{"id":100440,"date":"2026-10-16T22:47:32","date_gmt":"2026-10-16T22:47:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100440"},"modified":"2026-10-16T22:48:47","modified_gmt":"2026-10-16T22:48:47","slug":"entrega-no-prazo","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/","title":{"rendered":"Entrega no prazo na ind\u00fastria: cumpra suas promessas"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Entrega no prazo na ind\u00fastria: cumpra suas promessas<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/pt-br\/\">In\u00edcio<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos\/\">Recursos<\/a> &raquo; Entrega no prazo na ind\u00fastria: cumpra suas promessas<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tempo de leitura estimado: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minutos<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>O indicador de entrega no prazo (OTD, do ingl\u00eas On-Time Delivery) mede a regularidade com que voc\u00ea cumpre as datas de entrega acordadas com os clientes.<\/strong> Na ind\u00fastria, melhorar esse indicador significa garantir que os pedidos certos avancem pela produ\u00e7\u00e3o, sejam conclu\u00eddos e cheguem ao ponto de entrega combinado dentro do prazo.<\/p>\n\n\n<p>Isso n\u00e3o \u00e9 o mesmo que manter todas as m\u00e1quinas ocupadas. O corte pode estar adiantado em rela\u00e7\u00e3o ao plano, enquanto um pedido com expedi\u00e7\u00e3o prevista para amanh\u00e3 ainda depende de um componente soldado. A f\u00e1brica parece produtiva, mas o cliente recebe a entrega com atraso.<\/p>\n\n\n<p>A pergunta pr\u00e1tica \u00e9: <strong>a programa\u00e7\u00e3o atual da produ\u00e7\u00e3o ainda permite cumprir as datas prometidas?<\/strong> O SkyPlanner APS ajuda a responder ao programar as opera\u00e7\u00f5es de forma integrada, considerando capacidade, materiais e prioridades, e recalcular o plano quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. Voc\u00ea gasta menos tempo refazendo as filas das m\u00e1quinas e pode se dedicar mais a garantir o prazo dos pedidos que precisam de aten\u00e7\u00e3o.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Como calcular o indicador de entrega no prazo<\/h2>\n\n\n<p>Para que o OTD seja \u00fatil, \u00e9 preciso primeiro definir o que conta como entrega no prazo. O compromisso \u00e9 despachar os produtos, entreg\u00e1-los nas instala\u00e7\u00f5es do cliente ou disponibiliz\u00e1-los para retirada? Concluir uma ordem de produ\u00e7\u00e3o n\u00e3o significa, por si s\u00f3, entregar ao cliente no prazo.<\/p>\n\n\n<p>Para calcular o indicador por pedido, use:<\/p>\n\n\n<p><strong>Entrega no prazo (%) = Pedidos com entrega prevista no per\u00edodo que cumpriram a janela de entrega acordada \u00f7 Total de pedidos com entrega prevista no per\u00edodo \u00d7 100<\/strong><\/p>\n\n\n<p>Imagine que 50 pedidos tinham entrega prevista para este m\u00eas. Desses, 44 chegaram ao ponto de entrega acordado dentro da janela aceita. Seu OTD \u00e9 de 88%. Os pedidos que deveriam ter sido entregues, mas ainda n\u00e3o foram, permanecem no denominador. Caso contr\u00e1rio, os piores atrasos podem desaparecer do indicador.<\/p>\n\n\n<p>Defina estas regras em conjunto com quem usa o indicador:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Unidade de contagem:<\/strong> pedidos completos, itens de pedido ou entregas programadas. Mantenha o mesmo crit\u00e9rio.<\/li><li><strong>Data e janela de entrega:<\/strong> a data acordada e as toler\u00e2ncias aceitas para antecipa\u00e7\u00e3o ou atraso. Antecipar nem sempre \u00e9 aceit\u00e1vel, pois o cliente pode n\u00e3o ter condi\u00e7\u00f5es de receber ou armazenar os produtos.<\/li><li><strong>Entregas parciais:<\/strong> defina quando um pedido ser\u00e1 considerado entregue, em vez de tratar o primeiro envio como conclus\u00e3o da entrega.