{"id":106911,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"programacao-producao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/","title":{"rendered":"O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? <span class=\"hl\">CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Em parte. O QAD Adaptive ERP respeita os limites de capacidade ao carregar as linhas de produ\u00e7\u00e3o no Advanced Repetitive Line Schedule Workbench. Para ordens de produ\u00e7\u00e3o discreta, a vis\u00e3o de capacidade vem do Capacity Requirements Planning (CRP), que programa de tr\u00e1s para frente a partir das datas de entrega e deixa as sobrecargas para o planejador resolver. O sequenciador da QAD \u00e9 um produto separado, o QAD Advanced Scheduling. F\u00e1bricas que precisam <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programar respeitando a capacidade real<\/a> de cada m\u00e1quina, pessoa e ferramenta, al\u00e9m da disponibilidade de materiais, usam o SkyPlanner APS em conjunto com o QAD.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este artigo se baseia nos guias do usu\u00e1rio da QAD Enterprise Edition de 2020 e 2021, os mais recentes dispon\u00edveis publicamente. QAD Adaptive ERP \u00e9 o nome atual do mesmo ERP, que inclui as antigas vers\u00f5es Enterprise Edition, QAD Cloud ERP e MFG\/PRO.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-qad-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como o QAD planeja a capacidade, passo a passo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Dados mestres de capacidade<\/h3>\n\n\n<p>A capacidade come\u00e7a no <strong>Work Center Maintenance (14.5)<\/strong>, com os centros de trabalho agrupados pelo <strong>Department Maintenance (14.1)<\/strong>. A capacidade de um centro de trabalho resulta da quantidade de m\u00e1quinas ou pessoas multiplicada pelas horas do calend\u00e1rio fabril. O <strong>Routing Maintenance (14.13.1)<\/strong> armazena as opera\u00e7\u00f5es de um item, cada uma com tempos de <strong>fila, setup, execu\u00e7\u00e3o, espera e movimenta\u00e7\u00e3o<\/strong>. O <strong>Product Structure Maintenance (13.5)<\/strong> armazena os componentes.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP e ordens de produ\u00e7\u00e3o<\/h3>\n\n\n<p>O MRP cria ordens planejadas. O <strong>Work Order Maintenance (16.1)<\/strong> e o <strong>Work Order Release\/Print (16.7)<\/strong> as transformam em ordens de produ\u00e7\u00e3o liberadas. O roteiro padr\u00e3o \u00e9 copiado para cada ordem de produ\u00e7\u00e3o e pode ser alterado no <strong>Work Order Routing Maintenance (16.13.13)<\/strong>, at\u00e9 um limite que a QAD declara claramente: &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (Quando a ordem de produ\u00e7\u00e3o passa ao status Exploded, Allocated ou Released, n\u00e3o \u00e9 mais poss\u00edvel alterar o roteiro.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Capacity Requirements Planning: de tr\u00e1s para frente a partir da data de entrega<\/h3>\n\n\n<p>O <strong>Recalculate Capacity Plan (24.1)<\/strong> \u00e9 executado ap\u00f3s o MRP. Ele desdobra os roteiros das ordens planejadas, planejadas firmes e liberadas, e define as datas de cada opera\u00e7\u00e3o. A QAD descreve a l\u00f3gica: o CRP &#8220;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8221; (Parte da data de entrega de uma ordem ou programa\u00e7\u00e3o repetitiva e programa as opera\u00e7\u00f5es de tr\u00e1s para frente, da \u00faltima opera\u00e7\u00e3o do roteiro ou processo at\u00e9 a primeira.)<\/p>\n\n\n<p>A carga considera apenas os tempos de setup e execu\u00e7\u00e3o. &#8220;Queue, wait, and move times are excluded from load calculations.&#8221; (Os tempos de fila, espera e movimenta\u00e7\u00e3o s\u00e3o exclu\u00eddos do c\u00e1lculo de carga.) Toda a carga da opera\u00e7\u00e3o fica em um \u00fanico dia: &#8220;The system assigns the entire load for an operation to its scheduled start date.