{"id":106389,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/cegid\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"cegid","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/","title":{"rendered":"SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Cegid: <span class=\"hl\">Planejamento da produ\u00e7\u00e3o com capacidade finita<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento para o planejamento da produ\u00e7\u00e3o com capacidade finita nos ERPs industriais da Cegid, com foco inicial no Cegid PMI, al\u00e9m do Cegid Primavera e do Cegid Ekon. Ele programa cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e da equipe. Voc\u00ea v\u00ea onde e quando cada opera\u00e7\u00e3o de cada ordem de fabrica\u00e7\u00e3o ser\u00e1 executada, e o Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner tem integra\u00e7\u00e3o bidirecional com o Cegid. Do Cegid PMI, recebe ordens de fabrica\u00e7\u00e3o (OF) com seus roteiros, listas de materiais, centros de trabalho e m\u00e1quinas, al\u00e9m de itens, estoques e pedidos de compra. Devolve as datas planejadas de in\u00edcio e t\u00e9rmino de cada opera\u00e7\u00e3o da OF, junto com os tempos registrados na forma de apontamentos. Durante a implanta\u00e7\u00e3o, a equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente Cegid.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Uma sequ\u00eancia vi\u00e1vel em cada m\u00e1quina.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner aloca cada opera\u00e7\u00e3o da OF a uma m\u00e1quina e a um hor\u00e1rio espec\u00edficos. A capacidade \u00e9 definida pelos turnos reais, pelas aus\u00eancias e pelas horas extras. Assim, o plano pode ser executado pela sua f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menor custo nas trocas de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner armazena o tempo de setup entre cada par de produtos, nos dois sentidos. A passagem de um material macio para um duro pode exigir apenas uma troca r\u00e1pida de ferramenta, enquanto o caminho inverso exige uma limpeza completa. O motor de programa\u00e7\u00e3o ordena as opera\u00e7\u00f5es para perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pessoas e ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade no turno. Um molde ou dispositivo de fixa\u00e7\u00e3o em uso em uma m\u00e1quina nunca \u00e9 reservado em outra ao mesmo tempo. Quando uma m\u00e1quina est\u00e1 ocupada, o trabalho \u00e9 transferido para outra m\u00e1quina ou pessoa dispon\u00edvel como alternativa.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O material determina o in\u00edcio.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica o estoque e os pedidos de compra em aberto de cada componente. Uma opera\u00e7\u00e3o que depende de uma entrega \u00e9 programada para depois dessa data, em vez de come\u00e7ar e depois parar no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica diante de pedidos urgentes e quebras.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega um pedido urgente, o Autopilot refaz a programa\u00e7\u00e3o. Os bloqueios e as prioridades que voc\u00ea definiu continuam valendo, e as novas datas s\u00e3o enviadas de volta ao Cegid.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os operadores veem sua fila de opera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas opera\u00e7\u00f5es no celular ou tablet e registra o trabalho conforme ele acontece. O escrit\u00f3rio acompanha o andamento em tempo real, e voc\u00ea decide se os tempos registrados ser\u00e3o enviados ao Cegid.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e gerar um plano otimizado de tr\u00eas meses para todos os centros de trabalho leva menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Soldador da KJH-Comp esmerilhando uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de pontualidade de entrega, contra cerca de 50% antes<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo para manter nossa pontualidade de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Fabrica\u00e7\u00e3o de componentes em chapa met\u00e1lica e produ\u00e7\u00e3o sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega passou de cerca de 50% para at\u00e9 98%, e a programa\u00e7\u00e3o agora exige