{"id":100891,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100891"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"infor-cloudsuite-industrial","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/","title":{"rendered":"SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-pt\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-pt\/integracoes\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS permite aos fabricantes que utilizam o Infor CloudSuite Industrial (CSI, anteriormente SyteLine) programar a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e dos operadores, tendo em conta cada centro de trabalho, operador, ferramenta e material. Pode ver onde e quando \u00e9 executada cada tarefa, e o Autopilot reprograma automaticamente sempre que h\u00e1 altera\u00e7\u00f5es na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Marcar uma demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama de Gantt do SkyPlanner APS com tarefas programadas por centro de trabalho e uma lista de ordens em baixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre o SkyPlanner e o CloudSuite Industrial \u00e9 bidirecional: o SkyPlanner recebe ordens de fabrico, opera\u00e7\u00f5es, artigos, recursos, exist\u00eancias e encomendas de compra, e devolve as datas planeadas das opera\u00e7\u00f5es e os registos de m\u00e3o de obra. Durante a implementa\u00e7\u00e3o inicial, a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o do CSI.<\/p>\n\n\n<p>Os pre\u00e7os come\u00e7am nos 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gratuito dura 30 dias e permite utilizar at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">M\u00e1quinas sem sobrecarga.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o de cada m\u00e1quina, pessoa e ferramenta respeita a capacidade dispon\u00edvel, os turnos reais, as aus\u00eancias e as horas extraordin\u00e1rias. Uma matriz em utiliza\u00e7\u00e3o numa m\u00e1quina nunca \u00e9 reservada para outra ao mesmo tempo, e a uma tarefa que exige tr\u00eas operadores s\u00e3o atribu\u00eddas tr\u00eas pessoas com disponibilidade nos turnos. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho passa para uma m\u00e1quina ou pessoa alternativa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Datas de entrega que pode prometer.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o mostra quando cada encomenda ficar\u00e1 realmente conclu\u00edda. Responde aos clientes com base no plano, n\u00e3o em suposi\u00e7\u00f5es.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica perante urg\u00eancias e avarias.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para, chega uma encomenda urgente ou um trabalho termina antes do previsto, o Autopilot reprograma automaticamente. Os bloqueios e as prioridades que definiu continuam a ser respeitados.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 9h13l-3.5-3.5M20 15H7l3.5 3.5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Menos mudan\u00e7as de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner sabe quanto tempo demora a preparar uma m\u00e1quina para passar de um produto a outro, em ambos os sentidos. Passar de azul para vermelho pode demorar 30 minutos e de vermelho para azul, 60. As tarefas s\u00e3o programadas pela ordem que permite perder menos tempo em prepara\u00e7\u00f5es.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 21V9l9-5 9 5v12\"\/><path d=\"M2 21h20\"\/><rect x=\"8\" y=\"13\" width=\"8\" height=\"8\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Programa\u00e7\u00e3o ajustada aos materiais dispon\u00edveis.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica as exist\u00eancias e as encomendas de compra por receber. Uma tarefa que depende de uma entrega de fornecedor \u00e9 programada para depois dessa data de entrega, em vez de ficar parada no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Os operadores veem a sua fila de trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador consulta as pr\u00f3ximas tarefas num telem\u00f3vel ou tablet e regista o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o progresso em tempo real, e o trabalho registado \u00e9 enviado para o CloudSuite Industrial sob a forma de transa\u00e7\u00f5es de ordens de fabrico.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que dizem os fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento na UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>poupadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, pass\u00e1mos de planear a produ\u00e7\u00e3o em folhas de c\u00e1lculo Excel para otimizar a produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de abastecimento<\/b><br>UTU \u00b7 Quadros e aparelhagem el\u00e9trica<\/p>\n\n\n<p class=\"ind-cust__result\">O planeamento da produ\u00e7\u00e3o poupa 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/utu\/\">Ler o testemunho da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com fatos de sala limpa numa linha de enchimento de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel de TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e criar um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, demora menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/laboratory-allied\/\">Ler o testemunho da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no pavilh\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000s<\/b><span>de ordens de fabrico programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um controlo diferente sobre a produ\u00e7\u00e3o, e o nosso conhecimento da capacidade est\u00e1 num patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrico por contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de fabrico s\u00e3o programadas automaticamente, e toda a organiza\u00e7\u00e3o tem uma vis\u00e3o da produ\u00e7\u00e3o em tempo real.