{"id":107520,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Comarch ERP XL<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do Comarch ERP XL <span class=\"hl\">para planejamento da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do Comarch ERP XL mostra a parceiros e equipes de TI como conectar o Comarch ERP XL ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e Comarch ERP XL \u00e9 bidirecional e usa as interfaces da pr\u00f3pria Comarch:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>O SkyPlanner recebe ordens de produ\u00e7\u00e3o (zlecenia produkcyjne) com seus processos e opera\u00e7\u00f5es, tecnologias, centros de trabalho, recursos, itens, estoques e pedidos de compra.<\/li>\n\n\n<li>Os hor\u00e1rios planejados de in\u00edcio e t\u00e9rmino s\u00e3o gravados no ERP XL em cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o, por meio da XL API.<\/li>\n\n\n<li>Se voc\u00ea optar por isso, os apontamentos de tempo dos operadores s\u00e3o enviados de volta como registros de execu\u00e7\u00e3o das opera\u00e7\u00f5es.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es na programa\u00e7\u00e3o assim que elas ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implanta\u00e7\u00e3o, a equipe SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente Comarch ERP XL e continua dando suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia \u00e9 para parceiros e desenvolvedores que querem participar desse trabalho ou desenvolver por conta pr\u00f3pria com a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"comarch-erp-xl-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Comarch lista tr\u00eas formas de comunica\u00e7\u00e3o com o ERP XL: &#8220;DCOM, direct database connection (SQL Client), REST API&#8221; (DCOM, conex\u00e3o direta com o banco de dados via SQL Client, REST API) (<a href=\"https:\/\/www.comarch.pl\/erp\/xl\/\">Comarch, tradu\u00e7\u00e3o<\/a>). Para um sistema de programa\u00e7\u00e3o da produ\u00e7\u00e3o, duas delas atendem \u00e0 integra\u00e7\u00e3o:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>XL API (CDN_API.DLL).<\/strong> &#8220;These functions are collected in the CDN_API.DLL library, installed together with the whole Comarch ERP XL system.&#8221; (Essas fun\u00e7\u00f5es est\u00e3o reunidas na biblioteca CDN_API.DLL, instalada junto com todo o sistema Comarch ERP XL.) (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl017-wykorzystanie-api-erp-xl\/\">Ajuda da Comarch, tradu\u00e7\u00e3o<\/a>) Um programa externo inicia a sess\u00e3o com XLLogin, chama fun\u00e7\u00f5es que compartilham essa sess\u00e3o e a encerra com XLLogout. Cada estrutura tem um campo <strong>Wersja<\/strong> que seleciona a vers\u00e3o do conjunto de par\u00e2metros correspondente \u00e0 sua vers\u00e3o do ERP XL.<\/li>\n\n\n<li><strong>ERP XL Web REST API.<\/strong> O Comarch ERP XL Web 2026.0 disponibiliza microsservi\u00e7os REST: &#8220;Each RestAPI microservice exposes its own interactive documentation at the \/swagger endpoint.&#8221; (Cada microsservi\u00e7o RestAPI disponibiliza sua pr\u00f3pria documenta\u00e7\u00e3o interativa no endpoint \/swagger.) (<a href=\"https:\/\/pomoc.comarch.pl\/xlweb\/index.php\/dokumentacja\/modyfikacja-systemu\/\">Ajuda da Comarch, tradu\u00e7\u00e3o<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>A conex\u00e3o direta via <strong>SQL Client<\/strong> permite consultar dados mestres e ordens no banco de dados do ERP XL, conforme acordado com sua equipe de TI e seu parceiro Comarch.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Fun\u00e7\u00f5es da XL API para produ\u00e7\u00e3o<\/h3>\n\n\n<p>A Comarch documenta estas fun\u00e7\u00f5es de produ\u00e7\u00e3o (<a href=\"https:\/\/pomoc.comarch.pl\/xl\/index.php\/dokumentacja\/xl128-przyklady-zastosowania-api-w-produkcji\/\">XL128<\/a>):<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u00c1rea<\/th><th>Fun\u00e7\u00e3o<\/th><th>O que faz<\/th><\/tr><\/thead><tbody><tr><td>Tecnologias<\/td><td>XLNowaTechnologia, XLNowaCzynnoscTechnologia, XLNowaFunkcjaCzynnoscTechnologia, XLNowyZasobCzynnoscTechnologia<\/td><td>Cria uma tecnologia, uma opera\u00e7\u00e3o, um centro de trabalho em uma opera\u00e7\u00e3o ou um material ou produto em uma opera\u00e7\u00e3o<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o<\/td><td>XLNoweZlecenieProd<\/td><td>Cria