um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/kjh-comp\/\">Leia o depoimento da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, CEO da Mamec, na \u00e1rea de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>ordens de produ\u00e7\u00e3o programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um novo n\u00edvel de controle da produ\u00e7\u00e3o, e nossa compreens\u00e3o da capacidade est\u00e1 em um patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrica\u00e7\u00e3o sob contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de produ\u00e7\u00e3o s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/mamec\/\">Leia o depoimento da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-cegid-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Cegid envia o trabalho.<\/strong> O SkyPlanner recebe as OF com suas opera\u00e7\u00f5es, roteiros, listas de materiais, centros de trabalho, m\u00e1quinas, itens, estoques e pedidos de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria e mant\u00e9m a programa\u00e7\u00e3o atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em segundos e refaz a programa\u00e7\u00e3o conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e os apontamentos retornam ao Cegid.<\/strong> As datas planejadas de in\u00edcio e t\u00e9rmino s\u00e3o devolvidas a cada opera\u00e7\u00e3o da OF, e os tempos registrados podem ser enviados como apontamentos.<\/li>\n\n<\/ol>\n\n\n<p>O Cegid continua sendo o sistema oficial de registro dos seus dados. Itens, listas de materiais, roteiros, CBN (necessidades l\u00edquidas), compras, estoques, custeio e finan\u00e7as permanecem onde est\u00e3o. O SkyPlanner cuida de uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid PMI.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner l\u00ea e grava dados pela Web API que a Cegid disponibiliza para o PMI. A Cegid a descreve como uma forma segura de trocar dados com aplica\u00e7\u00f5es externas, mantendo intactas as regras de neg\u00f3cio do Manufacturing PMI (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Primavera.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner usa a PRIMAVERA ERP V10 API, que permite ler e gravar dados em todos os m\u00f3dulos. Recebe ordens de fabrica\u00e7\u00e3o, opera\u00e7\u00f5es, centros de trabalho, roteiros e fichas t\u00e9cnicas. As datas planejadas das opera\u00e7\u00f5es retornam pelo servi\u00e7o Planeamento (ActualizaPlaneamentoOperacao), e os tempos registrados, por Di\u00e1rios de Trabalho (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Ekon.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner recebe ordens de fabrica\u00e7\u00e3o, roteiros e listas de materiais e devolve as datas planejadas e os apontamentos. Na defini\u00e7\u00e3o de escopo, a equipe do SkyPlanner determina como ser\u00e1 feita a conex\u00e3o com a sua instala\u00e7\u00e3o do Ekon.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o na programa\u00e7\u00e3o assim que ela acontece, e a frequ\u00eancia de sincroniza\u00e7\u00e3o com o Cegid \u00e9 definida por f\u00e1brica. Cada f\u00e1brica usa o Cegid de um jeito. Por isso, a equipe do SkyPlanner configura a integra\u00e7\u00e3o para o seu ambiente durante a implanta\u00e7\u00e3o e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. Seu parceiro Cegid ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">Refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As interfaces, o mapeamento de dados e as regras de grava\u00e7\u00e3o no Cegid est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/cegid\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Cegid para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>. Usa o Cegid XRP Flex? Ele \u00e9 baseado no Acumatica. Veja o <a href=\"\/pt-br\/integracoes\/erp\/acumatica\/\">SkyPlanner para Acumatica<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-cegid-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Cegid programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Cegid PMI gerencia todo o ciclo de produ\u00e7\u00e3o: OF geradas a partir do pedido do cliente ou do CBN, planejamento, acompanhamento do ch\u00e3o de f\u00e1brica por centro de trabalho e apontamento de tempos por c\u00f3digo de barras. A <a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">p\u00e1gina do Cegid PMI<\/a> descreve o planejamento em duas etapas e indica como ir al\u00e9m:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Primeiro, capacidade infinita.