{"id":102829,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/dynamics-365-scm\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"dynamics-365-scm","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/","title":{"rendered":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Supply Chain Management<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Dynamics 365 Supply Chain Management: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Microsoft Dynamics 365 Supply Chain Management que respeita a capacidade real de m\u00e1quinas e equipes. Ele considera as restri\u00e7\u00f5es de cada ordem de produ\u00e7\u00e3o, recurso, operador, ferramenta e material em cada hor\u00e1rio, ao longo de todo o horizonte de programa\u00e7\u00e3o. No D365, a capacidade finita \u00e9 considerada apenas parcialmente. O Planning Optimization s\u00f3 considera a capacidade finita dentro do horizonte definido para capacidade. A Microsoft orienta a n\u00e3o usar capacidade finita quando a capacidade varia conforme os turnos (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">fonte<\/a>), e a programa\u00e7\u00e3o de trabalhos reserva capacidade para uma ordem por vez (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). O SkyPlanner programa todas as ordens em conjunto, e o Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O SkyPlanner se integra ao Dynamics 365 Supply Chain Management nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es de roteiro, recursos, produtos liberados e pedidos de compra, e devolve as datas programadas e os recursos alocados. Durante a implanta\u00e7\u00e3o, a equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente do Supply Chain Management.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Toda a f\u00e1brica em uma \u00fanica programa\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o de trabalhos do D365 SCM aloca as ordens de produ\u00e7\u00e3o uma a uma, conforme a capacidade que ainda n\u00e3o foi reservada. O SkyPlanner programa todas as ordens em aberto em conjunto, considerando a capacidade real. Assim, a primeira ordem programada deixa de ocupar os melhores hor\u00e1rios por padr\u00e3o.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Turnos que realmente contam.<\/p>\n\n\n<p class=\"fx-pain__b\">A capacidade de cada m\u00e1quina e pessoa \u00e9 limitada pelos turnos reais, aus\u00eancias e horas extras. \u00c9 justamente quando a capacidade depende dos turnos que a Microsoft desaconselha o uso de capacidade finita no planejamento mestre. O SkyPlanner foi feito para isso.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menos trocas de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de troca de produ\u00e7\u00e3o entre cada par de produtos, nos dois sentidos. Passar do azul para o vermelho pode levar 30 minutos, e do vermelho para o azul, 60. O motor sequencia as opera\u00e7\u00f5es para perder o m\u00ednimo de tempo com setups.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ferramentas e equipes compartilhadas sem sobreposi\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">Um molde em uso em uma m\u00e1quina nunca \u00e9 reservado para outra no mesmo hor\u00e1rio. Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade no turno. Quando um recurso est\u00e1 ocupado, a opera\u00e7\u00e3o passa para outra m\u00e1quina ou pessoa dispon\u00edvel.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Programa\u00e7\u00e3o que respeita a disponibilidade de materiais.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica o estoque e os pedidos de compra a receber. Uma opera\u00e7\u00e3o que depende de uma entrega do fornecedor \u00e9 programada para depois dessa data, em vez de ficar parada no ch\u00e3o de f\u00e1brica.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pedidos urgentes reprogramados em segundos.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega um pedido urgente, o Autopilot reprograma automaticamente. As travas e prioridades que voc\u00ea definiu continuam valendo, e os planejadores ajustam as opera\u00e7\u00f5es em um gr\u00e1fico de Gantt interativo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cada operador v\u00ea sua fila de trabalho.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas opera\u00e7\u00f5es no celular ou tablet e registra o trabalho \u00e0 medida que o executa. O escrit\u00f3rio acompanha o andamento em tempo real.