{"id":103179,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/proalpha\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proalpha","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/","title":{"rendered":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para proALPHA: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS complementa o proALPHA com uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipes e considera cada m\u00e1quina, operador, ferramenta e material. Os planejadores deixam de refazer o plano no Excel, e o Autopilot reprograma a produ\u00e7\u00e3o automaticamente quando h\u00e1 mudan\u00e7as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner se integra ao Proalpha nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, recursos, pe\u00e7as e estoques e devolve datas planejadas das opera\u00e7\u00f5es, aloca\u00e7\u00f5es de m\u00e1quinas e apontamentos dos operadores. Durante a implanta\u00e7\u00e3o, a equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente Proalpha.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O plano sai do Excel.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o fica em um s\u00f3 lugar, criada a partir das suas ordens de produ\u00e7\u00e3o do Proalpha. Todos seguem o mesmo plano, em vez de depender da planilha ou do caderno de um planejador.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A capacidade de cada recurso \u00e9 respeitada.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o considera os turnos reais, as indisponibilidades e as horas extras de m\u00e1quinas, pessoas e ferramentas. Um dispositivo de fixa\u00e7\u00e3o em uso em uma m\u00e1quina nunca \u00e9 reservado para outra ao mesmo tempo. Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade no turno.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos trocas de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner armazena o tempo de setup entre cada par de produtos, nos dois sentidos. A troca de azul para vermelho pode levar 30 minutos, e a de vermelho para azul, 60. O motor sequencia as opera\u00e7\u00f5es para perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material conferido antes de come\u00e7ar.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner programa a produ\u00e7\u00e3o considerando o estoque e os pedidos de compra a receber. Uma opera\u00e7\u00e3o que depende de uma entrega do fornecedor \u00e9 programada a partir da data dessa entrega, em vez de ficar parada na m\u00e1quina.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica a cada mudan\u00e7a.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para, chega um pedido urgente ou uma opera\u00e7\u00e3o termina antes do previsto, o Autopilot reprograma a produ\u00e7\u00e3o automaticamente. Os bloqueios e as prioridades que voc\u00ea definiu continuam sendo respeitados.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os operadores veem sua fila de opera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas opera\u00e7\u00f5es no celular ou tablet e faz os apontamentos conforme o trabalho avan\u00e7a. Esses apontamentos retornam \u00e0 ordem de produ\u00e7\u00e3o no Proalpha.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e gerar um plano otimizado de tr\u00eas meses para todos os centros de trabalho leva menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o da Fredman Operations, ao lado de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de visibilidade da capacidade dispon\u00edvel para a equipe de vendas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner oferece uma base confi\u00e1vel para todo o planejamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens adequados ao contato com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipe de vendas v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e as solicita\u00e7\u00f5es de altera\u00e7\u00e3o da programa\u00e7\u00e3o que levavam uma hora ou mais agora s\u00e3o respondidas em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/fredman-operations\/\">Leia o depoimento da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, CEO da Mamec, na \u00e1rea de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Milhares (1.000+)<\/b><span>de ordens de produ\u00e7\u00e3o programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTemos um novo n\u00edvel de controle da produ\u00e7\u00e3o, e nossa compreens\u00e3o da capacidade est\u00e1 em um patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrica\u00e7\u00e3o sob contrato de alta tecnologia<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de produ\u00e7\u00e3o s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/mamec\/\">Leia o depoimento da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proalpha-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Proalpha envia o trabalho.