{"id":106273,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/visma-l7\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"visma-l7","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/","title":{"rendered":"SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Visma L7: <span class=\"hl\">planejamento da produ\u00e7\u00e3o com capacidade finita<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento para o planejamento da produ\u00e7\u00e3o com capacidade finita no Visma L7, o ERP usado por m\u00e9dias e grandes empresas finlandesas dos setores industrial, de servi\u00e7os por empreitada e de energia. Cada m\u00e1quina, operador, ferramenta e material entra em uma programa\u00e7\u00e3o com hor\u00e1rios definidos, que respeita a capacidade real dispon\u00edvel. O Autopilot reprograma tudo automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner se integra ao Visma L7 nos dois sentidos pela Visma L7 REST API. Ele recebe n\u00fameros de ordem (ty\u00f6numero), etapas de trabalho (ty\u00f6nvaihe), recursos, estruturas de produtos, materiais, saldos de estoque e itens de pedidos de compra. As datas de in\u00edcio programadas, os recursos, as prioridades, as pessoas e as horas por dia s\u00e3o enviados de volta a cada ficha de trabalho. Durante a implanta\u00e7\u00e3o, a equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente L7.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada etapa com hor\u00e1rio definido.<\/p>\n\n\n<p class=\"fx-pain__b\">O L7 planeja cada etapa de trabalho como horas distribu\u00eddas por dia. O SkyPlanner aloca cada etapa em um centro de trabalho livre, com hor\u00e1rio definido, considerando turnos, feriados, aus\u00eancias e horas extras. Duas etapas nunca ocupam a mesma m\u00e1quina no mesmo hor\u00e1rio.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Programa\u00e7\u00e3o individual para cada m\u00e1quina.<\/p>\n\n\n<p class=\"fx-pain__b\">Em um recurso do L7, o trabalho \u00e9 dividido pela quantidade de m\u00e1quinas. O SkyPlanner cria uma fila pr\u00f3pria para cada m\u00e1quina e transfere uma etapa para um centro de trabalho alternativo quando a primeira op\u00e7\u00e3o est\u00e1 ocupada. O recurso escolhido \u00e9 enviado de volta \u00e0 ficha de trabalho do L7.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pessoas e ferramentas tamb\u00e9m t\u00eam limites.<\/p>\n\n\n<p class=\"fx-pain__b\">Um dispositivo de fixa\u00e7\u00e3o em uso em uma m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo, e uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade nos turnos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos prepara\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner armazena os tempos de troca de produ\u00e7\u00e3o entre produtos em uma matriz de tempos de prepara\u00e7\u00e3o, nos dois sentidos. A troca de azul para vermelho pode levar 30 minutos e a de vermelho para azul, 60. O Arcturus coloca opera\u00e7\u00f5es semelhantes em sequ\u00eancia e escolhe a ordem com o menor tempo de prepara\u00e7\u00e3o, levando tamb\u00e9m em conta os prazos de entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">As opera\u00e7\u00f5es come\u00e7am com o material dispon\u00edvel.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner projeta o estoque futuro com base nos saldos de estoque e nos itens de pedidos de compra do L7. Uma etapa que depende da entrega de um fornecedor \u00e9 programada para quando o material chegar. Se a entrega atrasar, a opera\u00e7\u00e3o \u00e9 reprogramada para acompanhar a nova data.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Seu planejamento continua mesmo com a troca de ERP.<\/p>\n\n\n<p class=\"fx-pain__b\">A Visma encerrou o desenvolvimento de novos recursos para o L7. Seus centros de trabalho, etapas de processo, matriz de tempos de prepara\u00e7\u00e3o e regras ficam no SkyPlanner. Assim, quando voc\u00ea migrar para um novo ERP, s\u00f3 a conex\u00e3o muda.