uma ordem de produ\u00e7\u00e3o<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o<\/td><td>XLZamknijZlecenieProd<\/td><td>Planeja, replaneja, apura ou encerra uma ordem de produ\u00e7\u00e3o, conforme o c\u00f3digo de a\u00e7\u00e3o selecionado<\/td><\/tr><tr><td>Opera\u00e7\u00f5es<\/td><td>XLDodajCzynnoscDoProcesuProd, XLDodajZasobDoProcesuProd<\/td><td>Adiciona uma opera\u00e7\u00e3o ou um recurso a um processo de produ\u00e7\u00e3o<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>XLDodajTerminDoProcesuProd<\/td><td>Adiciona um intervalo de datas a uma opera\u00e7\u00e3o: IdCzynnosci, TerminOd, TerminDo<\/td><\/tr><tr><td>Execu\u00e7\u00e3o<\/td><td>XLDodajRealizacjeOperacjiProd, XLProdZmienIloscRealizacji<\/td><td>Adiciona um registro de execu\u00e7\u00e3o de opera\u00e7\u00e3o \u00e0 ordem e altera a quantidade realizada<\/td><\/tr><tr><td>Documentos<\/td><td>XLProdObiektyDoDokumentow, XLProdGenerujDokumentyDlaObiektow<\/td><td>Gera documentos RW e PW para objetos de produ\u00e7\u00e3o<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e acesso<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>XL API.<\/strong> A integra\u00e7\u00e3o se conecta a um banco de dados como um operador do ERP XL usando XLLogin e recebe uma sess\u00e3o para as chamadas seguintes. A DLL \u00e9 executada em uma m\u00e1quina Windows com o ERP XL instalado. Por isso, o servi\u00e7o que grava os dados de volta no ERP XL \u00e9 executado na sua rede, junto ao ERP XL.<\/li>\n\n\n<li><strong>REST API.<\/strong> O acesso \u00e9 configurado para cada instala\u00e7\u00e3o do ERP XL Web. A p\u00e1gina Swagger de cada microsservi\u00e7o documenta suas chamadas.<\/li>\n\n\n<li><strong>Leitura via SQL.<\/strong> Um usu\u00e1rio de banco de dados com acesso somente de leitura, aprovado pela sua equipe de TI.<\/li>\n\n<\/ul>\n\n\n<p>No SkyPlanner, a REST API usa um token de API no cabe\u00e7alho Authorization-Token para autentica\u00e7\u00e3o (SkyPlanner Settings &gt; API) e est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> orienta voc\u00ea nas primeiras chamadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A documenta\u00e7\u00e3o consultada do Comarch ERP XL n\u00e3o apresenta webhooks de sa\u00edda. O pr\u00f3prio APS da Comarch busca os dados quando o planejador clica em &#8220;Aktualizuj dane z ERP&#8221; (Atualizar dados do ERP) (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">Ajuda do Comarch APS<\/a>).<\/p>\n\n\n<p>Por isso, os dados do ERP XL s\u00e3o consultados periodicamente. As consultas filtram ordens de produ\u00e7\u00e3o em aberto e altera\u00e7\u00f5es recentes para identificar novos trabalhos. A frequ\u00eancia \u00e9 definida para cada f\u00e1brica: de consultas a cada poucos minutos para ordens de produ\u00e7\u00e3o a consultas de hora em hora para estoques.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando h\u00e1 mudan\u00e7as de estado ou na programa\u00e7\u00e3o. Assim, a grava\u00e7\u00e3o de dados de volta no ERP XL \u00e9 acionada por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do Comarch ERP XL (interface)<\/th><th>Objeto do SkyPlanner<\/th><th>Dire\u00e7\u00e3o<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Karty towar\u00f3w, unidades de medida (REST ou leitura via SQL)<\/td><td>Produtos e materiais<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial, seguida de consultas peri\u00f3dicas<\/td><\/tr><tr><td>Technologia: opera\u00e7\u00f5es, materiais, produtos semiacabados e produtos por opera\u00e7\u00e3o<\/td><td>Estrutura do produto, subprodutos e materiais por etapa do processo<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Opera\u00e7\u00f5es de Technologia: centros de trabalho, recursos e tempos<\/td><td>Etapas do processo com dura\u00e7\u00f5es, tempos de setup e de desmontagem<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Gniazda robocze e zasoby (m\u00e1quinas, ferramentas e funcion\u00e1rios)<\/td><td>Centros de trabalho, grupos de centros de trabalho, ferramentas e pessoal<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Carga inicial, com atualiza\u00e7\u00f5es pouco frequentes depois<\/td><\/tr><tr><td>Kalendarze i okresy, przestoje i awarie<\/td><td>Turnos, per\u00edodos n\u00e3o trabalhados e paradas<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Diariamente, ou