&#8221; (O sistema atribui toda a carga de uma opera\u00e7\u00e3o \u00e0 sua data de in\u00edcio programada.) O <strong>Input\/Output Inquiry (24.4)<\/strong> e o <strong>Input\/Output Report (24.5)<\/strong> comparam a carga planejada com a realizada. (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Advanced Repetitive: carga limitada \u00e0 capacidade das linhas<\/h3>\n\n\n<p>F\u00e1bricas de produ\u00e7\u00e3o repetitiva configuram as linhas no <strong>Production Line Maintenance (18.22.1.1)<\/strong> e as programam no <strong>Line Schedule Workbench (18.22.1.10)<\/strong>. O guia da QAD descreve o objetivo: &#8220;Run a production line with repetitive schedules, forward scheduled to capacity limits.&#8221; (Operar uma linha de produ\u00e7\u00e3o com programa\u00e7\u00e3o repetitiva para frente, respeitando os limites de capacidade.) A ferramenta sequencia as quantidades na linha considerando as trocas de produ\u00e7\u00e3o, e os resultados se tornam programa\u00e7\u00f5es repetitivas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. As ferramentas de programa\u00e7\u00e3o<\/h3>\n\n\n<p>O <strong>Master Scheduling Workbench<\/strong> e o <strong>Production Scheduling Workbench<\/strong> programam itens de produ\u00e7\u00e3o discreta e repetitiva nas linhas de produ\u00e7\u00e3o. Segundo a QAD, &#8220;the PSW lets you schedule discrete and repetitive items on production lines,&#8221; (o PSW permite programar itens de produ\u00e7\u00e3o discreta e repetitiva nas linhas de produ\u00e7\u00e3o), sequenciando os itens dentro de um dia e turno. Ambos &#8220;are .NET UI-only scheduling tools,&#8221; (s\u00e3o ferramentas de programa\u00e7\u00e3o dispon\u00edveis apenas na interface .NET) e ambos &#8220;require an active Maintenance license before you can access them.&#8221; (exigem uma licen\u00e7a de manuten\u00e7\u00e3o ativa para permitir o acesso.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">fonte<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Os produtos de planejamento que a QAD oferece separadamente<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li>O <strong>QAD Advanced Scheduling<\/strong>, lan\u00e7ado em 2024, programa o trabalho no ch\u00e3o de f\u00e1brica &#8220;on a sequence-sensitive continuous time-line (Gantt chart)&#8221; (em uma linha do tempo cont\u00ednua que leva em conta a sequ\u00eancia, em um gr\u00e1fico de Gantt) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/06\/what-to-know-about-qad-advanced-scheduling\">blog da QAD<\/a>). A QAD descreve o resultado como &#8220;a minute-by-minute, line-by-line optimized production schedule for each plant.&#8221; (Uma programa\u00e7\u00e3o da produ\u00e7\u00e3o otimizada minuto a minuto e linha a linha para cada f\u00e1brica.)<\/li>\n\n\n<li>O <strong>QAD DSCP Production Planning<\/strong> cria um plano de produ\u00e7\u00e3o para v\u00e1rias unidades, considerando as restri\u00e7\u00f5es.<\/li>\n\n\n<li>O <strong>QAD Redzone<\/strong> \u00e9 o produto da QAD para conectar a for\u00e7a de trabalho e recebe os dados da programa\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que continua nas m\u00e3os do planejador<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sobrecargas.<\/strong> O CRP apresenta a carga em rela\u00e7\u00e3o \u00e0 capacidade. &#8220;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8221; (Se um centro de trabalho ou m\u00e1quina estiver com carga acima ou abaixo da capacidade, voc\u00ea pode alterar a capacidade, o momento ou a quantidade da carga.)<\/li>\n\n\n<li><strong>As datas manuais s\u00e3o sobrescritas.<\/strong> &#8220;When you run CRP, all open operations for selected work orders are rescheduled. That means that if you have manually adjusted your operation start and stop dates, they will probably be changed unless you also adjusted the work order release and due date to match.&#8221; (Ao executar o CRP, todas as opera\u00e7\u00f5es em aberto das ordens de produ\u00e7\u00e3o selecionadas s\u00e3o reprogramadas. Se voc\u00ea ajustou manualmente as datas de in\u00edcio e t\u00e9rmino das opera\u00e7\u00f5es, elas provavelmente ser\u00e3o alteradas, a menos que tamb\u00e9m tenha ajustado as datas de libera\u00e7\u00e3o e entrega da ordem de produ\u00e7\u00e3o para corresponder a elas.)<\/li>\n\n\n<li><strong>Carga em um \u00fanico dia.<\/strong> Opera\u00e7\u00f5es que duram v\u00e1rios dias t\u00eam toda a carga atribu\u00edda \u00e0 data de in\u00edcio, criando picos seguidos de quedas na vis\u00e3o de carga di\u00e1ria.<\/li>\n\n\n<li><strong>Lead time baseado em uma m\u00e9dia.