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Soldador da KJH-Comp esmerilhando uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de pontualidade de entrega, antes em cerca de 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo para manter nossa pontualidade de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Fabrica\u00e7\u00e3o de pe\u00e7as em chapa met\u00e1lica e manufatura sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega passou de cerca de 50% para at\u00e9 98%, e a programa\u00e7\u00e3o agora exige um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/kjh-comp\/\">Leia o depoimento da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, diretor-executivo da Mamec, no galp\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000+<\/b><span>ordens de produ\u00e7\u00e3o programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAgora temos outro n\u00edvel de controle da produ\u00e7\u00e3o, e nossa compreens\u00e3o da capacidade est\u00e1 em um patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, diretor-executivo<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e manufatura de alta tecnologia sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de produ\u00e7\u00e3o s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/mamec\/\">Leia o depoimento da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado de tr\u00eas meses para todos os centros de trabalho fica pronto em menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-visma-l7-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O L7 envia o trabalho.<\/strong> O SkyPlanner l\u00ea as etapas de trabalho com <code>GET \/manufphases\/<\/code>, os recursos com <code>GET \/manufresources\/<\/code>, as pe\u00e7as e os materiais com <code>GET \/manufcomponents\/<\/code> e <code>GET \/manufmaterials\/<\/code>, al\u00e9m de produtos, saldos de estoque e itens de pedidos de venda e de compra. Ap\u00f3s a carga inicial, essas consultas usam <code>modifiedAfter<\/code> para receber apenas os registros alterados desde a \u00faltima execu\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> O mecanismo Arcturus otimiza todo o plano em segundos, considerando cada m\u00e1quina, pessoa, ferramenta e material, e o Autopilot refaz o planejamento quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/li>\n\n\n<li><strong>A programa\u00e7\u00e3o \u00e9 enviada de volta ao L7.<\/strong> <code>PUT \/manufphases\/<\/code> grava na etapa de trabalho do L7 o recurso, a data de in\u00edcio, a prioridade, a pessoa e as horas por dia de cada ficha de trabalho. <code>POST \/resourceupdates\/<\/code> mant\u00e9m a capacidade do calend\u00e1rio de recursos sincronizada. Assim, as filas de trabalho do L7 mostram as opera\u00e7\u00f5es na ordem definida pelo SkyPlanner.<\/li>\n\n\n<li><strong>O andamento retorna ao SkyPlanner.<\/strong> Os eventos de produ\u00e7\u00e3o registrados nas filas de trabalho do L7 s\u00e3o lidos com <code>GET \/manufevents\/<\/code>, e os operadores tamb\u00e9m podem confirmar o trabalho no SkyPlanner Mobile Confirmations.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner roda na nuvem e se conecta \u00e0 L7 REST API no seu servidor Visma LTR, sem instalar nada no L7. A Visma lista a Skycode com o SkyPlanner em sua <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">p\u00e1gina de integra\u00e7\u00f5es do L7<\/a>. A equipe do SkyPlanner configura a integra\u00e7\u00e3o para o seu ambiente L7 e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/p>\n\n\n<p>O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com o plano, de acordo com seu processo e suas necessidades. Seu parceiro Visma ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Os endpoints, o mapeamento de campos e as regras que definem qual sistema controla cada dado est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/visma-l7\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Visma L7 para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-visma-l7-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Visma L7 programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O controle da produ\u00e7\u00e3o do L7 (Tuotannonohjaus) usa o c\u00e1lculo de necessidades (Tarvelaskenta), o planejamento detalhado (Hienosuunnittelu) e a grade de planejamento da produ\u00e7\u00e3o. O planejamento detalhado distribui as etapas pelos dias do calend\u00e1rio de cada recurso e mostra a carga di\u00e1ria. A pr\u00f3pria documenta\u00e7\u00e3o da Visma descreve os limites:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O trabalho \u00e9 dividido pela quantidade de m\u00e1quinas.