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/mamec\/\">Ler o testemunho da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Um soldador da KJH-Comp a rebarbar uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de fiabilidade das entregas, face a cerca de 50% anteriormente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da fiabilidade das nossas entregas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Constru\u00e7\u00e3o mec\u00e2nica em chapa e fabrico por contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A fiabilidade das entregas passou de cerca de 50% para valores que chegam aos 98%, e a programa\u00e7\u00e3o exige agora um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-pt\/historias-de-clientes\/kjh-comp\/\">Ler o testemunho da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-skyplanner-works-with-cloudsuite-industrial\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona o SkyPlanner com o CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how ind-how\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">1<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">O CloudSuite Industrial envia o trabalho.<\/h3>\n\n\n<p class=\"fxv-how__b\">O SkyPlanner recebe as ordens de fabrico, opera\u00e7\u00f5es, recursos, exist\u00eancias e encomendas de compra.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">2<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">O SkyPlanner cria a programa\u00e7\u00e3o e mant\u00e9m-na atualizada.<\/h3>\n\n\n<p class=\"fxv-how__b\">O motor Arcturus programa todas as opera\u00e7\u00f5es em segundos e reprograma \u00e0 medida que a produ\u00e7\u00e3o muda.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">3<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">As datas e os registos de trabalho s\u00e3o devolvidos.<\/h3>\n\n\n<p class=\"fxv-how__b\">As datas planeadas das opera\u00e7\u00f5es s\u00e3o devolvidas \u00e0s ordens de fabrico no CSI, e os registos de m\u00e3o de obra chegam sob a forma de transa\u00e7\u00f5es de ordens de fabrico, para lan\u00e7amento no CSI.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner funciona na nuvem e liga-se atrav\u00e9s das interfaces padr\u00e3o da pr\u00f3pria Infor, pelo que n\u00e3o \u00e9 instalado qualquer software SkyPlanner no CSI. Como cada f\u00e1brica utiliza o CSI de forma diferente, a equipa do SkyPlanner configura a integra\u00e7\u00e3o de acordo com a sua configura\u00e7\u00e3o durante a implementa\u00e7\u00e3o inicial e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. O seu parceiro Infor ou os seus pr\u00f3prios programadores tamb\u00e9m podem desenvolver a integra\u00e7\u00e3o com base na API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>Os detalhes t\u00e9cnicos est\u00e3o no <a href=\"\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o CloudSuite Industrial para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-cloudsuite-industrial-s-own-scheduling-fal\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde a programa\u00e7\u00e3o do pr\u00f3prio CloudSuite Industrial fica aqu\u00e9m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O CloudSuite Industrial faz a programa\u00e7\u00e3o da produ\u00e7\u00e3o respeitando a capacidade dispon\u00edvel atrav\u00e9s do m\u00f3dulo APS licenciado e sequencia o trabalho a curto prazo com o Scheduler. Sem essa licen\u00e7a, a <a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">documenta\u00e7\u00e3o da Infor<\/a> \u00e9 clara: &#8220;If the APS module is unlicensed, APS Planning can only be run in Infinite mode.&#8221; (Se o m\u00f3dulo APS n\u00e3o estiver licenciado, o APS Planning s\u00f3 pode ser executado no modo Infinite.) Mesmo com a licen\u00e7a, o dia a dia da produ\u00e7\u00e3o \u00e9 assim:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O replaneamento fica \u00e0 espera do respons\u00e1vel pelo planeamento.<\/strong> Ap\u00f3s uma avaria, a programa\u00e7\u00e3o mant\u00e9m-se inalterada at\u00e9 algu\u00e9m deslocar opera\u00e7\u00f5es ou voltar a executar o Scheduler. Uma encomenda urgente s\u00f3 recebe a capacidade que ainda est\u00e1 livre.<\/li>\n\n\n<li><strong>As altera\u00e7\u00f5es s\u00e3o feitas uma opera\u00e7\u00e3o de cada vez.<\/strong> Cada edi\u00e7\u00e3o no Gantt \u00e9 verificada isoladamente, e o respons\u00e1vel pelo planeamento ajusta manualmente as opera\u00e7\u00f5es seguintes.<\/li>\n\n\n<li><strong>Dois motores para manter sincronizados.<\/strong> O APS planeia a mais longo prazo e o Scheduler programa o dia seguinte, pelo que os respons\u00e1veis pelo planeamento t\u00eam de saber que execu\u00e7\u00e3o definiu cada data.