{"id":103119,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/mrpeasy\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"mrpeasy","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/","title":{"rendered":"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ MRPeasy<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para MRPeasy: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para MRPeasy que re\u00fane todas as ordens de produ\u00e7\u00e3o em aberto em uma \u00fanica programa\u00e7\u00e3o, de uma s\u00f3 vez. A programa\u00e7\u00e3o respeita a capacidade real de cada centro de trabalho e operador, al\u00e9m da disponibilidade de ferramentas e materiais. O Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre SkyPlanner e MRPeasy \u00e9 bidirecional: ordens de produ\u00e7\u00e3o, roteiros de produ\u00e7\u00e3o, centros de trabalho e itens s\u00e3o enviados ao SkyPlanner, e as datas planejadas e o andamento retornam ao MRPeasy. Durante a implanta\u00e7\u00e3o, a equipe SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente MRPeasy.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Toda a programa\u00e7\u00e3o, n\u00e3o uma ordem por vez.<\/p>\n\n\n<p class=\"fx-pain__b\">O MRPeasy aloca cada nova ordem de produ\u00e7\u00e3o no primeiro hor\u00e1rio livre. O motor Arcturus do SkyPlanner sequencia todas as ordens em aberto de uma s\u00f3 vez, considerando prioridade, prazo e material.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de entrega que voc\u00ea pode prometer.<\/p>\n\n\n<p class=\"fx-pain__b\">A data de conclus\u00e3o de cada ordem de produ\u00e7\u00e3o \u00e9 definida com base na programa\u00e7\u00e3o de toda a f\u00e1brica, que j\u00e1 inclui todas as outras ordens. A equipe comercial responde aos clientes com base nessa programa\u00e7\u00e3o, e n\u00e3o na ordem que, por acaso, foi cadastrada primeiro.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ordens urgentes que realmente passam \u00e0 frente.<\/p>\n\n\n<p class=\"fx-pain__b\">Atribua Fast Track ou uma prioridade mais alta a uma ordem, e o motor desloca as outras opera\u00e7\u00f5es para abrir espa\u00e7o. Ningu\u00e9m precisa arrastar dez ordens manualmente pelo gr\u00e1fico de Gantt.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica ap\u00f3s quebras.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para, um material atrasa ou uma opera\u00e7\u00e3o termina antes do previsto, o Autopilot reprograma automaticamente. Os bloqueios e as prioridades que voc\u00ea definiu continuam valendo, e o Running Time Lock mant\u00e9m as opera\u00e7\u00f5es j\u00e1 iniciadas no lugar.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos trocas de produto.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de setup entre cada par de produtos, nos dois sentidos. A troca de azul para vermelho pode levar 30 minutos, e a de vermelho para azul, 60. O motor sequencia as opera\u00e7\u00f5es para perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Respeito \u00e0 disponibilidade de ferramentas e equipes compartilhadas.<\/p>\n\n\n<p class=\"fx-pain__b\">Uma matriz ou um dispositivo de fixa\u00e7\u00e3o em uso em um centro de trabalho nunca \u00e9 reservado em outro ao mesmo tempo. Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade no turno.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Material verificado a cada altera\u00e7\u00e3o na programa\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica o estoque e os pedidos de compra a receber sempre que a programa\u00e7\u00e3o muda. Uma opera\u00e7\u00e3o que depende de uma entrega do fornecedor \u00e9 programada para depois da data dessa entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea sua fila de opera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas opera\u00e7\u00f5es no celular ou tablet e registra o trabalho conforme ele \u00e9 executado. O escrit\u00f3rio acompanha o andamento em tempo real, e essas informa\u00e7\u00f5es retornam ao MRPeasy.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que os fabricantes dizem sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas de Excel e passou para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, diretor de TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, leva menos de 30 minutos para ser gerado.