<\/strong> Em um recurso com v\u00e1rias m\u00e1quinas, a necessidade de capacidade \u00e9 dividida pelo n\u00famero de m\u00e1quinas (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">fonte<\/a>). O SkyPlanner programa cada m\u00e1quina como um centro de trabalho independente.<\/li>\n\n\n<li><strong>A sobrecarga \u00e9 sinalizada, n\u00e3o resolvida.<\/strong> Quando a carga excede a capacidade, o L7 mostra os valores de carga em vermelho (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">fonte<\/a>). A programa\u00e7\u00e3o de etapas fixas permite sobrecarga e abrange apenas estruturas de um \u00fanico n\u00edvel (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">material de treinamento de 2024<\/a>). O SkyPlanner nunca reserva uma m\u00e1quina, pessoa ou ferramenta para duas opera\u00e7\u00f5es ao mesmo tempo.<\/li>\n\n\n<li><strong>O planejador define a sequ\u00eancia do dia.<\/strong> O trabalho do dia \u00e9 ordenado por uma a\u00e7\u00e3o manual, e uma prioridade definida por um sistema externo \u00e9 mantida como est\u00e1 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">fonte<\/a>). O SkyPlanner define essa prioridade para voc\u00ea, e o L7 a mant\u00e9m.<\/li>\n\n\n<li><strong>Lacunas no calend\u00e1rio exigem aten\u00e7\u00e3o.<\/strong> Dias ausentes no calend\u00e1rio da f\u00e1brica podem fazer com que etapas sejam programadas para datas passadas (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">fonte<\/a>). O SkyPlanner usa calend\u00e1rios de turnos que consideram feriados e aus\u00eancias.<\/li>\n\n\n<li><strong>Sem l\u00f3gica de troca de produ\u00e7\u00e3o.<\/strong> O planejamento detalhado do L7 n\u00e3o tem matriz de prepara\u00e7\u00e3o. A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner ordena as opera\u00e7\u00f5es para minimizar o tempo de prepara\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n\n<p>Cada configura\u00e7\u00e3o e limite \u00e9 explicado em <a href=\"\/pt-br\/integracoes\/erp\/visma-l7\/programacao-producao\/\">O Visma L7 tem programa\u00e7\u00e3o com capacidade finita?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma L7 hoje e com SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Planejamento detalhado do Visma L7<\/th><th>Visma L7 com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Escala de tempo<\/td><td>Horas por dia em cada etapa de trabalho<\/td><td>Hor\u00e1rios definidos para cada etapa, m\u00e1quina e pessoa<\/td><\/tr><tr><td>M\u00e1quinas<\/td><td>Um recurso; o trabalho \u00e9 dividido pela quantidade de m\u00e1quinas<\/td><td>Cada m\u00e1quina \u00e9 um centro de trabalho; o Arcturus escolhe entre as alternativas que voc\u00ea permite<\/td><\/tr><tr><td>Sobrecarga<\/td><td>Os valores de carga ficam vermelhos; o planejador realoca as etapas<\/td><td>Nunca h\u00e1 sobrecarga; a capacidade de cada recurso \u00e9 respeitada<\/td><\/tr><tr><td>Sequ\u00eancia<\/td><td>Prioridade e ordena\u00e7\u00e3o manual do trabalho do dia<\/td><td>O Arcturus otimiza todo o plano em segundos<\/td><\/tr><tr><td>Trocas de produ\u00e7\u00e3o<\/td><td>Sem matriz de prepara\u00e7\u00e3o no planejamento detalhado<\/td><td>A matriz de tempos de prepara\u00e7\u00e3o ordena as opera\u00e7\u00f5es para minimizar o tempo de prepara\u00e7\u00e3o<\/td><\/tr><tr><td>Materiais<\/td><td>C\u00e1lculo de necessidades e reservas<\/td><td>O estoque projetado e os itens de pedidos de compra a receber determinam quando uma etapa come\u00e7a<\/td><\/tr><tr><td>Mudan\u00e7as<\/td><td>O planejador executa o planejamento novamente<\/td><td>O Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Filas de trabalho do L7 e LTR<\/td><td>Mobile Confirmations e leitura dos eventos de produ\u00e7\u00e3o do L7<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-visma-l7-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quais dados circulam entre o Visma L7 e o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7<\/th><th>Sentido<\/th><th>SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Produtos e estruturas de produto (tuoterakenne)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Produtos, subprodutos e materiais<\/td><\/tr><tr><td>N\u00fameros de ordem e etapas de produ\u00e7\u00e3o (<code>\/manufphases\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Ordens e opera\u00e7\u00f5es por centro