<\/strong> Se as quantidades das ordens diferirem da m\u00e9dia usada para o lead time, &#8220;CRP may schedule the start date for an order&#8217;s first operation before the release date for that order.&#8221; (O CRP pode programar o in\u00edcio da primeira opera\u00e7\u00e3o de uma ordem para antes da data de libera\u00e7\u00e3o dessa ordem.)<\/li>\n\n\n<li><strong>Os roteiros liberados ficam congelados.<\/strong> N\u00e3o \u00e9 poss\u00edvel alterar o roteiro ap\u00f3s os status Exploded, Allocated ou Released.<\/li>\n\n\n<li><strong>Os setups n\u00e3o dependem da sequ\u00eancia.<\/strong> Cada opera\u00e7\u00e3o do roteiro tem um \u00fanico tempo de setup, independentemente do que foi produzido antes na m\u00e1quina.<\/li>\n\n\n<li><strong>Ferramentas restritas a uma interface.<\/strong> MSW e PSW funcionam apenas na interface .NET.<\/li>\n\n<\/ul>\n\n\n<p>Fontes: <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">Guia do usu\u00e1rio de manufatura da QAD<\/a>, <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">Guia do Planning and Scheduling Workbench<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-qad-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando a programa\u00e7\u00e3o nativa do QAD \u00e9 suficiente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os recursos nativos do QAD atendem \u00e0 necessidade quando:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Voc\u00ea opera linhas de produ\u00e7\u00e3o repetitiva e as programa no Line Schedule Workbench ou no PSW.<\/li>\n\n\n<li>Uma vis\u00e3o semanal de carga por centro de trabalho no CRP \u00e9 suficiente para assumir compromissos de entrega.<\/li>\n\n\n<li>As m\u00e1quinas de um centro de trabalho s\u00e3o intercambi\u00e1veis, e os operadores n\u00e3o limitam o volume produzido.<\/li>\n\n\n<li>As trocas de produ\u00e7\u00e3o s\u00e3o r\u00e1pidas ou n\u00e3o dependem do produto que foi fabricado antes.<\/li>\n\n\n<li>As ordens de produ\u00e7\u00e3o liberadas raramente mudam de sequ\u00eancia depois de iniciadas.<\/li>\n\n<\/ul>\n\n\n<p>Se esse \u00e9 o seu cen\u00e1rio, mantenha os roteiros, a capacidade dos centros de trabalho e os calend\u00e1rios fabris alinhados \u00e0 realidade, e execute o CRP ap\u00f3s cada execu\u00e7\u00e3o do MRP.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quando voc\u00ea precisa de um sistema de programa\u00e7\u00e3o com capacidade finita<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os recursos nativos j\u00e1 n\u00e3o bastam quando v\u00e1rias destas situa\u00e7\u00f5es fazem parte da sua rotina:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>As entregas atrasam, embora o CRP mostre uma carga semanal aceit\u00e1vel.<\/li>\n\n\n<li>Os planejadores reinserem as datas das opera\u00e7\u00f5es ap\u00f3s cada execu\u00e7\u00e3o do CRP ou mant\u00eam a sequ\u00eancia real em uma planilha.<\/li>\n\n\n<li>Voc\u00ea trabalha com ordens de produ\u00e7\u00e3o discreta para pequenos lotes, distribu\u00eddas por muitas m\u00e1quinas.<\/li>\n\n\n<li>O tempo de troca de produ\u00e7\u00e3o depende do produto que foi fabricado antes.<\/li>\n\n\n<li>Operadores, turnos e aus\u00eancias limitam o volume produzido tanto quanto as m\u00e1quinas.<\/li>\n\n\n<li>Matrizes, moldes ou dispositivos de fixa\u00e7\u00e3o s\u00e3o transferidos entre m\u00e1quinas ou prensas.<\/li>\n\n\n<li>O atraso de materiais determina qual opera\u00e7\u00e3o pode come\u00e7ar.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">O que procurar<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Respeito simult\u00e2neo aos limites de cada recurso:<\/strong> m\u00e1quinas, pessoas e ferramentas, em vez de totais por centro de trabalho.<\/li>\n\n\n<li><strong>Sequenciamento por opera\u00e7\u00e3o<\/strong> conforme as prioridades e as datas de entrega.<\/li>\n\n\n<li><strong>Uma matriz de tempos de prepara\u00e7\u00e3o<\/strong> com tempos de troca de produ\u00e7\u00e3o assim\u00e9tricos e dependentes da sequ\u00eancia.<\/li>\n\n\n<li><strong>Ferramentas como recursos compartilhados de capacidade finita<\/strong> e <strong>opera\u00e7\u00f5es com v\u00e1rios operadores<\/strong>.<\/li>\n\n\n<li><strong>Programa\u00e7\u00e3o que considera os materiais<\/strong> e verifica o estoque e os pedidos de compra a receber.