<\/h3>\n\n\n<p>\u00c9 no nivelamento que as opera\u00e7\u00f5es s\u00e3o afetadas de acordo com a capacidade dispon\u00edvel, por interven\u00e7\u00e3o do planeador. Segundo o SAP Learning: &#8220;In capacity leveling, operations are scheduled finitely. They are dispatched to periods with free capacity.&#8221; (No nivelamento da capacidade, as opera\u00e7\u00f5es s\u00e3o programadas dentro dos limites de capacidade. S\u00e3o afetadas a per\u00edodos com capacidade livre.) As ferramentas s\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Ferramenta<\/th><th>O que faz<\/th><\/tr><\/thead><tbody><tr><td>Quadro de planeamento tabular<\/td><td>Afeta opera\u00e7\u00f5es a per\u00edodos com capacidade livre. Segundo a SAP: &#8220;you cannot create a specific sequence for the dispatched operations within a period&#8221; (n\u00e3o \u00e9 poss\u00edvel criar uma sequ\u00eancia espec\u00edfica para as opera\u00e7\u00f5es afetadas dentro de um per\u00edodo)<\/td><\/tr><tr><td><strong>Capacity Scheduling Table<\/strong> (anteriormente Schedule Production)<\/td><td>Afeta e desafeta opera\u00e7\u00f5es dos gargalos. &#8220;Only bottleneck operations that are assigned to a pacemaker work center are considered.&#8221; (S\u00f3 s\u00e3o consideradas as opera\u00e7\u00f5es dos gargalos atribu\u00eddas a um centro de trabalho regulador do ritmo.) As restantes opera\u00e7\u00f5es da ordem s\u00e3o ajustadas por programa\u00e7\u00e3o a partir de um ponto interm\u00e9dio<\/td><\/tr><tr><td><strong>Capacity Scheduling Board<\/strong><\/td><td>Quadro gr\u00e1fico para afetar, reprogramar ou desafetar opera\u00e7\u00f5es individuais dos gargalos nos centros de trabalho reguladores do ritmo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>O Graphical Planning Table cl\u00e1ssico (CM21, CM22 e as restantes transa\u00e7\u00f5es CM*) faz parte do \u00e2mbito de compatibilidade. Segundo o SAP Learning: &#8220;The use right for the Graphical Planning Table expires on Dec 31, 2025.&#8221; (O direito de utiliza\u00e7\u00e3o do Graphical Planning Table termina nessa data.) Essa data j\u00e1 passou. Se os seus planeadores ainda utilizam as transa\u00e7\u00f5es CM*, a mudan\u00e7a para as aplica\u00e7\u00f5es Fiori j\u00e1 devia ter sido feita.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. PP\/DS integrado<\/h3>\n\n\n<p>O PP\/DS \u00e9 a solu\u00e7\u00e3o da SAP para programa\u00e7\u00e3o autom\u00e1tica da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel. Anteriormente fazia parte do SAP APO e est\u00e1 integrado no S\/4HANA on-premise desde a vers\u00e3o 1610. A SAP apresenta-o como o passo seguinte ao MRP: &#8220;Move beyond classic MRP with SAP S\/4HANA Manufacturing for planning and scheduling software&#8221; (V\u00e1 al\u00e9m do MRP cl\u00e1ssico com este software de planeamento e programa\u00e7\u00e3o da produ\u00e7\u00e3o) (<a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">P\u00e1gina de produto da SAP<\/a>).<\/p>\n\n\n<p>O que acrescenta:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Recursos<\/strong> com um indicador Finite Scheduling: &#8220;You define whether a resource is finite or infinite in the scheduling parameters for the resource via the Finite Scheduling indicator&#8221; (O indicador Finite Scheduling permite definir, nos par\u00e2metros de programa\u00e7\u00e3o do recurso, se a sua capacidade \u00e9 limitada ou ilimitada) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">Ajuda SAP<\/a>). O otimizador pode sobrepor-se a essa defini\u00e7\u00e3o em cada execu\u00e7\u00e3o: o perfil de otimiza\u00e7\u00e3o inclui a op\u00e7\u00e3o &#8220;Always Schedule as Finite&#8221; (Programar sempre respeitando os limites de capacidade), que afeta opera\u00e7\u00f5es aos recursos respeitando a capacidade dispon\u00edvel (<a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>).