{"id":106099,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/xero\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"xero","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/","title":{"rendered":"SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Xero<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Xero: <span class=\"hl\">planejamento da produ\u00e7\u00e3o para fabricantes<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de planejamento da produ\u00e7\u00e3o para o Xero que transforma seus or\u00e7amentos aceitos em uma programa\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e da equipe. O Xero continua cuidando dos seus contatos, itens, faturas e registros cont\u00e1beis. O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o que o software de contabilidade n\u00e3o oferece, e o Autopilot reprograma a produ\u00e7\u00e3o automaticamente quando h\u00e1 mudan\u00e7as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre SkyPlanner e Xero funciona nos dois sentidos. O SkyPlanner recebe contatos, itens com controle de estoque, or\u00e7amentos aceitos e pedidos de compra com suas datas de entrega. Devolve a data de conclus\u00e3o planejada, rascunhos de faturas dos pedidos conclu\u00eddos e as horas registradas em projetos. A equipe do SkyPlanner configura a integra\u00e7\u00e3o com a sua organiza\u00e7\u00e3o no Xero durante a implanta\u00e7\u00e3o.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Um plano para cada m\u00e1quina, n\u00e3o uma lista de or\u00e7amentos aceitos.<\/p>\n\n\n<p class=\"fx-pain__b\">No Xero, um or\u00e7amento aceito fica aguardando o faturamento. O motor Arcturus do SkyPlanner transforma cada or\u00e7amento em opera\u00e7\u00f5es nos centros de trabalho que v\u00e3o execut\u00e1-las, com hor\u00e1rios definidos em um gr\u00e1fico de Gantt interativo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Prazos de entrega que voc\u00ea pode cumprir.<\/p>\n\n\n<p class=\"fx-pain__b\">A data de conclus\u00e3o de cada pedido \u00e9 calculada com base na carga de cada m\u00e1quina e pessoa. Antes de enviar um or\u00e7amento, voc\u00ea consegue ver que o CNC est\u00e1 ocupado por duas semanas, enquanto a montagem est\u00e1 livre.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Turnos de acordo com a sua f\u00e1brica.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada centro de trabalho e pessoa tem seus pr\u00f3prios turnos, folgas, aus\u00eancias e turnos extras. Adicione um turno \u00e0 noite no gargalo, e as datas se ajustam na hora.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos trocas de produto.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner armazena o tempo de setup entre cada par de produtos, nos dois sentidos. Passar do azul para o vermelho pode levar 30 minutos, e do vermelho para o azul, 60. O motor de programa\u00e7\u00e3o sequencia as opera\u00e7\u00f5es de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipes compartilhadas, sem conflitos.<\/p>\n\n\n<p class=\"fx-pain__b\">Um molde em uso em uma m\u00e1quina nunca \u00e9 reservado para outra no mesmo hor\u00e1rio. Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade no turno.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica diante de urg\u00eancias e quebras.<\/p>\n\n\n<p class=\"fx-pain__b\">Atribua Fast Track ou uma prioridade mais alta a uma ordem, e o motor de programa\u00e7\u00e3o abre espa\u00e7o para ela. Quando uma m\u00e1quina para, o Autopilot reprograma a produ\u00e7\u00e3o, e o Running Time Lock mant\u00e9m as opera\u00e7\u00f5es j\u00e1 iniciadas em seus hor\u00e1rios.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material conferido antes do in\u00edcio do trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner consulta o saldo dos itens com controle de estoque e a data prevista de chegada de cada pedido de compra no Xero. Uma opera\u00e7\u00e3o que depende da entrega de um fornecedor \u00e9 programada para depois da chegada dos materiais.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Produ\u00e7\u00e3o conclu\u00edda, pronta para faturar.<\/p>\n\n\n<p class=\"fx-pain__b\">Os operadores registram o trabalho pelo celular ou tablet com Mobile Confirmations ou Production Timer. Quando um pedido \u00e9 conclu\u00eddo, um rascunho de fatura com os itens do or\u00e7amento fica dispon\u00edvel no Xero para aprova\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que os fabricantes dizem sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas de Excel e passou para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, diretor de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, leva menos de 30 minutos para ser gerado.