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es de ind\u00fastrias sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de quadros el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Quadros el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia a avalia\u00e7\u00e3o da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com trajes para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, fica pronto em menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia a avalia\u00e7\u00e3o da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, CEO da Mamec, no galp\u00e3o de produ\u00e7\u00e3o da empresa em Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mais de 1.000<\/b><span> ordens de produ\u00e7\u00e3o programadas automaticamente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAgora temos um novo n\u00edvel de controle da produ\u00e7\u00e3o, e nossa compreens\u00e3o da capacidade est\u00e1 em um patamar completamente diferente.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 Misturadores industriais, bombas e fabrica\u00e7\u00e3o de alta tecnologia sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">Milhares de ordens de produ\u00e7\u00e3o s\u00e3o programadas automaticamente, com uma vis\u00e3o da produ\u00e7\u00e3o em tempo real para toda a organiza\u00e7\u00e3o.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/mamec\/\">Leia a avalia\u00e7\u00e3o da Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o da Fredman Operations, ao lado de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de capacidade dispon\u00edvel vis\u00edvel para a equipe de vendas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner oferece uma base s\u00f3lida e confi\u00e1vel para todo o planejamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens pr\u00f3prias para contato com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipe de vendas v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e as solicita\u00e7\u00f5es de altera\u00e7\u00e3o da programa\u00e7\u00e3o que levavam uma hora ou mais s\u00e3o respondidas em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/fredman-operations\/\">Leia a avalia\u00e7\u00e3o da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-dynamics-365-supply-chain-management-int\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Dynamics 365 Supply Chain Management<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Supply Chain Management envia o trabalho.<\/strong> As ordens de produ\u00e7\u00e3o firmadas e liberadas chegam ao SkyPlanner com suas opera\u00e7\u00f5es de roteiro e linhas da BOM, junto com recursos, calend\u00e1rios, estoque dispon\u00edvel e pedidos de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o considerando todos os recursos em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas retornam ao Supply Chain Management.<\/strong> Os hor\u00e1rios programados de in\u00edcio e t\u00e9rmino e o recurso escolhido retornam \u00e0 ordem de produ\u00e7\u00e3o e \u00e0s suas opera\u00e7\u00f5es de roteiro. Os webhooks do SkyPlanner enviam cada altera\u00e7\u00e3o da programa\u00e7\u00e3o assim que ela acontece.<\/li>\n\n<\/ol>\n\n\n<p>O Supply Chain Management continua sendo o sistema oficial de registro dos seus dados. Ele mant\u00e9m os produtos liberados, BOMs, roteiros, Planning Optimization, compras, estoque e custos. O SkyPlanner fica respons\u00e1vel pela sequ\u00eancia e pelos hor\u00e1rios de cada opera\u00e7\u00e3o.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objeto do Dynamics 365 SCM<\/th><th>Objeto do SkyPlanner<\/th><th>Sentido<\/th><\/tr><\/thead><tbody><tr><td>Produtos liberados<\/td><td>Produtos e materiais<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Lista de materiais, linhas da BOM de produ\u00e7\u00e3o<\/td><td>Estrutura do produto, subprodutos<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Roteiro, opera\u00e7\u00f5es do roteiro, propriedades das opera\u00e7\u00f5es<\/td><td>Etapas do processo com tempos de setup e execu\u00e7\u00e3o<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Recursos, grupos de recursos, capacidades<\/td><td>Centros de trabalho, grupos de centros de trabalho, efici\u00eancias<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Calend\u00e1rios de trabalho<\/td><td>Turnos<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es de roteiro, tarefas de roteiro<\/td><td>Ordens e opera\u00e7\u00f5es com prazos de entrega<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>Estoque dispon\u00edvel, linhas de pedidos de compra<\/td><td>Estoque e materiais a receber<\/td><td>SCM \u2192 SkyPlanner<\/td><\/tr><tr><td>In\u00edcio e t\u00e9rmino programados, recurso<\/td><td>Datas planejadas da opera\u00e7\u00e3o e centro de trabalho<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><tr><td>Di\u00e1rio de cart\u00e3o de roteiro<\/td><td>Horas e quantidades registradas<\/td><td>SkyPlanner \u2192 SCM<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>O SkyPlanner se conecta \u00e0s entidades de dados padr\u00e3o do Supply Chain Management pelo endpoint REST OData, com autentica\u00e7\u00e3o por meio de um registro de aplicativo no Microsoft Entra ID. N\u00e3o \u00e9 necess\u00e1rio instalar nenhum suplemento. Cada f\u00e1brica usa o D365 SCM de uma forma, por isso a equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente durante a implanta\u00e7\u00e3o e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, conforme seu processo e suas necessidades. Seu parceiro Dynamics ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As entidades, as regras para atualizar os dados no ERP e os pontos de aten\u00e7\u00e3o est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/dynamics-365-scm\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Dynamics 365 SCM para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"job-scheduling-planning-optimization-and-finite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Programa\u00e7\u00e3o de trabalhos, Planning Optimization e programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade finita<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O D365 SCM considera a capacidade finita apenas parcialmente. O Planning Optimization trabalha com capacidade finita dentro de um horizonte definido e com capacidade infinita fora dele. A programa\u00e7\u00e3o de trabalhos reserva capacidade finita, mas para uma ordem por vez, conforme a capacidade que ainda n\u00e3o foi reservada pelas ordens anteriores (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). A <a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">pr\u00f3pria documenta\u00e7\u00e3o da Microsoft<\/a> estabelece os limites:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O planejamento mestre com capacidade finita pressup\u00f5e capacidade fixa.<\/strong> Para o planejamento mestre, a Microsoft orienta: &#8220;If your capacity can change as requirements change (for example, when you&#8217;re working with shifts), you shouldn&#8217;t use finite capacity functionality.&#8221; (Se a capacidade puder mudar conforme as necessidades, por exemplo, ao trabalhar com turnos, voc\u00ea n\u00e3o deve usar a funcionalidade de capacidade finita.)<\/li>\n\n\n<li><strong>A capacidade s\u00f3 \u00e9 finita dentro de um horizonte definido.<\/strong> Fora do horizonte de capacidade finita, o planejamento mestre considera capacidade infinita. A Microsoft observa: &#8220;a single-day time fence is probably too low for most manufacturers.&#8221; (Um horizonte de apenas um dia provavelmente \u00e9 curto demais para a maioria dos fabricantes.)<\/li>\n\n\n<li><strong>Uma ordem por vez.<\/strong> A programa\u00e7\u00e3o de trabalhos posiciona cada ordem de produ\u00e7\u00e3o para a frente ou para tr\u00e1s no tempo, respeitando as reservas existentes, e seleciona os recursos pelo menor lead time ou pela prioridade. O setup \u00e9 contabilizado como tempo da opera\u00e7\u00e3o, e a programa\u00e7\u00e3o trabalha com no m\u00e1ximo 32 recursos por opera\u00e7\u00e3o. O planejamento mestre pode sequenciar ordens planejadas por atributos do produto, como cor e tamanho (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/master-plans\">fonte<\/a>).<\/li>\n\n\n<li><strong>Gr\u00e1fico de Gantt para ajustes manuais.<\/strong> Os planejadores programam as opera\u00e7\u00f5es selecionadas por meio de um menu, organizam as opera\u00e7\u00f5es em um recurso e as reatribuem a outro. Ao arrastar e soltar, s\u00f3 \u00e9 poss\u00edvel mover uma opera\u00e7\u00e3o por vez dentro do mesmo recurso. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/visual-scheduling-production\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Fora desse horizonte e sempre que os turnos alteram a capacidade, o planejamento mestre do D365 fornece um plano preliminar. O SkyPlanner programa todas as ordens, m\u00e1quinas, pessoas, ferramentas, materiais e trocas de produ\u00e7\u00e3o em conjunto, em um \u00fanico mecanismo, respeitando a capacidade real em todo o horizonte. O Autopilot replaneja automaticamente quando a produ\u00e7\u00e3o muda. Veja todos os detalhes em <a href=\"\/pt-br\/integracoes\/erp\/dynamics-365-scm\/programacao-producao\/\">O Dynamics 365 SCM tem programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"dynamics-365-scm-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Dynamics 365 SCM hoje e com SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Programa\u00e7\u00e3o padr\u00e3o do D365 SCM<\/th><th>D365 SCM com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Abrang\u00eancia<\/td><td>Ordens