{"id":103239,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/sage-200\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"sage-200","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/","title":{"rendered":"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Sage 200<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Sage 200: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Sage 200 que respeita a capacidade real de m\u00e1quinas e operadores e programa cada m\u00e1quina, operador, ferramenta e material. Voc\u00ea v\u00ea onde e quando cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o ser\u00e1 executada, e o Autopilot reprograma tudo automaticamente quando a produ\u00e7\u00e3o muda.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner se integra ao Sage 200 nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, produtos, estoques e pedidos de compra e devolve as datas programadas das opera\u00e7\u00f5es e os apontamentos de produ\u00e7\u00e3o. Durante a implanta\u00e7\u00e3o, a equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente Sage 200 e o complemento de manufatura que voc\u00ea utiliza.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Todos os recursos em uma s\u00f3 programa\u00e7\u00e3o, respeitando a capacidade de cada um.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada m\u00e1quina, pessoa e ferramenta recebe uma programa\u00e7\u00e3o que respeita sua capacidade e considera os turnos reais, as aus\u00eancias e as horas extras. Cada opera\u00e7\u00e3o tem hor\u00e1rio de in\u00edcio, hor\u00e1rio de t\u00e9rmino e um centro de trabalho definido. Uma opera\u00e7\u00e3o que exige dois operadores recebe duas pessoas com disponibilidade no turno.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Sobrecargas resolvidas pelo motor de programa\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">Voc\u00ea deixa de arrastar ordens de produ\u00e7\u00e3o e opera\u00e7\u00f5es para eliminar sobrecargas e conflitos. O motor Arcturus aloca cada opera\u00e7\u00e3o onde h\u00e1 capacidade de fato, em segundos.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos trocas de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner sabe quanto tempo leva para passar de um produto a outro em uma m\u00e1quina, nos dois sentidos. Do azul para o vermelho, podem ser 30 minutos; do vermelho para o azul, 60. A programa\u00e7\u00e3o sequencia as opera\u00e7\u00f5es para perder o m\u00ednimo de tempo com setups.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material conferido antes de come\u00e7ar.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner consulta o estoque e os pedidos de compra em aberto no Sage 200. Uma ordem de produ\u00e7\u00e3o que depende de uma entrega do fornecedor \u00e9 programada para depois da data dessa entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica diante de pedidos urgentes e quebras.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega um pedido urgente, o Autopilot reprograma a produ\u00e7\u00e3o automaticamente. Os bloqueios e as prioridades que voc\u00ea definiu continuam sendo respeitados.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os operadores veem sua fila de opera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas opera\u00e7\u00f5es no celular ou tablet e faz os apontamentos conforme o trabalho avan\u00e7a. O escrit\u00f3rio acompanha o progresso em tempo real, e os apontamentos retornam \u00e0 ordem de produ\u00e7\u00e3o.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e gerar um plano otimizado de tr\u00eas meses para todos os centros de trabalho leva menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o da Fredman Operations, ao lado de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de visibilidade da capacidade dispon\u00edvel para a equipe de vendas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner oferece uma base confi\u00e1vel para todo o planejamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens adequados ao contato com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipe de vendas v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e as solicita\u00e7\u00f5es de altera\u00e7\u00e3o da programa\u00e7\u00e3o que levavam uma hora ou mais agora s\u00e3o respondidas em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/fredman-operations\/\">Leia o depoimento da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, CEO da Mamec, na \u00e1rea de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Milhares (1.000+)<\/b><span>de ordens de produ\u00e7\u00e3o programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um novo n\u00edvel de controle da produ\u00e7\u00e3o, e nossa compreens\u00e3o da capacidade est\u00e1 em um patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrica\u00e7\u00e3o sob contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de produ\u00e7\u00e3o s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/mamec\/\">Leia o depoimento da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-sage-200-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Sage 200<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Sage 200 envia o trabalho.