{"id":107462,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/helios\/guia-de-integracao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ HELIOS<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do HELIOS <span class=\"hl\">para planejamento da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do HELIOS mostra a parceiros e equipes de TI como conectar HELIOS iNuvio e HELIOS Nephrite ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e HELIOS \u00e9 bidirecional e usa as pr\u00f3prias interfaces do HELIOS:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>S\u00e3o importadas as ordens de produ\u00e7\u00e3o (v\u00fdrobn\u00ed p\u0159\u00edkazy) com suas opera\u00e7\u00f5es, pe\u00e7as fabricadas, listas de materiais, roteiros de produ\u00e7\u00e3o, postos de trabalho, m\u00e1quinas, fun\u00e7\u00f5es profissionais, recursos de pessoal, estoques e pedidos de compra.<\/li>\n\n\n<li>As datas planejadas de in\u00edcio e t\u00e9rmino s\u00e3o enviadas de volta \u00e0s ordens de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Se voc\u00ea optar por isso, os apontamentos de tempo dos operadores podem ser enviados de volta como registros de opera\u00e7\u00f5es (evidence v\u00fdrobn\u00edch operac\u00ed).<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es na programa\u00e7\u00e3o assim que elas ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Durante a implanta\u00e7\u00e3o, a equipe SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente HELIOS e oferece suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia \u00e9 voltado a parceiros e desenvolvedores HELIOS que querem participar desse trabalho ou desenvolver suas pr\u00f3prias solu\u00e7\u00f5es com a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"helios-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces de integra\u00e7\u00e3o do HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Helios Inuvio Server (Inuvio REST API).<\/strong> A Asseco o descreve como um componente separado do HELIOS iNuvio que permite acessar os m\u00f3dulos do HELIOS iNuvio via REST API (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Helios_Inuvio_Server\">ajuda do Helios Inuvio Server<\/a>). Ele acompanha a distribui\u00e7\u00e3o do iNuvio, e a especifica\u00e7\u00e3o OpenAPI \u00e9 publicada nos formatos Rapidoc e Redoc. A API opera sobre as consultas do HELIOS (browses), cada uma com seu pr\u00f3prio ID e suas permiss\u00f5es:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>GET \/browses\/list<\/strong> e <strong>GET \/browses\/meta<\/strong> listam as consultas dispon\u00edveis e suas colunas.<\/li>\n\n\n<li><strong>\/browses\/data<\/strong> l\u00ea as linhas de uma consulta e grava linhas quando a consulta permite criar, atualizar e excluir registros.<\/li>\n\n\n<li><strong>\/api\/v1\/actions\/meta<\/strong> e <strong>\/api\/v1\/actions\/execute\/{dbName}\/{browseIdent}\/{actionIdent}<\/strong> executam a\u00e7\u00f5es externas em uma consulta. Atualmente, s\u00e3o a\u00e7\u00f5es externas dos tipos Procedure, Browse e Plugin.<\/li>\n\n<\/ul>\n\n\n<p>As consultas de produ\u00e7\u00e3o usadas pelo planejador incluem o plano de produ\u00e7\u00e3o (v\u00fdrobn\u00ed pl\u00e1n), as ordens de produ\u00e7\u00e3o (v\u00fdrobn\u00ed p\u0159\u00edkazy), as pe\u00e7as das ordens de produ\u00e7\u00e3o, os materiais e produtos semiacabados para produ\u00e7\u00e3o, as fun\u00e7\u00f5es profissionais, os recursos de pessoal, as predefini\u00e7\u00f5es de opera\u00e7\u00f5es dos roteiros de produ\u00e7\u00e3o e os registros de opera\u00e7\u00f5es. Estoques, entradas, sa\u00eddas e pedidos de compra emitidos (vydan\u00e9 objedn\u00e1vky) est\u00e3o dispon\u00edveis da mesma forma.<\/p>\n\n\n<p><strong>HELIOS Nephrite REST API.<\/strong> O roteiro de evolu\u00e7\u00e3o do Nephrite inclui o desenvolvimento da REST API (<a href=\"https:\/\/www.helios.eu\/files\/road-to-2025-nephrite.pdf\">roteiro de evolu\u00e7\u00e3o do HELIOS Nephrite<\/a>). Durante a defini\u00e7\u00e3o de escopo, a equipe SkyPlanner confirma com voc\u00ea e seu parceiro HELIOS quais endpoints do Nephrite est\u00e3o dispon\u00edveis na sua instala\u00e7\u00e3o. Os fluxos de dados abaixo permanecem os mesmos.<\/p>\n\n\n<p><strong>Excel e CSV.<\/strong> Todas as consultas do HELIOS permitem exportar para Microsoft Office, o que \u00e9 suficiente para a carga de teste.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o e licenciamento<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Duas formas de autentica\u00e7\u00e3o.