<\/strong> As ordens de produ\u00e7\u00e3o em aberto (Fertigungsauftr\u00e4ge) s\u00e3o enviadas ao SkyPlanner com suas opera\u00e7\u00f5es, recursos e tempos de setup e processamento, junto com as pe\u00e7as e os estoques.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em cada centro de trabalho em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>Datas, m\u00e1quinas e apontamentos retornam ao Proalpha.<\/strong> O in\u00edcio e o fim planejados de cada opera\u00e7\u00e3o, o recurso alocado e os apontamentos dos operadores retornam \u00e0 ordem de produ\u00e7\u00e3o no Proalpha.<\/li>\n\n<\/ol>\n\n\n<p>O envio dos dados de volta usa as pr\u00f3prias APIs REST do Proalpha, dispon\u00edveis no Proalpha API Portal: setWorkOrderOperationDates, changeWorkOrderOperationResource e operationDataEntry. Como cada f\u00e1brica configura o Proalpha de uma forma, a equipe do SkyPlanner mapeia seus recursos e ordens de produ\u00e7\u00e3o durante a implanta\u00e7\u00e3o e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em opera\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com seu processo e suas necessidades. Seu parceiro Proalpha ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As interfaces, o mapeamento de campos e as regras que definem qual sistema controla cada dado est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/proalpha\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o proALPHA para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-proalpha-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quais dados circulam entre proALPHA e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>proALPHA<\/th><th>SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Pe\u00e7a (Teil)<\/td><td>Produtos e materiais<\/td><td>Entrada<\/td><\/tr><tr><td>Ordem de produ\u00e7\u00e3o (Fertigungsauftrag) com quantidade e prazo<\/td><td>Ordem e opera\u00e7\u00f5es com prazo e prioridade<\/td><td>Entrada<\/td><\/tr><tr><td>Opera\u00e7\u00f5es da ordem de produ\u00e7\u00e3o com tempos previstos de setup e processamento<\/td><td>Etapas do processo com tempos de setup e dura\u00e7\u00f5es<\/td><td>Entrada<\/td><\/tr><tr><td>Recursos, grupos de recursos e grupos de recursos alternativos<\/td><td>Centros de trabalho, grupos de centros de trabalho e centros de trabalho alternativos<\/td><td>Entrada<\/td><\/tr><tr><td>Calend\u00e1rios dos recursos<\/td><td>Turnos, indisponibilidades e \u00edndices de efici\u00eancia<\/td><td>Entrada<\/td><\/tr><tr><td>Estoque por \u00e1rea de MRP<\/td><td>Estoque de materiais<\/td><td>Entrada<\/td><\/tr><tr><td>Pedidos de compra com data de entrega<\/td><td>Materiais a receber na data de entrega<\/td><td>Entrada<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>In\u00edcio e fim planejados de cada opera\u00e7\u00e3o<\/td><td>Retorno<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Centro de trabalho alocado pela programa\u00e7\u00e3o<\/td><td>Retorno<\/td><\/tr><tr><td>operationDataEntry<\/td><td>Tempos e quantidades apontados pelos operadores<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A matriz de tempos de prepara\u00e7\u00e3o, as ferramentas usadas como recursos e a quantidade de operadores por opera\u00e7\u00e3o s\u00e3o configuradas no SkyPlanner durante a implanta\u00e7\u00e3o.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proalpha-aps-and-finite-capacity-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proalpha APS e a programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Proalpha inclui seu pr\u00f3prio APS no Proalpha Production. O fornecedor o descreve assim:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APS como n\u00facleo.<\/strong> &#8220;APS (Advanced Planning and Scheduling) is the core of Proalpha Production.&#8221; (O APS, planejamento e programa\u00e7\u00e3o avan\u00e7ados, \u00e9 o n\u00facleo do Proalpha Production.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/modules\/production\/\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Planejamento otimizado de m\u00faltiplos recursos.<\/strong> O APS &#8220;allows optimized resource planning according to managerial targets such as delivery reliability and cycle times.&#8221; (permite otimizar o planejamento de recursos conforme metas gerenciais, como pontualidade de entrega e tempos de ciclo.) Uma opera\u00e7\u00e3o pode usar qualquer quantidade de recursos com disponibilidade sincronizada.<\/li>\n\n\n<li><strong>Planejamento autom\u00e1tico de ordens.<\/strong> Em um caso de cliente do Proalpha, o APS planeja e sequencia as ordens automaticamente (&#8220;automatisch geplant und eingetaktet&#8221;, ou seja, planejadas e sequenciadas automaticamente). (<a href=\"https:\/\/www.proalpha.com\/de\/proalpha-referenzen\/dickert\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Tamb\u00e9m permite ajustes manuais.<\/strong> &#8220;Finite planning allows manual changes to the sequence in which orders are processed on short notice.