<\/li>\n\n\n<li>Modos de programa\u00e7\u00e3o: programa\u00e7\u00e3o com capacidade infinita, procura de um intervalo livre, adi\u00e7\u00e3o de uma opera\u00e7\u00e3o no final, inser\u00e7\u00e3o de uma opera\u00e7\u00e3o, inser\u00e7\u00e3o de uma opera\u00e7\u00e3o com elimina\u00e7\u00e3o de intervalos livres e encaixe de uma opera\u00e7\u00e3o.<\/li>\n\n\n<li>Heur\u00edsticas e execu\u00e7\u00f5es de otimiza\u00e7\u00e3o que reduzem os tempos de prepara\u00e7\u00e3o, os custos de prepara\u00e7\u00e3o e os atrasos.<\/li>\n\n\n<li>Uma matriz de prepara\u00e7\u00e3o para mudan\u00e7as de produ\u00e7\u00e3o dependentes da sequ\u00eancia, intervalos m\u00ednimos e m\u00e1ximos entre opera\u00e7\u00f5es e modos alternativos.<\/li>\n\n\n<li>Liga\u00e7\u00e3o entre necessidades e abastecimentos a v\u00e1rios n\u00edveis, planeamento por campanhas e por blocos e alertas.<\/li>\n\n\n<li>O <strong>Production Scheduling Board<\/strong> (um gr\u00e1fico de Gantt em Fiori) e a aplica\u00e7\u00e3o <strong>Monitor Capacity Utilization<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p>Chegar a este ponto exige trabalho. \u00c9 necess\u00e1rio ativar a funcionalidade no Customizing (Advanced Planning &gt; Basic Settings &gt; Activate Advanced Planning and Scheduling), executar o liveCache integrado no HANA e assinalar os materiais e centros de trabalho para planeamento avan\u00e7ado. Tudo o que n\u00e3o estiver assinalado permanece no MRP cl\u00e1ssico. Segundo um artigo de um especialista de produto da SAP, o otimizador &#8220;needs to be additionally installed preferably in a separate hardware&#8221; (tem de ser instalado adicionalmente, de prefer\u00eancia em hardware separado) (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>). O mesmo artigo refere: &#8220;A dedicated license, Manufacturing for Planning and Scheduling is required if this switch is set to Active.&#8221; (\u00c9 necess\u00e1ria uma licen\u00e7a espec\u00edfica, Manufacturing for Planning and Scheduling, se esta op\u00e7\u00e3o estiver definida como Active.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sap-s-4hana-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Os limites do SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Limita\u00e7\u00e3o<\/th><th>Fonte<\/th><th>O que significa no ch\u00e3o de f\u00e1brica<\/th><\/tr><\/thead><tbody><tr><td>A programa\u00e7\u00e3o por lead time considera capacidade infinita<\/td><td>&#8220;The operations are scheduled infinitely&#8221; (As opera\u00e7\u00f5es s\u00e3o programadas com capacidade infinita) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Cada execu\u00e7\u00e3o do planeamento gera sobrecargas que algu\u00e9m tem de resolver<\/td><\/tr><tr><td>O nivelamento nas funcionalidades base depende do planeador<\/td><td>&#8220;In capacity leveling, operations are scheduled finitely&#8221; (No nivelamento da capacidade, as opera\u00e7\u00f5es s\u00e3o programadas dentro dos limites de capacidade) (mesma fonte)<\/td><td>O plano s\u00f3 respeita a capacidade dispon\u00edvel depois de o planeador afetar as opera\u00e7\u00f5es. Uma encomenda urgente ou uma avaria obriga a repetir essa afeta\u00e7\u00e3o<\/td><\/tr><tr><td>O nivelamento tabular n\u00e3o define uma sequ\u00eancia<\/td><td>N\u00e3o h\u00e1 sequ\u00eancia para as opera\u00e7\u00f5es afetadas dentro de um per\u00edodo (mesma fonte)<\/td><td>Sabe que o plano da semana \u00e9 exequ\u00edvel, mas n\u00e3o qual a tarefa a executar primeiro na ter\u00e7a-feira<\/td><\/tr><tr><td>A Capacity Scheduling Table nivela as opera\u00e7\u00f5es dos gargalos nos centros de trabalho reguladores do ritmo<\/td><td>&#8220;For an order, only the bottleneck operation is dispatched to the pacemaker work center&#8221; (Para cada ordem, apenas a opera\u00e7\u00e3o do gargalo \u00e9 afetada ao centro de trabalho regulador do ritmo) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/capacity-leveling-using-the-capacity-scheduling-table\">SAP Learning<\/a>)<\/td><td>As datas das restantes opera\u00e7\u00f5es resultam da programa\u00e7\u00e3o a partir de um ponto interm\u00e9dio, n\u00e3o de