{"id":103721,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/infor-m3\/guia-de-integracao\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Infor M3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do Infor M3 <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia de integra\u00e7\u00e3o do Infor M3 mostra a parceiros e equipes de TI como conectar o Infor M3 ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e Infor M3 \u00e9 bidirecional:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>O SkyPlanner recebe itens, estruturas de produto, centros de trabalho, ordens de produ\u00e7\u00e3o e pedidos de compra.<\/li>\n\n\n<li>Os hor\u00e1rios planejados de in\u00edcio e t\u00e9rmino retornam \u00e0s opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o (MO).<\/li>\n\n\n<li>Os apontamentos dos operadores retornam por meio de PMS070MI Report operation.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es na programa\u00e7\u00e3o assim que elas ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente M3 durante a implanta\u00e7\u00e3o inicial e oferece suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Este guia \u00e9 voltado a parceiros e desenvolvedores que participam desse processo ou desenvolvem por conta pr\u00f3pria usando a REST API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-m3-interfaces-skyplanner-uses\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfaces do M3 usadas pelo SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Infor M3 disponibiliza quatro camadas de integra\u00e7\u00e3o, cada uma com uma fun\u00e7\u00e3o neste processo.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>M3 API (programas MI) no ION API Gateway.<\/strong> Cada programa MI corresponde a uma chamada REST: <code>https:\/\/{ionapi-host}\/{tenant}\/M3\/m3api-rest\/v2\/execute\/{program}\/{transaction}<\/code>. Use a v2. Ela adiciona par\u00e2metros de empresa, divis\u00e3o e formato de data e retorna um payload diferente do da v1. O PMS100MI atende \u00e0s ordens de produ\u00e7\u00e3o, e o PMS070MI, aos apontamentos de opera\u00e7\u00f5es. (<a href=\"https:\/\/docs.infor.com\/m3csfsh\/2026.x\/en-us\/csfshlib\/industry_content_fashion\/vmw1731577228531.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n\n<li><strong>Compass query API no Infor Data Fabric.<\/strong> Permite leituras SQL em tabelas replicadas do M3, como MITMAS, MWOHED e MWOOPE. O Compass \u00e9 ass\u00edncrono: envie uma tarefa, consulte seu status periodicamente e busque as p\u00e1ginas de resultados, com at\u00e9 100.000 linhas ou 10 MB. \u00c9 adequado para a carga inicial de dados mestres, n\u00e3o para sincroniza\u00e7\u00e3o em tempo real. (<a href=\"https:\/\/docs.infor.com\/inforos\/2026.x\/en-us\/useradminlib_cloud\/datafabrug\/uan1631199548644.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n\n<li><strong>ION BODs.<\/strong> O M3 BOD Processor publica os BODs habilitados por entidade cont\u00e1bil. Os BODs de entrada incluem Process ProductionOrder, Sync e Process BillOfMaterials, Process ItemMaster e Sync InventoryCount. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/cnw1511966505258.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n\n<li><strong>M3 Event Hub.<\/strong> Um framework de publica\u00e7\u00e3o e assinatura para eventos no n\u00edvel das tabelas, como altera\u00e7\u00f5es no cabe\u00e7alho e nas opera\u00e7\u00f5es das MOs. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/szt1602149359647.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n<\/ol>\n\n\n<p>As especifica\u00e7\u00f5es da MI API ficam no cat\u00e1logo ION API de cada tenant, em Available APIs, com Swagger para cada programa. Quando uma transa\u00e7\u00e3o n\u00e3o est\u00e1 dispon\u00edvel no cat\u00e1logo padr\u00e3o, o XtendM3 adiciona um programa MI personalizado, e o Metadata Publisher cria APIs de listagem personalizadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentica\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Registre o SkyPlanner como aplicativo autorizado na ION API com OAuth 2.0. Use um aplicativo de servi\u00e7o de backend com uma conta de servi\u00e7o, para que a integra\u00e7\u00e3o funcione sem uma sess\u00e3o de usu\u00e1rio nominal. A ION API aplica as pol\u00edticas de limita\u00e7\u00e3o de chamadas e de seguran\u00e7a do tenant a cada chamada. (<a href=\"https:\/\/developer.infor.com\/?p=1587\">Portal de desenvolvedores da Infor<\/a>)<\/p>\n\n\n<p>No