<\/li>\n\n\n<li><strong>Reprograma\u00e7\u00e3o autom\u00e1tica<\/strong> quando o andamento da produ\u00e7\u00e3o ou as ordens mudam.<\/li>\n\n\n<li><strong>Um fluxo de dados bem definido com o QAD.<\/strong> Leitura via QXtend Outbound ou pelas REST APIs de documentos de neg\u00f3cio, e grava\u00e7\u00e3o via QXtend Inbound no Work Order Maintenance. Pergunte a cada fornecedor quais QDocs ele usa e quem d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n\n<p>Para conhecer o m\u00e9todo geral, consulte o <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">guia de programa\u00e7\u00e3o com capacidade finita<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Onde o SkyPlanner se encaixa<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner APS resolve cada uma das lacunas listadas acima. A capacidade de cada centro de trabalho, pessoa e ferramenta \u00e9 finita. O motor Arcturus AI cria em segundos uma programa\u00e7\u00e3o por opera\u00e7\u00e3o, sequenciada conforme a prioridade da opera\u00e7\u00e3o, a data de conclus\u00e3o, a prioridade do cliente, o Fast Track e o Dynamic Priorities.<\/p>\n\n\n<p>Sua matriz de tempos de prepara\u00e7\u00e3o armazena o tempo de troca entre cada par de produtos nos dois sentidos, e o motor escolhe a sequ\u00eancia com menos setup. As ferramentas s\u00e3o recursos compartilhados de capacidade finita, v\u00e1rias pessoas podem trabalhar na mesma opera\u00e7\u00e3o ao mesmo tempo, e o trabalho passa para m\u00e1quinas ou pessoas alternativas quando o recurso principal est\u00e1 indispon\u00edvel.<\/p>\n\n\n<p>A programa\u00e7\u00e3o orientada por materiais simula o estoque futuro com base no saldo atual e nos pedidos de compra a receber, para programar cada opera\u00e7\u00e3o quando o material estiver dispon\u00edvel. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda, e o Running Time Lock congela as pr\u00f3ximas horas da programa\u00e7\u00e3o para evitar interrup\u00e7\u00f5es no ch\u00e3o de f\u00e1brica. Os operadores registram o trabalho pelo celular ou tablet com Mobile Confirmations, Production Timer e Quick Log Mode.<\/p>\n\n\n<p><strong>Prefira o SkyPlanner ao QAD Advanced Scheduling e \u00e0s ferramentas de programa\u00e7\u00e3o quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sua produ\u00e7\u00e3o \u00e9 discreta, com ordens que envolvem m\u00e1quinas e pessoas.<\/strong> A QAD descreve o Advanced Scheduling como uma programa\u00e7\u00e3o linha a linha para cada f\u00e1brica. O SkyPlanner sequencia cada opera\u00e7\u00e3o, considerando cada m\u00e1quina, operador e ferramenta.<\/li>\n\n\n<li><strong>O CRP vive alterando suas datas.<\/strong> O SkyPlanner grava as datas de libera\u00e7\u00e3o e entrega das ordens de produ\u00e7\u00e3o de acordo com sua programa\u00e7\u00e3o, atendendo \u00e0 condi\u00e7\u00e3o que a QAD estabelece para preservar as datas durante uma execu\u00e7\u00e3o do CRP.<\/li>\n\n\n<li><strong>Trocas de produ\u00e7\u00e3o, ferramentas, equipes e materiais definem a sequ\u00eancia.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o, a disponibilidade limitada de ferramentas, as opera\u00e7\u00f5es com v\u00e1rios operadores, os centros de trabalho alternativos e as chegadas dos pedidos de compra entram na mesma programa\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Planejadores e operadores trabalham pelo navegador.<\/strong> As \u00e1reas de trabalho funcionam apenas na interface .NET. O SkyPlanner permite usu\u00e1rios ilimitados, e o Mobile Confirmations leva a fila de trabalho a qualquer celular ou tablet.<\/li>\n\n\n<li><strong>Voc\u00ea quer colocar a programa\u00e7\u00e3o em opera\u00e7\u00e3o em poucas semanas.<\/strong> Teste o SkyPlanner com suas pr\u00f3prias ordens de produ\u00e7\u00e3o do QAD durante o per\u00edodo de teste e entre em opera\u00e7\u00e3o em poucas semanas ap\u00f3s o in\u00edcio da implanta\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n\n<p>Comece com uma exporta\u00e7\u00e3o em Excel das ordens de produ\u00e7\u00e3o em aberto no QAD durante o <a href=\"\/pt-br\/teste\/\">teste gr\u00e1tis de 30 dias<\/a> (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). Depois, os pre\u00e7os partem de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e cobran\u00e7a mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com o plano, conforme seu processo e suas necessidades.