&#8221; (O planejamento com capacidade finita permite alterar manualmente, com pouca anteced\u00eancia, a sequ\u00eancia de processamento das ordens.)<\/li>\n\n\n<li><strong>Modelos de processo em vez de roteiros.<\/strong> O Proalpha &#8220;completely dispenses with bills of materials and routings for production planning&#8221; (dispensa completamente listas de materiais e roteiros no planejamento da produ\u00e7\u00e3o) e faz o planejamento com base em modelos de processo dos produtos.<\/li>\n\n\n<li><strong>Exige dados atualizados do ch\u00e3o de f\u00e1brica.<\/strong> A coleta de dados da f\u00e1brica &#8220;enables precise advanced planning and scheduling (APS).&#8221; (permite realizar o planejamento e a programa\u00e7\u00e3o avan\u00e7ados, APS, com precis\u00e3o.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/processes\/plant-data-collection-pdc\">Proalpha<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Essa otimiza\u00e7\u00e3o depende de modelos de processo consistentes, calend\u00e1rios de recursos e dados atualizados do ch\u00e3o de f\u00e1brica, configurados em um projeto Proalpha. O pr\u00f3prio Dr. Markus Berg, do Proalpha, considera os apontamentos em papel digitados no fim de semana &#8220;f\u00fcr eine APS-Planung zu ungenau&#8221; (imprecisos demais para o planejamento com APS) (<a href=\"https:\/\/it-production.com\/produktionsmanagement\/interview-markus-berg-proalpha\/\">IT&amp;Production<\/a>). F\u00e1bricas sem essa configura\u00e7\u00e3o continuam planejando no Excel em paralelo ao ERP. O SkyPlanner programa m\u00e1quinas, pessoas, ferramentas, materiais e trocas de produ\u00e7\u00e3o ao mesmo tempo, em um \u00fanico motor, com reprograma\u00e7\u00e3o pelo Autopilot e integra\u00e7\u00e3o configurada pela equipe do SkyPlanner. Assim, essas f\u00e1bricas t\u00eam uma programa\u00e7\u00e3o das pr\u00f3prias ordens de produ\u00e7\u00e3o que respeita a capacidade real ainda durante o per\u00edodo de teste, com pre\u00e7o p\u00fablico. Cada etapa \u00e9 explicada em <a href=\"\/pt-br\/integracoes\/erp\/proalpha\/programacao-producao\/\">O proALPHA tem programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-skyplanner-adds-to-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o SkyPlanner acrescenta ao proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Proalpha com planejamento no Excel<\/th><th>Proalpha com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Plano<\/td><td>Planilha mantida por um planejador<\/td><td>Uma programa\u00e7\u00e3o atualizada a partir das ordens de produ\u00e7\u00e3o do Proalpha<\/td><\/tr><tr><td>Capacidade<\/td><td>Conferida visualmente<\/td><td>Capacidade real de cada m\u00e1quina, pessoa e ferramenta, considerando os turnos<\/td><\/tr><tr><td>Sequ\u00eancia<\/td><td>Reordenada manualmente<\/td><td>Programa\u00e7\u00e3o detalhada por opera\u00e7\u00e3o em segundos<\/td><\/tr><tr><td>Trocas de produ\u00e7\u00e3o<\/td><td>Baseadas na experi\u00eancia do planejador<\/td><td>Opera\u00e7\u00f5es sequenciadas para minimizar o tempo total de setup<\/td><\/tr><tr><td>Ferramentas e equipes<\/td><td>Controladas separadamente<\/td><td>Disponibilidade real das ferramentas respeitada; aloca\u00e7\u00e3o de equipes para opera\u00e7\u00f5es com v\u00e1rios operadores<\/td><\/tr><tr><td>Materiais<\/td><td>Conferidos pelo planejador<\/td><td>Opera\u00e7\u00f5es come\u00e7am quando h\u00e1 material em estoque ou quando as entregas chegam<\/td><\/tr><tr><td>Mudan\u00e7as<\/td><td>Plano refeito a cada imprevisto<\/td><td>Autopilot reprograma respeitando suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Apontamentos em papel ou terminal<\/td><td>Fila de opera\u00e7\u00f5es e apontamentos pelo operador no celular ou tablet<\/td><\/tr><tr><td>Retorno dos dados<\/td><td>Datas digitadas no Proalpha<\/td><td>Datas, recursos e apontamentos via REST<\/td><\/tr><tr><td>In\u00edcio<\/td><td>Projeto Proalpha, sem tabela p\u00fablica de pre\u00e7os<\/td><td>Suas pr\u00f3prias ordens de produ\u00e7\u00e3o programadas durante o teste gratuito<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher um software de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Al\u00e9m da configura\u00e7\u00e3o do projeto descrita acima, a Proalpha ajusta o APS com seus pr\u00f3prios consultores. Na KWM, &#8220;Production planning was optimized remotely together with Proalpha consultants&#8221; (O planejamento da produ\u00e7\u00e3o foi otimizado remotamente em conjunto com consultores da Proalpha) (<a href=\"https:\/\/www.proalpha.com\/en\/references\/kwm-weisshaar-gmbh\">Proalpha<\/a>). A Proalpha n\u00e3o divulga pre\u00e7os; sua p\u00e1gina de pre\u00e7os responde &#8220;Das kommt darauf an&#8221; (Depende) (<a href=\"https:\/\/www.proalpha.com\/de\/preis\">Proalpha<\/a>). Uma <a href=\"\/pt-br\/software-de-programacao-da-producao-para-industrias-de\/\">f\u00e1brica de m\u00e9dio porte<\/a> que hoje planeja no Excel consegue colocar em uso mais rapidamente, com o SkyPlanner, uma programa\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e da equipe. Em ambos os casos, o Proalpha continua sendo o sistema principal.