{"id":102229,"date":"2026-10-20T08:15:33","date_gmt":"2026-10-20T08:15:33","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102229"},"modified":"2026-10-21T03:23:08","modified_gmt":"2026-10-21T03:23:08","slug":"dashboard-de-producao","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/","title":{"rendered":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A produ\u00e7\u00e3o da f\u00e1brica est\u00e1 acima da meta, mas um pedido com entrega para amanh\u00e3 est\u00e1 na fila de uma m\u00e1quina parada. Na reuni\u00e3o da manh\u00e3, o total em verde indica que a produ\u00e7\u00e3o vai bem. O cliente est\u00e1 prestes a ouvir outra hist\u00f3ria.<\/p>\n\n\n<p>Um dashboard de produ\u00e7\u00e3o \u00fatil evidencia essa diverg\u00eancia enquanto ainda \u00e9 poss\u00edvel agir. Ele ajuda a equipe a identificar o que precisa de aten\u00e7\u00e3o, entender o motivo e decidir o que deve mudar em seguida.<\/p>\n\n\n<p>O SkyPlanner APS conecta essa visibilidade \u00e0 programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade finita. Voc\u00ea pode reunir informa\u00e7\u00f5es relevantes da produ\u00e7\u00e3o em um dashboard personaliz\u00e1vel e usar o Arcturus e a programa\u00e7\u00e3o no Gantt para avaliar as consequ\u00eancias de uma mudan\u00e7a. Em vez de refazer um relat\u00f3rio e reorganizar as filas de cada m\u00e1quina separadamente, voc\u00ea gerencia o problema e o plano no mesmo ambiente.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que \u00e9 um dashboard de produ\u00e7\u00e3o?<\/h2>\n\n\n<p>Um dashboard de produ\u00e7\u00e3o \u00e9 uma vis\u00e3o geral, em formato visual, de informa\u00e7\u00f5es selecionadas da manufatura, atualizada com a frequ\u00eancia necess\u00e1ria para apoiar as decis\u00f5es de seus usu\u00e1rios. Ele pode mostrar o andamento da produ\u00e7\u00e3o, a capacidade, os atrasos e o desempenho em rela\u00e7\u00e3o a uma meta, usando gr\u00e1ficos, indicadores e tabelas em vez de uma longa lista de registros.<\/p>\n\n\n<p>Esse mesmo conceito tamb\u00e9m \u00e9 chamado de dashboard de manufatura. O objetivo n\u00e3o \u00e9 exibir tudo o que a f\u00e1brica mede, mas facilitar a identifica\u00e7\u00e3o de situa\u00e7\u00f5es relevantes: opera\u00e7\u00f5es que est\u00e3o ficando para tr\u00e1s, um recurso que perdeu capacidade ou um pedido que precisa de outro plano.<\/p>\n\n\n<p>O dashboard, o relat\u00f3rio e a programa\u00e7\u00e3o apoiam diferentes etapas dessa decis\u00e3o:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>O dashboard direciona a aten\u00e7\u00e3o.<\/strong> O que precisa ser analisado agora? Tend\u00eancias hist\u00f3ricas podem acrescentar contexto, mas a vis\u00e3o di\u00e1ria deve deixar claras as exce\u00e7\u00f5es de hoje.<\/li><li><strong>Um <a href=\"\/pt-br\/recursos-pt-br\/relatorio-de-producao\/\">relat\u00f3rio de produ\u00e7\u00e3o industrial<\/a> registra o resultado de um per\u00edodo definido.<\/strong> O que aconteceu durante o turno ou o dia e o que explica a diferen\u00e7a em rela\u00e7\u00e3o ao plano liberado?<\/li><li><strong>A programa\u00e7\u00e3o orienta a execu\u00e7\u00e3o.<\/strong> Qual opera\u00e7\u00e3o deve ser executada a seguir, em qual recurso apto e quando poder\u00e1 terminar?<\/li><\/ul>\n\n\n<p>Um gr\u00e1fico atualizado n\u00e3o \u00e9 uma programa\u00e7\u00e3o revisada. Quando uma exce\u00e7\u00e3o exige a\u00e7\u00e3o, a <a href=\"\/pt-br\/recursos-pt-br\/o-que-e-programacao-da-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> precisa considerar as outras opera\u00e7\u00f5es que disputam o mesmo tempo dispon\u00edvel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Comece por quem toma a decis\u00e3o<\/h2>\n\n\n<p>Defina o p\u00fablico antes de escolher os gr\u00e1ficos. Uma tela que tenta atender igualmente operadores, analistas de PCP e alta gest\u00e3o pode deixar todos procurando as informa\u00e7\u00f5es de que precisam.