<\/p>\n\n\n<p>O SkyPlanner se integra ao QAD Adaptive ERP nos dois sentidos por meio do QAD QXtend. A equipe do SkyPlanner configura a integra\u00e7\u00e3o durante a implanta\u00e7\u00e3o, e seu parceiro ou seus desenvolvedores podem trabalhar com a <a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">REST API<\/a> documentada. Consulte a p\u00e1gina <a href=\"\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/\">SkyPlanner para QAD Adaptive ERP<\/a>, o <a href=\"\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o QAD Adaptive ERP<\/a> ou todas as <a href=\"\/pt-br\/integracoes\/erp\/\">integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que os fabricantes dizem sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas de Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com roupas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, diretor de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, fica pronto em menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o da Fredman Operations, ao lado de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel que a equipe de vendas pode consultar<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner d\u00e1 base e confiabilidade a todo o planejamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens pr\u00f3prias para contato com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipe de vendas visualiza a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e as solicita\u00e7\u00f5es de altera\u00e7\u00e3o na programa\u00e7\u00e3o, que levavam uma hora ou mais para serem respondidas, agora recebem resposta em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/fredman-operations\/\">Leia o depoimento da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Menos<\/b><span>paradas por falta de material<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO valor que o SkyPlanner nos traz est\u00e1 em ser uma ferramenta que funciona no dia a dia, especialmente para definir datas de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gerente de planejamento da produ\u00e7\u00e3o<\/b><br>Eskomatic \u00b7 Usinagem sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A programa\u00e7\u00e3o autom\u00e1tica da carga de trabalho permite definir datas de entrega mais precisas, e as paradas de produ\u00e7\u00e3o por falta de material diminu\u00edram significativamente.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/eskomatic\/\">Leia o depoimento da Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O CRP do QAD trabalha com capacidade infinita?<\/summary>\n<p class=\"sp-faq__a\">O CRP n\u00e3o limita a carga \u00e0 capacidade dispon\u00edvel. Ele programa as opera\u00e7\u00f5es de tr\u00e1s para a frente a partir da data de entrega da ordem e apresenta a carga em rela\u00e7\u00e3o \u00e0 capacidade. Cabe ao planejador resolver as sobrecargas, alterando a capacidade ou o momento em que a carga ser\u00e1 executada.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O que \u00e9 o QAD Line Schedule Workbench?<\/summary>\n<p class=\"sp-faq__a\">\u00c9 o programa do Advanced Repetitive (18.22.1.10) que programa as linhas de produ\u00e7\u00e3o para a frente, respeitando os limites de capacidade e considerando as trocas de produ\u00e7\u00e3o. Ele atende \u00e0 programa\u00e7\u00e3o repetitiva em linhas, n\u00e3o \u00e0s ordens de produ\u00e7\u00e3o discreta distribu\u00eddas entre m\u00e1quinas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O QAD Advanced Scheduling faz parte do QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">A QAD oferece o Advanced Scheduling como um produto separado, lan\u00e7ado em 2024, e o apresenta junto com o DSCP Production Planning e o QAD Redzone. Os recursos de planejamento nativos do Adaptive ERP s\u00e3o MRP, CRP e Advanced Repetitive.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O QAD considera tempos de setup que dependem da sequ\u00eancia de produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Nas linhas repetitivas, sim, por meio das trocas de produ\u00e7\u00e3o no Line Schedule Workbench. Nas ordens de produ\u00e7\u00e3o discreta, cada opera\u00e7\u00e3o do roteiro de produ\u00e7\u00e3o tem um \u00fanico tempo de setup. A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner armazena os tempos de troca entre pares de produtos nos dois sentidos e sequencia as opera\u00e7\u00f5es para minimizar esses tempos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Posso testar o SkyPlanner antes de integr\u00e1-lo ao QAD?