uma programa\u00e7\u00e3o da produ\u00e7\u00e3o ajustada \u00e0 capacidade dispon\u00edvel. Os centros de trabalho que n\u00e3o regulam o ritmo continuam sobrecarregados<\/td><\/tr><tr><td>Os casos complexos s\u00e3o remetidos para o PP\/DS<\/td><td>A SAP posiciona o PP\/DS como a solu\u00e7\u00e3o para sincronizar ordens entre n\u00edveis da BOM, ter em conta a disponibilidade de materiais e coordenar v\u00e1rios recursos que constituem gargalos (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>A sequencia\u00e7\u00e3o das prepara\u00e7\u00f5es e as linhas com v\u00e1rios gargalos exigem um segundo m\u00f3dulo<\/td><\/tr><tr><td>No PP\/DS, considerar a capacidade finita \u00e9 uma decis\u00e3o de modela\u00e7\u00e3o<\/td><td>Indicador Finite Scheduling por recurso e op\u00e7\u00e3o &#8220;Always Schedule as Finite&#8221; (Programar sempre respeitando os limites de capacidade) no perfil de otimiza\u00e7\u00e3o (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">Ajuda SAP<\/a>, <a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>)<\/td><td>Os planeadores mant\u00eam os par\u00e2metros dos recursos, as heur\u00edsticas e os perfis de otimiza\u00e7\u00e3o. S\u00f3 s\u00e3o abrangidos os materiais e recursos configurados para planeamento avan\u00e7ado<\/td><\/tr><tr><td>O PP\/DS tem licenciamento e componentes t\u00e9cnicos pr\u00f3prios<\/td><td>Licen\u00e7a espec\u00edfica, liveCache e otimizador instalado separadamente (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>)<\/td><td>\u00c9 um projeto que envolve Basis, licenciamento e planeadores com forma\u00e7\u00e3o, n\u00e3o uma simples defini\u00e7\u00e3o<\/td><\/tr><tr><td>A Planned Order API n\u00e3o alimenta o PP\/DS<\/td><td>&#8220;Automatic integration to PP\/DS is not enabled from this API&#8221; (Esta API n\u00e3o permite a integra\u00e7\u00e3o autom\u00e1tica com esse sistema) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\">SAP Help<\/a>)<\/td><td>As ordens planeadas criadas fora do SAP n\u00e3o entram automaticamente no plano do PP\/DS<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sap-s-4hana-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando o planeamento nativo do SAP S\/4HANA \u00e9 suficiente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O S\/4HANA, por si s\u00f3, responde \u00e0s necessidades da f\u00e1brica quando:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tem um \u00fanico gargalo e lead times longos.<\/strong> As execu\u00e7\u00f5es do planeamento mostram as sobrecargas com semanas de anteced\u00eancia e um planeador nivela o centro de trabalho regulador do ritmo na Capacity Scheduling Table uma vez por semana.<\/li>\n\n\n<li><strong>A procura \u00e9 est\u00e1vel e gerida sobretudo pelo MRP.<\/strong> H\u00e1 poucas encomendas urgentes e poucas mudan\u00e7as de produ\u00e7\u00e3o com impacto significativo.<\/li>\n\n\n<li><strong>J\u00e1 tem licen\u00e7a e uma equipa para o PP\/DS.<\/strong> Os seus planeadores utilizam o Production Scheduling Board todos os dias e todos os materiais e centros de trabalho relevantes est\u00e3o assinalados para planeamento avan\u00e7ado.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando precisa de uma solu\u00e7\u00e3o de programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os sinais veem-se no dia a dia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Os planeadores refazem o plano no Excel ap\u00f3s cada execu\u00e7\u00e3o do MRP, porque as datas programadas j\u00e1 n\u00e3o s\u00e3o vi\u00e1veis.<\/li>\n\n\n<li>S\u00e3o v\u00e1rios os centros de trabalho que limitam a produ\u00e7\u00e3o, e n\u00e3o apenas um que dita o ritmo.<\/li>\n\n\n<li>A combina\u00e7\u00e3o de encomendas muda todos os dias e nivelar a capacidade uma vez por semana n\u00e3o permite responder a tempo.<\/li>\n\n\n<li>A equipa comercial indica datas com base nos lead times, e as entregas no prazo ressentem-se.