{"id":106070,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/quickbooks-online\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"quickbooks-online","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/","title":{"rendered":"SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ QuickBooks Online<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para QuickBooks Online: <span class=\"hl\">planejamento da produ\u00e7\u00e3o para ind\u00fastrias<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o com capacidade finita para QuickBooks Online. Ele transforma seus or\u00e7amentos aceitos e pedidos em um planejamento da produ\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas e da equipe. O QuickBooks continua cuidando dos seus clientes, produtos, faturas e registros cont\u00e1beis. O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o que o software cont\u00e1bil n\u00e3o oferece, e o Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner se integra ao QuickBooks Online nos dois sentidos. Recebe clientes, produtos e servi\u00e7os, or\u00e7amentos aceitos, pedidos de compra e funcion\u00e1rios. Devolve a data de expedi\u00e7\u00e3o planejada, as faturas dos pedidos conclu\u00eddos, as horas apontadas e as altera\u00e7\u00f5es de estoque. A equipe do SkyPlanner configura a integra\u00e7\u00e3o com a sua empresa no QuickBooks durante a implanta\u00e7\u00e3o.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Um plano para cada m\u00e1quina, n\u00e3o uma lista de or\u00e7amentos em aberto.<\/p>\n\n\n<p class=\"fx-pain__b\">No QuickBooks, um or\u00e7amento aceito \u00e9 um documento de venda. O mecanismo Arcturus do SkyPlanner transforma cada or\u00e7amento em opera\u00e7\u00f5es, alocadas nos centros de trabalho que v\u00e3o execut\u00e1-las, com hor\u00e1rios definidos em um gr\u00e1fico de Gantt interativo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Prazos de expedi\u00e7\u00e3o que voc\u00ea consegue cumprir.<\/p>\n\n\n<p class=\"fx-pain__b\">A data de conclus\u00e3o de cada pedido \u00e9 calculada com base na carga de cada m\u00e1quina e pessoa. Antes de enviar um or\u00e7amento, voc\u00ea consegue ver que a dobradeira est\u00e1 ocupada por duas semanas, enquanto a soldagem est\u00e1 livre.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Turnos de acordo com a realidade da sua f\u00e1brica.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada centro de trabalho e cada pessoa tem seu pr\u00f3prio calend\u00e1rio de turnos, folgas, aus\u00eancias e turnos extras. Adicione um turno no s\u00e1bado ao recurso que \u00e9 o gargalo, e as datas se ajustam na hora.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos trocas de produto.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner armazena o tempo de setup entre cada par de produtos, nos dois sentidos. Passar do azul para o vermelho pode levar 30 minutos, e do vermelho para o azul, 60. O motor de programa\u00e7\u00e3o sequencia as opera\u00e7\u00f5es de forma a perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipes compartilhadas, sem conflitos.<\/p>\n\n\n<p class=\"fx-pain__b\">Um dispositivo de fixa\u00e7\u00e3o em uso em uma m\u00e1quina nunca \u00e9 alocado em outra ao mesmo tempo. Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com turnos dispon\u00edveis.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica diante de urg\u00eancias e quebras.<\/p>\n\n\n<p class=\"fx-pain__b\">Atribua Fast Track ou uma prioridade mais alta a uma ordem, e o motor de programa\u00e7\u00e3o abre espa\u00e7o para ela. Quando uma m\u00e1quina para, o Autopilot reprograma a produ\u00e7\u00e3o, e o Running Time Lock mant\u00e9m as opera\u00e7\u00f5es j\u00e1 iniciadas em seus hor\u00e1rios.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material conferido antes do in\u00edcio do trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner consulta o estoque e os pedidos de compra em aberto no QuickBooks. Uma opera\u00e7\u00e3o que depende de uma entrega do fornecedor \u00e9 programada para depois da chegada do material.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Trabalho conclu\u00eddo segue direto para o faturamento.