<\/li><li><strong>Altera\u00e7\u00f5es no compromisso:<\/strong> mantenha a data originalmente acordada junto das revis\u00f5es, para que uma mudan\u00e7a de data n\u00e3o oculte um descumprimento.<\/li><\/ul>\n\n\n<p>O OTD se concentra no prazo. J\u00e1 o <strong>OTIF (entrega no prazo e na quantidade total acordada)<\/strong> combina o cumprimento do prazo com a entrega de toda a quantidade combinada. A <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/aderencia-ao-plano-de-producao\/\">ader\u00eancia ao plano de produ\u00e7\u00e3o<\/a> responde a outra pergunta: as opera\u00e7\u00f5es internas seguiram os hor\u00e1rios planejados? Uma f\u00e1brica pode recuperar o atraso de uma opera\u00e7\u00e3o e ainda entregar no prazo, ou seguir um plano de produ\u00e7\u00e3o invi\u00e1vel e n\u00e3o cumprir o compromisso com o cliente.<\/p>\n\n\n<p>Use o OTD para avaliar o resultado para o cliente e os indicadores internos para entender o que levou a esse resultado.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Por que uma f\u00e1brica com muita atividade ainda entrega com atraso<\/h2>\n\n\n<p>Os problemas de entrega costumam surgir entre as opera\u00e7\u00f5es, n\u00e3o apenas na m\u00e1quina que acaba concluindo o trabalho com atraso. Uma pe\u00e7a fica aguardando material, perde o hor\u00e1rio reservado na dobra e chega \u00e0 montagem depois das demais pe\u00e7as do conjunto.<\/p>\n\n\n<p>A fila de cada setor pode parecer razo\u00e1vel quando vista isoladamente. O problema \u00e9 que essas filas disputam a mesma capacidade e dependem umas das outras. Antecipar uma opera\u00e7\u00e3o urgente em uma m\u00e1quina pode deslocar outro pedido que tem menos tempo dispon\u00edvel para as etapas seguintes.<\/p>\n\n\n<p>A forma\u00e7\u00e3o de lotes tamb\u00e9m exige ponderar vantagens e desvantagens. Agrupar opera\u00e7\u00f5es semelhantes pode reduzir o tempo de setup, mas um lote longo e eficiente n\u00e3o \u00e9 uma boa escolha se atrasar um pedido que precisa sair hoje. O objetivo \u00e9 usar a capacidade com efici\u00eancia e concluir os pedidos certos, n\u00e3o maximizar a atividade em cada centro de trabalho.<\/p>\n\n\n<p>Uma <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/o-que-e-programacao-da-producao\/\">programa\u00e7\u00e3o orientada \u00e0s entregas<\/a> torna essas rela\u00e7\u00f5es vis\u00edveis. Em vez de perguntar apenas qual opera\u00e7\u00e3o \u00e9 mais urgente naquele setor, voc\u00ea pode avaliar qual sequ\u00eancia oferece um caminho vi\u00e1vel para concluir toda a carteira de pedidos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Transforme o prazo prometido ao cliente em uma meta de produ\u00e7\u00e3o<\/h2>\n\n\n<p>Parta do ponto de entrega esperado pelo cliente e calcule, de tr\u00e1s para frente, quando a fabrica\u00e7\u00e3o precisa terminar. Reserve tempo para o que acontece entre esses dois momentos: inspe\u00e7\u00e3o final, embalagem, hor\u00e1rios-limite de expedi\u00e7\u00e3o e transporte, conforme as necessidades do pedido.<\/p>\n\n\n<p>Se o cliente precisa dos produtos na sexta-feira e eles devem sair da f\u00e1brica na quinta-feira, a meta de conclus\u00e3o da produ\u00e7\u00e3o n\u00e3o pode ser tamb\u00e9m na sexta-feira. A produ\u00e7\u00e3o precisa terminar a tempo de preparar a expedi\u00e7\u00e3o de quinta-feira.<\/p>\n\n\n<p>No SkyPlanner, o <strong>Dia de entrega<\/strong> de um pedido \u00e9 a data at\u00e9 a qual ele deve estar conclu\u00eddo e pronto para expedi\u00e7\u00e3o. Use essa meta de produ\u00e7\u00e3o ao incorporar o compromisso com o cliente \u00e0 programa\u00e7\u00e3o. Assim, o prazo da f\u00e1brica fica vinculado ao acordo de entrega, sem confundir a conclus\u00e3o da produ\u00e7\u00e3o com o recebimento pelo cliente.