de trabalho<\/td><\/tr><tr><td>Recursos (<code>\/manufresources\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Centros de trabalho e grupos<\/td><\/tr><tr><td>Saldos de estoque e itens de pedidos de compra<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Estoque e pedidos de compra a receber<\/td><\/tr><tr><td>Pedidos de venda e seus itens<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Prazos de entrega e prioridade do cliente<\/td><\/tr><tr><td>Eventos de produ\u00e7\u00e3o (<code>\/manufevents\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Andamento de cada opera\u00e7\u00e3o<\/td><\/tr><tr><td>Recurso, data de in\u00edcio, prioridade, pessoa e horas por dia (<code>PUT \/manufphases\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Programa\u00e7\u00e3o<\/td><\/tr><tr><td>Capacidade no calend\u00e1rio do recurso (<code>POST \/resourceupdates\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Capacidade por turno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-scheduling-software-and-add-ons-compare\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comparativo de softwares e complementos para programa\u00e7\u00e3o da produ\u00e7\u00e3o no Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Indicado quando<\/th><\/tr><\/thead><tbody><tr><td>Controle da produ\u00e7\u00e3o do Visma L7<\/td><td>C\u00e1lculo de necessidades, planejamento detalhado e visualiza\u00e7\u00f5es de carga no L7<\/td><td>Um planejador organiza cada dia e voc\u00ea continua no L7 at\u00e9 o fim da vida \u00fatil do sistema<\/td><\/tr><tr><td>Su\u00edtes APS (por exemplo, Delfoi Planner)<\/td><td>Software de planejamento e simula\u00e7\u00e3o que inclui o L7 entre os ERPs com os quais se integra<\/td><td>Uma equipe dedicada de planejamento conduz um projeto de implanta\u00e7\u00e3o<\/td><\/tr><tr><td>Um novo ERP com planejamento integrado (por exemplo, Monitor ERP ou Odoo com Collapick Tempo)<\/td><td>Substitui\u00e7\u00e3o do L7 e de seu controle da produ\u00e7\u00e3o em um \u00fanico projeto<\/td><td>Voc\u00ea quer trocar o ERP e a ferramenta de planejamento ao mesmo tempo<\/td><\/tr><tr><td>APS na nuvem conectado por API (SkyPlanner APS)<\/td><td>Uma ferramenta de programa\u00e7\u00e3o que funciona no navegador, l\u00ea as etapas de produ\u00e7\u00e3o do L7 e envia a programa\u00e7\u00e3o de volta<\/td><td>Voc\u00ea quer programa\u00e7\u00e3o com capacidade finita agora e um plano que possa levar para o pr\u00f3ximo ERP<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Escolha o SkyPlanner em vez do L7 Hienosuunnittelu quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Voc\u00ea precisa de hor\u00e1rios definidos.<\/strong> O L7 registra cada etapa em horas distribu\u00eddas por dia. O SkyPlanner define hor\u00e1rios de in\u00edcio e t\u00e9rmino para cada etapa dentro de um turno real.<\/li>\n\n\n<li><strong>V\u00e1rias m\u00e1quinas compartilham um recurso.<\/strong> O L7 divide o trabalho pelo n\u00famero de m\u00e1quinas (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">fonte<\/a>). O SkyPlanner programa cada m\u00e1quina e escolhe a que est\u00e1 livre.<\/li>\n\n\n<li><strong>Os indicadores de carga em vermelho consomem horas da sua semana.<\/strong> O L7 sinaliza a sobrecarga (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">fonte<\/a>). O SkyPlanner j\u00e1 cria o plano sem sobrecarga.<\/li>\n\n\n<li><strong>Seus produtos t\u00eam estruturas de v\u00e1rios n\u00edveis.<\/strong> A programa\u00e7\u00e3o de etapas fixas do L7 atende apenas a estruturas de n\u00edvel \u00fanico (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">fonte<\/a>). O SkyPlanner programa produtos intermedi\u00e1rios e montagens em um \u00fanico plano.<\/li>\n\n\n<li><strong>As trocas de produ\u00e7\u00e3o determinam quanto voc\u00ea produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner ordena as opera\u00e7\u00f5es para minimizar o tempo de prepara\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Voc\u00ea est\u00e1 prestes a trocar de ERP.<\/strong> A Visma interrompeu o desenvolvimento de novas funcionalidades do L7, e o uso do produto termina no fim de 2028 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">comunicado da Visma<\/a>). O planejamento configurado no SkyPlanner \u00e9 mantido durante a migra\u00e7\u00e3o.