<\/li>\n\n\n<li>O PP\/DS foi avaliado e rejeitado devido ao custo, ao esfor\u00e7o ou \u00e0s compet\u00eancias necess\u00e1rias. Ou a f\u00e1brica \u00e9 uma unidade mais pequena num ambiente S\/4HANA mais vasto e nunca ter\u00e1 um projeto PP\/DS pr\u00f3prio.<\/li>\n\n\n<li>Os operadores trabalham com listas de ordens impressas e registam as confirma\u00e7\u00f5es com atraso, pelo que o plano est\u00e1 sempre desfasado da realidade.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">O que procurar<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Respeito pela capacidade de todos os recursos<\/strong>, incluindo pessoas e turnos, sem ter de modelar cada recurso individualmente.<\/li>\n\n\n<li><strong>Sequencia\u00e7\u00e3o de cada opera\u00e7\u00e3o<\/strong> ao longo do dia, em vez de agrega\u00e7\u00e3o por per\u00edodos.<\/li>\n\n\n<li><strong>Restri\u00e7\u00f5es reais<\/strong>: tempos de mudan\u00e7a de produ\u00e7\u00e3o entre produtos que dependem da sequ\u00eancia, ferramentas que s\u00f3 podem estar num local de cada vez, opera\u00e7\u00f5es que exigem v\u00e1rios operadores e m\u00e1quinas e pessoas alternativas.<\/li>\n\n\n<li><strong>Disponibilidade dos materiais<\/strong>: uma opera\u00e7\u00e3o n\u00e3o deve come\u00e7ar antes de os seus componentes estarem dispon\u00edveis, considerando tanto o stock como as encomendas de compra em aberto.<\/li>\n\n\n<li><strong>Reprograma\u00e7\u00e3o autom\u00e1tica<\/strong> quando uma encomenda muda ou uma m\u00e1quina para.<\/li>\n\n\n<li><strong>Responsabilidades bem delimitadas face ao S\/4HANA<\/strong>: o S\/4HANA gere os dados mestre, as ordens e o stock; o sistema de programa\u00e7\u00e3o gere a sequ\u00eancia e as datas. Os dados s\u00e3o enviados de volta atrav\u00e9s de APIs disponibilizadas para esse fim, e n\u00e3o por atualiza\u00e7\u00f5es diretas das tabelas.<\/li>\n\n\n<li><strong>Dados do ch\u00e3o de f\u00e1brica<\/strong> que d\u00e3o origem a confirma\u00e7\u00f5es no S\/4HANA.<\/li>\n\n\n<li><strong>Um teste com as suas pr\u00f3prias ordens de produ\u00e7\u00e3o exportadas em CSV<\/strong>, antes de algu\u00e9m mexer nos servi\u00e7os OData.<\/li>\n\n<\/ol>\n\n\n<p>As op\u00e7\u00f5es dividem-se em quatro grupos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Quadros de planeamento no cliente SAP<\/strong>: as aplica\u00e7\u00f5es base de capacidade e os quadros adicionais em SAP GUI ou Fiori, operados por um planeador. Adequam-se a um \u00fanico centro de trabalho que dita o ritmo, com procura est\u00e1vel determinada pelo MRP.<\/li>\n\n\n<li><strong>Planeamento avan\u00e7ado da pr\u00f3pria SAP<\/strong>: PP\/DS integrado, para f\u00e1bricas que adquirem a licen\u00e7a, o ativam e lhe afetam uma equipa.<\/li>\n\n\n<li><strong>Solu\u00e7\u00f5es APS empresariais<\/strong>: plataformas separadas, ligadas atrav\u00e9s de um projeto de implementa\u00e7\u00e3o e operadas por uma equipa de planeamento dedicada.<\/li>\n\n\n<li><strong>APS na cloud com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica<\/strong>, a categoria do SkyPlanner: programa\u00e7\u00e3o autom\u00e1tica da produ\u00e7\u00e3o que respeita a capacidade de todos os recursos, replaneamento com Autopilot e acesso dos operadores por telem\u00f3vel ou tablet, a funcionar em poucas semanas.<\/li>\n\n<\/ul>\n\n\n<p>As plataformas de planeamento da cadeia de abastecimento, incluindo o SAP IBP, tamb\u00e9m surgem nas discuss\u00f5es sobre S\/4HANA. Planeiam a rede, n\u00e3o a sequ\u00eancia de opera\u00e7\u00f5es numa m\u00e1quina.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde se enquadra o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner APS \u00e9 um sistema de programa\u00e7\u00e3o na cloud com IA que funciona em paralelo com o SAP S\/4HANA e preenche a lacuna entre o MRP e a programa\u00e7\u00e3o da produ\u00e7\u00e3o ajustada \u00e0 capacidade dispon\u00edvel. O MRP mant\u00e9m-se no SAP, e o SkyPlanner assume o nivelamento que os seus planeadores fazem hoje \u00e0 m\u00e3o:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Respeito pela capacidade de todos os recursos, automaticamente.