com turnos pr\u00f3prios no SkyPlanner<\/td><\/tr><tr><td>Zlecenia produkcyjne (ZP) com processos, opera\u00e7\u00f5es, materiais, prazo de entrega e prioridade<\/td><td>Ordens e opera\u00e7\u00f5es com prazos de entrega e necessidades de materiais<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Consultas a cada poucos minutos<\/td><\/tr><tr><td>Estoque por dep\u00f3sito<\/td><td>Saldos de estoque<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Consultas de hora em hora ou a cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>Zam\u00f3wienia zakupu (ZZ) com datas de entrega<\/td><td>Pedidos de compra e materiais a receber por data de entrega<\/td><td>ERP XL \u2192 SkyPlanner<\/td><td>Consultas de hora em hora ou a cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>Datas das opera\u00e7\u00f5es: TerminOd, TerminDo (XLDodajTerminDoProcesuProd)<\/td><td>In\u00edcio e t\u00e9rmino planejados por opera\u00e7\u00e3o<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>A cada altera\u00e7\u00e3o na programa\u00e7\u00e3o, via webhook do SkyPlanner<\/td><\/tr><tr><td>Realizacja operacji (XLDodajRealizacjeOperacjiProd)<\/td><td>Apontamentos de tempo e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 ERP XL<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se essa op\u00e7\u00e3o for escolhida<\/td><\/tr><tr><td>N\u00e3o consta no ERP XL<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas como recursos de capacidade finita, opera\u00e7\u00f5es com v\u00e1rios operadores, m\u00e1quinas e pessoal alternativos<\/td><td>Mantidos no SkyPlanner<\/td><td>Configurados durante a implanta\u00e7\u00e3o<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Padr\u00f5es de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestres.<\/strong> Leia itens, tecnologias, centros de trabalho, recursos e calend\u00e1rios. Defina com cuidado como mapear os centros de trabalho no SkyPlanner: um centro de trabalho com quatro m\u00e1quinas se torna um grupo de centros de trabalho ou quatro centros de trabalho. As ferramentas cadastradas como recursos no ERP XL passam a ser ferramentas de capacidade finita no SkyPlanner, e os funcion\u00e1rios passam a compor o pessoal com seus respectivos turnos.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens e pedidos.<\/strong> Leia as ordens de produ\u00e7\u00e3o com suas opera\u00e7\u00f5es e materiais, al\u00e9m dos pedidos de compra em aberto. O SkyPlanner considera o material comprado dispon\u00edvel na data de entrega do pedido de compra e atualiza o estoque quando o pedido \u00e9 marcado como Delivered.<\/p>\n\n\n<p><strong>3. Grava\u00e7\u00e3o da programa\u00e7\u00e3o no ERP.<\/strong> Quando o mecanismo agenda ou move uma opera\u00e7\u00e3o, um webhook do SkyPlanner aciona o servi\u00e7o de grava\u00e7\u00e3o no ERP. O servi\u00e7o chama XLDodajTerminDoProcesuProd com os valores TerminOd e TerminDo da opera\u00e7\u00e3o, para que cada opera\u00e7\u00e3o de ZP tenha o in\u00edcio e o fim planejados pelo SkyPlanner.<\/p>\n\n\n<p><strong>4. Apontamentos de ch\u00e3o de f\u00e1brica.<\/strong> Os operadores registram o trabalho com SkyPlanner Mobile Confirmations ou Production Timer, e os registros de tempo mant\u00eam a programa\u00e7\u00e3o atualizada. Voc\u00ea escolhe se os tempos reais ser\u00e3o enviados ao ERP. Se optar pelo envio, o servi\u00e7o adiciona os apontamentos com XLDodajRealizacjeOperacjiProd, e os documentos RW e PW seguem as regras do seu ERP XL. Se voc\u00ea usa Comarch MES em alguns centros de trabalho, mantenha uma \u00fanica fonte de apontamento por opera\u00e7\u00e3o.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente essas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Sistema respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Itens, tecnologias, quantidades, status de ZP, custeio<\/td><td>Comarch ERP XL<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, hor\u00e1rios de in\u00edcio e fim, aloca\u00e7\u00e3o de recursos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, requisitos de ferramentas e operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos, calend\u00e1rios e paradas<\/td><td>Um \u00fanico sistema, escolhido na defini\u00e7\u00e3o de escopo<\/td><\/tr><tr><td>Apontamentos, documentos RW e PW<\/td><td>Comarch ERP