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gr\u00e1tis.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todos os recursos do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados. H\u00e1 assist\u00eancia dispon\u00edvel para a configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Importe seus dados de produ\u00e7\u00e3o.<\/strong> Exporte do L7 os n\u00fameros de ordens em aberto, as etapas e os recursos para Excel ou CSV. Importe os dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Visma L7.<\/strong> Seu administrador do LTR cria o usu\u00e1rio da API. A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta suporte ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho. Voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes na <a href=\"\/pt-br\/precos\/\">p\u00e1gina de pre\u00e7os<\/a> e conhe\u00e7a outros sistemas na <a href=\"\/pt-br\/integracoes\/erp\/\">central de integra\u00e7\u00f5es com ERP<\/a>. Os fundamentos do planejamento com base na capacidade real est\u00e3o no <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">guia de programa\u00e7\u00e3o com capacidade finita<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de planejamento da produ\u00e7\u00e3o para o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o com capacidade finita com integra\u00e7\u00e3o bidirecional com o Visma L7. Ele recebe etapas de produ\u00e7\u00e3o, recursos, estruturas de produto, materiais, saldos de estoque e itens de pedidos de compra. Devolve ao L7 o recurso, a data de in\u00edcio, a prioridade, a pessoa e as horas por dia de cada ficha de produ\u00e7\u00e3o. A programa\u00e7\u00e3o respeita os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca ordena as opera\u00e7\u00f5es para minimizar o tempo de prepara\u00e7\u00e3o. Os pre\u00e7os come\u00e7am em 199 \u20ac por m\u00eas, e o teste gr\u00e1tis dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual software de planejamento da produ\u00e7\u00e3o se integra ao Visma L7?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS se integra ao Visma L7 pela REST API do Visma L7. A Visma lista a Skycode com o SkyPlanner em sua p\u00e1gina de integra\u00e7\u00f5es do L7. Su\u00edtes APS como o Delfoi Planner tamb\u00e9m se conectam ao L7. O SkyPlanner funciona no navegador, grava a programa\u00e7\u00e3o nas fichas de produ\u00e7\u00e3o do L7 e disponibiliza a fila de cada operador no celular ou tablet.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Visma L7 Hienosuunnittelu ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Use o planejamento detalhado do L7 se cada recurso corresponder a uma m\u00e1quina, suas estruturas forem de n\u00edvel \u00fanico e um planejador tiver tempo para organizar cada dia. Use o SkyPlanner quando precisar de hor\u00e1rios definidos, v\u00e1rias m\u00e1quinas por recurso, estruturas de v\u00e1rios n\u00edveis, sequenciamento que minimize a prepara\u00e7\u00e3o ou replanejamento autom\u00e1tico. O SkyPlanner tamb\u00e9m mant\u00e9m seu planejamento quando voc\u00ea substitui o L7.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O que acontece com o SkyPlanner quando deixamos o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">Seus centros de trabalho, etapas de processo, matriz de tempos de prepara\u00e7\u00e3o, turnos e regras permanecem no SkyPlanner. A integra\u00e7\u00e3o \u00e9 reconectada ao novo ERP, como <a href=\"\/pt-br\/integracoes\/erp\/business-central\/\">Business Central<\/a>, <a href=\"\/pt-br\/integracoes\/erp\/visma-net\/\">Visma Net<\/a>, <a href=\"\/pt-br\/integracoes\/erp\/lemonsoft\/\">Lemonsoft<\/a>, <a href=\"\/pt-br\/integracoes\/erp\/monitor-erp\/\">Monitor ERP<\/a> ou <a href=\"\/pt-br\/integracoes\/erp\/odoo\/\">Odoo<\/a>. A produ\u00e7\u00e3o mant\u00e9m o mesmo plano durante a troca.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Visma L7 \u00e9 o mesmo que o Visma Net ou o Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O Visma L7 \u00e9 o ERP da Visma para empresas que executam obras e servi\u00e7os por contrato, empresas de energia e ind\u00fastrias, geralmente de m\u00e9dio e grande porte. O <a href=\"\/pt-br\/integracoes\/erp\/visma-net\/\">Visma Net<\/a> \u00e9 o ERP na nuvem da Visma para m\u00e9dias e grandes empresas, e o <a href=\"\/pt-br\/integracoes\/erp\/visma-nova\/\">Visma Nova<\/a> atende a pequenas empresas. Cada um tem seu pr\u00f3prio modelo de dados e uma p\u00e1gina espec\u00edfica no site do SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar algo no Visma L7?