<\/strong> O PMI oferece &#8220;des OF planifi\u00e9s \u00e0 capacit\u00e9 infinie pour vous permettre de g\u00e9rer rapidement les charges et surcharges, la file d&#8217;attente&#8221;. (OF planejadas com capacidade infinita para gerenciar rapidamente as cargas, as sobrecargas e a fila.)<\/li>\n\n\n<li><strong>Depois, capacidade finita para recursos e estoques.<\/strong> A pr\u00f3xima etapa \u00e9 &#8220;la planification \u00e0 capacit\u00e9 finie tenant compte des contraintes de vos ressources et des stocks.&#8221; (O planejamento com capacidade finita que considera as restri\u00e7\u00f5es dos seus recursos e estoques.)<\/li>\n\n\n<li><strong>A Cegid recomenda um APS para ir al\u00e9m.<\/strong> &#8220;Connectez des outils de planification avanc\u00e9e pour aller plus loin dans la gestion des contraintes de planification.&#8221; (Conecte ferramentas de planejamento avan\u00e7ado para ir al\u00e9m na gest\u00e3o das restri\u00e7\u00f5es de planejamento.)<\/li>\n\n<\/ul>\n\n\n<p>O <strong>Cegid Primavera<\/strong> oferece planejamento gr\u00e1fico: o planejador distribui as opera\u00e7\u00f5es entre os centros de trabalho, e &#8220;o algoritmo de planeamento que sugere a melhor alternativa de escalonamento&#8221; (o algoritmo de planejamento que sugere a melhor alternativa de programa\u00e7\u00e3o) prop\u00f5e uma sequ\u00eancia. O planejador simula planos alternativos e decide (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera Manufacturing<\/a>).<\/p>\n\n\n<p>O <strong>Cegid Ekon XRP Industria<\/strong> gera roteiros, listas de materiais e ordens de trabalho a partir das ordens de fabrica\u00e7\u00e3o e registra apontamentos no ch\u00e3o de f\u00e1brica ou no escrit\u00f3rio (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/\">Cegid Ekon<\/a>).<\/p>\n\n\n<p>O SkyPlanner \u00e9 uma ferramenta de planejamento avan\u00e7ado exatamente do tipo que a Cegid recomenda conectar. Cada etapa \u00e9 explicada em <a href=\"\/pt-br\/integracoes\/erp\/cegid\/programacao-producao\/\">O Cegid oferece programa\u00e7\u00e3o com capacidade finita?<\/a> Para entender os conceitos, veja <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o com capacidade finita<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cegid-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cegid hoje e com SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planejamento no Cegid PMI<\/th><th>Cegid com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacidade<\/td><td>OF com capacidade infinita, seguidas de planejamento com capacidade finita para recursos e estoques<\/td><td>Capacidade finita de cada m\u00e1quina, pessoa e ferramenta, com turnos reais<\/td><\/tr><tr><td>Programa\u00e7\u00e3o<\/td><td>Pr\u00f3ximas OF por centro de trabalho para as pr\u00f3ximas horas ou dias<\/td><td>Sequ\u00eancia detalhada de cada opera\u00e7\u00e3o das OF em segundos<\/td><\/tr><tr><td>Trocas de produ\u00e7\u00e3o<\/td><td>Planejadas dentro das restri\u00e7\u00f5es de recursos e estoques<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o: menor tempo total de setup<\/td><\/tr><tr><td>Pessoas e ferramentas<\/td><td>Funcion\u00e1rios e m\u00e1quinas nos dados mestres<\/td><td>Operadores identificados com seus turnos; ferramentas como recursos compartilhados de capacidade finita; opera\u00e7\u00f5es com v\u00e1rios operadores<\/td><\/tr><tr><td>Materiais<\/td><td>O CBN sugere OF e pedidos de compra<\/td><td>As opera\u00e7\u00f5es come\u00e7am quando h\u00e1 material em estoque ou quando chegam os pedidos de compra<\/td><\/tr><tr><td>Mudan\u00e7as<\/td><td>O planejador gerencia as cargas, as sobrecargas e a fila<\/td><td>O Autopilot reprograma toda a f\u00e1brica respeitando suas prioridades<\/td><\/tr><tr><td>Opera\u00e7\u00f5es iniciadas<\/td><td>Apontamentos por c\u00f3digo de barras na OF<\/td><td>O progresso registrado atualiza o plano; Running Time Lock congela a programa\u00e7\u00e3o das pr\u00f3ximas horas<\/td><\/tr><tr><td>Vis\u00e3o do planejador<\/td><td>Carga, sobrecargas e fila por centro de trabalho<\/td><td>Gantt