de produ\u00e7\u00e3o programadas uma a uma, respeitando as reservas existentes<\/td><td>Todas as ordens de produ\u00e7\u00e3o programadas em conjunto, em segundos<\/td><\/tr><tr><td>Capacidade<\/td><td>Parcialmente finita: no planejamento mestre, apenas dentro de um horizonte definido e sem capacidade vari\u00e1vel por turno; na programa\u00e7\u00e3o de trabalhos, uma ordem por vez<\/td><td>Capacidade real de cada m\u00e1quina, pessoa, ferramenta e material respeitada em cada hor\u00e1rio, com os turnos e as aus\u00eancias reais, em todo o horizonte<\/td><\/tr><tr><td>Trocas de produ\u00e7\u00e3o<\/td><td>Tempo de setup por opera\u00e7\u00e3o; sequenciamento de ordens planejadas por atributos<\/td><td>Opera\u00e7\u00f5es sequenciadas para obter o menor tempo total de setup<\/td><\/tr><tr><td>Ferramentas e equipes<\/td><td>Ferramentas e trabalhadores alocados ordem por ordem<\/td><td>Ferramentas compartilhadas e opera\u00e7\u00f5es com v\u00e1rios operadores programadas considerando todas as ordens<\/td><\/tr><tr><td>Materiais<\/td><td>Disponibilidade limitada de materiais considerada por ordem<\/td><td>Opera\u00e7\u00f5es iniciadas quando h\u00e1 estoque ou quando as entregas previstas chegam<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>O planejador reprograma ordens e ajusta opera\u00e7\u00f5es no gr\u00e1fico de Gantt<\/td><td>O Autopilot replaneja toda a f\u00e1brica respeitando suas prioridades<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Production floor execution<\/td><td>Mobile Confirmations: os operadores consultam sua fila e fazem apontamentos pelo celular ou tablet<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-dynamics-365-scm\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher um sistema de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Dynamics 365 SCM<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Para uma <a href=\"\/pt-br\/software-de-programacao-da-producao-para-industrias-de\/\">f\u00e1brica de m\u00e9dio porte<\/a> que est\u00e1 deixando as planilhas, a escolha \u00e9 entre o agendamento de trabalhos e o Planning Optimization do pr\u00f3prio D365 ou o SkyPlanner. O D365 considera a capacidade finita dentro de um horizonte definido e uma ordem por vez. O SkyPlanner oferece uma programa\u00e7\u00e3o que respeita a capacidade real de toda a f\u00e1brica. <strong>Escolha o SkyPlanner em vez do agendamento de trabalhos do D365 e do Planning Optimization quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Todas as ordens de produ\u00e7\u00e3o disputam os mesmos recursos.<\/strong> No agendamento de trabalhos, voc\u00ea define uma data de in\u00edcio ou t\u00e9rmino e executa a programa\u00e7\u00e3o. O mecanismo seleciona o recurso com o menor lead time, respeitando as reservas j\u00e1 feitas (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). A primeira ordem programada fica com os melhores hor\u00e1rios. O SkyPlanner programa todas as ordens em conjunto, em segundos.<\/li>\n\n\n<li><strong>Voc\u00ea quer respeitar a capacidade real em todo o horizonte, com os turnos reais.<\/strong> O Planning Optimization s\u00f3 considera a capacidade finita dentro do horizonte de capacidade, e a Microsoft desaconselha o uso de capacidade finita no planejamento mestre quando a capacidade varia com os turnos (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/master-planning\/planning-optimization\/finite-capacity\">fonte<\/a>). O SkyPlanner planeja cada m\u00e1quina e pessoa respeitando sua capacidade real, com turnos, horas extras e aus\u00eancias, em todo o horizonte.<\/li>\n\n\n<li><strong>As trocas de produ\u00e7\u00e3o determinam quanto voc\u00ea produz.<\/strong> No agendamento de trabalhos, o setup \u00e9 um tempo da opera\u00e7\u00e3o, somado ao tempo de execu\u00e7\u00e3o (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/job-scheduling\">fonte<\/a>). A matriz de tempos de prepara\u00e7\u00e3o do SkyPlanner armazena o tempo de troca de produ\u00e7\u00e3o para cada par de produtos, nos dois sentidos, e sequencia as opera\u00e7\u00f5es para obter o menor tempo total de setup.<\/li>\n\n\n<li><strong>Ferramentas compartilhadas, equipes e a chegada dos materiais determinam o que pode ser produzido a seguir.<\/strong> A disponibilidade limitada das ferramentas \u00e9 respeitada, as opera\u00e7\u00f5es com v\u00e1rios operadores recebem todas as pessoas necess\u00e1rias, o trabalho \u00e9 transferido para centros de trabalho alternativos e as opera\u00e7\u00f5es come\u00e7am quando h\u00e1 estoque ou quando as entregas previstas chegam.<\/li>\n\n\n<li><strong>O plano muda v\u00e1rias vezes por semana.