<\/strong> O iNuvio oferece uma API propriet\u00e1ria de autentica\u00e7\u00e3o mais antiga (\/api\/token) e uma API OAuth2 mais recente, baseada na RFC 6749 (\/oauth\/token, \/oauth\/revoke). Os tokens s\u00e3o renovados por POST \/oauth\/token ou GET \/api\/token.<\/li>\n\n\n<li><strong>Licenciamento.<\/strong> O Helios Inuvio Server em si \u00e9 gratuito, mas a REST API exige licen\u00e7a. A partir da vers\u00e3o 3.0.2026.0301, as APIs de sistema e de m\u00f3dulos s\u00e3o unificadas em uma \u00fanica Inuvio REST API, e o acesso \u00e0 API deixa de ser limitado pelo n\u00famero de usu\u00e1rios.<\/li>\n\n\n<li><strong>Permiss\u00f5es.<\/strong> O usu\u00e1rio da integra\u00e7\u00e3o precisa de permiss\u00e3o de leitura nas consultas de produ\u00e7\u00e3o e estoque, al\u00e9m de permiss\u00e3o para executar as a\u00e7\u00f5es externas acordadas.<\/li>\n\n<\/ul>\n\n\n<p>No SkyPlanner, a REST API usa um token de API no cabe\u00e7alho Authorization-Token para autentica\u00e7\u00e3o (SkyPlanner Settings &gt; API) e est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> orienta voc\u00ea nas primeiras chamadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Eventos e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner consulta o HELIOS em intervalos definidos. As chamadas a \/browses\/data usam filtros para ordens de produ\u00e7\u00e3o em aberto e altera\u00e7\u00f5es recentes, identificando novas opera\u00e7\u00f5es. A frequ\u00eancia \u00e9 definida por f\u00e1brica: de intervalos de poucos minutos para ordens de produ\u00e7\u00e3o a consultas de hora em hora para estoques.<\/p>\n\n\n<p>O SkyPlanner envia webhooks quando h\u00e1 mudan\u00e7as de estado ou na programa\u00e7\u00e3o. Assim, o envio de dados de volta ao HELIOS \u00e9 acionado por eventos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do HELIOS (consulta)<\/th><th>Objeto do SkyPlanner<\/th><th>Dire\u00e7\u00e3o<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Cadastros de itens e pe\u00e7as fabricadas (vyr\u00e1b\u011bn\u00e9 d\u00edlce), unidades<\/td><td>Produtos e materiais<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial, depois consultas peri\u00f3dicas<\/td><\/tr><tr><td>Listas de materiais (kusovn\u00edk, kusovn\u00edkov\u00e9 vazby) com datas de validade<\/td><td>Estrutura do produto, subprodutos, materiais por produto<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Roteiros de produ\u00e7\u00e3o (technologick\u00fd postup): opera\u00e7\u00e3o, posto de trabalho, tempo de prepara\u00e7\u00e3o da m\u00e1quina e do operador, tempo unit\u00e1rio, tempo de finaliza\u00e7\u00e3o, tempo entre opera\u00e7\u00f5es<\/td><td>Etapas do processo com dura\u00e7\u00f5es e tempos de prepara\u00e7\u00e3o e desmontagem<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Postos de trabalho (pracovi\u0161t\u011b), m\u00e1quinas (stroje), postos de trabalho alternativos<\/td><td>Centros de trabalho, grupos de centros de trabalho, centros de trabalho alternativos<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial, raramente depois<\/td><\/tr><tr><td>Fun\u00e7\u00f5es profissionais (v\u00fdrobn\u00ed profese), recursos de pessoal (v\u00fdrobn\u00ed person\u00e1ln\u00ed zdroje)<\/td><td>Pessoal e n\u00famero de operadores por opera\u00e7\u00e3o<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Carga inicial, depois a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Calend\u00e1rios de planejamento (pl\u00e1novac\u00ed kalend\u00e1\u0159e)<\/td><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Diariamente, ou turnos pr\u00f3prios no SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (v\u00fdrobn\u00ed p\u0159\u00edkazy), pe\u00e7as e opera\u00e7\u00f5es das ordens, materiais para produ\u00e7\u00e3o<\/td><td>Ordens e opera\u00e7\u00f5es com prazos e necessidades de materiais<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Consultas a cada poucos minutos<\/td><\/tr><tr><td>Estoque (stav skladu)<\/td><td>Saldos de estoque<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Consultas a cada hora ou a cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>Pedidos de compra emitidos (vydan\u00e9 objedn\u00e1vky) com datas de entrega<\/td><td>Pedidos de compra, materiais a receber por data de entrega<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Consultas de hora em hora ou ao executar a programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e