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de pontualidade de entrega desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner nos d\u00e1 visibilidade da capacidade e torna o planejamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Ind\u00fastria qu\u00edmica e aliment\u00edcia<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega se mant\u00e9m em 100% durante todo o per\u00edodo de uso do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/opes-corporation\/\">Leia o depoimento da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para telhados da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>de pontualidade de entrega<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner deu mais visibilidade aos gargalos e tornou a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gerente de produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para telhados e de capta\u00e7\u00e3o de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega chegou a 99,2% neste ano, e a programa\u00e7\u00e3o economiza at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/piristeel\/\">Leia o depoimento da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-xero-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O trabalho vem do Xero.<\/strong> O SkyPlanner recebe contatos, itens com controle de estoque e seus saldos, or\u00e7amentos aceitos e pedidos de compra com as datas previstas de chegada. Cada or\u00e7amento aceito se torna uma ordem de produ\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> Voc\u00ea cadastra uma \u00fanica vez no SkyPlanner as etapas do processo, os centros de trabalho e os tempos de setup de cada produto. A partir da\u00ed, o motor Arcturus programa todas as opera\u00e7\u00f5es em cada m\u00e1quina em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>O trabalho conclu\u00eddo volta para o Xero.<\/strong> O SkyPlanner adiciona a data de conclus\u00e3o planejada ao hist\u00f3rico do or\u00e7amento. Quando um pedido \u00e9 conclu\u00eddo, cria um rascunho de fatura de venda com os itens e a refer\u00eancia do or\u00e7amento e altera o status do or\u00e7amento para Invoiced. No caso de trabalhos por projeto, as horas registradas s\u00e3o enviadas ao Xero Projects como apontamentos de horas.<\/li>\n\n<\/ol>\n\n\n<p>A integra\u00e7\u00e3o usa a Xero Accounting API e a Projects API com OAuth 2.0, sem instalar nada no Xero. Os webhooks do Xero informam a cria\u00e7\u00e3o e a altera\u00e7\u00e3o de contatos e faturas. O SkyPlanner consulta os or\u00e7amentos, itens e pedidos de compra alterados desde a \u00faltima sincroniza\u00e7\u00e3o, e seus webhooks enviam as mudan\u00e7as na programa\u00e7\u00e3o assim que elas ocorrem. Cada f\u00e1brica organiza seus itens, or\u00e7amentos e estoques de forma diferente no Xero. Por isso, a equipe do SkyPlanner faz o mapeamento dos seus dados durante a implanta\u00e7\u00e3o e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o depois da entrada em opera\u00e7\u00e3o.<\/p>\n\n\n<p>O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com seu processo e suas necessidades. Seu consultor Xero, parceiro de integra\u00e7\u00e3o ou sua pr\u00f3pria equipe de desenvolvimento tamb\u00e9m pode criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Os endpoints, o mapeamento de campos e as regras de grava\u00e7\u00e3o de dados de volta no Xero est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/xero\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Xero para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-xero-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Xero programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Xero \u00e9 um software de contabilidade. Ele gerencia or\u00e7amentos, faturas, pedidos de compra, contas a pagar e concilia\u00e7\u00e3o banc\u00e1ria, al\u00e9m de acompanhar o estoque dos itens com esse controle. Nas palavras do Xero: &#8220;If an item is tracked it means Xero tracks the available quantity and value of the item.&#8221; (Se um item tem controle de estoque, o Xero acompanha a quantidade dispon\u00edvel e o valor desse item.) (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/items\">fonte<\/a>)<\/p>\n\n\n<p>O Xero n\u00e3o mant\u00e9m listas de materiais, roteiros de produ\u00e7\u00e3o, m\u00e1quinas nem ordens de produ\u00e7\u00e3o. Hoje, a produ\u00e7\u00e3o de produtos acabados a partir de componentes n\u00e3o \u00e9 contemplada pelo Xero. Em seu f\u00f3rum de sugest\u00f5es, a equipe do Xero escreveu em 2026 que o controle de estoque de montagem &#8220;hasn&#8217;t been roadmapped at this stage.