<\/li>\n\n<\/ul>\n\n\n<p>Cada camada \u00e9 explicada em <a href=\"\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/programacao-producao\/\">O Infor CloudSuite Industrial tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cloudsuite-industrial-alone-vs-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">CloudSuite Industrial: sem e com SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>CloudSuite Industrial sem SkyPlanner<\/th><th>CloudSuite Industrial com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>Programa\u00e7\u00e3o da produ\u00e7\u00e3o no APS apenas com licen\u00e7a APS<\/td><td>Capacidade real e turnos definidos para cada m\u00e1quina, pessoa e ferramenta<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>Execu\u00e7\u00f5es do APS e uma execu\u00e7\u00e3o di\u00e1ria do Scheduler<\/td><td>Programa\u00e7\u00e3o detalhada de cada opera\u00e7\u00e3o em segundos<\/td><\/tr><tr><td>Mudan\u00e7as de produ\u00e7\u00e3o<\/td><td>Tabelas de prepara\u00e7\u00e3o por grupo de recursos<\/td><td>Tarefas sequenciadas para minimizar o tempo de prepara\u00e7\u00e3o, considerando os dois sentidos de cada mudan\u00e7a de produ\u00e7\u00e3o<\/td><\/tr><tr><td>Materiais<\/td><td>O MRP planeia os materiais sem considerar a capacidade<\/td><td>As tarefas come\u00e7am quando os materiais est\u00e3o em stock ou as entregas previstas chegam<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O respons\u00e1vel pelo planeamento edita o Gantt ou volta a executar o Scheduler<\/td><td>O Autopilot replaneia toda a f\u00e1brica de acordo com as suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Registos de m\u00e3o de obra e transa\u00e7\u00f5es de ordens de fabrico introduzidos no CSI<\/td><td>Os operadores consultam a sua fila de tarefas e registam o trabalho num telem\u00f3vel ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cloudsuite-industr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma ferramenta de programa\u00e7\u00e3o para o CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O APS e o Scheduler do pr\u00f3prio CloudSuite Industrial s\u00e3o adequados a uma f\u00e1brica com o m\u00f3dulo APS licenciado, gamas operat\u00f3rias rigorosas e poucas altera\u00e7\u00f5es no ch\u00e3o de f\u00e1brica entre execu\u00e7\u00f5es do Scheduler.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Escolha o SkyPlanner quando os respons\u00e1veis pelo planeamento passam a manh\u00e3 a deslocar opera\u00e7\u00f5es no Resource Gantt.<\/strong> O Autopilot replaneia, e o Running Time Lock mant\u00e9m o trabalho j\u00e1 iniciado no seu lugar.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as mudan\u00e7as de produ\u00e7\u00e3o determinam quanto consegue produzir.<\/strong> O SkyPlanner sequencia as tarefas para minimizar o tempo total de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as ferramentas e equipas partilhadas determinam o que pode ser executado a seguir.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando a chegada dos materiais determina que tarefa pode come\u00e7ar.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando pretende programar a produ\u00e7\u00e3o de acordo com a capacidade dispon\u00edvel, sem ter de licenciar e afinar o m\u00f3dulo APS.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando pretende reunir a programa\u00e7\u00e3o e os registos do ch\u00e3o de f\u00e1brica numa \u00fanica ferramenta.<\/strong><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todas as funcionalidades do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele a sua produ\u00e7\u00e3o.<\/strong> Crie centros de trabalho a partir dos recursos e grupos de recursos do CSI e adicione turnos, ferramentas e tempos de mudan\u00e7a de produ\u00e7\u00e3o. Est\u00e1 dispon\u00edvel apoio \u00e0 implementa\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue as suas ordens de fabrico.<\/strong> Exporte as ordens de fabrico em aberto e as opera\u00e7\u00f5es do CSI com Save to Excel, importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com o seu plano atual.<\/li>\n\n\n<li><strong>Ligue o CloudSuite Industrial.<\/strong> A equipa do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta apoio ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o faturados mensalmente por centro de trabalho. Pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-pt\/precos\/\">pre\u00e7os<\/a> para saber mais.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/avaliacao\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-pt\/vendas-de-contacto\/\">Falar com a equipa comercial<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Infor CloudSuite Industrial tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim, em duas componentes. O Finite APS Planning exige a licen\u00e7a APS, e o Scheduler sequencia as opera\u00e7\u00f5es a curto prazo, que os respons\u00e1veis pelo planeamento ajustam num Gantt. O SkyPlanner APS acrescenta replaneamento autom\u00e1tico para todos os recursos, reunindo mudan\u00e7as de produ\u00e7\u00e3o, ferramentas, equipas e materiais numa \u00fanica programa\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c9 necess\u00e1rio instalar alguma coisa no CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em paralelo com o CSI, e liga-se atrav\u00e9s da IDO REST API padr\u00e3o da Infor e do ION. O SyteLine instalado localmente liga-se atrav\u00e9s da mesma camada IDO.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui as funcionalidades de produ\u00e7\u00e3o do CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, complementa-as. O CSI continua a gerir artigos, listas de materiais, MRP, compras, invent\u00e1rio, custeio e finan\u00e7as. O SkyPlanner programa as ordens de fabrico firmes e lan\u00e7adas de acordo com a capacidade real e devolve as datas e os registos de m\u00e3o de obra.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que utiliza o CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">Desde 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com a sua pr\u00f3pria fila de tarefas programadas. O pre\u00e7o n\u00e3o depende da sua subscri\u00e7\u00e3o Infor nem da licen\u00e7a APS. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades, juntamente com o plano escolhido, para que conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo demora a implementa\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implementa\u00e7\u00e3o fica normalmente conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo de configura\u00e7\u00e3o e acompanhamento. A equipa mapeia os seus recursos e gamas operat\u00f3rias, liga as ordens de fabrico e as encomendas de compra e configura o envio das datas planeadas e dos registos de m\u00e3o de obra para o CSI. Tudo \u00e9 testado face ao seu plano atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de o integrar com o CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">Sim. A avalia\u00e7\u00e3o de 30 dias utiliza uma exporta\u00e7\u00e3o Excel do CSI. Pode ver a <a href=\"\/pt-pt\/recursos-pt-pt\/capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> com as suas pr\u00f3prias tarefas e recursos, respeitando a capacidade dispon\u00edvel, antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos da licen\u00e7a APS do CSI para utilizar o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner programa a produ\u00e7\u00e3o de forma aut\u00f3noma, respeitando a capacidade dispon\u00edvel, a partir das ordens de fabrico, opera\u00e7\u00f5es e recursos do CSI. O MRP ou o Infinite APS podem continuar a planear os materiais no CSI.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Infor CloudSuite Industrial SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o O SkyPlanner APS permite aos fabricantes que utilizam o Infor CloudSuite Industrial (CSI, anteriormente SyteLine) programar a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e dos operadores, tendo em conta cada centro de trabalho, operador, ferramenta e material. &#8230; <a title=\"SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/\" aria-label=\"Leia mais sobre SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o\">Ler mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100684,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100891","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Programa\u00e7\u00e3o da produ\u00e7\u00e3o: CloudSuite Industrial | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS programa tarefas do Infor CloudSuite Industrial (SyteLine) com capacidade real e devolve datas e horas de trabalho. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS programa tarefas do Infor CloudSuite Industrial (SyteLine) com capacidade real e devolve datas e horas de trabalho. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-cloudsuite-industrial\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-cloudsuite-industrial\\\/\",\"name\":\"Programa\u00e7\u00e3o da produ\u00e7\u00e3o: CloudSuite Industrial | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS programa tarefas do Infor CloudSuite Industrial (SyteLine) com capacidade real e devolve datas e horas de trabalho. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-cloudsuite-industrial\\\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-cloudsuite-industrial\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/infor-cloudsuite-industrial\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para o seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Programa\u00e7\u00e3o da produ\u00e7\u00e3o: CloudSuite Industrial | SkyPlanner APS","description":"SkyPlanner APS programa tarefas do Infor CloudSuite Industrial (SyteLine) com capacidade real e devolve datas e horas de trabalho. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/","og_locale":"pt_PT","og_type":"article","og_title":"SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o","og_description":"SkyPlanner APS programa tarefas do Infor CloudSuite Industrial (SyteLine) com capacidade real e devolve datas e horas de trabalho. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Tempo estimado de leitura":"11 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/","url":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/","name":"Programa\u00e7\u00e3o da produ\u00e7\u00e3o: CloudSuite Industrial | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS programa tarefas do Infor CloudSuite Industrial (SyteLine) com capacidade real e devolve datas e horas de trabalho. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/infor-cloudsuite-industrial\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-pt\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para o seu ERP","item":"https:\/\/skyplanner.ai\/pt-pt\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-pt\/#website","url":"https:\/\/skyplanner.ai\/pt-pt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-pt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-pt\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-pt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-pt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Infor CloudSuite Industrial SkyPlanner APS para Infor CloudSuite Industrial (SyteLine): programa\u00e7\u00e3o da produ\u00e7\u00e3o O SkyPlanner APS permite aos fabricantes que utilizam o Infor CloudSuite Industrial (CSI, anteriormente SyteLine) programar a produ\u00e7\u00e3o respeitando a capacidade real das m\u00e1quinas e dos operadores, tendo em conta cada centro de trabalho, operador, ferramenta e material.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100891","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/comments?post=100891"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100891\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/pages\/100684"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-pt\/wp-json\/wp\/v2\/media?parent=100891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}