t\u00e9rmino planejados por opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o (a\u00e7\u00e3o externa)<\/td><td>In\u00edcio e t\u00e9rmino planejados por opera\u00e7\u00e3o<\/td><td>SkyPlanner \u2192 HELIOS<\/td><td>A cada altera\u00e7\u00e3o na programa\u00e7\u00e3o, via webhook do SkyPlanner<\/td><\/tr><tr><td>Registros de opera\u00e7\u00f5es (evidence v\u00fdrobn\u00edch operac\u00ed)<\/td><td>Apontamentos de tempo e confirma\u00e7\u00f5es dos operadores<\/td><td>SkyPlanner \u2192 HELIOS<\/td><td>Por confirma\u00e7\u00e3o ou por turno, se essa op\u00e7\u00e3o for escolhida<\/td><\/tr><tr><td>N\u00e3o dispon\u00edvel no HELIOS<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o, ferramentas como recursos finitos, opera\u00e7\u00f5es com v\u00e1rios operadores<\/td><td>Mantidos no SkyPlanner<\/td><td>Configurados durante a implanta\u00e7\u00e3o<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Padr\u00f5es de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestres.<\/strong> Leia pe\u00e7as fabricadas, listas de materiais, roteiros de produ\u00e7\u00e3o, postos de trabalho, m\u00e1quinas, fun\u00e7\u00f5es profissionais, recursos de pessoal e calend\u00e1rios nas consultas TPV. Cada recurso do HELIOS tem uma marca\u00e7\u00e3o que o inclui no planejamento da capacidade produtiva. Por isso, defina quais recursos ser\u00e3o programados pelo SkyPlanner. Um posto de trabalho com quatro m\u00e1quinas se torna um grupo de centros de trabalho ou quatro centros de trabalho.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens.<\/strong> Leia as ordens de produ\u00e7\u00e3o com suas pe\u00e7as, opera\u00e7\u00f5es e materiais, al\u00e9m dos pedidos de compra emitidos. O SkyPlanner considera o material comprado dispon\u00edvel na data de entrega do pedido de compra e atualiza o estoque quando o pedido recebe o status Delivered. Programe as ordens de produ\u00e7\u00e3o liberadas. As quantidades previstas no plano de produ\u00e7\u00e3o permanecem no HELIOS at\u00e9 se tornarem ordens de produ\u00e7\u00e3o.<\/p>\n\n\n<p><strong>3. Retorno da programa\u00e7\u00e3o ao HELIOS.<\/strong> Quando o mecanismo de programa\u00e7\u00e3o aloca ou move uma opera\u00e7\u00e3o, um webhook do SkyPlanner aciona uma a\u00e7\u00e3o externa na consulta de ordens de produ\u00e7\u00e3o por meio de \/api\/v1\/actions\/execute. Essa a\u00e7\u00e3o \u00e9 um procedimento do HELIOS, acordado na defini\u00e7\u00e3o de escopo, que define o in\u00edcio e o t\u00e9rmino planejados da opera\u00e7\u00e3o da ordem. O HELIOS valida a altera\u00e7\u00e3o usando sua pr\u00f3pria l\u00f3gica.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es do ch\u00e3o de f\u00e1brica.<\/strong> Os operadores registram o trabalho no SkyPlanner Mobile Confirmations ou no Production Timer, e os apontamentos de tempo mant\u00eam a programa\u00e7\u00e3o atualizada. Voc\u00ea decide se os tempos reais ser\u00e3o enviados de volta ao HELIOS. Se optar pelo envio, uma a\u00e7\u00e3o externa os grava como registros de opera\u00e7\u00f5es para cada opera\u00e7\u00e3o da ordem. Caso contr\u00e1rio, os operadores continuam fazendo os apontamentos nos terminais HELIOS, e o SkyPlanner l\u00ea esses registros.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente essas defini\u00e7\u00f5es antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Itens, listas de materiais, roteiros de produ\u00e7\u00e3o, quantidades, status das ordens<\/td><td>HELIOS<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, hor\u00e1rios de in\u00edcio e t\u00e9rmino, aloca\u00e7\u00e3o de m\u00e1quinas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o, requisitos de ferramentas e operadores, recursos alternativos<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos e dias n\u00e3o \u00fateis<\/td><td>Um \u00fanico sistema, escolhido na defini\u00e7\u00e3o de escopo<\/td><\/tr><tr><td>Registros de opera\u00e7\u00f5es, sa\u00eddas e entradas de materiais<\/td><td>HELIOS, com registros inseridos diretamente ou enviados a partir dos apontamentos de tempo do SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Defina um \u00fanico sistema respons\u00e1vel por gravar as datas das ordens. Se o planejamento da capacidade produtiva do HELIOS ou o Nephrite APS ainda gravar datas, desative essa fun\u00e7\u00e3o para as ordens programadas pelo SkyPlanner ou mantenha o plano do HELIOS apenas como plano de teste.