<\/strong> O motor Arcturus cria em segundos uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel, a partir de ordens, prioridades, restri\u00e7\u00f5es, capacidades, materiais e regras. Em cada execu\u00e7\u00e3o, respeita a capacidade de todos os centros de trabalho, turnos e pessoas, sem se limitar a um centro que dita o ritmo e sem perfis de otimiza\u00e7\u00e3o para afinar.<\/li>\n\n\n<li><strong>Uma sequ\u00eancia, n\u00e3o uma agrega\u00e7\u00e3o por per\u00edodos.<\/strong> Os planeadores veem num diagrama de Gantt interativo qual \u00e9 a primeira tarefa de ter\u00e7a-feira, e o motor mant\u00e9m o plano coerente quando arrastam uma tarefa.<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o em fun\u00e7\u00e3o dos materiais.<\/strong> Para cada tarefa, o sistema verifica o stock e as encomendas de compra por receber. O material encomendado \u00e9 considerado dispon\u00edvel na data de entrega da encomenda de compra, e o stock \u00e9 atualizado quando esta passa ao estado Delivered. Assim, uma opera\u00e7\u00e3o n\u00e3o come\u00e7a antes de os seus componentes estarem dispon\u00edveis.<\/li>\n\n\n<li><strong>Mudan\u00e7as de produ\u00e7\u00e3o em fun\u00e7\u00e3o da sequ\u00eancia.<\/strong> Uma matriz de tempos de prepara\u00e7\u00e3o guarda os tempos de mudan\u00e7a de produ\u00e7\u00e3o para cada par de produtos, que podem variar consoante o sentido da mudan\u00e7a (de azul para vermelho, 30 minutos; de vermelho para azul, 60). O motor utiliza-a para escolher a sequ\u00eancia com menos tempo de prepara\u00e7\u00e3o, e a regra &#8220;Allow similarity&#8221; agrupa tarefas que partilham uma propriedade, como uma ferramenta.<\/li>\n\n\n<li><strong>Ferramentas e equipas como restri\u00e7\u00f5es.<\/strong> Uma ferramenta em utiliza\u00e7\u00e3o num centro de trabalho n\u00e3o \u00e9 programada noutro ao mesmo tempo. A uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddos tr\u00eas operadores. Quando a m\u00e1quina ou a pessoa principal n\u00e3o est\u00e1 dispon\u00edvel, o motor considera alternativas.<\/li>\n\n\n<li><strong>Um plano sempre atualizado.<\/strong> O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. A sess\u00e3o semanal de nivelamento d\u00e1 assim lugar a um plano di\u00e1rio que acompanha o ch\u00e3o de f\u00e1brica.<\/li>\n\n\n<li><strong>Confirma\u00e7\u00f5es a partir do ch\u00e3o de f\u00e1brica.<\/strong> Os operadores consultam a sua fila de trabalho e registam o trabalho num telem\u00f3vel ou tablet com Mobile Confirmations, Production Timer e Quick Log Mode. A integra\u00e7\u00e3o envia esses registos de tempo para o S\/4HANA como confirma\u00e7\u00f5es de ordens de produ\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n\n<p><strong>Escolha o SkyPlanner quando<\/strong> v\u00e1rios centros de trabalho limitam a produ\u00e7\u00e3o e nivelar apenas o centro que dita o ritmo j\u00e1 n\u00e3o permite manter o plano vi\u00e1vel.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner quando<\/strong> as mudan\u00e7as de produ\u00e7\u00e3o dependem da sequ\u00eancia, ou quando as ferramentas partilhadas e as tarefas com v\u00e1rios operadores determinam o que pode ser executado a seguir.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner quando<\/strong> o nivelamento manual j\u00e1 n\u00e3o chega para a sua f\u00e1brica, um projeto PP\/DS excede o que o problema exige e pretende ter uma programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o que respeite a capacidade dispon\u00edvel em poucas semanas.<\/p>\n\n\n<p>O S\/4HANA mant\u00e9m os materiais, as BOMs, as gamas operat\u00f3rias, os centros de trabalho, as ordens de produ\u00e7\u00e3o e o stock. O SkyPlanner integra-se com ele nos dois sentidos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>As ordens de produ\u00e7\u00e3o e as opera\u00e7\u00f5es s\u00e3o importadas atrav\u00e9s de API_PRODUCTION_ORDER_2_SRV, e os centros de trabalho atrav\u00e9s de API_WORK_CENTERS.