&#8221; (ainda n\u00e3o foi inclu\u00eddo no plano de desenvolvimento nesta etapa.) (<a href=\"https:\/\/productideas.xero.com\/forums\/967139-purchase-orders-bills-inventory\/suggestions\/45048400-advanced-inventory-assembly-inventory\">fonte<\/a>)<\/p>\n\n\n<p>A pr\u00f3pria p\u00e1gina de estoque do Xero indica aplicativos para empresas que precisam de mais recursos: &#8220;Apps include Cin7 Core, Unleashed, and ZapInventory&#8221; (Entre os aplicativos est\u00e3o Cin7 Core, Unleashed e ZapInventory). (<a href=\"https:\/\/www.xero.com\/us\/accounting-software\/manage-inventory\/\">fonte<\/a>) Esses aplicativos cuidam do estoque e dos pedidos. O SkyPlanner acrescenta o planejamento de m\u00e1quinas e pessoas. Cada etapa \u00e9 explicada em <a href=\"\/pt-br\/integracoes\/erp\/xero\/programacao-producao\/\">O Xero oferece planejamento da produ\u00e7\u00e3o?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero hoje e com SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Xero<\/th><th>Xero com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Carteira de pedidos<\/td><td>Or\u00e7amentos aceitos e faturas de venda<\/td><td>Cada pedido dividido em opera\u00e7\u00f5es na linha do tempo dos centros de trabalho<\/td><\/tr><tr><td>Capacidade<\/td><td>N\u00e3o modelada<\/td><td>Cada m\u00e1quina, pessoa e ferramenta com seus pr\u00f3prios turnos<\/td><\/tr><tr><td>Roteiros de produ\u00e7\u00e3o<\/td><td>N\u00e3o cadastrados<\/td><td>Etapas do processo, centros de trabalho e tempos de setup por produto<\/td><\/tr><tr><td>Sequenciamento<\/td><td>O planejador define a sequ\u00eancia em um quadro ou em uma planilha<\/td><td>O motor sequencia todos os pedidos em aberto por prioridade e prazo de entrega<\/td><\/tr><tr><td>Trocas de produto<\/td><td>N\u00e3o modeladas<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o para o menor tempo total de setup<\/td><\/tr><tr><td>Mudan\u00e7as<\/td><td>Telefonemas e replanejamento manual<\/td><td>O Autopilot replaneja toda a f\u00e1brica<\/td><\/tr><tr><td>Materiais<\/td><td>Saldo de cada item com controle de estoque<\/td><td>Estoque e datas de chegada dos pedidos de compra verificados a cada mudan\u00e7a<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Fichas de opera\u00e7\u00e3o em papel<\/td><td>Fila com hor\u00e1rios definidos, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>Faturamento<\/td><td>Fatura digitada ap\u00f3s a conclus\u00e3o da opera\u00e7\u00e3o<\/td><td>Rascunho de fatura criado a partir do trabalho conclu\u00eddo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-xero-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quais dados s\u00e3o trocados entre Xero e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Xero<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Contact (cliente)<\/td><td>Cliente, prioridade de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>Item (com e sem controle de estoque) com QuantityOnHand<\/td><td>Produtos e materiais, estoque<\/td><td>Entrada<\/td><\/tr><tr><td>Quote (Accepted) com itens<\/td><td>Pedido com prazo de entrega e opera\u00e7\u00f5es por item<\/td><td>Entrada<\/td><\/tr><tr><td>PurchaseOrder com ExpectedArrivalDate e DeliveryDate<\/td><td>Material a receber com data de chegada<\/td><td>Entrada<\/td><\/tr><tr><td>Nota no hist\u00f3rico de Quote<\/td><td>Data de conclus\u00e3o planejada<\/td><td>Retorno<\/td><\/tr><tr><td>Invoice (ACCREC, Draft) com os itens e a refer\u00eancia do or\u00e7amento<\/td><td>Pedido conclu\u00eddo<\/td><td>Retorno<\/td><\/tr><tr><td>Quote com status Invoiced<\/td><td>Pedido conclu\u00eddo<\/td><td>Retorno<\/td><\/tr><tr><td>Apontamento de horas no Projects<\/td><td>Mobile Confirmations, registros de horas<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comparativo de softwares e complementos de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando faz sentido<\/th><\/tr><\/thead><tbody><tr><td>Apenas Xero<\/td><td>Or\u00e7amentos, faturas, pedidos de compra e controle de estoque no Xero, com o planejamento em um quadro<\/td><td>Uma ou duas m\u00e1quinas, e uma pessoa conhece a sequ\u00eancia do trabalho<\/td><\/tr><tr><td>Aplicativos de estoque e MRP que sincronizam com o Xero (por exemplo, Katana, MRPeasy, Fishbowl Manufacturing, Cin7 Core, Unleashed)<\/td><td>Um segundo sistema para estoque, listas de materiais e pedidos, que envia