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas t\u00edpicas do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da implanta\u00e7\u00e3o. Antes disso, valide a programa\u00e7\u00e3o no teste gratuito de 30 dias com postos de trabalho, roteiros de produ\u00e7\u00e3o e ordens de produ\u00e7\u00e3o em aberto exportados do HELIOS em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e se os registros de opera\u00e7\u00f5es ser\u00e3o enviados de volta.<\/li>\n\n\n<li><strong>Acesso ao HELIOS.<\/strong> Configure o Helios Inuvio Server, o usu\u00e1rio da integra\u00e7\u00e3o, as credenciais OAuth2 e o licenciamento da REST API. Fa\u00e7a os primeiros testes em uma c\u00f3pia do banco de dados.<\/li>\n\n\n<li><strong>Carga inicial.<\/strong> Pe\u00e7as fabricadas, listas de materiais, roteiros de produ\u00e7\u00e3o, postos de trabalho, m\u00e1quinas, fun\u00e7\u00f5es profissionais e calend\u00e1rios.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens e pedidos de compra.<\/strong> Consultas peri\u00f3dicas com filtros, pagina\u00e7\u00e3o e novas tentativas em caso de falha.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Matriz de tempos de prepara\u00e7\u00e3o, ferramentas, quantidade de operadores por opera\u00e7\u00e3o e m\u00e1quinas ou pessoal alternativos.<\/li>\n\n\n<li><strong>Retorno da programa\u00e7\u00e3o ao HELIOS.<\/strong> Crie e teste as a\u00e7\u00f5es externas para as datas planejadas e, se essa op\u00e7\u00e3o for escolhida, para os registros de opera\u00e7\u00f5es.<\/li>\n\n\n<li><strong>Testes em paralelo.<\/strong> Execute o SkyPlanner em paralelo ao plano atual, compare as datas e corrija os dados mestres.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong> Ative o envio de dados de volta ao HELIOS quando os dados coincidirem.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-helios-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que considerar ao planejar uma integra\u00e7\u00e3o com o HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Marca\u00e7\u00f5es de planejamento.<\/strong> Somente os recursos marcados para planejamento da capacidade produtiva t\u00eam dados de capacidade confi\u00e1veis. Verifique as marca\u00e7\u00f5es dos postos de trabalho, m\u00e1quinas, fun\u00e7\u00f5es profissionais e servi\u00e7os subcontratados antes da primeira carga.<\/li>\n\n\n<li><strong>Unidades de tempo.<\/strong> Os tempos de prepara\u00e7\u00e3o, por unidade e de finaliza\u00e7\u00e3o podem ser informados em horas, minutos ou segundos. Converta as unidades na importa\u00e7\u00e3o; caso contr\u00e1rio, todas as dura\u00e7\u00f5es ficar\u00e3o incorretas.<\/li>\n\n\n<li><strong>Tempo entre opera\u00e7\u00f5es.<\/strong> O tempo constante entre opera\u00e7\u00f5es \u00e9 uma espera entre etapas, n\u00e3o tempo de m\u00e1quina. Modele esse intervalo como espera, n\u00e3o como capacidade.<\/li>\n\n\n<li><strong>Opera\u00e7\u00f5es terceirizadas (kooperace).<\/strong> O tempo de transporte se aplica tanto \u00e0 ida quanto \u00e0 volta. Modele as opera\u00e7\u00f5es terceirizadas como etapas que consideram apenas o tempo.<\/li>\n\n\n<li><strong>Vis\u00f5es que permitem grava\u00e7\u00e3o.<\/strong> Todas as vis\u00f5es permitem leitura, mas apenas algumas permitem criar, atualizar e excluir registros. GET \/browses\/list com o filtro browseCreateImplemented=1 mostra quais s\u00e3o. As vis\u00f5es de ordens de produ\u00e7\u00e3o s\u00e3o somente leitura, por isso as datas planejadas s\u00e3o enviadas de volta pela a\u00e7\u00e3o externa acordada.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-helios-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o com o HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipe SkyPlanner configura a integra\u00e7\u00e3o durante a implanta\u00e7\u00e3o e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o,<\/strong> abrangendo as vis\u00f5es e a\u00e7\u00f5es externas acordadas. Cada f\u00e1brica usa o HELIOS de uma forma, e \u00e9 nessa etapa que esse conhecimento \u00e9 aplicado.<\/li>\n\n\n<li><strong>Seu parceiro HELIOS pode participar.<\/strong> Ele conhece sua instala\u00e7\u00e3o, os procedimentos personalizados e o licenciamento, e pode configurar o Helios Inuvio Server e as a\u00e7\u00f5es externas junto com a equipe SkyPlanner.