<\/li>\n\n\n<li>Cada opera\u00e7\u00e3o \u00e9 programada no S\/4HANA atrav\u00e9s da a\u00e7\u00e3o ScheduleProductionOrderOperation, com programa\u00e7\u00e3o para a frente, estado de programa\u00e7\u00e3o e a data e hora de in\u00edcio definidas pelo SkyPlanner.<\/li>\n\n\n<li>As horas registadas s\u00e3o enviadas atrav\u00e9s de API_PROD_ORDER_CONFIRMATION_2_SRV.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o \u00e0 programa\u00e7\u00e3o assim que ocorre.<\/li>\n\n<\/ul>\n\n\n<p>N\u00e3o h\u00e1 duas f\u00e1bricas que configurem os centros de trabalho, as categorias de capacidade e as gamas operat\u00f3rias da mesma forma. Por isso, a equipa do SkyPlanner adapta a integra\u00e7\u00e3o \u00e0 sua configura\u00e7\u00e3o do S\/4HANA durante a fase de arranque e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O seu parceiro SAP ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Basta uma chave de API para come\u00e7ar.<\/p>\n\n\n<p>Comece com exporta\u00e7\u00f5es CSV ou Excel do S\/4HANA no teste gratuito de 30 dias (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). Veja a sua pr\u00f3pria programa\u00e7\u00e3o antes de algu\u00e9m mexer numa API. Depois, os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, fatura\u00e7\u00e3o mensal e possibilidade de cancelar a qualquer momento. A integra\u00e7\u00e3o \u00e9 or\u00e7amentada antecipadamente de acordo com o seu processo e as suas necessidades, juntamente com o seu plano, para que conhe\u00e7a o custo total antes de come\u00e7ar. A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da fase de arranque.<\/p>\n\n\n<p>Consulte <a href=\"\/pt-pt\/integracoes\/erp\/sap-s4hana\/\">SkyPlanner para SAP S\/4HANA<\/a> para saber que dados circulam entre os sistemas e o <a href=\"\/pt-pt\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com S\/4HANA<\/a> para conhecer a abordagem t\u00e9cnica. Os detalhes da programa\u00e7\u00e3o est\u00e3o nas <a href=\"\/pt-pt\/funcionalidades\/\">funcionalidades<\/a> e na <a href=\"\/pt-pt\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o do SkyPlanner<\/a>. Encontra outros ERPs nas <a href=\"\/pt-pt\/integracoes\/erp\/\">integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Opini\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para a otimizar em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e aparelhagem de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestu\u00e1rio de sala limpa numa linha de enchimento de frascos da f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrico de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no pavilh\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000s<\/b><span>de ordens de trabalho programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos outro controlo sobre a produ\u00e7\u00e3o, e o nosso conhecimento da capacidade est\u00e1 num n\u00edvel completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de trabalho s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o na Fredman Operations, junto de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipa comercial<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner \u00e9 a base de todo o planeamento da produ\u00e7\u00e3o e d\u00e1-lhe fiabilidade.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, respons\u00e1vel de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is de embalagem aptos para contacto alimentar<\/p>\n\n\n<p class=\"ind-cust__result\">A equipa comercial v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e os pedidos de altera\u00e7\u00e3o da programa\u00e7\u00e3o que demoravam uma hora ou mais recebem resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/fredman-operations\/\">Ler o testemunho da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SAP S\/4HANA tem uma ferramenta de programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim, duas. O planeamento da produ\u00e7\u00e3o de base inclui a avalia\u00e7\u00e3o da capacidade e o nivelamento efetuado pelo planeador na Capacity Scheduling Table e no quadro gr\u00e1fico Capacity Scheduling Board. A programa\u00e7\u00e3o autom\u00e1tica da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel, com heur\u00edsticas, otimiza\u00e7\u00e3o, uma matriz de prepara\u00e7\u00e3o e o Production Scheduling Board, est\u00e1 dispon\u00edvel no PP\/DS incorporado, comercializado como SAP S\/4HANA Manufacturing for planning and scheduling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O MRP no S\/4HANA considera a capacidade finita?