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Soldador da KJH-Comp esmerilhando uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de pontualidade de entrega, antes em cerca de 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo para manter nossa pontualidade de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Fabrica\u00e7\u00e3o de componentes em chapa met\u00e1lica e produ\u00e7\u00e3o sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega passou de cerca de 50% para at\u00e9 98%, e a programa\u00e7\u00e3o agora exige um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/kjh-comp\/\">Leia o depoimento da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para telhados da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>de pontualidade de entrega<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner trouxe visibilidade para identificar gargalos e tornou a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gerente de produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para telhados e de capta\u00e7\u00e3o de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega chegou a 99,2% neste ano, e a programa\u00e7\u00e3o economiza at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/piristeel\/\">Leia o depoimento da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-mrpeasy-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o MRPeasy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O MRPeasy envia o trabalho a executar.<\/strong> Ordens de produ\u00e7\u00e3o, roteiros de produ\u00e7\u00e3o, grupos de centros de trabalho, centros de trabalho, itens, estoque e pedidos de compra s\u00e3o enviados ao SkyPlanner.<\/li>\n\n\n<li><strong>O SkyPlanner monta a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> O motor Arcturus programa todas as opera\u00e7\u00f5es em todos os centros de trabalho em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e o andamento retornam ao MRPeasy.<\/strong> As datas planejadas e o andamento s\u00e3o enviados de volta para cada ordem de produ\u00e7\u00e3o no MRPeasy. Assim, as equipes comercial e de compras veem a mesma programa\u00e7\u00e3o que o ch\u00e3o de f\u00e1brica.<\/li>\n\n<\/ol>\n\n\n<p>O SkyPlanner j\u00e1 foi integrado ao MRPeasy em projetos de clientes. A integra\u00e7\u00e3o usa a REST API do MRPeasy, sem instalar nada no MRPeasy. Os webhooks do SkyPlanner enviam as mudan\u00e7as na programa\u00e7\u00e3o assim que elas acontecem, e as ordens novas ou alteradas s\u00e3o consultadas no MRPeasy em intervalos curtos. Como cada f\u00e1brica usa o MRPeasy de uma forma, a equipe SkyPlanner mapeia seus roteiros de produ\u00e7\u00e3o, grupos de centros de trabalho e fluxo de ordens durante a implanta\u00e7\u00e3o e d\u00e1 suporte \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/p>\n\n\n<p>O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com o seu processo e as suas necessidades. Seu consultor MRPeasy ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>O <a href=\"\/pt-br\/integracoes\/erp\/mrpeasy\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o MRPeasy para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a> detalha os endpoints, o mapeamento de campos, os limites de requisi\u00e7\u00f5es e a grava\u00e7\u00e3o de dados de volta no MRPeasy.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-mrpeasy-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o MRPeasy programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O MRPeasy programa as opera\u00e7\u00f5es respeitando a capacidade dispon\u00edvel dos centros de trabalho. Ele faz isso uma ordem por vez, na sequ\u00eancia em que voc\u00ea as cadastra. O <a href=\"https:\/\/www.mrpeasy.com\/resources\/user-manual\/production-planning\/production-schedule\/\">manual do usu\u00e1rio do MRPeasy<\/a> deixa claro o que acontece em seguida:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Primeiro hor\u00e1rio livre.<\/strong> &#8220;By default, the software schedules the Manufacturing Order to the first available time.&#8221; (Por padr\u00e3o, o software programa a ordem de produ\u00e7\u00e3o para o primeiro hor\u00e1rio dispon\u00edvel.)<\/li>\n\n\n<li><strong>Uma ordem muda, as demais ficam onde est\u00e3o.<\/strong> &#8220;The software will only reschedule the manufacturing order which has been dragged to a new time, other manufacturing orders will not be rescheduled.