{"id":98182,"date":"2026-10-15T01:40:32","date_gmt":"2026-10-15T01:40:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=98182"},"modified":"2026-10-15T01:41:41","modified_gmt":"2026-10-15T01:41:41","slug":"taxa-de-producao","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/","title":{"rendered":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/pt-br\/\">In\u00edcio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos\/\">Recursos<\/a> &raquo; Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>As m\u00e1quinas no in\u00edcio do processo est\u00e3o ocupadas, os paletes v\u00e3o se enchendo e a montagem continua esperando as pe\u00e7as de que precisa. Ao fim do turno, a f\u00e1brica iniciou muito trabalho, mas concluiu poucos pedidos.<\/p>\n\n\n<p>A taxa de produ\u00e7\u00e3o evidencia essa diferen\u00e7a. <strong>Ela mede a quantidade de produtos aprovados que um processo produtivo definido conclui por unidade de tempo: por exemplo, conjuntos aprovados por hora ou toneladas de produto acabado por turno.<\/strong> Mede o que sai do processo, n\u00e3o o volume de atividade dentro dele.<\/p>\n\n\n<p>Para melhorar essa taxa, n\u00e3o basta acelerar a primeira opera\u00e7\u00e3o. \u00c9 preciso que o trabalho certo chegue \u00e0 pr\u00f3xima etapa enquanto ainda h\u00e1 tempo para conclu\u00ed-lo. O SkyPlanner ajuda a transformar essa necessidade em uma programa\u00e7\u00e3o da produ\u00e7\u00e3o, relacionando a capacidade dos recursos, as depend\u00eancias entre opera\u00e7\u00f5es e as prioridades. Assim, sua equipe pode trabalhar para concluir pedidos, em vez de aumentar filas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Como calcular a taxa de produ\u00e7\u00e3o<\/h2>\n\n\n<p>Use esta f\u00f3rmula:<\/p>\n\n\n<p><strong>Taxa de produ\u00e7\u00e3o = Unidades aprovadas conclu\u00eddas \u00f7 Per\u00edodo de medi\u00e7\u00e3o<\/strong><\/p>\n\n\n<p>Imagine que 80 unidades cheguem \u00e0 inspe\u00e7\u00e3o final durante um turno de oito horas. Oito ainda precisam de corre\u00e7\u00e3o e n\u00e3o foram aprovadas. Portanto, o turno produziu 72 unidades aprovadas:<\/p>\n\n\n<p><strong>72 unidades aprovadas \u00f7 8 horas = 9 unidades aprovadas por hora<\/strong><\/p>\n\n\n<p>As unidades que aguardam retrabalho ainda n\u00e3o entram na contagem da produ\u00e7\u00e3o aprovada. Se forem corrigidas e aprovadas depois, conte-as uma \u00fanica vez nesse momento, e n\u00e3o a cada passagem por uma m\u00e1quina. Refugos n\u00e3o contam como produ\u00e7\u00e3o aprovada.<\/p>\n\n\n<p>Em um processo cont\u00ednuo, use uma unidade f\u00edsica adequada, como quilogramas ou litros, em vez de pe\u00e7as. O princ\u00edpio \u00e9 o mesmo: defina o que \u00e9 produ\u00e7\u00e3o aprovada e divida essa quantidade pelo per\u00edodo em que ela foi conclu\u00edda.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Antes de aumentar a taxa, garanta que os n\u00fameros sejam compar\u00e1veis<\/h3>\n\n\n<p>O c\u00e1lculo da taxa de produ\u00e7\u00e3o exige que se delimite o processo medido. Uma c\u00e9lula de usinagem pode medir as pe\u00e7as aprovadas que saem dela; uma f\u00e1brica pode medir os produtos acabados que passam pela aprova\u00e7\u00e3o final. As duas medidas s\u00e3o \u00fateis, mas uma taxa maior na c\u00e9lula n\u00e3o comprova que a f\u00e1brica concluiu mais produtos.<\/p>\n\n\n<p>Mantenha tr\u00eas crit\u00e9rios consistentes:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>O ponto de sa\u00edda.<\/strong> Conte as unidades conclu\u00eddas sempre na mesma etapa. Transferir a medi\u00e7\u00e3o da aprova\u00e7\u00e3o final para uma opera\u00e7\u00e3o anterior pode fazer o resultado parecer melhor sem aumentar a produ\u00e7\u00e3o de produtos acabados.<\/li><li><strong>O per\u00edodo de medi\u00e7\u00e3o.<\/strong> No exemplo, todas as oito horas do turno permanecem no denominador, inclusive as interrup\u00e7\u00f5es. Uma taxa calculada apenas sobre as horas em que a m\u00e1quina esteve em opera\u00e7\u00e3o responde a outra pergunta. Identifique essa taxa separadamente, em vez de excluir o tempo perdido da compara\u00e7\u00e3o entre turnos.<\/li><li><strong>O mix de produtos.