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o teste de 30 dias, importe do QAD as ordens de produ\u00e7\u00e3o em aberto, os roteiros de produ\u00e7\u00e3o e os centros de trabalho em Excel ou CSV e compare o planejamento da produ\u00e7\u00e3o com seu plano atual. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>, <a href=\"\/pt-br\/teste\/\">inicie o teste<\/a> ou <a href=\"\/pt-br\/vendas-de-contacto\/\">fale com a equipe de vendas<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ QAD Adaptive ERP O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS Em parte. O QAD Adaptive ERP respeita os limites de capacidade ao carregar as linhas de produ\u00e7\u00e3o no Advanced Repetitive Line Schedule Workbench. Para ordens de produ\u00e7\u00e3o discreta, a vis\u00e3o de capacidade &#8230; <a title=\"O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/\" aria-label=\"Read more about O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106186,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106911","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita?<\/title>\n<meta name=\"description\" content=\"O CRP do QAD parte das datas de entrega e programa para tr\u00e1s. Sobrecargas ficam com o planejador. Recursos do QAD, Line Schedule Workbench e quando usar APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"O CRP do QAD parte das datas de entrega e programa para tr\u00e1s. Sobrecargas ficam com o planejador. Recursos do QAD, Line Schedule Workbench e quando usar APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/programacao-producao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/programacao-producao\\\/\",\"name\":\"QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"O CRP do QAD parte das datas de entrega e programa para tr\u00e1s. Sobrecargas ficam com o planejador. Recursos do QAD, Line Schedule Workbench e quando usar APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/programacao-producao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/programacao-producao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/programacao-producao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para QAD Adaptive ERP: planejamento da produ\u00e7\u00e3o com capacidade finita\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita?","description":"O CRP do QAD parte das datas de entrega e programa para tr\u00e1s. Sobrecargas ficam com o planejador. Recursos do QAD, Line Schedule Workbench e quando usar APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/","og_locale":"pt_BR","og_type":"article","og_title":"O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS","og_description":"O CRP do QAD parte das datas de entrega e programa para tr\u00e1s. Sobrecargas ficam com o planejador. Recursos do QAD, Line Schedule Workbench e quando usar APS.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/","name":"QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"O CRP do QAD parte das datas de entrega e programa para tr\u00e1s. Sobrecargas ficam com o planejador. Recursos do QAD, Line Schedule Workbench e quando usar APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/programacao-producao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para QAD Adaptive ERP: planejamento da produ\u00e7\u00e3o com capacidade finita","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ QAD Adaptive ERP O QAD Adaptive ERP tem programa\u00e7\u00e3o com capacidade finita? CRP, programa\u00e7\u00e3o de linhas e SkyPlanner APS Em parte. O QAD Adaptive ERP respeita os limites de capacidade ao carregar as linhas de produ\u00e7\u00e3o no Advanced Repetitive Line Schedule Workbench. Para ordens de produ\u00e7\u00e3o discreta, a vis\u00e3o de capacidade&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=106911"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106911\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106186"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=106911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}