<\/p>\n\n\n<p>Antes de assumir um novo compromisso, verifique se ele cabe na carga de trabalho existente. Depois de aceitar o pedido, continue verificando se a programa\u00e7\u00e3o, \u00e0 medida que muda, ainda permite cumprir o combinado. Uma data vi\u00e1vel na semana passada pode deixar de ser vi\u00e1vel ap\u00f3s uma quebra de m\u00e1quina ou um atraso de fornecedor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preserve os prazos prometidos na programa\u00e7\u00e3o di\u00e1ria da produ\u00e7\u00e3o<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Garanta um caminho vi\u00e1vel para cada pedido dentro da capacidade dispon\u00edvel<\/h3>\n\n\n<p>Programe as opera\u00e7\u00f5es restantes de forma integrada, considerando as m\u00e1quinas, os turnos, as pessoas e as depend\u00eancias do processo necess\u00e1rias para conclu\u00ed-las. Um hor\u00e1rio livre no corte s\u00f3 \u00e9 \u00fatil se as opera\u00e7\u00f5es seguintes ainda puderem terminar a tempo.<\/p>\n\n\n<p>O Arcturus, mecanismo de programa\u00e7\u00e3o com IA do SkyPlanner, calcula a programa\u00e7\u00e3o com base nos recursos e nas regras da sua produ\u00e7\u00e3o. A linha do tempo de Gantt mostra onde cada opera\u00e7\u00e3o foi alocada. Em vez de calcular filas separadamente, voc\u00ea passa a ter uma vis\u00e3o integrada de como os pedidos disputam o tempo dispon\u00edvel.<\/p>\n\n\n<p>Quando a carga de trabalho n\u00e3o cabe na capacidade dispon\u00edvel, a programa\u00e7\u00e3o oferece uma base para agir: avalie ampliar a capacidade com pessoal dispon\u00edvel, usar um centro de trabalho alternativo apto a executar a opera\u00e7\u00e3o ou mudar a sequ\u00eancia. Se nenhuma dessas op\u00e7\u00f5es permitir cumprir o prometido, trate o conflito de entrega enquanto o cliente ainda tem tempo para reagir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Inclua a disponibilidade de materiais no plano<\/h3>\n\n\n<p>Ter uma m\u00e1quina livre n\u00e3o significa que um pedido possa entrar em produ\u00e7\u00e3o. A falta de mat\u00e9ria-prima ou de um componente comprado pode interromper o fluxo de produ\u00e7\u00e3o mesmo quando h\u00e1 capacidade dispon\u00edvel.<\/p>\n\n\n<p>Quando a regra correspondente est\u00e1 habilitada, a programa\u00e7\u00e3o do SkyPlanner considera o estoque e os materiais com recebimento previsto. Assim, a disponibilidade de materiais passa a influenciar a programa\u00e7\u00e3o das opera\u00e7\u00f5es, em vez de ficar em uma anota\u00e7\u00e3o separada que o planejador precisa lembrar ao reorganizar as filas.<\/p>\n\n\n<p>Mantenha as atualiza\u00e7\u00f5es de compras conectadas ao planejamento. Quando uma data de recebimento muda, n\u00e3o basta perguntar quando o material chegar\u00e1: \u00e9 preciso saber quais entregas j\u00e1 assumidas agora exigem outro plano de produ\u00e7\u00e3o.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Defina prioridades com crit\u00e9rio, n\u00e3o pela \u00faltima liga\u00e7\u00e3o recebida<\/h3>\n\n\n<p>Uma solicita\u00e7\u00e3o urgente exige uma decis\u00e3o que considere suas consequ\u00eancias. Antecip\u00e1-la pode consumir a mesma capacidade de que outro pedido j\u00e1 prometido precisa.<\/p>\n\n\n<p>As prioridades din\u00e2micas do SkyPlanner permitem que as datas de conclus\u00e3o e outras prioridades do neg\u00f3cio influenciem o sequenciamento. Os planejadores definem as prioridades e as regras; o Arcturus as aplica no c\u00e1lculo. Assim, voc\u00ea pode preservar compromissos importantes sem precisar mover manualmente, a cada mudan\u00e7a, todas as opera\u00e7\u00f5es afetadas.<\/p>\n\n\n<p>N\u00e3o atribua prioridade m\u00e1xima a todos os pedidos. Se o conflito de capacidade \u00e9 real, mudar os r\u00f3tulos n\u00e3o vai elimin\u00e1-lo. Use as prioridades para decidir quais opera\u00e7\u00f5es devem receber o tempo escasso e depois avalie o efeito sobre os demais compromissos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Atualize o plano conforme as mudan\u00e7as no ch\u00e3o de f\u00e1brica<\/h3>\n\n\n<p>Registre prontamente as opera\u00e7\u00f5es conclu\u00eddas, as dura\u00e7\u00f5es revisadas, as paradas e as mudan\u00e7as de capacidade. Uma programa\u00e7\u00e3o baseada no andamento de ontem pode dar uma base errada para a discuss\u00e3o de hoje sobre as entregas.