&#8221; (O software reprograma apenas a ordem de produ\u00e7\u00e3o arrastada para um novo hor\u00e1rio; as demais n\u00e3o s\u00e3o reprogramadas.)<\/li>\n\n\n<li><strong>Sem verifica\u00e7\u00e3o de materiais no gr\u00e1fico de Gantt.<\/strong> Ao arrastar uma ordem, &#8220;The software will not check for material availability.&#8221; (O software n\u00e3o verifica a disponibilidade de materiais.)<\/li>\n\n\n<li><strong>Paradas n\u00e3o deslocam as opera\u00e7\u00f5es.<\/strong> &#8220;Setting an idle time does not reschedule works automatically which were previously planned for the idle time.&#8221; (Definir um per\u00edodo de parada n\u00e3o reprograma automaticamente as opera\u00e7\u00f5es previstas para esse per\u00edodo.)<\/li>\n\n<\/ul>\n\n\n<p>A programa\u00e7\u00e3o para tr\u00e1s exige o plano Enterprise, e o MRPeasy informa que &#8220;Material lead times are ignored when backward scheduling is used.&#8221; (Os prazos de reposi\u00e7\u00e3o dos materiais s\u00e3o ignorados na programa\u00e7\u00e3o para tr\u00e1s.) O tempo de setup \u00e9 um valor fixo por opera\u00e7\u00e3o do roteiro de produ\u00e7\u00e3o, independentemente do que foi produzido antes. Assim, a cada ordem urgente, quebra ou atraso de entrega, o planejador precisa refazer a sequ\u00eancia das ordens manualmente. Cada limita\u00e7\u00e3o \u00e9 explicada em <a href=\"\/pt-br\/integracoes\/erp\/mrpeasy\/programacao-producao\/\">O MRPeasy programa a produ\u00e7\u00e3o respeitando a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-mrpeasy-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quais dados circulam entre MRPeasy e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>MRPeasy<\/th><th>SkyPlanner<\/th><th>Dire\u00e7\u00e3o<\/th><\/tr><\/thead><tbody><tr><td>Item, Product group, Unit of measurement<\/td><td>Produtos e materiais<\/td><td>Entrada<\/td><\/tr><tr><td>BOM, BOMs multin\u00edvel<\/td><td>Estrutura do produto, subprodutos<\/td><td>Entrada<\/td><\/tr><tr><td>Opera\u00e7\u00f5es do roteiro de produ\u00e7\u00e3o: Setup time, Cycle time, Capacity<\/td><td>Etapas do processo, tempos de setup, opera\u00e7\u00f5es em lote<\/td><td>Entrada<\/td><\/tr><tr><td>Workstation group, Workstation, Productivity<\/td><td>Grupos de centros de trabalho, centros de trabalho, efici\u00eancias<\/td><td>Entrada<\/td><\/tr><tr><td>Work hours, Holidays, Idle time<\/td><td>Turnos e aus\u00eancias<\/td><td>Entrada<\/td><\/tr><tr><td>Manufacturing Order com opera\u00e7\u00f5es e prazo<\/td><td>Ordens e opera\u00e7\u00f5es<\/td><td>Entrada<\/td><\/tr><tr><td>Lotes em estoque, estoque, Purchase Order<\/td><td>Estoque e materiais a receber<\/td><td>Entrada<\/td><\/tr><tr><td>Prazo e campos personalizados de Manufacturing Order<\/td><td>In\u00edcio e t\u00e9rmino planejados e andamento<\/td><td>Retorno<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"mrpeasy-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">MRPeasy hoje e com SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>MRPeasy<\/th><th>MRPeasy com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Sequenciamento<\/td><td>Primeiro hor\u00e1rio livre, na sequ\u00eancia de cadastro<\/td><td>Todas as ordens em aberto sequenciadas por prioridade e prazo<\/td><\/tr><tr><td>Ordens urgentes<\/td><td>Encaixe apenas nos hor\u00e1rios livres<\/td><td>Fast Track desloca outras opera\u00e7\u00f5es para abrir espa\u00e7o<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Cada ordem \u00e9 arrastada manualmente<\/td><td>Autopilot reprograma toda a f\u00e1brica<\/td><\/tr><tr><td>Trocas de produto<\/td><td>Tempo de setup fixo por opera\u00e7\u00e3o<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o para minimizar o tempo total de setup<\/td><\/tr><tr><td>Ferramentas e equipes<\/td><td>Apenas os hor\u00e1rios de trabalho dos centros de trabalho<\/td><td>Disponibilidade limitada de ferramentas e opera\u00e7\u00f5es com v\u00e1rios operadores<\/td><\/tr><tr><td>Materiais<\/td><td>Sem verifica\u00e7\u00e3o ao mover ordens no Gantt<\/td><td>Estoque e pedidos de compra a receber verificados a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Iniciar, pausar e concluir por opera\u00e7\u00e3o<\/td><td>Fila do operador, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-mrpeasy\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher uma solu\u00e7\u00e3o de programa\u00e7\u00e3o para MRPeasy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A programa\u00e7\u00e3o do pr\u00f3prio MRPeasy atende a uma f\u00e1brica pequena com poucos gargalos, onde as ordens s\u00e3o cadastradas na sequ\u00eancia em que devem ser executadas. Para outras necessidades, h\u00e1 quatro caminhos a avaliar: usar apenas o MRPeasy, programar em planilhas alimentadas por exporta\u00e7\u00f5es CSV, usar ferramentas gen\u00e9ricas de automa\u00e7\u00e3o para notifica\u00e7\u00f5es ou adotar um APS na nuvem que grave os dados de volta no MRPeasy.