<\/p>\n\n\n<p><strong>Escolha o SkyPlanner em vez do Proalpha APS quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Hoje voc\u00ea planeja no Excel<\/strong> e quer programar suas pr\u00f3prias ordens de produ\u00e7\u00e3o respeitando a capacidade real em quest\u00e3o de semanas, sem esperar por um projeto de planejamento.<\/li>\n\n\n<li><strong>Voc\u00ea quer testar primeiro com dados reais,<\/strong> durante o teste de 30 dias, antes de decidir sobre licen\u00e7as ou projetos.<\/li>\n\n\n<li><strong>As trocas de produ\u00e7\u00e3o determinam quanto voc\u00ea produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o sequencia as opera\u00e7\u00f5es para minimizar o tempo total de setup.<\/li>\n\n\n<li><strong>Ferramentas compartilhadas e opera\u00e7\u00f5es que exigem v\u00e1rios operadores determinam o que pode ser executado a seguir.<\/strong><\/li>\n\n\n<li><strong>A chegada dos materiais determina qual opera\u00e7\u00e3o pode come\u00e7ar.<\/strong> O estoque e os pedidos de compra condicionam o in\u00edcio de cada opera\u00e7\u00e3o.<\/li>\n\n\n<li><strong>O plano muda todos os dias.<\/strong> O Autopilot reprograma a cada altera\u00e7\u00e3o, sem que o planejador precise iniciar o processamento, e as novas datas s\u00e3o enviadas de volta ao Proalpha.<\/li>\n\n\n<li><strong>Os operadores devem trabalhar a partir de sua pr\u00f3pria fila<\/strong> no celular ou tablet, com as confirma\u00e7\u00f5es enviadas ao Proalpha.<\/li>\n\n\n<li><strong>Voc\u00ea quer contar com uma equipe para configurar e dar suporte \u00e0 integra\u00e7\u00e3o.<\/strong> A equipe do SkyPlanner configura e mant\u00e9m a integra\u00e7\u00e3o em opera\u00e7\u00e3o ap\u00f3s a entrada em produ\u00e7\u00e3o, com pre\u00e7o p\u00fablico a partir de 199 \u20ac por m\u00eas.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> S\u00e3o 30 dias, at\u00e9 20 centros de trabalho e todos os recursos do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados. Voc\u00ea pode contar com assist\u00eancia na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Importe suas ordens de produ\u00e7\u00e3o.<\/strong> Exporte do Proalpha as ordens de produ\u00e7\u00e3o em aberto e suas opera\u00e7\u00f5es para CSV ou Excel. Importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Proalpha.<\/strong> A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional de acordo com o seu ambiente e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho. Voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes na <a href=\"\/pt-br\/precos\/\">p\u00e1gina de pre\u00e7os<\/a> e veja outros ERPs na <a href=\"\/pt-br\/integracoes\/erp\/\">central de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Proalpha?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real e se integra ao Proalpha nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, recursos, pe\u00e7as e dados de estoque e devolve as datas planejadas das opera\u00e7\u00f5es, as aloca\u00e7\u00f5es de m\u00e1quinas e as confirma\u00e7\u00f5es dos operadores. A programa\u00e7\u00e3o considera os limites de cada m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que considera a dire\u00e7\u00e3o de cada troca sequencia as opera\u00e7\u00f5es para minimizar o tempo de setup. O Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. O pre\u00e7o parte de 199 \u20ac por m\u00eas, e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O proALPHA oferece programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade finita?<\/summary>\n<p class=\"sp-faq__a\">Sim. O Proalpha APS otimiza planos que envolvem v\u00e1rios recursos com base em metas como pontualidade de entrega e tempos de ciclo, e o Feinplanung permite que os planejadores ajustem a sequ\u00eancia manualmente. Para isso, precisa de modelos de processo consistentes e dados atualizados do ch\u00e3o de f\u00e1brica. O SkyPlanner APS programa cada m\u00e1quina, pessoa, ferramenta e material em um \u00fanico mecanismo na nuvem, com reprograma\u00e7\u00e3o pelo Autopilot, pre\u00e7o p\u00fablico e um teste com suas pr\u00f3prias ordens de produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o Proalpha APS ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Escolha o SkyPlanner se hoje voc\u00ea planeja no Excel. O Proalpha APS s\u00f3 planeja bem depois que os modelos de processo, os calend\u00e1rios de recursos e o retorno de dados PDC em tempo real s\u00e3o configurados em um projeto Proalpha. A Proalpha faz os ajustes com seus pr\u00f3prios consultores e apresenta um or\u00e7amento por instala\u00e7\u00e3o. O SkyPlanner programa cada m\u00e1quina, pessoa, ferramenta e material na nuvem, o Autopilot reprograma a cada altera\u00e7\u00e3o e os operadores trabalham pelo Mobile Confirmations. Voc\u00ea entra em produ\u00e7\u00e3o em quest\u00e3o de semanas, a partir de 199 \u20ac por m\u00eas, ap\u00f3s um teste de 30 dias com suas pr\u00f3prias ordens de produ\u00e7\u00e3o. N\u00e3o \u00e9 preciso ter o Proalpha APS para usar o SkyPlanner; se ele estiver ativo, a configura\u00e7\u00e3o inicial define qual sistema controla as datas das opera\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Proalpha Production?