SkyPlanner, a REST API usa um token de API para autentica\u00e7\u00e3o (SkyPlanner Settings &gt; API) e est\u00e1 documentada em Swagger\/OpenAPI. O <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a> orienta as primeiras chamadas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-event-hub-bods-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Detec\u00e7\u00e3o de altera\u00e7\u00f5es: Event Hub, BODs e consultas peri\u00f3dicas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O M3 pode enviar altera\u00e7\u00f5es automaticamente, mas esse envio exige configura\u00e7\u00e3o no lado da Infor:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>O <strong>Event Hub<\/strong> publica apenas eventos que tenham um assinante ativo. O ION Enterprise Connector (IEC) faz a assinatura por meio de um canal EventHub Subscriber.<\/li>\n\n\n<li>Os <strong>BODs<\/strong> precisam ser habilitados por entidade cont\u00e1bil no BOD Processor, o que exige a fun\u00e7\u00e3o M3EC-Administrator. (<a href=\"https:\/\/docs.infor.com\/m3core\/2026.x\/en-us\/useradminlib_cloud\/m3cecoreag_cloud\/bka1516953041992.html\">Documenta\u00e7\u00e3o da Infor<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Enquanto o envio autom\u00e1tico n\u00e3o estiver configurado, consulte periodicamente as transa\u00e7\u00f5es de listagem do PMS100MI ou execute consultas no Compass com base nos registros de data e hora de altera\u00e7\u00e3o.<\/p>\n\n\n<p>Os webhooks do pr\u00f3prio SkyPlanner permitem que o envio de dados de volta ao M3 seja orientado a eventos desde o primeiro dia.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do Infor M3 (interface)<\/th><th>Objeto do SkyPlanner<\/th><th>Dire\u00e7\u00e3o<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td>Item, MMS001 (MITMAS via Compass, programas MI de itens)<\/td><td>Produtos e materiais<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Cabe\u00e7alho da estrutura de produto no PDS001, materiais no PDS002<\/td><td>Estrutura de produto, subprodutos, materiais<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Opera\u00e7\u00f5es no PDS002: n\u00famero da opera\u00e7\u00e3o, centro de trabalho, tempo de setup e tempo de execu\u00e7\u00e3o<\/td><td>Etapas do processo com tempos de setup e de execu\u00e7\u00e3o<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial e, depois, a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Centro de trabalho no PDS010, capacidade di\u00e1ria no PDS015<\/td><td>Centros de trabalho, grupos de centros de trabalho, efici\u00eancias<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Carga inicial, raramente depois<\/td><\/tr><tr><td>Ordem de produ\u00e7\u00e3o PMS100 (MWOHED), PMS100MI<\/td><td>Ordens com prazos e quantidades<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub ou consultas peri\u00f3dicas<\/td><\/tr><tr><td>Opera\u00e7\u00f5es das MOs (MWOOPE)<\/td><td>Opera\u00e7\u00f5es programadas para cada opera\u00e7\u00e3o da MO<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Event Hub ou consultas peri\u00f3dicas<\/td><\/tr><tr><td>Saldos de estoque<\/td><td>Estoque por material<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Consultas a cada hora ou a cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>Linhas de pedidos de compra com datas de entrega<\/td><td>Material a receber, dispon\u00edvel na data de entrega<\/td><td>M3 \u2192 SkyPlanner<\/td><td>Consultas a cada hora ou a cada execu\u00e7\u00e3o da programa\u00e7\u00e3o<\/td><\/tr><tr><td>In\u00edcio e t\u00e9rmino planejados por opera\u00e7\u00e3o da MO<\/td><td>Opera\u00e7\u00f5es programadas no Gantt<\/td><td>SkyPlanner \u2192 M3<\/td><td>A cada altera\u00e7\u00e3o na programa\u00e7\u00e3o, via webhook do SkyPlanner<\/td><\/tr><tr><td>PMS070MI Report operation: tempo de setup, tempo de execu\u00e7\u00e3o, quantidade<\/td><td>Tempos e quantidades apontados pelos operadores<\/td><td>SkyPlanner \u2192 M3<\/td><td>A cada confirma\u00e7\u00e3o ou por turno<\/td><\/tr><tr><td>Dados de restri\u00e7\u00f5es do SkyPlanner<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas como recursos finitos, operadores por opera\u00e7\u00e3o, centros de trabalho alternativos<\/td><td>Mantidos no SkyPlanner<\/td><td>Configurados durante a implanta\u00e7\u00e3o inicial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Padr\u00f5es de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga inicial de dados mestres.