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. A programa\u00e7\u00e3o por lead time respeita o calend\u00e1rio de f\u00e1brica e os per\u00edodos n\u00e3o laborais, mas ignora a carga que outras ordens colocam num centro de trabalho. A programa\u00e7\u00e3o da produ\u00e7\u00e3o ajustada \u00e0 capacidade dispon\u00edvel ocorre depois, no nivelamento da capacidade ou no PP\/DS.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 a diferen\u00e7a entre SAP PP e PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">O PP abrange o MRP, as ordens de produ\u00e7\u00e3o, as gamas operat\u00f3rias, os centros de trabalho e o planeamento da capacidade no sistema de base. O PP\/DS acrescenta a programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade dispon\u00edvel e tem em conta a sequ\u00eancia das opera\u00e7\u00f5es, para os materiais e recursos configurados para planeamento avan\u00e7ado. Disp\u00f5e de heur\u00edsticas pr\u00f3prias, de um otimizador, do liveCache e do Production Scheduling Board.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O PP\/DS est\u00e1 inclu\u00eddo na licen\u00e7a do S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">As orienta\u00e7\u00f5es de arquitetura empresarial da SAP apresentam o MRP e o CRP como funcionalidades de base do S\/4HANA Enterprise e o Manufacturing for planning and scheduling como uma op\u00e7\u00e3o separada. Num artigo de blogue, um especialista de produto da SAP afirma que as funcionalidades de planeamento avan\u00e7ado &#8220;are not part of the standard SAP S\/4HANA Enterprise license.&#8221; (n\u00e3o fazem parte da licen\u00e7a padr\u00e3o). Confirme as condi\u00e7\u00f5es do seu contrato com a SAP.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O que substitui a CM21 e a Graphical Planning Table no S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">As aplica\u00e7\u00f5es Fiori Manage Work Center Capacity, Capacity Scheduling Table e Capacity Scheduling Board. O direito de utiliza\u00e7\u00e3o da Graphical Planning Table terminou em 31 de dezembro de 2025.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Que restri\u00e7\u00f5es deve considerar uma ferramenta de programa\u00e7\u00e3o para S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">No m\u00ednimo: os limites de capacidade de cada m\u00e1quina, pessoa e turno; as mudan\u00e7as de produ\u00e7\u00e3o que dependem da sequ\u00eancia; as ferramentas partilhadas entre centros de trabalho; as opera\u00e7\u00f5es que exigem v\u00e1rios operadores; os recursos alternativos; e a disponibilidade de materiais, incluindo as encomendas de compra em aberto. O SkyPlanner APS tem em conta todas estas restri\u00e7\u00f5es automaticamente, sempre que executa a programa\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner APS pode funcionar com o SAP S\/4HANA sem PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">Sim. O pr\u00f3prio SkyPlanner APS cria a programa\u00e7\u00e3o da produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel, a partir das ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, centros de trabalho e materiais do S\/4HANA. As datas e confirma\u00e7\u00f5es das opera\u00e7\u00f5es s\u00e3o enviadas de volta para o S\/4HANA, e a equipa do SkyPlanner configura a integra\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial. O per\u00edodo de avalia\u00e7\u00e3o come\u00e7a com importa\u00e7\u00f5es