<\/li>\n\n\n<li><strong>Seus pr\u00f3prios desenvolvedores podem ampliar a integra\u00e7\u00e3o<\/strong> usando a REST API do SkyPlanner com um token de API. Basta um token de API para come\u00e7ar, e a equipe SkyPlanner ajuda quando necess\u00e1rio. Consulte a <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o de integra\u00e7\u00e3o do SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner custa a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e cobran\u00e7a mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com seu plano, de acordo com seu processo e suas necessidades. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>, a <a href=\"\/pt-br\/integracoes\/erp\/helios\/programacao-producao\/\">programa\u00e7\u00e3o com capacidade finita no HELIOS<\/a>, a <a href=\"\/pt-br\/integracoes\/erp\/helios\/\">p\u00e1gina do HELIOS<\/a> e a <a href=\"\/pt-br\/integracoes\/erp\/\">central de integra\u00e7\u00f5es com ERP<\/a>. Para conhecer os fundamentos, consulte <a href=\"\/pt-br\/recursos-pt-br\/o-que-e-programacao-da-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Depoimentos de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o passou das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Ler o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado de tr\u00eas meses para todos os centros de trabalho fica pronto em menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Ler o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor executivo da Mamec, no galp\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Milhares (\u00d7 1.000)<\/b><span>de ordens de produ\u00e7\u00e3o programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cHoje temos um controle diferente da produ\u00e7\u00e3o, e nossa compreens\u00e3o da capacidade est\u00e1 em um patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrica\u00e7\u00e3o sob contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de produ\u00e7\u00e3o s\u00e3o programadas automaticamente, e toda a organiza\u00e7\u00e3o tem uma vis\u00e3o da produ\u00e7\u00e3o em tempo real.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/mamec\/\">Leia o depoimento da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de pontualidade de entrega desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner nos d\u00e1 visibilidade da capacidade e torna o planejamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Fabrica\u00e7\u00e3o de produtos qu\u00edmicos e alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega se mant\u00e9m em 100% desde 2021, durante todo o per\u00edodo de uso do SkyPlanner.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/opes-corporation\/\">Leia o depoimento da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O HELIOS tem uma API para ordens de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O Helios Inuvio Server oferece acesso REST \u00e0s vis\u00f5es do HELIOS iNuvio, incluindo o plano de produ\u00e7\u00e3o, as ordens de produ\u00e7\u00e3o, os itens das ordens, os materiais para produ\u00e7\u00e3o e os registros de opera\u00e7\u00f5es. Para o HELIOS Nephrite, a equipe SkyPlanner define a abordagem para sua instala\u00e7\u00e3o junto com voc\u00ea e seu parceiro HELIOS, durante a defini\u00e7\u00e3o de escopo da implanta\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como o SkyPlanner identifica as altera\u00e7\u00f5es no HELIOS?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner consulta periodicamente as vis\u00f5es do HELIOS, em intervalos definidos para cada f\u00e1brica, filtrando as ordens de produ\u00e7\u00e3o em aberto e as altera\u00e7\u00f5es recentes. Os webhooks do pr\u00f3prio SkyPlanner enviam as altera\u00e7\u00f5es no planejamento assim que elas ocorrem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como as datas planejadas s\u00e3o gravadas de volta no HELIOS?<\/summary>\n<p class=\"sp-faq__a\">Por meio de uma a\u00e7\u00e3o externa na vis\u00e3o de ordens de produ\u00e7\u00e3o, executada com \/api\/v1\/actions\/execute. Essa a\u00e7\u00e3o \u00e9 um procedimento do HELIOS acordado na defini\u00e7\u00e3o de escopo, de modo que o HELIOS aplica sua pr\u00f3pria l\u00f3gica a cada data recebida.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual autentica\u00e7\u00e3o a Inuvio REST API usa?<\/summary>\n<p class=\"sp-faq__a\">OAuth2 conforme a RFC 6749 em \/oauth\/token, ou o mecanismo propriet\u00e1rio mais antigo em \/api\/token. A API do pr\u00f3prio SkyPlanner usa um token de API no cabe\u00e7alho Authorization-Token.