<\/strong> O Autopilot replaneja automaticamente a cada mudan\u00e7a relevante, e as novas datas s\u00e3o enviadas de volta ao Supply Chain Management.<\/li>\n\n\n<li><strong>Voc\u00ea quer uma programa\u00e7\u00e3o que respeite a capacidade real em poucas semanas.<\/strong> O teste gratuito de 30 dias usa seus pr\u00f3prios dados, os planos come\u00e7am em 199 \u20ac por m\u00eas e os operadores fazem apontamentos com o Mobile Confirmations na mesma ferramenta.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gratuito.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todos os recursos do plano Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados dos seus recursos e calend\u00e1rios. Voc\u00ea pode contar com orienta\u00e7\u00e3o na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue suas ordens de produ\u00e7\u00e3o.<\/strong> Exporte as ordens de produ\u00e7\u00e3o em aberto e as opera\u00e7\u00f5es dos roteiros do D365 SCM por meio de um projeto de exporta\u00e7\u00e3o do gerenciamento de dados ou do suplemento do Excel. Importe esses dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Supply Chain Management.<\/strong> A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> Os planos s\u00e3o cobrados mensalmente por centro de trabalho, e voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os detalhes na <a href=\"\/pt-br\/precos\/\">p\u00e1gina de pre\u00e7os<\/a>. Outros ERPs est\u00e3o listados na <a href=\"\/pt-br\/integracoes\/erp\/\">central de integra\u00e7\u00f5es com ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Dynamics 365 Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real e se integra ao Dynamics 365 Supply Chain Management nos dois sentidos: recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es dos roteiros, recursos, produtos liberados e pedidos de compra, e devolve as datas programadas e os recursos alocados. A capacidade e a disponibilidade de cada recurso, operador, ferramenta e material s\u00e3o respeitadas. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca sequencia as opera\u00e7\u00f5es para obter o menor tempo de setup. O Autopilot reprograma automaticamente quando a produ\u00e7\u00e3o muda. Os pre\u00e7os come\u00e7am em 199 \u20ac por m\u00eas, e o teste gratuito dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Dynamics 365 Supply Chain Management tem programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real?<\/summary>\n<p class=\"sp-faq__a\">Apenas em parte. O Planning Optimization s\u00f3 considera a capacidade finita dentro do horizonte de capacidade, e a Microsoft desaconselha o uso de capacidade finita no planejamento mestre quando os turnos alteram a capacidade. O agendamento de trabalhos respeita a capacidade finita, mas programa uma ordem por vez, considerando a capacidade j\u00e1 reservada. O SkyPlanner APS acrescenta uma programa\u00e7\u00e3o \u00fanica para todas as ordens em todo o horizonte, respeitando a capacidade e a disponibilidade de m\u00e1quinas, pessoas, ferramentas e materiais.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar o agendamento de trabalhos do D365 e o Planning Optimization ou o SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Use o Planning Optimization para planejar os materiais e o SkyPlanner para programar a produ\u00e7\u00e3o respeitando a capacidade real. O D365 considera a capacidade finita apenas parcialmente. O Planning Optimization s\u00f3 considera a capacidade finita dentro de um horizonte definido, e a Microsoft desaconselha o planejamento mestre com capacidade finita quando os turnos alteram a capacidade. O agendamento de trabalhos programa uma ordem por vez, considerando as reservas existentes, ent\u00e3o a primeira ordem programada fica com os melhores hor\u00e1rios. O SkyPlanner programa todas as ordens, m\u00e1quinas, pessoas, ferramentas e materiais em conjunto, com uma matriz de tempos de prepara\u00e7\u00e3o para as trocas de produ\u00e7\u00e3o. O Autopilot replaneja automaticamente a cada mudan\u00e7a relevante. A equipe do SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte, e voc\u00ea entra em opera\u00e7\u00e3o em poucas semanas. Os planos come\u00e7am em 199 \u20ac por m\u00eas, com um teste gratuito de 30 dias usando seus pr\u00f3prios dados.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar um suplemento no Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. O SkyPlanner funciona na nuvem, em paralelo ao D365 SCM, e se conecta pelas entidades de dados padr\u00e3o do D365 SCM via OData. Seu administrador registra um aplicativo no Microsoft Entra ID e o associa a um usu\u00e1rio com as fun\u00e7\u00f5es necess\u00e1rias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner substitui o Planning Optimization ou as funcionalidades de manufatura do D365 SCM?