de ficheiros CSV ou Excel. <a href=\"\/pt-pt\/avaliacao\/\">Inicie a avalia\u00e7\u00e3o gratuita<\/a> ou <a href=\"\/pt-pt\/vendas-de-contacto\/\">fale com a equipa comercial<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ SAP S\/4HANA O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS Em termos gerais, a programa\u00e7\u00e3o da produ\u00e7\u00e3o com limites de capacidade organiza o trabalho de acordo com a capacidade efetivamente dispon\u00edvel das m\u00e1quinas e das equipas. No SAP S\/4HANA, h\u00e1 nivelamento manual da capacidade nas &#8230; <a title=\"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/\" aria-label=\"Leia mais sobre O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100802,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101129","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/title>\n<meta name=\"description\" content=\"S\/4HANA: programa\u00e7\u00e3o por lead time sem limites; nivelamento manual de reguladores; PP\/DS automatiza com limites. Como funciona e onde entra SkyPlanner APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"S\/4HANA: programa\u00e7\u00e3o por lead time sem limites; nivelamento manual de reguladores; PP\/DS automatiza com limites. Como funciona e onde entra SkyPlanner APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"21 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/programacao-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/programacao-producao\\\/\",\"name\":\"O SAP S\\\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"S\\\/4HANA: programa\u00e7\u00e3o por lead time sem limites; nivelamento manual de reguladores; PP\\\/DS automatiza com limites. Como funciona e onde entra SkyPlanner APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/programacao-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/programacao-producao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/programacao-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para SAP S\\\/4HANA: programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"O SAP S\\\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\\\/DS e SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?","description":"S\/4HANA: programa\u00e7\u00e3o por lead time sem limites; nivelamento manual de reguladores; PP\/DS automatiza com limites. Como funciona e onde entra SkyPlanner APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/","og_locale":"pt_PT","og_type":"article","og_title":"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS","og_description":"S\/4HANA: programa\u00e7\u00e3o por lead time sem limites; nivelamento manual de reguladores; PP\/DS automatiza com limites. Como funciona e onde entra SkyPlanner APS.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"21 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/","name":"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"S\/4HANA: programa\u00e7\u00e3o por lead time sem limites; nivelamento manual de reguladores; PP\/DS automatiza com limites. Como funciona e onde entra SkyPlanner APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/programacao-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para SAP S\/4HANA: programa\u00e7\u00e3o da produ\u00e7\u00e3o","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ SAP S\/4HANA O SAP S\/4HANA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o? Nivelamento da capacidade, PP\/DS e SkyPlanner APS Em termos gerais, a programa\u00e7\u00e3o da produ\u00e7\u00e3o com limites de capacidade organiza o trabalho de acordo com a capacidade efetivamente dispon\u00edvel das m\u00e1quinas e das equipas. No SAP S\/4HANA, h\u00e1 nivelamento manual da capacidade nas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=101129"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/101129\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100802"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=101129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}