<\/strong> Leia itens, estruturas de produto, opera\u00e7\u00f5es e centros de trabalho em lote pelo Compass. Defina de forma criteriosa se cada centro de trabalho do M3 corresponder\u00e1 a um centro de trabalho ou a um grupo no SkyPlanner. Um centro de trabalho que representa tr\u00eas m\u00e1quinas em paralelo se torna tr\u00eas centros de trabalho se voc\u00ea quiser program\u00e1-las separadamente.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens.<\/strong> Leia as MOs liberadas e suas opera\u00e7\u00f5es no PMS100MI ou na MWOOPE, al\u00e9m dos saldos de estoque e das linhas de pedidos de compra em aberto. O SkyPlanner considera o material comprado dispon\u00edvel na data de entrega do pedido de compra e atualiza o estoque quando o pedido \u00e9 marcado como Delivered. A programa\u00e7\u00e3o verifica ambos.<\/p>\n\n\n<p>Programe apenas MOs firmes. As MOs planejadas (PMS170) s\u00e3o geradas novamente pelo MRP, e o M3 recria sua carga a cada replanejamento.<\/p>\n\n\n<p><strong>3. Grava\u00e7\u00e3o da programa\u00e7\u00e3o no M3.<\/strong> Para cada opera\u00e7\u00e3o que o motor programou ou moveu, o SkyPlanner grava o in\u00edcio e o t\u00e9rmino planejados na opera\u00e7\u00e3o da MO. A chamada usa uma transa\u00e7\u00e3o M3 MI para opera\u00e7\u00f5es de MO do cat\u00e1logo do seu tenant, ou um programa MI do XtendM3 se o seu ambiente exigir. O M3 continua respons\u00e1vel por quantidades, status e custeio.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es do ch\u00e3o de f\u00e1brica.<\/strong> Os operadores registram o trabalho com SkyPlanner Mobile Confirmations ou Production Timer. O SkyPlanner envia tempo de setup, tempo de execu\u00e7\u00e3o e quantidade por meio de PMS070MI Report operation e usa Confirm ou Close operation quando a etapa \u00e9 conclu\u00edda. A Infor afirma que &#8220;it is important that every operation is reported,&#8221; (\u00e9 importante que toda opera\u00e7\u00e3o seja apontada), e isso mant\u00e9m a carga do M3 alinhada ao progresso no SkyPlanner. (<a href=\"https:\/\/developer.infor.com\/pms070mi-740845\/pms070mi-manufacturing-order-report-operation\">PMS070MI<\/a>)<\/p>\n\n\n<p>Escolha um \u00fanico canal de apontamento para cada opera\u00e7\u00e3o. Apontar a mesma opera\u00e7\u00e3o pelo SkyPlanner e pelo PMS070 no M3 duplica as quantidades.<\/p>\n\n\n<p><strong>5. Responsabilidade pelos dados e regras de conflito.<\/strong> Documente essas regras antes da entrada em produ\u00e7\u00e3o:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Dados<\/th><th>Respons\u00e1vel<\/th><\/tr><\/thead><tbody><tr><td>Itens, estruturas de produto, quantidades, status das MOs<\/td><td>Infor M3<\/td><\/tr><tr><td>Sequ\u00eancia das opera\u00e7\u00f5es, in\u00edcio e t\u00e9rmino, aloca\u00e7\u00e3o aos centros de trabalho<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, ferramentas, operadores por opera\u00e7\u00e3o, alternativas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Turnos e aus\u00eancias<\/td><td>Um \u00fanico sistema, escolhido na defini\u00e7\u00e3o de escopo<\/td><\/tr><tr><td>Apontamento de opera\u00e7\u00f5es<\/td><td>M3, alimentado pelo SkyPlanner via PMS070MI<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A principal fonte de conflitos \u00e9 a pr\u00f3pria l\u00f3gica de datas do M3. A carga &#8220;is automatically generated when a manufacturing order or planned manufacturing order is generated or replanned.&#8221; (\u00e9 gerada automaticamente quando uma ordem de produ\u00e7\u00e3o ou ordem de produ\u00e7\u00e3o planejada \u00e9 gerada ou replanejada). Trate uma MO replanejada como uma nova vers\u00e3o, sincronize-a novamente e deixe o SkyPlanner refazer a programa\u00e7\u00e3o. O Autopilot refaz a programa\u00e7\u00e3o automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. O SkyPlanner n\u00e3o precisa do M3 Scheduling Workbench; se houver uma licen\u00e7a do SWB, deixe o SkyPlanner respons\u00e1vel pelas datas das opera\u00e7\u00f5es para que os dois n\u00e3o sobrescrevam os dados um do outro.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapas t\u00edpicas do projeto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em quest\u00e3o de semanas ap\u00f3s o in\u00edcio do onboarding. Antes disso, voc\u00ea pode usar seus pr\u00f3prios dados no teste gr\u00e1tis de 30 dias. Exporte itens, centros de trabalho e MOs em aberto do M3 com sua extra\u00e7\u00e3o habitual pelo Excel ou Compass e importe os arquivos em CSV ou Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Levantamento com o administrador do M3.