<\/p>\n\n\n<p>Com o Autopilot habilitado, o SkyPlanner pode recalcular a programa\u00e7\u00e3o em resposta a eventos configurados ou em intervalos definidos, mantendo suas regras e seus bloqueios. O destaque das opera\u00e7\u00f5es atrasadas no Gantt ajuda a chamar aten\u00e7\u00e3o para o que precisa ser revisto. O benef\u00edcio \u00e9 ter um plano atualizado que orienta suas a\u00e7\u00f5es, em vez de precisar refazer manualmente as filas ap\u00f3s cada mudan\u00e7a.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Decida como lidar com o risco de atraso antes do dia da expedi\u00e7\u00e3o<\/h2>\n\n\n<p>Imagine um pedido j\u00e1 aceito que precisa estar pronto para expedi\u00e7\u00e3o na quinta-feira. O corte est\u00e1 conclu\u00eddo, mas um componente comprado, necess\u00e1rio para a montagem, chegar\u00e1 mais tarde do que o previsto. Al\u00e9m disso, a equipe de montagem \u00e9 compartilhada com outro pedido cuja entrega est\u00e1 prevista para a semana seguinte.<\/p>\n\n\n<p>Simplesmente marcar o primeiro pedido como urgente n\u00e3o resolve a falta do componente. Antecipar opera\u00e7\u00f5es sem rela\u00e7\u00e3o com esse pedido pode manter a equipe ocupada, mas deixar pouca capacidade de montagem para quando o componente chegar.<\/p>\n\n\n<p>Revise a programa\u00e7\u00e3o integrada com a nova data de recebimento do material. Ainda h\u00e1 tempo para concluir a montagem restante e a inspe\u00e7\u00e3o antes da expedi\u00e7\u00e3o? Seria poss\u00edvel deslocar as opera\u00e7\u00f5es do pedido com prazo posterior sem descumprir esse outro compromisso? Ampliar as horas de trabalho com equipe dispon\u00edvel resolveria o conflito, ou o material j\u00e1 chegar\u00e1 tarde demais?<\/p>\n\n\n<p>O SkyPlanner incorpora os dados de materiais, capacidade e prioridades ao c\u00e1lculo da programa\u00e7\u00e3o. Isso d\u00e1 ao planejador uma base mais clara para escolher uma a\u00e7\u00e3o de recupera\u00e7\u00e3o. Se n\u00e3o houver mais um caminho vi\u00e1vel, comunique o problema e combine o pr\u00f3ximo passo, em vez de esperar at\u00e9 quinta-feira para confirmar o que o plano j\u00e1 mostra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O que mudou na KJH-Comp<\/h2>\n\n\n<p>A KJH-Comp, fabricante finlandesa de pe\u00e7as de chapa met\u00e1lica sob contrato, enfrentava um descompasso entre a vis\u00e3o semanal da produ\u00e7\u00e3o e os compromissos assumidos para dias espec\u00edficos. Seu ERP C9000 e suas planilhas mostravam a carga geral por semana, enquanto os supervisores distribu\u00edam manualmente as opera\u00e7\u00f5es entre as m\u00e1quinas.<\/p>\n\n\n<p>Com o SkyPlanner, a <a href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o com capacidade finita<\/a> e a aloca\u00e7\u00e3o de opera\u00e7\u00f5es \u00e0s m\u00e1quinas passaram a ser autom\u00e1ticas. A verifica\u00e7\u00e3o que a empresa faz antes da soldagem tamb\u00e9m re\u00fane as pe\u00e7as necess\u00e1rias, incluindo os componentes comprados, antes de liberar as opera\u00e7\u00f5es para a fila. Essa mudan\u00e7a conecta as opera\u00e7\u00f5es prontas para execu\u00e7\u00e3o \u00e0 capacidade e aos prazos que precisam ser atendidos.<\/p>\n\n\n<p>A KJH-Comp relata que a pontualidade de entrega passou de cerca de 50% para at\u00e9 98% em 2026. Para outras ind\u00fastrias, a li\u00e7\u00e3o est\u00e1 na mudan\u00e7a de planejamento por tr\u00e1s desse resultado: conhecer a carga total da semana n\u00e3o basta quando os clientes esperam receber seus pedidos em um dia espec\u00edfico.<\/p>\n\n\n<p>Leia sobre <a href=\"https:\/\/skyplanner.ai\/pt-br\/historias-de-clientes\/kjh-comp\/\">a experi\u00eancia da KJH-Comp com o SkyPlanner<\/a> para conhecer o relato completo da implanta\u00e7\u00e3o e dos resultados.