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro HELIOS deve propor o HELIOS APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o plano do cliente muda com frequ\u00eancia e precisa respeitar os limites de capacidade. O planejamento no HELIOS funciona por meio de c\u00e1lculos sobre um \u00fanico plano ativo, pode mudar para capacidade ilimitada para cumprir as datas e deixa a resolu\u00e7\u00e3o de conflitos a cargo do planejador (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Z%C3%A1kladn%C3%AD_kapacitn%C3%AD_pl%C3%A1nov%C3%A1n%C3%AD_-_V%C3%BDroba\">ajuda do HELIOS<\/a>). O SkyPlanner se conecta pela REST API, replaneja automaticamente, planeja trocas de produ\u00e7\u00e3o, ferramentas, equipes e materiais, e oferece usu\u00e1rios ilimitados, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gratuito de 30 dias permite usar at\u00e9 20 centros de trabalho com importa\u00e7\u00f5es de arquivos CSV ou Excel do HELIOS, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-br\/teste\/\">Inicie o teste<\/a> ou <a href=\"\/pt-br\/vendas-de-contacto\/\">fale com a equipe comercial<\/a> para definir o escopo da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ HELIOS Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do HELIOS mostra a parceiros e equipes de TI como conectar HELIOS iNuvio e HELIOS Nephrite ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e HELIOS \u00e9 bidirecional e usa as pr\u00f3prias interfaces do HELIOS: &#8230; <a title=\"Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/\" aria-label=\"Read more about Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106447,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107462","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o HELIOS APS: guia de planejamento da produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Conecte HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, consultas de ordens de produ\u00e7\u00e3o, a\u00e7\u00f5es externas de retorno, mapeamento de dados e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Conecte HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, consultas de ordens de produ\u00e7\u00e3o, a\u00e7\u00f5es externas de retorno, mapeamento de dados e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o HELIOS APS: guia de planejamento da produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Conecte HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, consultas de ordens de produ\u00e7\u00e3o, a\u00e7\u00f5es externas de retorno, mapeamento de dados e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/helios\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para HELIOS: planejamento da produ\u00e7\u00e3o com capacidade finita\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/helios\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o HELIOS APS: guia de planejamento da produ\u00e7\u00e3o","description":"Conecte HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, consultas de ordens de produ\u00e7\u00e3o, a\u00e7\u00f5es externas de retorno, mapeamento de dados e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/","og_locale":"pt_BR","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Conecte HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, consultas de ordens de produ\u00e7\u00e3o, a\u00e7\u00f5es externas de retorno, mapeamento de dados e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o HELIOS APS: guia de planejamento da produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Conecte HELIOS ao SkyPlanner APS: Inuvio REST API, OAuth2, consultas de ordens de produ\u00e7\u00e3o, a\u00e7\u00f5es externas de retorno, mapeamento de dados e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para HELIOS: planejamento da produ\u00e7\u00e3o com capacidade finita","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/helios\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ HELIOS Guia de integra\u00e7\u00e3o do HELIOS para planejamento da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do HELIOS mostra a parceiros e equipes de TI como conectar HELIOS iNuvio e HELIOS Nephrite ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e HELIOS \u00e9 bidirecional e usa as pr\u00f3prias interfaces do HELIOS:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/107462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=107462"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/107462\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106447"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=107462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}