<\/strong> Confirme o ambiente de implanta\u00e7\u00e3o, o tenant da ION API, as transa\u00e7\u00f5es MI dispon\u00edveis no seu cat\u00e1logo, a empresa e a divis\u00e3o.<\/li>\n\n\n<li><strong>Mapeamento.<\/strong> Defina a tabela de mapeamento, as regras de responsabilidade pelos dados, as frequ\u00eancias de sincroniza\u00e7\u00e3o e o canal de apontamento.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o da ION API.<\/strong> Cadastre o aplicativo autorizado e a conta de servi\u00e7o, come\u00e7ando pelo tenant de sandbox.<\/li>\n\n\n<li><strong>Carga inicial.<\/strong> Carregue itens, estruturas de produto, opera\u00e7\u00f5es e centros de trabalho pelo Compass.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens.<\/strong> Sincronize MOs, opera\u00e7\u00f5es das MOs, estoque e pedidos de compra por consultas peri\u00f3dicas, adicionando o Event Hub quando estiver pronto.<\/li>\n\n\n<li><strong>Configura\u00e7\u00e3o de restri\u00e7\u00f5es no SkyPlanner.<\/strong> Configure a matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o, as ferramentas, os operadores por opera\u00e7\u00e3o e os centros de trabalho alternativos.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o no M3 e apontamentos.<\/strong> Envie as datas das opera\u00e7\u00f5es ao M3 e use PMS070MI para os apontamentos dos operadores.<\/li>\n\n\n<li><strong>Execu\u00e7\u00e3o em paralelo e entrada em produ\u00e7\u00e3o.<\/strong> Execute o SkyPlanner em paralelo ao plano atual, corrija os dados mestres e, depois, ative a grava\u00e7\u00e3o no M3.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que considerar ao planejar uma integra\u00e7\u00e3o com o Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>N\u00e3o h\u00e1 objeto de roteiro de produ\u00e7\u00e3o.<\/strong> As opera\u00e7\u00f5es ficam na estrutura do produto (PDS002) e na MO, como opera\u00e7\u00f5es da MO. N\u00e3o procure uma API de roteiro de produ\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Estruturas sem opera\u00e7\u00f5es.<\/strong> Uma estrutura de produto precisa de pelo menos uma opera\u00e7\u00e3o. Caso contr\u00e1rio, o M3 n\u00e3o gera carga e o SkyPlanner n\u00e3o recebe nenhuma opera\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Os indicadores de capacidade finita do M3 entram em conflito com o plano externo.<\/strong> O indicador em PDS010 e as configura\u00e7\u00f5es de gargalo em CRS786 alteram as pr\u00f3prias datas do M3. Mantenha os centros de trabalho com capacidade infinita no M3 e deixe o SkyPlanner controlar a programa\u00e7\u00e3o conforme a capacidade real de m\u00e1quinas e equipes.<\/li>\n\n\n<li><strong>Especifica\u00e7\u00f5es da API variam por tenant.<\/strong> As respostas de v1 e v2 s\u00e3o diferentes, e os nomes das transa\u00e7\u00f5es variam conforme seu cat\u00e1logo e suas extens\u00f5es XtendM3. Use v2 com par\u00e2metros expl\u00edcitos de empresa e divis\u00e3o.<\/li>\n\n\n<li><strong>O envio por push n\u00e3o vem ativado por padr\u00e3o.<\/strong> O Event Hub precisa de um assinante, e os BODs precisam ser habilitados por entidade cont\u00e1bil. Defina quem configura ION e IEC ou comece com consultas peri\u00f3dicas.<\/li>\n\n\n<li><strong>Limita\u00e7\u00e3o de requisi\u00e7\u00f5es e pagina\u00e7\u00e3o.<\/strong> A ION API limita as requisi\u00e7\u00f5es conforme a pol\u00edtica do tenant, e o Compass retorna no m\u00e1ximo 100.000 linhas ou 10 MB por p\u00e1gina. Consulte apenas as altera\u00e7\u00f5es, sem recarregar todos os dados.<\/li>\n\n\n<li><strong>M3 n\u00e3o \u00e9 CloudSuite Industrial.<\/strong> O CSI usa APIs IDO; o M3 usa programas MI. Identifique os objetos do M3 em todas as especifica\u00e7\u00f5es.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-infor-m3-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura a integra\u00e7\u00e3o com o Infor M3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A equipe do SkyPlanner configura a integra\u00e7\u00e3o durante o onboarding e oferece suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/strong> Cada f\u00e1brica usa o M3 de uma forma, e esse conhecimento \u00e9 aplicado na configura\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Seu parceiro Infor M3 pode desenvolver a integra\u00e7\u00e3o ou participar do projeto.