<\/p>\n\n\n<p class=\"fx-pain__b\">Os operadores apontam o trabalho pelo celular ou tablet com Mobile Confirmations ou Production Timer. Quando um pedido \u00e9 conclu\u00eddo, a fatura e as horas j\u00e1 est\u00e3o no QuickBooks.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que os fabricantes dizem sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas de Excel e passou para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, diretor de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, leva menos de 30 minutos para ser gerado.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Menos<\/b><span>paradas por falta de material<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO valor que o SkyPlanner nos traz \u00e9 ser uma ferramenta que funciona no dia a dia, especialmente para definir prazos de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gerente de planejamento da produ\u00e7\u00e3o<\/b><br>Eskomatic \u00b7 Usinagem sob encomenda<\/p>\n\n\n<p class=\"ind-cust__result\">A programa\u00e7\u00e3o autom\u00e1tica da carga permite definir datas de entrega mais precisas, e as paradas de produ\u00e7\u00e3o por falta de material ca\u00edram significativamente.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/eskomatic\/\">Leia o depoimento da Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Soldador da KJH-Comp desbastando uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de pontualidade de entrega, ante cerca de 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo para manter nossa pontualidade de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Fabrica\u00e7\u00e3o de pe\u00e7as em chapa met\u00e1lica e produ\u00e7\u00e3o sob encomenda<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega passou de cerca de 50% para at\u00e9 98%, e a programa\u00e7\u00e3o agora exige um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/kjh-comp\/\">Leia o depoimento da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-quickbooks-online-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o QuickBooks Online<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O QuickBooks envia o trabalho.<\/strong> Clientes, produtos e servi\u00e7os com saldo em estoque, or\u00e7amentos aceitos, pedidos de compra em aberto e funcion\u00e1rios s\u00e3o enviados ao SkyPlanner. Cada or\u00e7amento aceito se torna uma ordem de produ\u00e7\u00e3o com seu prazo de entrega.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> Voc\u00ea define uma \u00fanica vez as etapas do processo, os centros de trabalho e os tempos de setup de cada produto no SkyPlanner. O mecanismo Arcturus ent\u00e3o programa cada opera\u00e7\u00e3o em cada m\u00e1quina em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>O trabalho conclu\u00eddo volta para o QuickBooks.<\/strong> O SkyPlanner preenche o campo de data de expedi\u00e7\u00e3o do or\u00e7amento com a data de conclus\u00e3o planejada. Quando um pedido \u00e9 conclu\u00eddo, ele cria uma fatura vinculada ao or\u00e7amento, lan\u00e7a as horas apontadas como registros de horas trabalhadas e registra os produtos acabados e os materiais consumidos como um ajuste de estoque.<\/li>\n\n<\/ol>\n\n\n<p>A integra\u00e7\u00e3o usa a QuickBooks Online Accounting API da Intuit com OAuth 2.0, portanto nada \u00e9 instalado no QuickBooks. Os webhooks do QuickBooks informam inclus\u00f5es e altera\u00e7\u00f5es de clientes, or\u00e7amentos, itens e pedidos de compra, e os webhooks do SkyPlanner enviam as mudan\u00e7as na programa\u00e7\u00e3o assim que elas ocorrem. Cada f\u00e1brica configura seus produtos, or\u00e7amentos e estoque de um jeito no QuickBooks. Por isso, a equipe do SkyPlanner faz o mapeamento dos seus dados durante a implanta\u00e7\u00e3o e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o depois da entrada em opera\u00e7\u00e3o.