<\/strong> Um turno que fabrica suportes simples n\u00e3o \u00e9 diretamente compar\u00e1vel a outro que produz conjuntos complexos. Compare fam\u00edlias de produtos semelhantes ou use uma medida documentada de produ\u00e7\u00e3o equivalente quando o mix variar muito.<\/li><\/ul>\n\n\n<p>Em uma f\u00e1brica com produ\u00e7\u00e3o sob encomenda, acompanhe a taxa junto com o desempenho das entregas. Concluir muitas unidades f\u00e1ceis de fabricar n\u00e3o representa sucesso se os pedidos de que os clientes precisam continuam esperando.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Taxa de produ\u00e7\u00e3o n\u00e3o \u00e9 tempo de atravessamento<\/h2>\n\n\n<p>Os termos podem causar confus\u00e3o, mas as unidades de medida mostram a qual pergunta cada indicador responde:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Taxa de produ\u00e7\u00e3o:<\/strong> qual \u00e9 a quantidade de produtos aprovados conclu\u00eddos por hora, turno ou dia?<\/li><li><strong>Tempo de atravessamento:<\/strong> quanto tempo uma unidade ou um lote leva para percorrer o processo produtivo definido, incluindo as esperas?<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/tempo-de-ciclo\/\">Tempo de ciclo<\/a>:<\/strong> quanto tempo leva uma opera\u00e7\u00e3o repetitiva ou um ciclo de produ\u00e7\u00e3o? Algumas organiza\u00e7\u00f5es usam o tempo de ciclo para todo o intervalo de produ\u00e7\u00e3o, por isso \u00e9 importante delimitar o que est\u00e1 sendo medido.<\/li><li><strong>Capacidade:<\/strong> quanto trabalho os recursos dispon\u00edveis poderiam processar nas condi\u00e7\u00f5es operacionais estabelecidas?<\/li><li><strong>Utiliza\u00e7\u00e3o:<\/strong> quanto do tempo dispon\u00edvel de um recurso est\u00e1 ocupado?<\/li><\/ul>\n\n\n<p>Uma m\u00e1quina pode apresentar alta utiliza\u00e7\u00e3o enquanto fabrica componentes que v\u00e3o esperar dias pela montagem. Da mesma forma, reduzir a dura\u00e7\u00e3o de uma \u00fanica opera\u00e7\u00e3o pode n\u00e3o aumentar a produ\u00e7\u00e3o de produtos acabados se outra etapa n\u00e3o conseguir receber o trabalho adicional.<\/p>\n\n\n<p>Aqui, taxa de produ\u00e7\u00e3o significa a quantidade f\u00edsica de produtos aprovados conclu\u00edda por unidade de tempo. J\u00e1 a contabilidade de ganhos usa uma medida financeira; n\u00e3o misture esse ganho monet\u00e1rio com unidades por hora no mesmo gr\u00e1fico de desempenho.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Por que iniciar mais trabalho nem sempre significa concluir mais pedidos<\/h2>\n\n\n<p>Imagine uma f\u00e1brica que monta bombas. Cada unidade acabada precisa de uma carca\u00e7a usinada e de um eixo, e um mesmo centro de usinagem pode produzir qualquer um desses componentes. Para evitar uma troca de produ\u00e7\u00e3o, o operador segue com outro lote de carca\u00e7as. Enquanto isso, a montagem tem carca\u00e7as dispon\u00edveis, mas est\u00e1 esperando os eixos.<\/p>\n\n\n<p>Manter o centro de usinagem ocupado com carca\u00e7as aumenta o estoque em processo. Isso n\u00e3o fornece o componente que falta nem conclui uma bomba.<\/p>\n\n\n<p>Um plano voltado \u00e0 conclus\u00e3o parte das necessidades da montagem e programa as etapas anteriores. Ele coordena as opera\u00e7\u00f5es de carca\u00e7as e eixos para que os componentes correspondentes estejam dispon\u00edveis antes do hor\u00e1rio previsto para a montagem. As m\u00e1quinas n\u00e3o ficaram mais r\u00e1pidas. A sequ\u00eancia passou a atender melhor \u00e0s necessidades da produ\u00e7\u00e3o.<\/p>\n\n\n<p>Isso n\u00e3o significa zerar todas as filas. Se houver pouco trabalho pronto para iniciar, um recurso cr\u00edtico pode ficar ocioso quando uma opera\u00e7\u00e3o anterior atrasar. O objetivo \u00e9 ter trabalho suficiente e adequado no ponto certo, n\u00e3o a menor fila poss\u00edvel em todos os lugares.<\/p>\n\n\n<p>Os <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/gargalos-de-producao\/\">gargalos de produ\u00e7\u00e3o<\/a> continuam sendo importantes: uma opera\u00e7\u00e3o que realmente restringe o fluxo imp\u00f5e um limite que o sequenciamento, sozinho, n\u00e3o consegue eliminar. Mas, antes de comprar mais equipamentos, diferencie a falta de capacidade de processamento das esperas evit\u00e1veis por materiais, componentes correspondentes ou uma sequ\u00eancia vi\u00e1vel de opera\u00e7\u00f5es.