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem e faz chamadas \u00e0 REST API do L7 no seu servidor Visma LTR. Seu administrador do LTR cria o usu\u00e1rio da API e os tokens, e voc\u00ea contrata as licen\u00e7as dos endpoints REST usados pela integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma empresa que usa o Visma L7?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com sua pr\u00f3pria fila de opera\u00e7\u00f5es programadas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com seu processo e suas necessidades, junto com o plano contratado. Assim, voc\u00ea conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o assistida. A equipe mapeia seus recursos e etapas de produ\u00e7\u00e3o, conecta os n\u00fameros de ordem e os materiais e grava a programa\u00e7\u00e3o de volta no L7. Tudo \u00e9 testado em compara\u00e7\u00e3o com seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Visma L7 SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita O SkyPlanner APS \u00e9 um complemento para o planejamento da produ\u00e7\u00e3o com capacidade finita no Visma L7, o ERP usado por m\u00e9dias e grandes empresas finlandesas dos setores industrial, de servi\u00e7os por empreitada e de energia. Cada m\u00e1quina, &#8230; <a title=\"SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/\" aria-label=\"Read more about SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106273","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7: planejamento da produ\u00e7\u00e3o com APS de capacidade finita<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: complemento para Visma L7; programa\u00e7\u00e3o finita e integra\u00e7\u00e3o bidirecional de etapas, recursos, pessoas e materiais. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: complemento para Visma L7; programa\u00e7\u00e3o finita e integra\u00e7\u00e3o bidirecional de etapas, recursos, pessoas e materiais. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/visma-l7\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/visma-l7\\\/\",\"name\":\"Visma L7: planejamento da produ\u00e7\u00e3o com APS de capacidade finita\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: complemento para Visma L7; programa\u00e7\u00e3o finita e integra\u00e7\u00e3o bidirecional de etapas, recursos, pessoas e materiais. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/visma-l7\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/visma-l7\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/visma-l7\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7: planejamento da produ\u00e7\u00e3o com APS de capacidade finita","description":"SkyPlanner APS: complemento para Visma L7; programa\u00e7\u00e3o finita e integra\u00e7\u00e3o bidirecional de etapas, recursos, pessoas e materiais. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita","og_description":"SkyPlanner APS: complemento para Visma L7; programa\u00e7\u00e3o finita e integra\u00e7\u00e3o bidirecional de etapas, recursos, pessoas e materiais. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/","name":"Visma L7: planejamento da produ\u00e7\u00e3o com APS de capacidade finita","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: complemento para Visma L7; programa\u00e7\u00e3o finita e integra\u00e7\u00e3o bidirecional de etapas, recursos, pessoas e materiais. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/visma-l7\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Visma L7 SkyPlanner APS para Visma L7: planejamento da produ\u00e7\u00e3o com capacidade finita O SkyPlanner APS \u00e9 um complemento para o planejamento da produ\u00e7\u00e3o com capacidade finita no Visma L7, o ERP usado por m\u00e9dias e grandes empresas finlandesas dos setores industrial, de servi\u00e7os por empreitada e de energia. Cada m\u00e1quina,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=106273"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106273\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=106273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}