<\/p>\n\n\n<p><strong>O supervisor de turno<\/strong> precisa saber se a equipe consegue concluir o trabalho atribu\u00eddo e o que est\u00e1 impedindo o avan\u00e7o. As opera\u00e7\u00f5es em andamento, as interrup\u00e7\u00f5es e a produ\u00e7\u00e3o aproveit\u00e1vel importam mais do que uma m\u00e9dia mensal da f\u00e1brica inteira. Para esse p\u00fablico, s\u00e3o \u00fateis os detalhes sobre a opera\u00e7\u00e3o e o turno atual.<\/p>\n\n\n<p><strong>O gerente de produ\u00e7\u00e3o ou analista de PCP<\/strong> precisa identificar quais compromissos est\u00e3o em risco e onde o plano j\u00e1 n\u00e3o cabe na capacidade dispon\u00edvel. A carga dos centros de trabalho, as opera\u00e7\u00f5es atrasadas e as etapas restantes do roteiro ajudam a decidir se \u00e9 preciso mudar uma prioridade, ajustar a capacidade ou revisar uma data de conclus\u00e3o. O horizonte vai al\u00e9m do turno, pois o atraso de hoje pode bloquear o trabalho de amanh\u00e3.<\/p>\n\n\n<p><strong>A gest\u00e3o da f\u00e1brica<\/strong> precisa de tend\u00eancias que apoiem decis\u00f5es sobre recursos e melhorias: gargalos recorrentes, desempenho das entregas e perdas que persistem em per\u00edodos compar\u00e1veis. Essas tend\u00eancias merecem uma vis\u00e3o pr\u00f3pria, em vez de sobrecarregar a tela de exce\u00e7\u00f5es do dia.<\/p>\n\n\n<p>Comece pelas decis\u00f5es que sua reuni\u00e3o de acompanhamento precisa gerar. Se o objetivo \u00e9 preservar as entregas desta semana, organize a vis\u00e3o geral em torno desses compromissos e dos recursos dos quais dependem. Acrescente uma m\u00e9trica apenas quando ela ajudar a equipe a escolher ou verificar uma a\u00e7\u00e3o.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Quais m\u00e9tricas s\u00e3o \u00fateis em um dashboard de produ\u00e7\u00e3o?<\/h2>\n\n\n<p>Os sinais a seguir s\u00e3o um ponto de partida pr\u00e1tico para a an\u00e1lise di\u00e1ria do gestor. Escolha as m\u00e9tricas que ajudam sua equipe a tomar decis\u00f5es sobre a produ\u00e7\u00e3o.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Sinal<\/th><th>Como interpretar no contexto<\/th><th>Decis\u00e3o que pode apoiar<\/th><\/tr><\/thead><tbody><tr><td>Andamento em rela\u00e7\u00e3o ao plano<\/td><td>Quais opera\u00e7\u00f5es j\u00e1 deveriam ter come\u00e7ado ou terminado e o que ainda falta?<\/td><td>Investigar uma interrup\u00e7\u00e3o ou atualizar o trabalho restante<\/td><\/tr><tr><td>Carga em rela\u00e7\u00e3o \u00e0 capacidade dispon\u00edvel<\/td><td>Em qual centro de trabalho e intervalo de tempo a carga necess\u00e1ria supera o tempo dispon\u00edvel?<\/td><td>Alterar a aloca\u00e7\u00e3o, a capacidade ou as prioridades<\/td><\/tr><tr><td>Opera\u00e7\u00f5es atrasadas e pedidos com entrega prevista<\/td><td>Quais opera\u00e7\u00f5es afetadas fazem parte do roteiro necess\u00e1rio para cumprir um compromisso com o cliente?<\/td><td>Preservar uma entrega ou informar ao cliente uma nova data vi\u00e1vel<\/td><\/tr><tr><td>Produ\u00e7\u00e3o aproveit\u00e1vel e perdas de qualidade<\/td><td>As quantidades conclu\u00eddas est\u00e3o prontas para a pr\u00f3xima etapa ou os refugos e as pend\u00eancias de qualidade fazem com que faltem pe\u00e7as?<\/td><td>Confirmar a produ\u00e7\u00e3o de reposi\u00e7\u00e3o e a capacidade necess\u00e1ria<\/td><\/tr><tr><td>Perdas recorrentes de tempo ou desempenho<\/td><td>A mesma opera\u00e7\u00e3o est\u00e1 levando mais tempo do que o previsto repetidamente?<\/td><td>Investigar a causa e melhorar a estimativa ou o processo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>N\u00e3o confunda m\u00e9tricas com significados diferentes. O hist\u00f3rico de OTD (On-Time Delivery) mostra o desempenho das entregas j\u00e1 realizadas. Por si s\u00f3, ele n\u00e3o indica se os pedidos em aberto com entrega prevista para esta semana ser\u00e3o conclu\u00eddos no prazo. Use a programa\u00e7\u00e3o atual para analisar essa perspectiva futura.