XL, com lan\u00e7amento direto ou envio a partir dos registros de tempo do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Defina um \u00fanico sistema para gravar as datas das opera\u00e7\u00f5es. Se o replanejamento autom\u00e1tico do ERP XL ou o Comarch APS ainda gravar datas nas mesmas ordens de produ\u00e7\u00e3o, desative essa fun\u00e7\u00e3o para as ordens programadas pelo SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas t\u00edpicas do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em semanas ap\u00f3s o in\u00edcio da implanta\u00e7\u00e3o. Antes disso, valide a programa\u00e7\u00e3o no teste gr\u00e1tis de 30 dias com centros de trabalho, tecnologias e ordens de produ\u00e7\u00e3o em aberto exportados do ERP XL em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se os apontamentos ser\u00e3o enviados ao ERP.<\/li>\n\n\n<li><strong>Acesso ao ERP XL.<\/strong> Crie o operador de integra\u00e7\u00e3o, configure a conex\u00e3o de leitura e instale o servi\u00e7o de grava\u00e7\u00e3o em um servidor com ERP XL instalado. Fa\u00e7a os primeiros testes em uma c\u00f3pia do banco de dados.<\/li>\n\n\n<li><strong>Carga inicial.<\/strong> Itens, tecnologias, centros de trabalho, recursos e calend\u00e1rios.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens de produ\u00e7\u00e3o e pedidos de compra.<\/strong> Consultas peri\u00f3dicas com filtros e novas tentativas.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas, quantidade de operadores por opera\u00e7\u00e3o e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o da programa\u00e7\u00e3o no ERP.<\/strong> Chamadas a XLDodajTerminDoProcesuProd acionadas por webhooks do SkyPlanner, al\u00e9m dos apontamentos, se essa op\u00e7\u00e3o for escolhida.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Execute o SkyPlanner em paralelo ao plano atual, compare as datas e corrija os dados mestres.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative a grava\u00e7\u00e3o no ERP assim que os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-comarch-erp-xl-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que considerar ao planejar uma integra\u00e7\u00e3o com Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Capacidade informada manualmente.<\/strong> No ERP XL, a capacidade do centro de trabalho \u00e9 um n\u00famero definido pelo usu\u00e1rio, com um percentual de carga permitido. J\u00e1 o SkyPlanner calcula a capacidade a partir dos turnos e recursos reais. Por isso, configure os turnos com cuidado e deixe de lado o percentual.<\/li>\n\n\n<li><strong>Recursos ilimitados.<\/strong> O ERP XL n\u00e3o verifica a ocupa\u00e7\u00e3o dos recursos marcados com capacidade ilimitada. Decida, para cada um deles, se ser\u00e1 um centro de trabalho com capacidade finita no SkyPlanner.<\/li>\n\n\n<li><strong>Ordens liberadas.<\/strong> O ERP XL exclui do replanejamento as opera\u00e7\u00f5es liberadas para produ\u00e7\u00e3o, a menos que a op\u00e7\u00e3o &#8220;Przesu\u0144 na zwolnionych&#8221; esteja marcada. Defina como as datas do SkyPlanner ser\u00e3o aplicadas \u00e0s ordens liberadas e use Running Time Lock para congelar a programa\u00e7\u00e3o das pr\u00f3ximas horas de trabalho.<\/li>\n\n\n<li><strong>Vers\u00f5es das estruturas.<\/strong> As estruturas da XL API cont\u00eam um campo Wersja. Configure-o de acordo com a vers\u00e3o do seu ERP XL e repita os testes ap\u00f3s cada atualiza\u00e7\u00e3o anual.<\/li>\n\n\n<li><strong>Unidades e tempos no sistema polon\u00eas.<\/strong> Os tempos das opera\u00e7\u00f5es e as unidades dos calend\u00e1rios devem ser convertidos com exatid\u00e3o na importa\u00e7\u00e3o. Caso contr\u00e1rio, todas as dura\u00e7\u00f5es estar\u00e3o erradas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-comarch-erp-xl-i\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o com Comarch ERP XL<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipe do SkyPlanner configura a integra\u00e7\u00e3o durante a implanta\u00e7\u00e3o e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> cobrindo as leituras e chamadas \u00e0 XL API acordadas. Cada f\u00e1brica usa o Comarch ERP XL de uma maneira, e \u00e9 nessa etapa que esse conhecimento \u00e9 aplicado.<\/li>\n\n\n<li><strong>Seu parceiro Comarch pode participar.