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, ele complementa o Proalpha Production. O Proalpha continua respons\u00e1vel pelas pe\u00e7as, pelos modelos de processo dos produtos, pela gest\u00e3o de materiais, pelas compras e pelas finan\u00e7as. O SkyPlanner programa as ordens de produ\u00e7\u00e3o em aberto de acordo com a capacidade real e devolve datas, recursos e confirma\u00e7\u00f5es.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar algo no Proalpha?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem e grava os dados de volta no Proalpha por meio das REST APIs publicadas pela Proalpha. As ordens de produ\u00e7\u00e3o chegam ao SkyPlanner pelas interfaces do seu Proalpha, configuradas durante a implanta\u00e7\u00e3o inicial.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa Proalpha?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas para cada centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com sua pr\u00f3pria fila de opera\u00e7\u00f5es programadas. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, junto com o plano contratado, de acordo com seu processo e suas necessidades. Assim, voc\u00ea conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em quest\u00e3o de semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipe mapeia seus recursos e suas ordens de produ\u00e7\u00e3o, conecta os dados de estoque e os pedidos de compra e ativa o envio de dados de volta ao Proalpha. Tudo \u00e9 testado em compara\u00e7\u00e3o com seu plano atual antes da entrada em produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de integr\u00e1-lo ao Proalpha?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias usa um arquivo CSV ou Excel com as ordens de produ\u00e7\u00e3o em aberto exportadas do Proalpha. Voc\u00ea v\u00ea uma <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o que respeita a capacidade real<\/a> antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ proALPHA ERP SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS complementa o proALPHA com uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipes e considera cada m\u00e1quina, operador, ferramenta e material. Os planejadores deixam de refazer o plano no Excel, e &#8230; <a title=\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/\" aria-label=\"Read more about SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103179","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: programa\u00e7\u00e3o com capacidade real no proALPHA e integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: programa\u00e7\u00e3o com capacidade real no proALPHA e integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/proalpha\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/proalpha\\\/\",\"name\":\"Integra\u00e7\u00e3o proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: programa\u00e7\u00e3o com capacidade real no proALPHA e integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/proalpha\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/proalpha\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/proalpha\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com APS","description":"SkyPlanner APS: programa\u00e7\u00e3o com capacidade real no proALPHA e integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS: programa\u00e7\u00e3o com capacidade real no proALPHA e integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"15 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/","name":"Integra\u00e7\u00e3o proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: programa\u00e7\u00e3o com capacidade real no proALPHA e integra\u00e7\u00e3o bidirecional: cada m\u00e1quina, turno, ferramenta e material. Desde 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/proalpha\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ proALPHA ERP SkyPlanner APS para proALPHA: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS complementa o proALPHA com uma programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e das equipes e considera cada m\u00e1quina, operador, ferramenta e material. Os planejadores deixam de refazer o plano no Excel, e&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103179","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=103179"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103179\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=103179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}