interativo: mova as opera\u00e7\u00f5es sem perder a consist\u00eancia do plano<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Terminais de c\u00f3digo de barras e interface MES<\/td><td>Os operadores veem sua fila e registram o trabalho no celular ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cegid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher um sistema de programa\u00e7\u00e3o para o Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O planejamento do Cegid PMI atende a f\u00e1bricas com roteiros est\u00e1veis, poucos centros de trabalho cr\u00edticos e um plano semanal revisado por um planejador. O planejamento gr\u00e1fico do Cegid Primavera atende a quem define a sequ\u00eancia no quadro e usa as sugest\u00f5es do algoritmo como apoio. Quando m\u00e1quinas, pessoas, ferramentas e materiais limitam a produ\u00e7\u00e3o ao mesmo tempo e o plano muda todos os dias, \u00e9 hora de conectar um APS, como a pr\u00f3pria Cegid sugere.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando atende<\/th><\/tr><\/thead><tbody><tr><td>Planejamento nativo do Cegid<\/td><td>No PMI, planejamento com capacidade infinita e depois finita; no Primavera, planejamento gr\u00e1fico com sugest\u00f5es de um algoritmo<\/td><td>Um planejador define manualmente a sequ\u00eancia de poucos gargalos<\/td><\/tr><tr><td>APS e ferramentas de planejamento para Cegid<\/td><td>Sistemas de programa\u00e7\u00e3o por restri\u00e7\u00f5es, ferramentas de planejamento geral de recursos e MES com planejamento, conectados ao Cegid<\/td><td>Uma equipe dedicada ao planejamento opera uma ferramenta de programa\u00e7\u00e3o separada<\/td><\/tr><tr><td>APS na nuvem com execu\u00e7\u00e3o no ch\u00e3o de f\u00e1brica<\/td><td>SkyPlanner APS: capacidade finita para cada recurso, reprograma\u00e7\u00e3o autom\u00e1tica, aplicativo para operadores e integra\u00e7\u00e3o bidirecional com o Cegid<\/td><td>Voc\u00ea quer, em semanas, um plano com capacidade finita que acompanhe a produ\u00e7\u00e3o e se mantenha atualizado automaticamente<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do planejamento nativo do Cegid quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>As restri\u00e7\u00f5es v\u00e3o al\u00e9m dos recursos e do estoque.<\/strong> A Cegid descreve a etapa de programa\u00e7\u00e3o com capacidade finita do PMI como um planejamento baseado em recursos e estoque e recomenda ferramentas de planejamento avan\u00e7ado para outras restri\u00e7\u00f5es (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). O SkyPlanner planeja m\u00e1quinas, operadores, ferramentas, setups e materiais a receber em uma \u00fanica execu\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O plano precisa se manter atualizado.<\/strong> O algoritmo do Primavera sugere um plano, e o planejador simula e decide (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera<\/a>). O Autopilot refaz o planejamento automaticamente a cada mudan\u00e7a relevante, e as datas retornam ao Cegid.<\/li>\n\n\n<li><strong>As trocas determinam quanto voc\u00ea produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o registra os tempos de setup conforme o sentido da troca entre produtos, e a op\u00e7\u00e3o &#8220;Allow similarity&#8221; agrupa opera\u00e7\u00f5es por uma caracter\u00edstica, como a ferramenta utilizada.<\/li>\n\n\n<li><strong>Equipes e ferramentas limitam o plano.<\/strong> As opera\u00e7\u00f5es que exigem v\u00e1rios operadores recebem pessoal conforme os turnos reais, cada ferramenta \u00e9 reservada para uma m\u00e1quina por vez, e o trabalho \u00e9 realocado para m\u00e1quinas ou pessoas alternativas.<\/li>\n\n\n<li><strong>Todos os operadores devem seguir o plano.<\/strong> O Mobile Confirmations disponibiliza a fila atualizada em cada celular ou tablet, sem limite de usu\u00e1rios: o pre\u00e7o depende dos centros de trabalho, n\u00e3o do n\u00famero de usu\u00e1rios.<\/li>\n\n\n<li><strong>Voc\u00ea quer um \u00fanico valor mensal.<\/strong> A partir de 199 \u20ac por m\u00eas, com a integra\u00e7\u00e3o bidirecional configurada pela equipe SkyPlanner e suporte prestado por ela.