<\/strong> Ele conhece sua configura\u00e7\u00e3o, seu licenciamento e a XL API, e pode configurar o operador, a conex\u00e3o de leitura e o servidor de grava\u00e7\u00e3o no ERP junto com a equipe do SkyPlanner.<\/li>\n\n\n<li><strong>Seus pr\u00f3prios desenvolvedores podem ampliar a integra\u00e7\u00e3o<\/strong> usando a REST API do SkyPlanner com um token de API. Um token de API \u00e9 suficiente para come\u00e7ar, e a equipe do SkyPlanner ajuda quando necess\u00e1rio. A documenta\u00e7\u00e3o est\u00e1 dispon\u00edvel em <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">Documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner custa a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e cobran\u00e7a mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com o plano, de acordo com seu processo e suas necessidades. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>, a p\u00e1gina de <a href=\"\/pt-br\/integracoes\/erp\/comarch-erp-xl\/programacao-producao\/\">programa\u00e7\u00e3o com capacidade finita para Comarch ERP XL<\/a>, a <a href=\"\/pt-br\/integracoes\/erp\/comarch-erp-xl\/\">p\u00e1gina do Comarch ERP XL<\/a> e a <a href=\"\/pt-br\/integracoes\/erp\/\">central de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es do SkyPlanner por fabricantes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, no ch\u00e3o de f\u00e1brica de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas de Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia a avalia\u00e7\u00e3o da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied, em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e gerar um plano otimizado de tr\u00eas meses para todos os centros de trabalho leva menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia a avalia\u00e7\u00e3o da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o da Fredman Operations, ao lado de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de visibilidade da capacidade dispon\u00edvel para a equipe de vendas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner oferece a base e a confiabilidade para todo o planejamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens adequados ao contato com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipe de vendas enxerga a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e as solicita\u00e7\u00f5es de altera\u00e7\u00e3o da programa\u00e7\u00e3o que levavam uma hora ou mais s\u00e3o respondidas em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/fredman-operations\/\">Leia a avalia\u00e7\u00e3o da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de pontualidade de entrega desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner nos d\u00e1 visibilidade da capacidade e torna o planejamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Fabrica\u00e7\u00e3o de produtos qu\u00edmicos e alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega se mant\u00e9m em 100% durante todo o per\u00edodo de uso do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/opes-corporation\/\">Leia a avalia\u00e7\u00e3o da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Comarch ERP XL tem uma API para ordens de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. A XL API (CDN_API.DLL) cria ordens de produ\u00e7\u00e3o, faz o planejamento e o replanejamento com XLZamknijZlecenieProd, adiciona datas \u00e0s opera\u00e7\u00f5es com XLDodajTerminDoProcesuProd e registra apontamentos com XLDodajRealizacjeOperacjiProd. O Comarch ERP XL Web acrescenta microsservi\u00e7os REST documentados no Swagger.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como as datas planejadas s\u00e3o gravadas no Comarch ERP XL?<\/summary>\n<p class=\"sp-faq__a\">Por meio de XLDodajTerminDoProcesuProd, que adiciona um intervalo de datas (TerminOd, TerminDo) a cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o. Um webhook do SkyPlanner aciona a chamada sempre que o planejamento da produ\u00e7\u00e3o muda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Comarch ERP XL oferece suporte a webhooks?