<\/p>\n\n\n<p>O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antes do in\u00edcio do trabalho, de acordo com seu processo e suas necessidades. Seu QuickBooks ProAdvisor, parceiro de integra\u00e7\u00e3o ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem usar a API documentada do SkyPlanner para criar a integra\u00e7\u00e3o (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Os endpoints, o mapeamento de campos e as regras de grava\u00e7\u00e3o de dados de volta no QuickBooks est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/quickbooks-online\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o do QuickBooks Online para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-quickbooks-online-schedules-and-what-skypla\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o QuickBooks Online programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O QuickBooks Online \u00e9 um software cont\u00e1bil. Seus planos permitem acompanhar produtos, or\u00e7amentos, faturas, pedidos de compra e horas. Nos planos Plus e Advanced, os itens de estoque t\u00eam um saldo dispon\u00edvel. Nenhum dos planos registra m\u00e1quinas, roteiros de fabrica\u00e7\u00e3o ou ordens de produ\u00e7\u00e3o. Portanto, nenhum recurso do QuickBooks Online planeja o ch\u00e3o de f\u00e1brica.<\/p>\n\n\n<p>A Intuit oferece recursos de manufatura em apenas um produto. A ajuda da Intuit informa: &#8220;Manufacturing features are currently available in Intuit Enterprise Suite.&#8221; (Os recursos de manufatura est\u00e3o dispon\u00edveis atualmente no Intuit Enterprise Suite.) (<a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/inventory-account\/understand-production-costs-using-manufacturing\/L4FBrL1Ip_US_en_US\">fonte<\/a>) Nele, uma ordem de produ\u00e7\u00e3o funciona assim:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Um produto e uma quantidade.<\/strong> Voc\u00ea escolhe um item de estoque do tipo conjunto e a quantidade a produzir.<\/li>\n\n\n<li><strong>Duas datas.<\/strong> A orienta\u00e7\u00e3o \u00e9 &#8220;select a production Start date and Required by date.&#8221; (selecione a data de in\u00edcio da produ\u00e7\u00e3o e a data em que ela deve estar pronta).<\/li>\n\n\n<li><strong>Componentes da lista de materiais.<\/strong> O status Planned reserva os componentes, e a conclus\u00e3o da ordem abre um formul\u00e1rio de montagem para informar as quantidades e os custos finais.<\/li>\n\n\n<li><strong>Servi\u00e7os como uma linha de custo.<\/strong> O custo dos servi\u00e7os e dos componentes n\u00e3o estoc\u00e1veis \u00e9 calculado &#8220;based on actual rates entered on the build assembly page.&#8221; (com base nos valores reais informados na p\u00e1gina de montagem do produto).<\/li>\n\n\n<li><strong>Um n\u00edvel.<\/strong> &#8220;Multi level bill of materials with sub assemblies aren&#8217;t supported in Intuit Enterprise Suite.&#8221; (O Intuit Enterprise Suite n\u00e3o oferece suporte a listas de materiais multin\u00edvel com subconjuntos.) (<a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/sales-orders\/learn-manufacturing-orders-assemblies\/L7ffspckB_US_en_US\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Isso \u00e9 c\u00e1lculo de custos e reserva de componentes. N\u00e3o h\u00e1 opera\u00e7\u00f5es, centros de trabalho nem capacidade, portanto nada verifica se uma m\u00e1quina ou pessoa est\u00e1 dispon\u00edvel na data de in\u00edcio. Cada etapa \u00e9 explicada em <a href=\"\/pt-br\/integracoes\/erp\/quickbooks-online\/programacao-producao\/\">O QuickBooks tem programa\u00e7\u00e3o da produ\u00e7\u00e3o?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"quickbooks-online-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QuickBooks Online hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QuickBooks Online<\/th><th>QuickBooks Online com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Carteira de pedidos<\/td><td>Or\u00e7amentos aceitos e faturas<\/td><td>Cada pedido desdobrado em opera\u00e7\u00f5es no cronograma dos centros de trabalho<\/td><\/tr><tr><td>Capacidade<\/td><td>N\u00e3o modelada<\/td><td>Cada m\u00e1quina, pessoa e ferramenta com seus pr\u00f3prios turnos<\/td><\/tr><tr><td>Roteiros de fabrica\u00e7\u00e3o<\/td><td>N\u00e3o registrados<\/td><td>Etapas do processo, centros de trabalho e tempos de setup por produto<\/td><\/tr><tr><td>Sequenciamento<\/td><td>O planejador decide no papel ou em uma planilha<\/td><td>O mecanismo sequencia todos os pedidos em aberto por prioridade e prazo de entrega<\/td><\/tr><tr><td>Trocas de produto<\/td><td>N\u00e3o modeladas<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o, com o menor tempo total de