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todos os recursos do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe seus centros de carga e m\u00e1quinas do Cegid. Voc\u00ea pode contar com assist\u00eancia na implanta\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Importe suas OF.<\/strong> Exporte do Cegid para o Excel as OF em aberto e suas opera\u00e7\u00f5es, usando, por exemplo, o gerador de relat\u00f3rios do PMI. Importe os dados no SkyPlanner e compare a programa\u00e7\u00e3o com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Cegid.<\/strong> A equipe SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho, e voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a> para ver os detalhes ou conhe\u00e7a <a href=\"\/pt-br\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de planejamento da produ\u00e7\u00e3o para o Cegid?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de planejamento da produ\u00e7\u00e3o com capacidade finita que se integra ao Cegid PMI, Cegid Primavera e Cegid Ekon nos dois sentidos. Ele recebe OF com roteiros, listas de materiais, centros de carga, m\u00e1quinas, itens, estoque e pedidos de compra e devolve as datas planejadas das opera\u00e7\u00f5es e os tempos apontados. A capacidade de cada m\u00e1quina, operador e ferramenta e a disponibilidade de cada material s\u00e3o tratadas como finitas. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido das trocas sequencia as opera\u00e7\u00f5es para minimizar o setup. O Autopilot refaz o planejamento automaticamente quando a produ\u00e7\u00e3o muda. O pre\u00e7o parte de 199 \u20ac por m\u00eas, e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Cegid oferece planejamento da produ\u00e7\u00e3o com capacidade finita?<\/summary>\n<p class=\"sp-faq__a\">Em parte. O Cegid PMI primeiro planeja as OF com capacidade infinita e depois com capacidade finita, considerando recursos e estoque. Para outras restri\u00e7\u00f5es, a Cegid recomenda ferramentas de planejamento avan\u00e7ado. O Cegid Primavera oferece planejamento gr\u00e1fico com um algoritmo que sugere uma sequ\u00eancia. O SkyPlanner APS trabalha junto ao Cegid, planejando a produ\u00e7\u00e3o conforme a capacidade real de cada m\u00e1quina, pessoa e ferramenta e a disponibilidade de cada material, e refaz o planejamento automaticamente.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual software de planejamento da produ\u00e7\u00e3o se integra ao Cegid?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS se integra ao Cegid nos dois sentidos. Com o Cegid PMI, faz a leitura e a grava\u00e7\u00e3o pela PMI Web API: recebe OF e opera\u00e7\u00f5es e devolve datas planejadas e apontamentos. Com o Cegid Primavera, usa a PRIMAVERA V10 API: recebe ordens de fabrica\u00e7\u00e3o, devolve as datas planejadas das opera\u00e7\u00f5es pelo servi\u00e7o Planeamento e os tempos pelo servi\u00e7o Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o planejamento do Cegid PMI ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando suas restri\u00e7\u00f5es v\u00e3o al\u00e9m de m\u00e1quinas e estoque e o plano muda com frequ\u00eancia. A Cegid descreve o planejamento com capacidade finita do PMI como baseado em recursos e estoque e recomenda ferramentas de planejamento avan\u00e7ado para outras necessidades. O SkyPlanner \u00e9 essa ferramenta: planeja operadores, ferramentas, setups e materiais a receber em conjunto, refaz o planejamento automaticamente e disponibiliza a fila de trabalho de cada operador, sem limite de usu\u00e1rios. Voc\u00ea comprova isso com suas pr\u00f3prias OF no teste gratuito.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui a gest\u00e3o da produ\u00e7\u00e3o do Cegid?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, ele a complementa. O Cegid continua respons\u00e1vel pelos itens, listas de materiais, roteiros, CBN, cria\u00e7\u00e3o de OF, compras, estoque, custeio e finan\u00e7as. O SkyPlanner planeja suas OF conforme a capacidade real e devolve as datas ao Cegid.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Com quais ERPs da Cegid o SkyPlanner funciona?<\/summary>\n<p class=\"sp-faq__a\">Cegid PMI na Fran\u00e7a, Cegid Primavera Manufacturing em Portugal e Cegid Ekon XRP Industria na Espanha. O Cegid XRP Flex \u00e9 baseado no Acumatica, portanto a <a href=\"\/pt-br\/integracoes\/erp\/acumatica\/\">integra\u00e7\u00e3o com o Acumatica<\/a> se aplica.