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Use o SkyPlanner para sequenciar o trabalho com foco na conclus\u00e3o<\/h2>\n\n\n<p>Com uma carteira de pedidos que muda constantemente, coordenar essas decis\u00f5es manualmente logo se torna dif\u00edcil. Alterar a posi\u00e7\u00e3o de uma opera\u00e7\u00e3o afeta a capacidade dispon\u00edvel para as demais, suas etapas seguintes e suas datas de conclus\u00e3o.<\/p>\n\n\n<p>O SkyPlanner APS <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/o-que-e-programacao-da-producao\/\">cuida desse c\u00e1lculo da programa\u00e7\u00e3o<\/a>. Seu mecanismo de IA, Arcturus, programa as opera\u00e7\u00f5es conforme a capacidade configurada dos centros de trabalho, as depend\u00eancias e as prioridades. O gr\u00e1fico de Gantt exibe o plano resultante. Voc\u00ea define as prioridades, as regras e os bloqueios; o Arcturus faz os c\u00e1lculos respeitando essas defini\u00e7\u00f5es.<\/p>\n\n\n<p>Tr\u00eas decis\u00f5es de programa\u00e7\u00e3o s\u00e3o especialmente valiosas para melhorar a taxa de produ\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Organize o trabalho pronto para iniciar em uma sequ\u00eancia realista<\/h3>\n\n\n<p>Uma janela dispon\u00edvel na m\u00e1quina pouco ajuda se o material necess\u00e1rio s\u00f3 vai chegar amanh\u00e3. Quando a programa\u00e7\u00e3o que considera materiais est\u00e1 habilitada, o SkyPlanner leva a disponibilidade deles em conta no c\u00e1lculo. As depend\u00eancias entre opera\u00e7\u00f5es tamb\u00e9m conectam o trabalho anterior \u00e0s etapas seguintes.<\/p>\n\n\n<p>Assim, o plano considera quando o trabalho pode avan\u00e7ar, em vez de formar uma fila que pressup\u00f5e que tudo est\u00e1 pronto. No ch\u00e3o de f\u00e1brica, use esse plano para orientar a libera\u00e7\u00e3o das ordens e verificar se as condi\u00e7\u00f5es necess\u00e1rias est\u00e3o atendidas antes de autorizar a entrada de mais trabalho na produ\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Reduza as trocas de produ\u00e7\u00e3o sem perder os prazos de vista<\/h3>\n\n\n<p>Alternar repetidamente entre ferramentas, materiais ou cores pode consumir tempo que estaria dispon\u00edvel para produzir. O SkyPlanner pode agrupar opera\u00e7\u00f5es com propriedades compat\u00edveis por meio das regras dos centros de trabalho e das prioridades din\u00e2micas, usando o <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/tempo-de-setup\/\">tempo de setup<\/a> configurado para opera\u00e7\u00f5es diferentes.<\/p>\n\n\n<p>O benef\u00edcio \u00e9 uma sequ\u00eancia mais bem planejada: opera\u00e7\u00f5es compat\u00edveis podem ser executadas em sequ\u00eancia, em vez de cada troca de produ\u00e7\u00e3o ser decidida isoladamente. Equilibre esse agrupamento com as datas de conclus\u00e3o e as prioridades dos clientes. Um lote longo e conveniente n\u00e3o \u00e9 a escolha certa quando atrasa os componentes necess\u00e1rios para concluir um pedido urgente.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Recalcule quando as condi\u00e7\u00f5es mudarem<\/h3>\n\n\n<p>Uma opera\u00e7\u00e3o atrasada ou uma mudan\u00e7a de prioridade pode tornar a sequ\u00eancia de ontem inadequada para o trabalho de hoje. O Arcturus pode recalcular a programa\u00e7\u00e3o com base nas informa\u00e7\u00f5es atualizadas, enquanto a visualiza\u00e7\u00e3o de Gantt permite revisar a aloca\u00e7\u00e3o das opera\u00e7\u00f5es e as datas de conclus\u00e3o resultantes.<\/p>\n\n\n<p>Em vez de refazer manualmente a fila de cada m\u00e1quina, voc\u00ea pode se concentrar nas decis\u00f5es: qual trabalho precisa terminar primeiro, se a capacidade exige aten\u00e7\u00e3o e quais compromissos o plano revisado permite assumir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que mudou na Eskomatic com a visibilidade dos materiais dispon\u00edveis<\/h2>\n\n\n<p>A Eskomatic, empresa finlandesa de usinagem sob contrato, organizava suas filas de trabalho em grande parte manualmente, em um sistema de controle da produ\u00e7\u00e3o antigo. A pouca visibilidade da situa\u00e7\u00e3o dos materiais fazia com que as faltas pudessem ser identificadas muito perto do in\u00edcio previsto de uma opera\u00e7\u00e3o.