setup<\/td><\/tr><tr><td>Mudan\u00e7as<\/td><td>Quadro branco e liga\u00e7\u00f5es telef\u00f4nicas<\/td><td>O Autopilot reprograma toda a f\u00e1brica<\/td><\/tr><tr><td>Materiais<\/td><td>Saldo em estoque por item<\/td><td>Estoque e pedidos de compra a receber conferidos a cada mudan\u00e7a<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Fichas de acompanhamento em papel<\/td><td>Fila com hor\u00e1rios definidos, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>Faturamento<\/td><td>Fatura digitada ap\u00f3s a conclus\u00e3o do trabalho<\/td><td>Fatura e horas geradas a partir do trabalho conclu\u00eddo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-quickbooks-online-and-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quais dados s\u00e3o trocados entre QuickBooks Online e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QuickBooks Online<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Cliente<\/td><td>Cliente, prioridade de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>Item (Inventory, NonInventory, Service) com QtyOnHand<\/td><td>Produtos e materiais, estoque<\/td><td>Entrada<\/td><\/tr><tr><td>Estimate (aceito) com linhas e data de expedi\u00e7\u00e3o<\/td><td>Pedido com prazo de entrega, opera\u00e7\u00f5es por linha<\/td><td>Entrada<\/td><\/tr><tr><td>PurchaseOrder (em aberto) com itens<\/td><td>Material a receber<\/td><td>Entrada<\/td><\/tr><tr><td>Employee<\/td><td>Pessoal<\/td><td>Entrada<\/td><\/tr><tr><td>ShipDate do Estimate<\/td><td>Conclus\u00e3o planejada<\/td><td>Retorno<\/td><\/tr><tr><td>Invoice vinculada ao or\u00e7amento<\/td><td>Ordem conclu\u00edda<\/td><td>Retorno<\/td><\/tr><tr><td>TimeActivity (funcion\u00e1rio, cliente, item de servi\u00e7o, horas)<\/td><td>Confirma\u00e7\u00f5es pelo celular, apontamentos de horas<\/td><td>Retorno<\/td><\/tr><tr><td>InventoryAdjustment<\/td><td>Entrada de produtos acabados, materiais consumidos<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"quickbooks-online-scheduling-software-and-add-on\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comparativo de softwares e complementos de programa\u00e7\u00e3o da produ\u00e7\u00e3o para QuickBooks Online<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Op\u00e7\u00e3o<\/th><th>O que \u00e9<\/th><th>Quando faz sentido<\/th><\/tr><\/thead><tbody><tr><td>QuickBooks sem complementos ou ordens de produ\u00e7\u00e3o do Intuit Enterprise Suite<\/td><td>Or\u00e7amentos, faturas e estoque no QuickBooks; no Intuit Enterprise Suite, ordens de produ\u00e7\u00e3o com lista de materiais e duas datas<\/td><td>H\u00e1 uma ou duas m\u00e1quinas, e uma pessoa sabe a sequ\u00eancia do trabalho<\/td><\/tr><tr><td>Sistemas de estoque e MRP que sincronizam com o QuickBooks (por exemplo, Katana, MRPeasy, Fishbowl Manufacturing, Autodesk Fusion Operations)<\/td><td>Um segundo sistema para estoque, listas de materiais e ordens de produ\u00e7\u00e3o, que envia faturas, contas a pagar e custos ao QuickBooks<\/td><td>Voc\u00ea quer transferir a gest\u00e3o de estoque e de pedidos para fora do QuickBooks<\/td><\/tr><tr><td>APS na nuvem conectado por API (SkyPlanner APS)<\/td><td>Uma ferramenta de programa\u00e7\u00e3o com capacidade finita que l\u00ea os pedidos do QuickBooks e envia de volta os dados do trabalho conclu\u00eddo<\/td><td>O QuickBooks continua sendo seu sistema, e as m\u00e1quinas e as pessoas precisam de um plano realista<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Se voc\u00ea j\u00e1 usa um MRP junto com o QuickBooks, o SkyPlanner programa a produ\u00e7\u00e3o a partir dos dados dele. Veja as p\u00e1ginas do <a href=\"\/pt-br\/integracoes\/erp\/katana\/\">Katana<\/a> e do <a href=\"\/pt-br\/integracoes\/erp\/mrpeasy\/\">MRPeasy<\/a>.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner para QuickBooks Online quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Voc\u00ea quer manter o QuickBooks como est\u00e1.<\/strong> O SkyPlanner acrescenta o plano de produ\u00e7\u00e3o e mant\u00e9m sua contabilidade, seus itens e seu faturamento onde est\u00e3o.<\/li>\n\n\n<li><strong>V\u00e1rias m\u00e1quinas disputam as mesmas ordens,<\/strong> e a fila s\u00f3 existe na cabe\u00e7a de algu\u00e9m.