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Escolha o SkyPlanner quando novas prioridades precisarem reorganizar as ordens existentes,<\/strong> e n\u00e3o apenas preencher hor\u00e1rios livres.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando seu planejador passar horas por dia arrastando ordens<\/strong> ap\u00f3s quebras e atrasos de entrega.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando as trocas de produto dependerem da sequ\u00eancia.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o e transi\u00e7\u00e3o define essa sequ\u00eancia.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando ferramentas e equipes compartilhadas determinarem o que pode ser produzido em seguida.<\/strong><\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando quiser receber a programa\u00e7\u00e3o de volta no MRPeasy,<\/strong> e n\u00e3o em uma planilha separada.<\/li>\n\n\n<li><strong>Escolha o SkyPlanner quando os operadores precisarem trabalhar com sua pr\u00f3pria fila de opera\u00e7\u00f5es<\/strong> no celular ou tablet.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gr\u00e1tis.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todos os recursos do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre centros de trabalho, pessoas e turnos no SkyPlanner ou importe esses dados. H\u00e1 suporte dispon\u00edvel para a configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue suas ordens de produ\u00e7\u00e3o.<\/strong> Exporte itens, listas de materiais, roteiros de produ\u00e7\u00e3o e ordens de produ\u00e7\u00e3o em aberto das telas de listagem do MRPeasy para CSV. Importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o MRPeasy.<\/strong> A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho. Voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes na p\u00e1gina de <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>. Tamb\u00e9m usa outro sistema? Veja todas as <a href=\"\/pt-br\/integracoes\/erp\/\">integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e equipes e se integra ao MRPeasy nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, roteiros de produ\u00e7\u00e3o, centros de trabalho e itens, e devolve datas planejadas e informa\u00e7\u00f5es de andamento. A capacidade de cada centro de trabalho, operador e ferramenta e a disponibilidade de cada material s\u00e3o limitadas. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca sequencia as opera\u00e7\u00f5es para minimizar o setup. O Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am em 199 \u20ac por m\u00eas, e o teste gr\u00e1tis dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O MRPeasy programa a produ\u00e7\u00e3o considerando a capacidade real dos recursos?<\/summary>\n<p class=\"sp-faq__a\">Sim, uma ordem por vez. O MRPeasy aloca cada nova ordem de produ\u00e7\u00e3o no primeiro hor\u00e1rio livre do centro de trabalho, e mover uma ordem n\u00e3o altera as demais. O SkyPlanner APS sequencia todas as ordens em aberto em conjunto e replaneja automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar algo no MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem em paralelo ao MRPeasy e se conecta a ele pela REST API do MRPeasy. O SkyPlanner j\u00e1 foi integrado ao MRPeasy em projetos de clientes.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, ele complementa o MRPeasy. Itens, listas de materiais, roteiros de produ\u00e7\u00e3o, estoque, compras, vendas e contabilidade continuam no MRPeasy. O SkyPlanner programa suas ordens de produ\u00e7\u00e3o com base na capacidade real e envia de volta as datas e as informa\u00e7\u00f5es de andamento.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa usar o SkyPlanner com o MRPeasy?