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Avalie o risco de atraso antes que ele se concretize<\/h2>\n\n\n<p>Concentre a discuss\u00e3o di\u00e1ria de planejamento nos pedidos aceitos cujas metas de conclus\u00e3o est\u00e3o em risco. Para cada um, identifique o material, a opera\u00e7\u00e3o ou o recurso que limita o andamento, escolha uma a\u00e7\u00e3o e verifique quais outros compromissos ela afeta. Deixe a sequ\u00eancia resultante vis\u00edvel para quem executa o trabalho.<\/p>\n\n\n<p>Al\u00e9m do indicador de entrega no prazo (OTD), avalie a dura\u00e7\u00e3o dos atrasos nas entregas e suas causas recorrentes. Um problema de disponibilidade de materiais exige uma resposta diferente daquela necess\u00e1ria para lidar com a sobrecarga recorrente no mesmo centro de trabalho. Acompanhe o desempenho tanto em rela\u00e7\u00e3o aos prazos prometidos originalmente quanto aos compromissos revisados, para que a melhoria esteja nas entregas, e n\u00e3o apenas nas mudan\u00e7as de data.<\/p>\n\n\n<p>Se, mesmo ap\u00f3s essa an\u00e1lise, algu\u00e9m ainda precisa ajustar manualmente as filas de v\u00e1rias m\u00e1quinas, o SkyPlanner \u00e9 um pr\u00f3ximo passo pr\u00e1tico. Ele <a href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/\">se integra a qualquer ERP ou MES<\/a> por meio de sua REST API aberta e transforma os dados de produ\u00e7\u00e3o em uma programa\u00e7\u00e3o que pode se manter alinhada \u00e0s mudan\u00e7as no trabalho.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/pt-br\/vendas-de-contacto\/\">Agende uma demonstra\u00e7\u00e3o<\/a> com base em um pedido aceito e em um imprevisto real da sua f\u00e1brica. Veja como conciliar as etapas restantes do roteiro, a carga de trabalho dos outros pedidos e a meta de entrega. Ou <a href=\"https:\/\/skyplanner.ai\/pt-br\/teste\/\">inicie um teste com dados de demonstra\u00e7\u00e3o<\/a> para explorar como o SkyPlanner pode ajudar sua equipe a cumprir o pr\u00f3ximo compromisso.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Entrega no prazo na ind\u00fastria: cumpra suas promessas In\u00edcio &raquo; Recursos &raquo; Entrega no prazo na ind\u00fastria: cumpra suas promessas O indicador de entrega no prazo (OTD, do ingl\u00eas On-Time Delivery) mede a regularidade com que voc\u00ea cumpre as datas de entrega acordadas com os clientes. Na ind\u00fastria, melhorar esse indicador significa garantir que os &#8230; <a title=\"Entrega no prazo na ind\u00fastria: cumpra suas promessas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/\" aria-label=\"Read more about Entrega no prazo na ind\u00fastria: cumpra suas promessas\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":100454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2563,310],"tags":[],"class_list":["post-100440","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficiencia-fabril","category-recursos-pt-br","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Entrega no prazo na ind\u00fastria: cumpra suas promessas<\/title>\n<meta name=\"description\" content=\"F\u00e1brica movimentada e pedidos atrasados? Saiba medir a entrega no prazo e usar o SkyPlanner para alinhar a produ\u00e7\u00e3o \u00e0s datas prometidas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Entrega no prazo na ind\u00fastria: cumpra suas promessas\" \/>\n<meta property=\"og:description\" content=\"F\u00e1brica movimentada e pedidos atrasados? Saiba medir a entrega no prazo e usar o SkyPlanner para alinhar a produ\u00e7\u00e3o \u00e0s datas prometidas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T22:47:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T22:48:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Entrega no prazo na ind\u00fastria: cumpra suas promessas\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:48:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/\"},\"wordCount\":2333,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"articleSection\":[\"Efici\u00eancia