<\/strong> Ele conhece seu tenant, suas extens\u00f5es XtendM3 e sua configura\u00e7\u00e3o do ION. O SkyPlanner fornece a REST API, a documenta\u00e7\u00e3o Swagger\/OpenAPI e os webhooks.<\/li>\n\n\n<li><strong>Seus pr\u00f3prios desenvolvedores podem criar a integra\u00e7\u00e3o<\/strong> usando a mesma REST API com um token de API. Um token de API basta para come\u00e7ar, e a equipe do SkyPlanner ajuda quando necess\u00e1rio. A equipe interna de TI da Laboratory &amp; Allied desenvolveu a maior parte da integra\u00e7\u00e3o com seu ERP por conta pr\u00f3pria, com ajuda do SkyPlanner.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner custa a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e cobran\u00e7a mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com o seu plano, de acordo com seu processo e suas necessidades. Assim, voc\u00ea conhece o custo total antes de come\u00e7ar. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>, veja o que o planejamento nativo do M3 oferece em <a href=\"\/pt-br\/integracoes\/erp\/infor-m3\/programacao-producao\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o no Infor M3 com capacidade finita<\/a>, confira a vis\u00e3o geral na <a href=\"\/pt-br\/integracoes\/erp\/infor-m3\/\">p\u00e1gina do Infor M3<\/a> e conhe\u00e7a outros sistemas na <a href=\"\/pt-br\/integracoes\/erp\/\">central de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Depoimentos de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, no ch\u00e3o de f\u00e1brica de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, sa\u00edmos do planejamento da produ\u00e7\u00e3o em planilhas Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado de tr\u00eas meses para todos os centros de trabalho fica pronto em menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Soldador da KJH-Comp desbastando uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de pontualidade de entrega, ante cerca de 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da nossa pontualidade de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Fabrica\u00e7\u00e3o de componentes em chapa met\u00e1lica e manufatura sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega passou de cerca de 50% para at\u00e9 98%, e a programa\u00e7\u00e3o agora exige um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/kjh-comp\/\">Leia o depoimento da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de pontualidade de entrega desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner nos d\u00e1 visibilidade da capacidade e torna o planejamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Fabrica\u00e7\u00e3o de produtos qu\u00edmicos e alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega se mant\u00e9m em 100% durante todo o per\u00edodo de uso do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/opes-corporation\/\">Leia o depoimento da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual API do Infor M3 o SkyPlanner usa?<\/summary>\n<p class=\"sp-faq__a\">A API do M3 no ION API Gateway, com chamadas a programas MI como PMS100MI e PMS070MI via REST com OAuth 2.0. O Compass, no Infor Data Fabric, faz as leituras em lote, e o Event Hub ou os BODs do ION enviam as altera\u00e7\u00f5es por push.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quem desenvolve a integra\u00e7\u00e3o com o Infor M3?<\/summary>\n<p class=\"sp-faq__a\">A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional conforme seu ambiente M3 durante o onboarding e oferece suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Seu parceiro M3 ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a REST API documentada do SkyPlanner. Um token de API basta para come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual API do M3 recebe os apontamentos de opera\u00e7\u00f5es do ch\u00e3o de f\u00e1brica?<\/summary>\n<p class=\"sp-faq__a\">A PMS070MI, com Report operation para tempo de setup, tempo de execu\u00e7\u00e3o e quantidade, e Confirm and Close operation para concluir uma etapa. O SkyPlanner envia os apontamentos dos operadores por essa API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o funciona com o M3 instalado localmente?