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, ele complementa essas funcionalidades. O Planning Optimization continua planejando materiais e propondo ordens de produ\u00e7\u00e3o planejadas. O Supply Chain Management continua respons\u00e1vel por produtos, BOMs, roteiros, compras e custeio. O SkyPlanner programa as ordens de produ\u00e7\u00e3o firmadas de acordo com a capacidade real e envia as datas de volta.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O SkyPlanner \u00e9 s\u00f3 para o Business Central?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. Business Central e Supply Chain Management s\u00e3o produtos distintos da Microsoft, e o SkyPlanner se integra aos dois. Esta p\u00e1gina trata do Supply Chain Management: ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es dos roteiros, recursos e grupos de recursos. O Business Central tem uma <a href=\"\/pt-br\/integracoes\/erp\/business-central\/\">p\u00e1gina pr\u00f3pria<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa Dynamics 365 SCM?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com sua pr\u00f3pria fila de opera\u00e7\u00f5es programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7ada antecipadamente de acordo com seu processo e suas necessidades, junto com o plano, para que voc\u00ea conhe\u00e7a o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o assistida, mesmo em grandes empresas. A equipe mapeia seus recursos e roteiros, conecta as ordens de produ\u00e7\u00e3o e os pedidos de compra e configura o envio dos dados de volta ao ERP. Tudo \u00e9 testado em compara\u00e7\u00e3o com seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de integr\u00e1-lo ao Supply Chain Management?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias usa dados exportados das suas ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es dos roteiros e recursos. Voc\u00ea v\u00ea uma programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o que respeita a capacidade real antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Microsoft Dynamics 365 Supply Chain Management que respeita a capacidade real de m\u00e1quinas e equipes. Ele &#8230; <a title=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/\" aria-label=\"Read more about SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102829","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dynamics 365 SCM: integra\u00e7\u00e3o APS com capacidade finita<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade finita e integra\u00e7\u00e3o bidirecional. A partir de 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade finita e integra\u00e7\u00e3o bidirecional. A partir de 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/\",\"name\":\"Dynamics 365 SCM: integra\u00e7\u00e3o APS com capacidade finita\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade finita e integra\u00e7\u00e3o bidirecional. A partir de 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/dynamics-365-scm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dynamics 365 SCM: integra\u00e7\u00e3o APS com capacidade finita","description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade finita e integra\u00e7\u00e3o bidirecional. A partir de 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes","og_description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade finita e integra\u00e7\u00e3o bidirecional. A partir de 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"17 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/","name":"Dynamics 365 SCM: integra\u00e7\u00e3o APS com capacidade finita","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o com capacidade finita e integra\u00e7\u00e3o bidirecional. A partir de 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/dynamics-365-scm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Microsoft Dynamics 365 Supply Chain Management SkyPlanner APS para Dynamics 365 Supply Chain Management: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real de m\u00e1quinas e equipes O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Microsoft Dynamics 365 Supply Chain Management que respeita a capacidade real de m\u00e1quinas e equipes. Ele&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/102829","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=102829"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/102829\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=102829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}