<\/p>\n\n\n<p>Com o SkyPlanner conectado ao ERP que j\u00e1 utilizava, a equipe passou a contar com filas de trabalho mais claras no Gantt, programa\u00e7\u00e3o automatizada da carga e maior visibilidade das faltas de materiais. A Eskomatic relata menos paradas de produ\u00e7\u00e3o por falta de materiais e maior precis\u00e3o na defini\u00e7\u00e3o das datas de entrega.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/pt-br\/historias-de-clientes\/eskomatic\/\">experi\u00eancia da Eskomatic<\/a> mostra por que ter as condi\u00e7\u00f5es necess\u00e1rias para iniciar o trabalho importa para o fluxo: uma programa\u00e7\u00e3o \u00fatil considera se o trabalho pode avan\u00e7ar, n\u00e3o apenas sua posi\u00e7\u00e3o na fila. Para o analista de PCP, ter mais clareza sobre o trabalho di\u00e1rio e menos interrup\u00e7\u00f5es por falta de materiais significa gastar menos tempo resolvendo faltas depois que uma opera\u00e7\u00e3o j\u00e1 deveria ter come\u00e7ado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Verifique se produzir mais significa concluir o que voc\u00ea precisa<\/h2>\n\n\n<p>Depois de mudar a sequ\u00eancia ou a forma de liberar ordens para produ\u00e7\u00e3o, me\u00e7a novamente as unidades conclu\u00eddas e aprovadas, mantendo os mesmos limites de medi\u00e7\u00e3o. Analise turnos ou semanas compar\u00e1veis, n\u00e3o apenas a primeira tarde de muita atividade.<\/p>\n\n\n<p>Avalie a taxa de produ\u00e7\u00e3o junto com o estoque em processo, a qualidade e o desempenho das entregas. Se mais opera\u00e7\u00f5es entram na produ\u00e7\u00e3o, mas a quantidade conclu\u00edda e aprovada n\u00e3o muda, a melhoria pode ser apenas uma fila maior. Se a produ\u00e7\u00e3o aumenta porque voc\u00ea selecionou produtos mais f\u00e1ceis de fabricar, o mix explica ao menos parte da mudan\u00e7a. Se o estoque de produtos acabados cresce sem demanda, uma taxa maior pode imobilizar capital em vez de ajudar o neg\u00f3cio.<\/p>\n\n\n<p>A programa\u00e7\u00e3o tamb\u00e9m \u00e9 apenas parte da solu\u00e7\u00e3o. Quebras recorrentes, defeitos ou capacidade f\u00edsica insuficiente exigem medidas de manuten\u00e7\u00e3o, de melhoria da qualidade ou de adequa\u00e7\u00e3o da capacidade produtiva. Um plano melhor ajuda a coordenar os recursos dispon\u00edveis; n\u00e3o substitui esses recursos nem torna um processo inst\u00e1vel confi\u00e1vel por si s\u00f3.<\/p>\n\n\n<p>Para uma f\u00e1brica em que o trabalho vive parado no lugar errado, o SkyPlanner \u00e9 um pr\u00f3ximo passo pr\u00e1tico. Ele se integra a qualquer ERP ou MES por meio de sua REST API aberta, levando os dados de produ\u00e7\u00e3o existentes para a programa\u00e7\u00e3o com capacidade finita, sem exigir a substitui\u00e7\u00e3o de um sistema que j\u00e1 atende ao seu neg\u00f3cio.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/pt-br\/vendas-de-contacto\/\">Agende uma demonstra\u00e7\u00e3o do SkyPlanner<\/a> para conversar sobre o trabalho que sua f\u00e1brica tem dificuldade para concluir. Traga um roteiro de fabrica\u00e7\u00e3o t\u00edpico, um atraso recente de material e o indicador de conclus\u00e3o que deseja melhorar. A pergunta relevante n\u00e3o \u00e9 apenas se cada m\u00e1quina poderia ficar mais ocupada. \u00c9 como uma sequ\u00eancia melhor poderia ajudar a concluir mais do trabalho certo, com produtos aprovados e prontos para o cliente.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas In\u00edcio &raquo; Recursos &raquo; Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas As m\u00e1quinas no in\u00edcio do processo est\u00e3o ocupadas, os paletes v\u00e3o se enchendo e a montagem continua esperando as pe\u00e7as de que precisa. Ao fim do turno, a f\u00e1brica iniciou muito trabalho, mas &#8230; <a title=\"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/\" aria-label=\"Read more about Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":98222,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2535,310],"tags":[],"class_list":["post-98182","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-e-programacao","category-recursos-pt-br","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas<\/title>\n<meta name=\"description\" content=\"M\u00e1quinas ocupadas nem sempre geram mais pedidos conclu\u00eddos. Me\u00e7a a taxa de produ\u00e7\u00e3o e use o SkyPlanner para programar o trabalho e concluir o que importa.