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa Cegid?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com sua pr\u00f3pria fila de opera\u00e7\u00f5es programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7ada antecipadamente conforme seus processos e necessidades, junto com seu plano, para que voc\u00ea saiba o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em algumas semanas ap\u00f3s o in\u00edcio do processo de configura\u00e7\u00e3o e orienta\u00e7\u00e3o. A equipe mapeia seus centros de carga, m\u00e1quinas e roteiros, conecta as OF e os pedidos de compra e devolve as datas planejadas ao Cegid. Tudo \u00e9 testado em compara\u00e7\u00e3o com seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de integr\u00e1-lo ao Cegid?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias usa um arquivo Excel com suas OF em aberto exportadas do Cegid. Voc\u00ea visualiza um <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">planejamento da produ\u00e7\u00e3o com capacidade finita<\/a> da sua pr\u00f3pria produ\u00e7\u00e3o antes de iniciar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Cegid SkyPlanner APS para Cegid: Planejamento da produ\u00e7\u00e3o com capacidade finita O SkyPlanner APS \u00e9 um complemento para o planejamento da produ\u00e7\u00e3o com capacidade finita nos ERPs industriais da Cegid, com foco inicial no Cegid PMI, al\u00e9m do Cegid Primavera e do Cegid Ekon. Ele programa cada m\u00e1quina, operador, ferramenta e &#8230; <a title=\"SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/\" aria-label=\"Read more about SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106389","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cegid: planejamento da produ\u00e7\u00e3o integrado a APS de carga finita<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: complemento de capacidade finita para Cegid. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. A partir de 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: complemento de capacidade finita para Cegid. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. A partir de 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/cegid\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/cegid\\\/\",\"name\":\"Cegid: planejamento da produ\u00e7\u00e3o integrado a APS de carga finita\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: complemento de capacidade finita para Cegid. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. A partir de 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/cegid\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/cegid\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/cegid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cegid: planejamento da produ\u00e7\u00e3o integrado a APS de carga finita","description":"SkyPlanner APS: complemento de capacidade finita para Cegid. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. A partir de 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita","og_description":"SkyPlanner APS: complemento de capacidade finita para Cegid. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. A partir de 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/","name":"Cegid: planejamento da produ\u00e7\u00e3o integrado a APS de carga finita","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: complemento de capacidade finita para Cegid. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. A partir de 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/cegid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Cegid: planejamento da produ\u00e7\u00e3o com capacidade finita"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Cegid SkyPlanner APS para Cegid: Planejamento da produ\u00e7\u00e3o com capacidade finita O SkyPlanner APS \u00e9 um complemento para o planejamento da produ\u00e7\u00e3o com capacidade finita nos ERPs industriais da Cegid, com foco inicial no Cegid PMI, al\u00e9m do Cegid Primavera e do Cegid Ekon. Ele programa cada m\u00e1quina, operador, ferramenta e&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=106389"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106389\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=106389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}