<\/li>\n\n\n<li><strong>As trocas de produto determinam quanto voc\u00ea produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o armazena um tempo para cada par de produtos, nos dois sentidos da troca, e escolhe a sequ\u00eancia com o menor tempo de setup.<\/li>\n\n\n<li><strong>Operadores, dispositivos de fixa\u00e7\u00e3o e materiais limitam o plano tanto quanto as m\u00e1quinas.<\/strong> Os limites de todos os recursos s\u00e3o considerados ao mesmo tempo, e as opera\u00e7\u00f5es com v\u00e1rios operadores recebem as pessoas necess\u00e1rias.<\/li>\n\n\n<li><strong>Voc\u00ea quer faturar o trabalho conclu\u00eddo sem redigitar dados.<\/strong> As faturas e as horas chegam ao QuickBooks assim que os operadores confirmam a opera\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Voc\u00ea quer um pre\u00e7o claro.<\/strong> A partir de 199 \u20ac por m\u00eas, com or\u00e7amento pr\u00e9vio para a integra\u00e7\u00e3o bidirecional e suporte da equipe SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gr\u00e1tis.<\/strong> S\u00e3o 30 dias, at\u00e9 20 centros de trabalho e todos os recursos do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre centros de trabalho, pessoas, turnos e etapas do processo no SkyPlanner ou importe esses dados. Voc\u00ea pode contar com assist\u00eancia na implanta\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Carregue seus pedidos.<\/strong> Exporte seus clientes, produtos e or\u00e7amentos em aberto do QuickBooks para Excel ou CSV, importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o QuickBooks Online.<\/strong> A equipe SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte depois que ela entra em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho, e voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a> para saber mais ou leia o <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">guia de programa\u00e7\u00e3o com capacidade finita<\/a>. Tamb\u00e9m usa outro sistema? Veja <a href=\"\/pt-br\/integracoes\/erp\/\">todas as integra\u00e7\u00f5es<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de planejamento da produ\u00e7\u00e3o para o QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o com capacidade finita que se integra ao QuickBooks Online nos dois sentidos. Clientes, itens, or\u00e7amentos aceitos, pedidos de compra e funcion\u00e1rios s\u00e3o importados. A data de expedi\u00e7\u00e3o planejada, as faturas de ordens conclu\u00eddas, os apontamentos de horas e os ajustes de estoque s\u00e3o enviados de volta. Os limites de cada m\u00e1quina, operador, ferramenta e material s\u00e3o respeitados, e uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca organiza as opera\u00e7\u00f5es para minimizar o tempo de setup. O Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. O pre\u00e7o parte de 199 \u20ac por m\u00eas, e o teste gr\u00e1tis dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual software de planejamento da produ\u00e7\u00e3o se integra ao QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS se integra ao QuickBooks Online pela Accounting API da Intuit, com OAuth 2.0 e webhooks do QuickBooks. A equipe SkyPlanner configura a integra\u00e7\u00e3o durante a implanta\u00e7\u00e3o. Sistemas de estoque e MRP como Katana, MRPeasy e Fishbowl tamb\u00e9m sincronizam com o QuickBooks. Se voc\u00ea usa um deles, o SkyPlanner pode programar a produ\u00e7\u00e3o a partir dos dados desse sistema.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O QuickBooks Online tem planejamento da produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. Os planos do QuickBooks Online n\u00e3o t\u00eam m\u00e1quinas, roteiros nem ordens de produ\u00e7\u00e3o. O Intuit Enterprise Suite acrescenta ordens de produ\u00e7\u00e3o com lista de materiais, data de in\u00edcio e data-limite de conclus\u00e3o, mas sem opera\u00e7\u00f5es nem capacidade. O SkyPlanner APS acrescenta a <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o com capacidade finita<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos substituir o QuickBooks por um ERP para planejar a produ\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona junto com o QuickBooks Online. Clientes, itens, or\u00e7amentos, faturas, compras e contabilidade continuam no QuickBooks. O SkyPlanner programa o trabalho de acordo com a capacidade real e envia de volta os dados do trabalho conclu\u00eddo para faturamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa usar o SkyPlanner junto com o QuickBooks Online?