<\/summary>\n<p class=\"sp-faq__a\">Sim. O M3 instalado localmente exp\u00f5e a mesma API do M3. Sem o ION API Gateway, o SkyPlanner se conecta pelo endpoint local do ION ou do Grid, ou por middleware. O levantamento com o administrador do M3 define o caminho de conex\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Um parceiro M3 deve propor o M3 Scheduling Workbench ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner, quando o cliente quer uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeite a capacidade real de m\u00e1quinas e equipes, em vez de um plano aproximado. A pr\u00f3pria Infor recomenda, para a entrada em produ\u00e7\u00e3o do SWB, come\u00e7ar com todos os recursos com capacidade infinita e aplicar capacidade finita apenas ao gargalo cr\u00edtico (<a href=\"https:\/\/docs.infor.com\/m3swb\/2026.x\/en-us\/m3swbolh\/pages\/1096_help.html\">documenta\u00e7\u00e3o da Infor<\/a>). A Infor apresenta o SWB como um complemento que os usu\u00e1rios iniciam pelo RDWeb ou pelo menu Iniciar. O SkyPlanner se conecta pela mesma API do M3, programa cada recurso respeitando sua capacidade, reprograma automaticamente e oferece Mobile Confirmations aos operadores, a partir de 199 \u20ac por m\u00eas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de desenvolver a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste gr\u00e1tis de 30 dias permite usar at\u00e9 20 centros de trabalho com importa\u00e7\u00f5es do M3 em CSV ou Excel, sem necessidade de cart\u00e3o de cr\u00e9dito. <a href=\"\/pt-br\/teste\/\">Inicie o teste<\/a> ou <a href=\"\/pt-br\/vendas-de-contacto\/\">fale com a equipe de vendas<\/a> para definir o escopo da integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Infor M3 Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do Infor M3 mostra a parceiros e equipes de TI como conectar o Infor M3 ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e Infor M3 \u00e9 bidirecional: skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o &#8230; <a title=\"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/\" aria-label=\"Read more about Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102945,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103721","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor M3: guia de integra\u00e7\u00e3o APS para programar a produ\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"Integre Infor M3 ao SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas de projeto.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Integre Infor M3 ao SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas de projeto.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/\",\"name\":\"Infor M3: guia de integra\u00e7\u00e3o APS para programar a produ\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Integre Infor M3 ao SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas de projeto.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/infor-m3\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Infor M3: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade finita\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/infor-m3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor M3: guia de integra\u00e7\u00e3o APS para programar a produ\u00e7\u00e3o","description":"Integre Infor M3 ao SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas de projeto.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","og_locale":"pt_BR","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Integre Infor M3 ao SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas de projeto.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/","name":"Infor M3: guia de integra\u00e7\u00e3o APS para programar a produ\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Integre Infor M3 ao SkyPlanner APS: M3 API no ION API Gateway, OAuth 2.0, PMS100MI e PMS070MI, Compass, BODs, mapeamento de dados e dicas de projeto.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Infor M3: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade finita","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/infor-m3\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Infor M3 Guia de integra\u00e7\u00e3o do Infor M3 para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia de integra\u00e7\u00e3o do Infor M3 mostra a parceiros e equipes de TI como conectar o Infor M3 ao SkyPlanner APS. A integra\u00e7\u00e3o entre SkyPlanner e Infor M3 \u00e9 bidirecional: skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=103721"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103721\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/102945"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=103721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}