<\/strong> O SkyPlanner recebe as ordens de produ\u00e7\u00e3o com suas opera\u00e7\u00f5es, recursos de m\u00e3o de obra e m\u00e1quinas, al\u00e9m de produtos, n\u00edveis de estoque e pedidos de compra.<\/li>\n\n\n<li><strong>O SkyPlanner monta a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e os apontamentos retornam ao Sage 200.<\/strong> As datas programadas das opera\u00e7\u00f5es voltam \u00e0s ordens de produ\u00e7\u00e3o, e os registros de tempo dos operadores alimentam os apontamentos de horas de cada opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p>O Sage 200 continua sendo o sistema oficial de registro dos seus dados. Produtos, listas de materiais, MRP, compras, estoque e custeio permanecem onde est\u00e3o. O SkyPlanner fica respons\u00e1vel pela sequ\u00eancia e pelos hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O SkyPlanner consulta produtos, saldos em estoque, pedidos de compra e pedidos de venda pela REST API do Sage 200. As ordens de produ\u00e7\u00e3o e opera\u00e7\u00f5es v\u00eam do seu complemento de manufatura, seja ele Sicon Manufacturing, Cim200 ou o antigo m\u00f3dulo Sage 200 Manufacturing. Cada f\u00e1brica usa o Sage 200 de uma forma, por isso a equipe do SkyPlanner configura a integra\u00e7\u00e3o para o seu ambiente durante a implanta\u00e7\u00e3o e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com seus processos e necessidades. Seu parceiro Sage 200 ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>Os endpoints, o mapeamento dos dados e as regras para enviar dados de volta ao sistema est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/sage-200\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Sage 200 para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-sage-200-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Sage 200 programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os recursos de manufatura do Sage 200 sempre foram oferecidos em m\u00f3dulos e, em 2026, a programa\u00e7\u00e3o depende do complemento que voc\u00ea utiliza. A pr\u00f3pria ajuda do Sage agora traz o aviso: <a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/General\/What_Manufacturing_does.htm\">&#8220;The Sage 200 Manufacturing module is now retired, from the Sage 200 Professional 2025 R2 release.&#8221;<\/a> (O m\u00f3dulo foi descontinuado a partir dessa vers\u00e3o.) Veja como cada op\u00e7\u00e3o trata a capacidade:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O antigo Sage 200 Manufacturing planeja por per\u00edodos.<\/strong> O MPS gera &#8220;the material and capacity requirements&#8221; (as necessidades de materiais e capacidade), e o Sage informa que &#8220;Planning periods are normally a month or a four week period.&#8221; (Os per\u00edodos de planejamento normalmente s\u00e3o de um m\u00eas ou quatro semanas.) (<a href=\"https:\/\/desktophelp.sage.co.uk\/sage200\/professional\/Content\/PLN\/How_Planning_Works.htm\">fonte<\/a>)<\/li>\n\n\n<li><strong>O Sicon MRP apresenta um plano agregado.<\/strong> O Rough Cut Capacity Planning oferece &#8220;a daily\/weekly schedule of labour and machine capacity based on existing live works orders.&#8221; (uma programa\u00e7\u00e3o di\u00e1ria\/semanal da capacidade de m\u00e3o de obra e m\u00e1quinas com base nas ordens de produ\u00e7\u00e3o ativas existentes.) (<a href=\"https:\/\/www.sicon.co.uk\/product\/material-and-resource-planning-mrp\/\">fonte<\/a>)<\/li>\n\n\n<li><strong>As sobrecargas s\u00e3o niveladas manualmente.<\/strong> O plano gr\u00e1fico do Sicon vem &#8220;with functionality to amend works order dates to smooth overloads.&#8221; (com funcionalidade para alterar as datas das ordens de produ\u00e7\u00e3o e nivelar sobrecargas.) (<a href=\"https:\/\/uk-marketplace.sage.com\/en-GB\/apps\/52808\/sicon-manufacturing-suite\/features\">fonte<\/a>)<\/li>\n\n\n<li><strong>O Cim200 programa opera\u00e7\u00f5es e sinaliza conflitos.<\/strong> Sua ferramenta de programa\u00e7\u00e3o aloca as opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o em sequ\u00eancia, com base nos tempos dos roteiros de produ\u00e7\u00e3o e nos calend\u00e1rios de produ\u00e7\u00e3o. As opera\u00e7\u00f5es em vermelho indicam que &#8220;there is a resource clash&#8221; (h\u00e1 um conflito de recursos), e o planejador as arrasta para outro hor\u00e1rio. (<a href=\"https:\/\/cim-software.co.uk\/knowledgebase\/cim200\/scheduler\/works-order-view\/\">fonte<\/a>) O Cim200 \u00e9 um complemento separado, &#8220;available on a monthly subscription basis.&#8221; (dispon\u00edvel por assinatura mensal.) (<a href=\"https:\/\/cim-software.co.uk\/cim200\/\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>No dia a dia da produ\u00e7\u00e3o, ainda cabe ao planejador resolver os conflitos. O Sicon mostra a carga por dia ou semana, o Cim200 mostra os conflitos na linha do tempo, e algu\u00e9m precisa mover as opera\u00e7\u00f5es at\u00e9 elimin\u00e1-los. Esse trabalho recome\u00e7a a cada pedido urgente ou quebra.