<\/p>\n\n\n<p>Da mesma forma, uma contagem alta de pe\u00e7as pode refletir a produ\u00e7\u00e3o de um lote de produtos simples, e n\u00e3o uma melhora de desempenho em toda a f\u00e1brica. Compare trabalhos semelhantes e n\u00e3o conte o mesmo componente em v\u00e1rias opera\u00e7\u00f5es como se fossem v\u00e1rios produtos acabados.<\/p>\n\n\n<p>Carga e tempo de funcionamento tamb\u00e9m respondem a perguntas diferentes. A carga planejada representa o trabalho alocado \u00e0 capacidade; o tempo de funcionamento registrado mostra o que aconteceu. Uma m\u00e1quina ociosa n\u00e3o \u00e9 necessariamente o pr\u00f3ximo destino de uma opera\u00e7\u00e3o: ela precisa ser capaz de execut\u00e1-la, com as pessoas e os insumos necess\u00e1rios.<\/p>\n\n\n<p>A efici\u00eancia global do equipamento, ou OEE, pode ajudar a investigar perdas nos equipamentos quando \u00e9 medida de forma consistente. Mas melhorar a efici\u00eancia de uma m\u00e1quina isoladamente n\u00e3o substitui a decis\u00e3o sobre quais pedidos devem passar por ela. Uma m\u00e1quina ocupada com o trabalho errado pode deixar uma entrega urgente esperando.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exemplo: total de produ\u00e7\u00e3o em verde, entrega em risco<\/h2>\n\n\n<p>Imagine uma empresa de usinagem cuja produ\u00e7\u00e3o di\u00e1ria parece ir bem porque concluiu um grande lote de pe\u00e7as simples. Um pedido urgente de um cliente, por\u00e9m, ainda precisa passar por uma opera\u00e7\u00e3o em um centro de usinagem que parou. Depois disso, ainda h\u00e1 inspe\u00e7\u00e3o e expedi\u00e7\u00e3o antes que o pedido possa sair.<\/p>\n\n\n<p>O total geral tranquiliza; as etapas restantes do roteiro do pedido, n\u00e3o. O dashboard do gestor precisa direcionar a aten\u00e7\u00e3o para o trabalho atrasado e o recurso afetado, e n\u00e3o apenas comemorar o n\u00famero de pe\u00e7as produzidas.<\/p>\n\n\n<p>Primeiro, confirme a situa\u00e7\u00e3o. A opera\u00e7\u00e3o realmente n\u00e3o foi conclu\u00edda ou a conclus\u00e3o ainda n\u00e3o foi registrada? Por quanto tempo a m\u00e1quina deve ficar indispon\u00edvel? A falta de uma atualiza\u00e7\u00e3o exige uma resposta diferente da exigida por uma quebra.<\/p>\n\n\n<p>Se a interrup\u00e7\u00e3o for confirmada, o PCP pode comparar alternativas vi\u00e1veis. Outra m\u00e1quina pode estar apta a executar a opera\u00e7\u00e3o urgente, mas transferi-la para l\u00e1 consumir\u00e1 tempo j\u00e1 reservado a outros pedidos. Recuperar a m\u00e1quina original pode ser prefer\u00edvel, mas somente se ainda houver tempo para concluir as opera\u00e7\u00f5es restantes antes da expedi\u00e7\u00e3o. Dar maior prioridade \u00e0 opera\u00e7\u00e3o muda a sequ\u00eancia; n\u00e3o cria capacidade extra.<\/p>\n\n\n<p>\u00c9 aqui que a programa\u00e7\u00e3o mostra seu valor ao lado do dashboard. Analise em conjunto as opera\u00e7\u00f5es afetadas, defina a prioridade e verifique as datas de conclus\u00e3o resultantes antes de passar uma nova sequ\u00eancia \u00e0 produ\u00e7\u00e3o. Se n\u00e3o for poss\u00edvel preservar a entrega, a equipe comercial precisa de uma nova data vi\u00e1vel, e n\u00e3o de mais uma promessa otimista.<\/p>\n\n\n<p>O dashboard cumpre seu papel quando a exce\u00e7\u00e3o leva a uma decis\u00e3o clara e a um plano compartilhado, e n\u00e3o apenas a um indicador vermelho que todos j\u00e1 viram.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Conecte a vis\u00e3o geral \u00e0 a\u00e7\u00e3o com o SkyPlanner<\/h2>\n\n\n<p>Os dashboards de relat\u00f3rios do SkyPlanner permitem organizar widgets com o recurso de arrastar e soltar, escolher intervalos de datas e criar visualiza\u00e7\u00f5es diferentes para cada usu\u00e1rio. Voc\u00ea tamb\u00e9m pode exibir um dashboard em uma tela na produ\u00e7\u00e3o. Assim, fica mais f\u00e1cil compartilhar uma vis\u00e3o relevante na reuni\u00e3o di\u00e1ria sem preparar uma apresenta\u00e7\u00e3o separada a cada manh\u00e3.