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o h\u00e1 webhooks de sa\u00edda documentados. Por isso, a integra\u00e7\u00e3o consulta o ERP XL periodicamente, em intervalos definidos para cada f\u00e1brica. Os pr\u00f3prios webhooks do SkyPlanner enviam as altera\u00e7\u00f5es no planejamento da produ\u00e7\u00e3o assim que elas ocorrem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro Comarch deve propor Comarch APS ou SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, quando o cliente quer ter, em semanas, um planejamento da produ\u00e7\u00e3o que respeite a capacidade real de m\u00e1quinas e pessoal e se mantenha atualizado. O Comarch APS \u00e9 uma aplica\u00e7\u00e3o separada, com banco de dados PostgreSQL, integrador e chave de licen\u00e7a pr\u00f3prios. A sincroniza\u00e7\u00e3o ocorre quando o planejador clica, e o tempo de setup \u00e9 um valor fixo por opera\u00e7\u00e3o (<a href=\"https:\/\/pomoc.comarch.pl\/aps\/index.php\/dokumentacja\/dokumentacja-uzytkownika-wersja-2026-3\/\">ajuda do Comarch APS<\/a>). O SkyPlanner \u00e9 um software em nuvem que replaneja automaticamente e planeja trocas de produ\u00e7\u00e3o, ferramentas, equipes e materiais, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gr\u00e1tis de 30 dias permite usar at\u00e9 20 centros de trabalho, com importa\u00e7\u00f5es do ERP XL em CSV ou Excel, sem cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-br\/teste\/\">Inicie o teste<\/a> ou <a href=\"\/pt-br\/vendas-de-contacto\/\">fale com a equipe de vendas<\/a> para definir o escopo da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Comarch ERP XL Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do Comarch ERP XL mostra a parceiros e equipes de TI como conectar o Comarch ERP XL ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e Comarch ERP XL \u00e9 bidirecional &#8230; <a title=\"Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\" aria-label=\"Read more about Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106476,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107520","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o Comarch XL APS: guia de planejamento da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Integre Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas das opera\u00e7\u00f5es, mapeamento de dados e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Integre Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas das opera\u00e7\u00f5es, mapeamento de dados e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o Comarch XL APS: guia de planejamento da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Integre Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas das opera\u00e7\u00f5es, mapeamento de dados e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Comarch ERP XL: planejamento da produ\u00e7\u00e3o com capacidade finita\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/comarch-erp-xl\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o Comarch XL APS: guia de planejamento da produ\u00e7\u00e3o","description":"Integre Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas das opera\u00e7\u00f5es, mapeamento de dados e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","og_locale":"pt_BR","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Integre Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas das opera\u00e7\u00f5es, mapeamento de dados e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o Comarch XL APS: guia de planejamento da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Integre Comarch ERP XL ao SkyPlanner APS: produ\u00e7\u00e3o via XL API, ERP XL Web REST API, retorno de datas das opera\u00e7\u00f5es, mapeamento de dados e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Comarch ERP XL: planejamento da produ\u00e7\u00e3o com capacidade finita","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/comarch-erp-xl\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Comarch ERP XL Guia de integra\u00e7\u00e3o do Comarch ERP XL para planejamento da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do Comarch ERP XL mostra a parceiros e equipes de TI como conectar o Comarch ERP XL ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e Comarch ERP XL \u00e9 bidirecional&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/107520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=107520"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/107520\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106476"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=107520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}