<\/p>\n\n\n<p>Todas as op\u00e7\u00f5es e limita\u00e7\u00f5es s\u00e3o explicadas em <a href=\"\/pt-br\/integracoes\/erp\/sage-200\/programacao-producao\/\">O Sage 200 programa a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sage-200-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Sage 200 hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Sage 200 com um complemento de manufatura<\/th><th>Sage 200 com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Vis\u00e3o da capacidade<\/td><td>Carga por dia ou semana (Sicon) ou opera\u00e7\u00f5es em uma linha do tempo com conflitos sinalizados (Cim200)<\/td><td>Cada opera\u00e7\u00e3o em uma linha do tempo, com precis\u00e3o de minutos<\/td><\/tr><tr><td>Sobrecargas<\/td><td>O planejador move ordens de produ\u00e7\u00e3o ou opera\u00e7\u00f5es para eliminar sobrecargas e conflitos<\/td><td>O motor aloca opera\u00e7\u00f5es apenas onde h\u00e1 capacidade<\/td><\/tr><tr><td>Recursos<\/td><td>M\u00e3o de obra e m\u00e1quinas<\/td><td>M\u00e1quinas, pessoas identificadas individualmente e ferramentas, cada recurso com capacidade limitada<\/td><\/tr><tr><td>Trocas de produ\u00e7\u00e3o<\/td><td>Tempos de opera\u00e7\u00e3o obtidos da lista de materiais, do roteiro de produ\u00e7\u00e3o e dos dados dos recursos<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o: menor tempo total de setup<\/td><\/tr><tr><td>Materiais<\/td><td>O MRP sugere ordens de produ\u00e7\u00e3o e pedidos de compra<\/td><td>As opera\u00e7\u00f5es come\u00e7am quando h\u00e1 estoque dispon\u00edvel ou quando as entregas chegam<\/td><\/tr><tr><td>Mudan\u00e7as<\/td><td>\u00c9 preciso executar o planejamento novamente e mover opera\u00e7\u00f5es para eliminar novos conflitos<\/td><td>O Autopilot replaneja toda a f\u00e1brica respeitando suas prioridades<\/td><\/tr><tr><td>Vis\u00e3o do planejador<\/td><td>Gr\u00e1fico de capacidade ou linha do tempo das opera\u00e7\u00f5es<\/td><td>Gantt interativo: mova uma opera\u00e7\u00e3o e o plano continua consistente<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Horas apontadas nas opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o<\/td><td>Os operadores veem sua fila e fazem apontamentos pelo celular ou tablet<\/td><\/tr><tr><td>Primeiros passos<\/td><td>Assinatura e configura\u00e7\u00e3o de um complemento separado<\/td><td>Teste de 30 dias com suas ordens de produ\u00e7\u00e3o exportadas; depois, a partir de 199 \u20ac por m\u00eas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-sage-200\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o para Sage 200<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O plano agregado do Sicon ou a ferramenta de programa\u00e7\u00e3o do Cim200 atende a uma f\u00e1brica com poucos recursos-chave, prazos longos e um ciclo de planejamento semanal. Em qualquer caso, o Sage 200 continua sendo o sistema principal.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Escolha o SkyPlanner quando m\u00e1quinas, pessoas, ferramentas e materiais limitam o que pode ser executado a seguir.<\/strong> Um \u00fanico motor programa a produ\u00e7\u00e3o considerando todas as restri\u00e7\u00f5es ao mesmo tempo, sem a necessidade de licenciar m\u00f3dulos extras.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando voc\u00ea passa horas nivelando sobrecargas manualmente.<\/strong> O motor faz isso em segundos e continua fazendo os ajustes.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as trocas de produ\u00e7\u00e3o determinam o quanto voc\u00ea produz.<\/strong> As opera\u00e7\u00f5es seguem a sequ\u00eancia com o menor tempo de setup.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando ferramentas compartilhadas e opera\u00e7\u00f5es com v\u00e1rios operadores determinam o que pode ser executado a seguir.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando estiver migrando do m\u00f3dulo descontinuado Sage 200 Manufacturing<\/strong> e quiser programar a produ\u00e7\u00e3o respeitando a capacidade real desde o primeiro dia, sem esperar por um projeto completo de manufatura.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando o plano muda v\u00e1rias vezes por semana.<\/strong> O Autopilot replaneja, o Running Time Lock mant\u00e9m as opera\u00e7\u00f5es em andamento no lugar e as novas datas retornam ao Sage 200.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gr\u00e1tis.<\/strong> S\u00e3o 30 dias, at\u00e9 20 centros de trabalho e todos os recursos do Basic, sem necessidade de cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados. H\u00e1 assist\u00eancia dispon\u00edvel para a implanta\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Carregue suas ordens.<\/strong> Exporte as ordens de produ\u00e7\u00e3o em aberto e suas opera\u00e7\u00f5es do seu complemento de manufatura para o Excel, importe-as e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Sage 200.<\/strong> A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho, e voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes em <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Sage 200?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real e se integra ao Sage 200 nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, produtos, estoques e pedidos de compra e devolve as datas programadas das opera\u00e7\u00f5es e os apontamentos de produ\u00e7\u00e3o. A programa\u00e7\u00e3o considera os limites de cada m\u00e1quina, operador, ferramenta e material, e uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca sequencia as opera\u00e7\u00f5es para o menor tempo de setup. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. Os pre\u00e7os come\u00e7am em 199 \u20ac por m\u00eas, e o teste gr\u00e1tis dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Sage 200 oferece programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e equipe?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o no sistema base. Complementos preenchem essa lacuna: o Sicon mostra a carga de trabalho da equipe e das m\u00e1quinas em rela\u00e7\u00e3o \u00e0 disponibilidade, e o Cim200 programa as opera\u00e7\u00f5es em uma linha do tempo e sinaliza conflitos de recursos. Nos dois casos, o planejador precisa remanejar as opera\u00e7\u00f5es para resolver as sobrecargas. O SkyPlanner APS acrescenta uma <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real<\/a> de cada m\u00e1quina, pessoa e ferramenta, contemplando todas as opera\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar algo no Sage 200?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em paralelo ao Sage 200. Ele usa a REST API do Sage 200 para acessar produtos, estoques e pedidos, e l\u00ea as ordens de produ\u00e7\u00e3o do seu complemento de manufatura.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Sicon, o Cim200 ou o Sage 200 Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner complementa esses sistemas. Seu complemento continua respons\u00e1vel pelas listas de materiais, ordens de produ\u00e7\u00e3o, MRP, baixas de estoque e apura\u00e7\u00e3o de custos. O SkyPlanner programa as opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o com base na capacidade real e envia as datas de volta.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Sage 200 Manufacturing foi descontinuado. O SkyPlanner pode ajudar?<\/summary>\n<p class=\"sp-faq__a\">Sim. A Sage deixou de vender o m\u00f3dulo em novembro de 2020, e ele n\u00e3o pode ser usado a partir do Sage 200 Professional 2025 R2. O SkyPlanner programa as ordens de produ\u00e7\u00e3o do complemento para o qual voc\u00ea migrar, e voc\u00ea pode come\u00e7ar o teste com seus dados atuais ainda hoje.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa Sage 200?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com sua pr\u00f3pria fila de opera\u00e7\u00f5es programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7ada antecipadamente de acordo com seu processo e suas necessidades, junto com o plano, para que voc\u00ea saiba o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda nas semanas seguintes ao in\u00edcio do processo de integra\u00e7\u00e3o do cliente. A equipe mapeia seus recursos e as opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o, conecta os dados de estoque e dos pedidos de compra e envia as datas planejadas de volta. Tudo \u00e9 testado com base no seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de integr\u00e1-lo ao Sage 200?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias usa uma exporta\u00e7\u00e3o em Excel das suas ordens de produ\u00e7\u00e3o em aberto. Voc\u00ea v\u00ea a programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o respeitando a capacidade real dos recursos antes de iniciar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Sage 200 SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Sage 200 que respeita a capacidade real de m\u00e1quinas e operadores e programa cada m\u00e1quina, operador, ferramenta e material. Voc\u00ea v\u00ea onde e quando cada opera\u00e7\u00e3o da &#8230; <a title=\"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/\" aria-label=\"Read more about SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103239","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sage 200: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sage-200\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sage-200\\\/\",\"name\":\"Sage 200: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sage-200\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sage-200\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sage-200\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sage 200: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real","description":"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/","name":"Sage 200: integra\u00e7\u00e3o APS com programa\u00e7\u00e3o por capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o com capacidade real e integra\u00e7\u00e3o bidirecional. Cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sage-200\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Sage 200 SkyPlanner APS para Sage 200: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Sage 200 que respeita a capacidade real de m\u00e1quinas e operadores e programa cada m\u00e1quina, operador, ferramenta e material. Voc\u00ea v\u00ea onde e quando cada opera\u00e7\u00e3o da&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=103239"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103239\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=103239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}