faturas, contas a pagar e custos ao Xero<\/td><td>Voc\u00ea quer transferir a gest\u00e3o de estoque e pedidos para fora do Xero<\/td><\/tr><tr><td>APS na nuvem conectado por API (SkyPlanner APS)<\/td><td>Uma solu\u00e7\u00e3o de programa\u00e7\u00e3o com capacidade finita que l\u00ea or\u00e7amentos do Xero e envia de volta os dados do trabalho conclu\u00eddo<\/td><td>Voc\u00ea quer manter o Xero, mas precisa de um plano real para as m\u00e1quinas e a equipe<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Se voc\u00ea j\u00e1 usa um MRP junto com o Xero, o SkyPlanner programa a produ\u00e7\u00e3o com base nos dados dele. Veja as p\u00e1ginas do <a href=\"\/pt-br\/integracoes\/erp\/katana\/\">Katana<\/a> e do <a href=\"\/pt-br\/integracoes\/erp\/mrpeasy\/\">MRPeasy<\/a>.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner para Xero quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Voc\u00ea quer manter o Xero como est\u00e1.<\/strong> O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o sem tirar sua contabilidade, seus itens e seu faturamento de onde est\u00e3o.<\/li>\n\n\n<li><strong>V\u00e1rias m\u00e1quinas disputam os mesmos pedidos,<\/strong> e a fila s\u00f3 existe na cabe\u00e7a de algu\u00e9m.<\/li>\n\n\n<li><strong>As trocas de produ\u00e7\u00e3o determinam quanto voc\u00ea produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o registra o tempo de transi\u00e7\u00e3o entre cada par de produtos, nos dois sentidos, e escolhe a sequ\u00eancia com o menor tempo de setup.<\/li>\n\n\n<li><strong>Operadores, dispositivos de fixa\u00e7\u00e3o e materiais limitam o plano tanto quanto as m\u00e1quinas.<\/strong> Os limites de todos os recursos s\u00e3o considerados ao mesmo tempo, e as opera\u00e7\u00f5es que exigem v\u00e1rios operadores recebem a equipe necess\u00e1ria.<\/li>\n\n\n<li><strong>Voc\u00ea quer faturar o trabalho conclu\u00eddo sem redigitar dados.<\/strong> Um rascunho de fatura chega ao Xero assim que a conclus\u00e3o do pedido \u00e9 confirmada.<\/li>\n\n\n<li><strong>Voc\u00ea quer um pre\u00e7o claro.<\/strong> A partir de 199 \u20ac por m\u00eas, com or\u00e7amento pr\u00e9vio da integra\u00e7\u00e3o bidirecional e suporte da equipe SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gr\u00e1tis.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todos os recursos do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre centros de trabalho, pessoas, turnos e etapas do processo no SkyPlanner ou importe esses dados. Voc\u00ea pode contar com assist\u00eancia na implanta\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Carregue seus pedidos.<\/strong> Exporte do Xero seus contatos, produtos e servi\u00e7os e or\u00e7amentos em aberto para CSV. Importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Xero.<\/strong> A equipe SkyPlanner configura a integra\u00e7\u00e3o bidirecional e presta suporte depois que ela entra em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho. Voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a> para ver os detalhes ou leia o <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">guia de programa\u00e7\u00e3o com capacidade finita<\/a>. Tamb\u00e9m usa outro sistema? Veja <a href=\"\/pt-br\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de planejamento da produ\u00e7\u00e3o para o Xero?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o com capacidade finita com integra\u00e7\u00e3o bidirecional com o Xero. Ele recebe contatos, itens com controle de estoque, or\u00e7amentos aceitos e pedidos de compra. Envia de volta a data prevista de conclus\u00e3o, rascunhos de faturas de pedidos conclu\u00eddos e apontamentos de horas em projetos. O planejamento respeita os limites reais de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o considera o sentido de cada troca de produto para ordenar as opera\u00e7\u00f5es com o menor tempo de setup. O Autopilot refaz o planejamento automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am em 199 \u20ac por m\u00eas, e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual software de planejamento da produ\u00e7\u00e3o se integra ao Xero?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS se integra ao Xero por meio da Xero Accounting API e da Projects API, com OAuth 2.0 e webhooks do Xero. A equipe SkyPlanner configura a integra\u00e7\u00e3o durante a implanta\u00e7\u00e3o. Aplicativos de estoque e MRP, como Katana, MRPeasy e Fishbowl, tamb\u00e9m sincronizam dados com o Xero. Se voc\u00ea usa um deles, o SkyPlanner pode planejar a produ\u00e7\u00e3o com base nos dados desse aplicativo.