<\/p>\n\n\n<p>Para o analista de PCP, capacidade, carga e trabalho atrasado s\u00e3o bons pontos de partida. Mantenha os registros detalhados dispon\u00edveis para responder \u00e0s perguntas que surgem a partir da vis\u00e3o geral. Os relat\u00f3rios de opera\u00e7\u00f5es e de itens de pedido do SkyPlanner fornecem o contexto de cada trabalho, enquanto o Timer registra o tempo de produ\u00e7\u00e3o e as quantidades produzidas ou com defeito. Voc\u00ea pode investigar a opera\u00e7\u00e3o afetada em vez de procurar a explica\u00e7\u00e3o de um total nas planilhas de v\u00e1rios departamentos.<\/p>\n\n\n<p>Em seguida, use a programa\u00e7\u00e3o da produ\u00e7\u00e3o para agir. O Arcturus, a IA de programa\u00e7\u00e3o do SkyPlanner, calcula a programa\u00e7\u00e3o considerando os centros de trabalho, turnos, operadores, depend\u00eancias entre opera\u00e7\u00f5es e prioridades que voc\u00ea configurou. O Gantt mostra a sequ\u00eancia resultante. Quando a capacidade ou as prioridades mudam, a reprograma\u00e7\u00e3o calcula os efeitos sobre as opera\u00e7\u00f5es interligadas, em vez de deixar que voc\u00ea refa\u00e7a cada fila manualmente.<\/p>\n\n\n<p>Voc\u00ea define as prioridades e as decis\u00f5es da programa\u00e7\u00e3o que devem ser preservadas; o Arcturus trabalha dentro das suas regras e dos seus bloqueios. No exemplo da usinagem, isso significa considerar o centro de trabalho indispon\u00edvel e verificar o impacto da programa\u00e7\u00e3o revisada sobre o pedido urgente e as demais opera\u00e7\u00f5es pr\u00f3ximas a ele na sequ\u00eancia.<\/p>\n\n\n<p>O SkyPlanner se integra a qualquer ERP ou MES por meio de sua REST API aberta. Assim, os pedidos e as atualiza\u00e7\u00f5es da produ\u00e7\u00e3o dos seus sistemas atuais podem ser conectados \u00e0 programa\u00e7\u00e3o, em vez de gerar mais um trabalho isolado de elabora\u00e7\u00e3o de relat\u00f3rios. Conhe\u00e7a os <a href=\"\/pt-br\/funcionalidades\/\">recursos de relat\u00f3rios e programa\u00e7\u00e3o do SkyPlanner<\/a> para ver como a vis\u00e3o geral, os registros de produ\u00e7\u00e3o e o plano funcionam em conjunto.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Garanta informa\u00e7\u00f5es confi\u00e1veis para orientar as a\u00e7\u00f5es<\/h2>\n\n\n<p>Uma tela que parece mostrar dados em tempo real s\u00f3 \u00e9 \u00fatil se a informa\u00e7\u00e3o chegar a tempo da decis\u00e3o. Defina com a equipe de onde vem cada sinal importante, quem registra as mudan\u00e7as e com que frequ\u00eancia a fonte \u00e9 atualizada. Atualizar a tela com mais frequ\u00eancia n\u00e3o vai mostrar a conclus\u00e3o de uma opera\u00e7\u00e3o que ningu\u00e9m registrou.<\/p>\n\n\n<p>Deixe claro o escopo da visualiza\u00e7\u00e3o: a f\u00e1brica ou o departamento, o per\u00edodo analisado, a meta e h\u00e1 quanto tempo os dados foram atualizados. Uma decis\u00e3o de produ\u00e7\u00e3o tomada a cada hora pode exigir atualiza\u00e7\u00f5es frequentes do andamento; uma an\u00e1lise semanal de capacidade tem outra necessidade. Defina a frequ\u00eancia de atualiza\u00e7\u00e3o de acordo com o tempo de resposta necess\u00e1rio, n\u00e3o pelo apelo da express\u00e3o \u201ctempo real\u201d.<\/p>\n\n\n<p>Deixe claro tamb\u00e9m qual \u00e9 o plano de refer\u00eancia. A programa\u00e7\u00e3o atual deve se adaptar \u00e0s mudan\u00e7as na produ\u00e7\u00e3o, enquanto a compara\u00e7\u00e3o de desempenho precisa de uma meta identific\u00e1vel. Caso contr\u00e1rio, uma altera\u00e7\u00e3o no plano de hoje pode dar a impress\u00e3o de que o desvio de ontem deixou de existir.<\/p>\n\n\n<p>Durante a an\u00e1lise, defina uma a\u00e7\u00e3o, um respons\u00e1vel e uma pr\u00f3xima verifica\u00e7\u00e3o para cada desvio significativo. Estabele\u00e7a os limites de alerta com base nas consequ\u00eancias relevantes para a sua f\u00e1brica, como uma opera\u00e7\u00e3o atrasada que p\u00f5e em risco o prazo de um pedido. Um alerta deve indicar \u00e0 equipe o que investigar, e n\u00e3o culpar automaticamente o operador nem exigir uma mudan\u00e7a precipitada.