fabril\",\"recursos\"],\"inLanguage\":\"pt-BR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/\",\"name\":\"Entrega no prazo na ind\u00fastria: cumpra suas promessas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:48:47+00:00\",\"description\":\"F\u00e1brica movimentada e pedidos atrasados? Saiba medir a entrega no prazo e usar o SkyPlanner para alinhar a produ\u00e7\u00e3o \u00e0s datas prometidas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manufactured components converge into a complete shipping carton beside a waiting delivery truck.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/recursos-pt-br\\\/entrega-no-prazo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Entrega no prazo na ind\u00fastria: cumpra suas promessas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Entrega no prazo na ind\u00fastria: cumpra suas promessas","description":"F\u00e1brica movimentada e pedidos atrasados? Saiba medir a entrega no prazo e usar o SkyPlanner para alinhar a produ\u00e7\u00e3o \u00e0s datas prometidas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/","og_locale":"pt_BR","og_type":"article","og_title":"Entrega no prazo na ind\u00fastria: cumpra suas promessas","og_description":"F\u00e1brica movimentada e pedidos atrasados? Saiba medir a entrega no prazo e usar o SkyPlanner para alinhar a produ\u00e7\u00e3o \u00e0s datas prometidas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T22:47:32+00:00","article_modified_time":"2026-10-16T22:48:47+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Jussi M\u00e4ntyl\u00e4","Est. tempo de leitura":"12 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Entrega no prazo na ind\u00fastria: cumpra suas promessas","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:48:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/"},"wordCount":2333,"publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","articleSection":["Efici\u00eancia fabril","recursos"],"inLanguage":"pt-BR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/","url":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/","name":"Entrega no prazo na ind\u00fastria: cumpra suas promessas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:48:47+00:00","description":"F\u00e1brica movimentada e pedidos atrasados? Saiba medir a entrega no prazo e usar o SkyPlanner para alinhar a produ\u00e7\u00e3o \u00e0s datas prometidas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","width":1672,"height":941,"caption":"Manufactured components converge into a complete shipping carton beside a waiting delivery truck."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/recursos-pt-br\/entrega-no-prazo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Entrega no prazo na ind\u00fastria: cumpra suas promessas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Entrega no prazo na ind\u00fastria: cumpra suas promessas In\u00edcio &raquo; Recursos &raquo; Entrega no prazo na ind\u00fastria: cumpra suas promessas O indicador de entrega no prazo (OTD, do ingl\u00eas On-Time Delivery) mede a regularidade com que voc\u00ea cumpre as datas de entrega acordadas com os clientes. Na ind\u00fastria, melhorar esse indicador significa garantir que os&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/100440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=100440"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/100440\/revisions"}],"predecessor-version":[{"id":100499,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/posts\/100440\/revisions\/100499"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media\/100454"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=100440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/categories?post=100440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/tags?post=100440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}