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Uma f\u00e1brica com 20 centros de trabalho paga 499 \u20ac por m\u00eas, independentemente do n\u00famero de usu\u00e1rios do MRPeasy. A integra\u00e7\u00e3o \u00e9 or\u00e7ada antecipadamente conforme seu processo e suas necessidades, junto com o plano, para que voc\u00ea saiba o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>De qual plano do MRPeasy precisamos para a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A integra\u00e7\u00e3o em opera\u00e7\u00e3o usa a REST API do MRPeasy, inclu\u00edda no plano Unlimited. O teste funciona com qualquer plano do MRPeasy, pois usa arquivos CSV exportados das telas de listagem do MRPeasy.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipe mapeia seus grupos de centros de trabalho e roteiros de produ\u00e7\u00e3o, conecta as ordens de produ\u00e7\u00e3o e os pedidos de compra e envia as datas planejadas de volta ao MRPeasy. Tudo \u00e9 testado e comparado com seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner com nossos dados do MRPeasy antes?<\/summary>\n<p class=\"sp-faq__a\">Sim. Exporte roteiros de produ\u00e7\u00e3o, centros de trabalho e ordens de produ\u00e7\u00e3o em aberto para CSV e importe esses dados no teste. Antes de iniciar qualquer trabalho de integra\u00e7\u00e3o, voc\u00ea j\u00e1 pode ver uma <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o da sua produ\u00e7\u00e3o<\/a> que respeita a capacidade real de m\u00e1quinas e equipes.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ MRPeasy SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para MRPeasy que re\u00fane todas as ordens de produ\u00e7\u00e3o em aberto em uma \u00fanica programa\u00e7\u00e3o, de uma s\u00f3 vez. A programa\u00e7\u00e3o respeita a capacidade real de &#8230; <a title=\"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/\" aria-label=\"Read more about SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103119","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o MRPeasy: APS que respeita a capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS no MRPeasy: capacidade real e integra\u00e7\u00e3o bidirecional para cada centro de trabalho, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS no MRPeasy: capacidade real e integra\u00e7\u00e3o bidirecional para cada centro de trabalho, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/mrpeasy\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/mrpeasy\\\/\",\"name\":\"Integra\u00e7\u00e3o MRPeasy: APS que respeita a capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS no MRPeasy: capacidade real e integra\u00e7\u00e3o bidirecional para cada centro de trabalho, operador, ferramenta e material. Desde 199 \u20ac\\\/m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/mrpeasy\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/mrpeasy\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/mrpeasy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o MRPeasy: APS que respeita a capacidade real","description":"SkyPlanner APS no MRPeasy: capacidade real e integra\u00e7\u00e3o bidirecional para cada centro de trabalho, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes","og_description":"SkyPlanner APS no MRPeasy: capacidade real e integra\u00e7\u00e3o bidirecional para cada centro de trabalho, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"13 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/","name":"Integra\u00e7\u00e3o MRPeasy: APS que respeita a capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS no MRPeasy: capacidade real e integra\u00e7\u00e3o bidirecional para cada centro de trabalho, operador, ferramenta e material. Desde 199 \u20ac\/m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/mrpeasy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ MRPeasy SkyPlanner APS para MRPeasy: programa\u00e7\u00e3o da produ\u00e7\u00e3o dentro da capacidade real de m\u00e1quinas e equipes SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para MRPeasy que re\u00fane todas as ordens de produ\u00e7\u00e3o em aberto em uma \u00fanica programa\u00e7\u00e3o, de uma s\u00f3 vez. A programa\u00e7\u00e3o respeita a capacidade real de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=103119"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/103119\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=103119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}