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uma vis\u00e3o compartilhada da produ\u00e7\u00e3o na UTU<\/h2>\n\n\n<p>A UTU, fabricante de quadros el\u00e9tricos e equipamentos de manobra, antes fazia o planejamento em planilhas de Excel separadas por departamento. Quando a sequ\u00eancia mudava no ERP, a atualiza\u00e7\u00e3o nem sempre chegava ao ch\u00e3o de f\u00e1brica. Era dif\u00edcil ter uma vis\u00e3o realista da capacidade, e a equipe gastava tempo todas as manh\u00e3s confirmando o que fazer e em qual ordem.<\/p>\n\n\n<p>Com o SkyPlanner integrado ao Oracle NetSuite e ao seu sistema de folha de pagamento, a UTU reuniu as linhas e os departamentos da f\u00e1brica de Ulvila em um \u00fanico ambiente. Os gr\u00e1ficos de capacidade e carga apoiam o controle di\u00e1rio, junto com o cronograma de Gantt e a programa\u00e7\u00e3o com IA. Segundo a UTU, a fila de trabalho revisada chega aos montadores na linha em segundos.<\/p>\n\n\n<p>O ganho relevante est\u00e1 na conex\u00e3o: as pessoas conseguem visualizar a situa\u00e7\u00e3o da produ\u00e7\u00e3o e trabalhar com a sequ\u00eancia atualizada. O <a href=\"\/pt-br\/historias-de-clientes\/utu\/\">depoimento da UTU sobre o SkyPlanner<\/a> mostra por que uma vis\u00e3o compartilhada ganha valor quando est\u00e1 conectada ao plano que as pessoas de fato seguem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Use um desvio real como ponto de partida para a pr\u00f3xima reuni\u00e3o di\u00e1ria<\/h2>\n\n\n<p>Escolha um problema da sua \u00faltima reuni\u00e3o de produ\u00e7\u00e3o. A equipe conseguiu identificar as opera\u00e7\u00f5es afetadas, confirmar a causa e avaliar o impacto de uma mudan\u00e7a sobre as outras entregas? Se foi preciso gerar mais um relat\u00f3rio e atualizar v\u00e1rias filas separadamente para chegar \u00e0 resposta, melhorar apenas os gr\u00e1ficos ainda deixar\u00e1 boa parte desse trabalho por fazer.<\/p>\n\n\n<p><a href=\"\/pt-br\/vendas-de-contacto\/\">Agende uma demonstra\u00e7\u00e3o do SkyPlanner<\/a> e traga esse desvio, os pedidos afetados e o recurso que eles compartilham. Veja como uma vis\u00e3o focada da produ\u00e7\u00e3o e a programa\u00e7\u00e3o com capacidade finita podem ajudar voc\u00ea a responder com menos coordena\u00e7\u00e3o manual. Se preferir explorar o ambiente primeiro, <a href=\"\/pt-br\/teste\/\">experimente o SkyPlanner com dados de demonstra\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje A produ\u00e7\u00e3o da f\u00e1brica est\u00e1 acima da meta, mas um pedido com entrega para amanh\u00e3 est\u00e1 na fila de uma m\u00e1quina parada. Na reuni\u00e3o da manh\u00e3, o total em verde indica que a produ\u00e7\u00e3o vai bem. O cliente est\u00e1 prestes a ouvir outra hist\u00f3ria. Um dashboard &#8230; <a title=\"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/\" aria-label=\"Read more about Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":102249,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2563,310],"tags":[],"class_list":["post-102229","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-fabril","category-recursos-pt-br","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje<\/title>\n<meta name=\"description\" content=\"Total de produ\u00e7\u00e3o em verde pode ocultar pedido atrasado. Use sinais no dashboard de produ\u00e7\u00e3o para decidir hoje e agir na programa\u00e7\u00e3o com SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje\" \/>\n<meta property=\"og:description\" content=\"Total de produ\u00e7\u00e3o em verde pode ocultar pedido atrasado. Use sinais no dashboard de produ\u00e7\u00e3o para decidir hoje e agir na programa\u00e7\u00e3o com SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T08:15:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T03:23:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje\",\"datePublished\":\"2026-10-20T08:15:33+00:00\",\"dateModified\":\"2026-10-21T03:23:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/\"},\"wordCount\":2558,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"articleSection\":[\"Efici\u00eancia fabril\",\"recursos\"],\"inLanguage\":\"pt-BR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/\",\"name\":\"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"datePublished\":\"2026-10-20T08:15:33+00:00\",\"dateModified\":\"2026-10-21T03:23:08+00:00\",\"description\":\"Total de produ\u00e7\u00e3o em verde pode ocultar pedido atrasado. Use sinais no dashboard de produ\u00e7\u00e3o para decidir hoje e agir na programa\u00e7\u00e3o com SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-dashboard-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A magnifying glass highlights a paused machining station and waiting work within an otherwise orderly production flow.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/dashboard-de-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje","description":"Total de produ\u00e7\u00e3o em verde pode ocultar pedido atrasado. Use sinais no dashboard de produ\u00e7\u00e3o para decidir hoje e agir na programa\u00e7\u00e3o com SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/","og_locale":"pt_BR","og_type":"article","og_title":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje","og_description":"Total de produ\u00e7\u00e3o em verde pode ocultar pedido atrasado. Use sinais no dashboard de produ\u00e7\u00e3o para decidir hoje e agir na programa\u00e7\u00e3o com SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T08:15:33+00:00","article_modified_time":"2026-10-21T03:23:08+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Est. tempo de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje","datePublished":"2026-10-20T08:15:33+00:00","dateModified":"2026-10-21T03:23:08+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/"},"wordCount":2558,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","articleSection":["Efici\u00eancia fabril","recursos"],"inLanguage":"pt-BR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/","url":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/","name":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","datePublished":"2026-10-20T08:15:33+00:00","dateModified":"2026-10-21T03:23:08+00:00","description":"Total de produ\u00e7\u00e3o em verde pode ocultar pedido atrasado. Use sinais no dashboard de produ\u00e7\u00e3o para decidir hoje e agir na programa\u00e7\u00e3o com SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png","width":1672,"height":941,"caption":"A magnifying glass highlights a paused machining station and waiting work within an otherwise orderly production flow."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/dashboard-de-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-dashboard-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Dashboard de produ\u00e7\u00e3o: veja o que exige a\u00e7\u00e3o hoje A produ\u00e7\u00e3o da f\u00e1brica est\u00e1 acima da meta, mas um pedido com entrega para amanh\u00e3 est\u00e1 na fila de uma m\u00e1quina parada. Na reuni\u00e3o da manh\u00e3, o total em verde indica que a produ\u00e7\u00e3o vai bem. O cliente est\u00e1 prestes a ouvir outra hist\u00f3ria. Um dashboard&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/102229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=102229"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/102229\/revisions"}],"predecessor-version":[{"id":102292,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/102229\/revisions\/102292"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media\/102249"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=102229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/categories?post=102229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/tags?post=102229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}