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Uma f\u00e1brica com 10 centros de trabalho paga 299 \u20ac por m\u00eas. Voc\u00ea recebe antecipadamente um or\u00e7amento da integra\u00e7\u00e3o, adequado ao seu processo e \u00e0s suas necessidades, junto com o pre\u00e7o do plano, para conhecer o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De qual plano do QuickBooks Online precisamos?<\/summary>\n<p class=\"sp-faq__a\">Os planos QuickBooks Online Plus e Advanced incluem saldos de estoque, conforme a <a href=\"https:\/\/quickbooks.intuit.com\/pricing\/\">p\u00e1gina de pre\u00e7os da Intuit<\/a>, e tamb\u00e9m <a href=\"https:\/\/quickbooks.intuit.com\/learn-support\/en-us\/help-article\/purchase-orders\/create-send-purchase-orders-quickbooks-online\/L2mVpjOoq_US_en_US\">pedidos de compra<\/a>. Para conectar o SkyPlanner, entre no QuickBooks e autorize o acesso pela tela OAuth 2.0 da Intuit.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em semanas ap\u00f3s o in\u00edcio do processo. A equipe configura seus centros de trabalho e etapas do processo, conecta or\u00e7amentos e pedidos de compra e ativa o envio de faturas e horas de volta ao QuickBooks. Tudo \u00e9 testado com base no seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner com nossos dados do QuickBooks primeiro?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o teste, importe seus produtos e or\u00e7amentos em aberto a partir de uma exporta\u00e7\u00e3o do QuickBooks. Voc\u00ea ver\u00e1 sua pr\u00f3pria produ\u00e7\u00e3o programada com capacidade finita antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ QuickBooks Online SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o com capacidade finita para QuickBooks Online. Ele transforma seus or\u00e7amentos aceitos e pedidos em um planejamento da produ\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas &#8230; <a title=\"SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/\" aria-label=\"Read more about SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106070","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QuickBooks: planejamento da produ\u00e7\u00e3o, complemento APS integrado<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/quickbooks-online\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/quickbooks-online\\\/\",\"name\":\"QuickBooks: planejamento da produ\u00e7\u00e3o, complemento APS integrado\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/quickbooks-online\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/quickbooks-online\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/quickbooks-online\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QuickBooks: planejamento da produ\u00e7\u00e3o, complemento APS integrado","description":"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias","og_description":"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/","name":"QuickBooks: planejamento da produ\u00e7\u00e3o, complemento APS integrado","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: complemento de planejamento da produ\u00e7\u00e3o para QuickBooks Online. Integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, pessoa e ferramenta. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/quickbooks-online\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ QuickBooks Online SkyPlanner APS para QuickBooks Online: planejamento da produ\u00e7\u00e3o para ind\u00fastrias O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o com capacidade finita para QuickBooks Online. Ele transforma seus or\u00e7amentos aceitos e pedidos em um planejamento da produ\u00e7\u00e3o para cada m\u00e1quina, operador, ferramenta e material, respeitando a capacidade real das m\u00e1quinas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=106070"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/106070\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=106070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}