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas\" \/>\n<meta property=\"og:description\" content=\"M\u00e1quinas ocupadas nem sempre geram mais pedidos conclu\u00eddos. Me\u00e7a a taxa de produ\u00e7\u00e3o e use o SkyPlanner para programar o trabalho e concluir o que importa.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T01:40:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T01:41:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas\",\"datePublished\":\"2026-10-15T01:40:32+00:00\",\"dateModified\":\"2026-10-15T01:41:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/\"},\"wordCount\":2147,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"articleSection\":[\"APS e programa\u00e7\u00e3o\",\"recursos\"],\"inLanguage\":\"pt-BR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/\",\"name\":\"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"datePublished\":\"2026-10-15T01:40:32+00:00\",\"dateModified\":\"2026-10-15T01:41:41+00:00\",\"description\":\"M\u00e1quinas ocupadas nem sempre geram mais pedidos conclu\u00eddos. Me\u00e7a a taxa de produ\u00e7\u00e3o e use o SkyPlanner para programar o trabalho e concluir o que importa.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-throughput-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/taxa-de-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas","description":"M\u00e1quinas ocupadas nem sempre geram mais pedidos conclu\u00eddos. Me\u00e7a a taxa de produ\u00e7\u00e3o e use o SkyPlanner para programar o trabalho e concluir o que importa.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/","og_locale":"pt_BR","og_type":"article","og_title":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas","og_description":"M\u00e1quinas ocupadas nem sempre geram mais pedidos conclu\u00eddos. Me\u00e7a a taxa de produ\u00e7\u00e3o e use o SkyPlanner para programar o trabalho e concluir o que importa.","og_url":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T01:40:32+00:00","article_modified_time":"2026-10-15T01:41:41+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Est. tempo de leitura":"11 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas","datePublished":"2026-10-15T01:40:32+00:00","dateModified":"2026-10-15T01:41:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/"},"wordCount":2147,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","articleSection":["APS e programa\u00e7\u00e3o","recursos"],"inLanguage":"pt-BR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/","url":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/","name":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","datePublished":"2026-10-15T01:40:32+00:00","dateModified":"2026-10-15T01:41:41+00:00","description":"M\u00e1quinas ocupadas nem sempre geram mais pedidos conclu\u00eddos. Me\u00e7a a taxa de produ\u00e7\u00e3o e use o SkyPlanner para programar o trabalho e concluir o que importa.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/taxa-de-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-throughput-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas In\u00edcio &raquo; Recursos &raquo; Taxa de produ\u00e7\u00e3o: conclua mais, n\u00e3o apenas ocupe m\u00e1quinas As m\u00e1quinas no in\u00edcio do processo est\u00e3o ocupadas, os paletes v\u00e3o se enchendo e a montagem continua esperando as pe\u00e7as de que precisa. Ao fim do turno, a f\u00e1brica iniciou muito trabalho, mas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/98182","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=98182"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/98182\/revisions"}],"predecessor-version":[{"id":98245,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/98182\/revisions\/98245"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media\/98222"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=98182"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/categories?post=98182"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/tags?post=98182"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}