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Xero tem planejamento da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O Xero n\u00e3o tem listas de materiais, roteiros de produ\u00e7\u00e3o, m\u00e1quinas nem ordens de produ\u00e7\u00e3o, e a gest\u00e3o de estoque para montagem n\u00e3o est\u00e1 nos seus planos de desenvolvimento. O SkyPlanner APS funciona junto com ele e acrescenta a <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o com capacidade finita<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos substituir o Xero por um ERP para fazer o planejamento da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona junto com o Xero. Contatos, itens, or\u00e7amentos, faturas, compras e contabilidade continuam no Xero. O SkyPlanner planeja o trabalho conforme a capacidade real e envia de volta os dados do trabalho conclu\u00eddo para faturamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa usar o SkyPlanner junto com o Xero?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Uma oficina com 10 centros de trabalho paga 299 \u20ac por m\u00eas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com o plano, de acordo com seu processo e suas necessidades. Assim, voc\u00ea sabe o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar algo no Xero?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, junto com o Xero. Um administrador do Xero faz login uma \u00fanica vez e autoriza o acesso pela tela de OAuth 2.0 do Xero.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio do processo. A equipe configura seus centros de trabalho e etapas do processo, conecta os or\u00e7amentos e pedidos de compra e ativa o envio de faturas ao Xero. Tudo \u00e9 testado em rela\u00e7\u00e3o ao seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner com nossos dados do Xero antes?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o teste, importe seus produtos e or\u00e7amentos em aberto de um arquivo CSV exportado do Xero. Voc\u00ea ver\u00e1 a programa\u00e7\u00e3o com capacidade finita da sua pr\u00f3pria produ\u00e7\u00e3o antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Xero SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes O SkyPlanner APS \u00e9 um complemento de planejamento da produ\u00e7\u00e3o para o Xero que transforma seus or\u00e7amentos aceitos em uma programa\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e da equipe. O Xero continua cuidando &#8230; <a title=\"SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/\" aria-label=\"Read more about SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106099","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Xero: planejamento da produ\u00e7\u00e3o integrado com complemento APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para Xero. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para Xero. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/xero\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/xero\\\/\",\"name\":\"Xero: planejamento da produ\u00e7\u00e3o integrado com complemento APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para Xero. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/xero\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/xero\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/xero\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Xero: planejamento da produ\u00e7\u00e3o integrado com complemento APS","description":"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para Xero. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes","og_description":"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para Xero. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/","name":"Xero: planejamento da produ\u00e7\u00e3o integrado com complemento APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para Xero. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/xero\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Xero SkyPlanner APS para Xero: planejamento da produ\u00e7\u00e3o para fabricantes O SkyPlanner APS \u00e9 um complemento de planejamento da produ\u00e7\u00e3o para o Xero que transforma seus or\u00e7amentos aceitos em uma programa\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e da equipe. O Xero continua cuidando&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=106099"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106099\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=106099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}