{"id":102800,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracoes\/erp\/acumatica\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"acumatica","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/","title":{"rendered":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS para Acumatica: <span class=\"hl\">programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica Manufacturing Edition que respeita a capacidade real de m\u00e1quinas e equipes. Ele considera os limites de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material em hor\u00e1rios exatos, ao longo de todo o horizonte de planejamento. O APS do pr\u00f3prio Acumatica faz um planejamento agregado. A programa\u00e7\u00e3o com capacidade finita \u00e9 executada pelo formul\u00e1rio Rough Cut Planning, e o Classic APS planeja com capacidade infinita todas as ordens com t\u00e9rmino al\u00e9m de 120 dias (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">fonte<\/a>). Com o SkyPlanner, voc\u00ea v\u00ea onde e quando cada opera\u00e7\u00e3o ser\u00e1 executada, e o Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gratuito<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com opera\u00e7\u00f5es programadas nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A integra\u00e7\u00e3o entre SkyPlanner e Acumatica \u00e9 bidirecional: ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, centros de trabalho, m\u00e1quinas, ferramentas, itens de estoque e pedidos de compra s\u00e3o enviados ao SkyPlanner. As datas planejadas das opera\u00e7\u00f5es e os apontamentos de produ\u00e7\u00e3o retornam ao Acumatica. Durante a implanta\u00e7\u00e3o, a equipe SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente Acumatica.<\/p>\n\n\n<p>Os planos custam a partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos. Cada centro de trabalho adicional custa 20 \u20ac por m\u00eas. O teste gr\u00e1tis dura 30 dias, permite at\u00e9 20 centros de trabalho e n\u00e3o exige cart\u00e3o de cr\u00e9dito.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que muda na sua produ\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os limites de cada recurso s\u00e3o respeitados o tempo todo.<\/p>\n\n\n<p class=\"fx-pain__b\">Centros de trabalho, m\u00e1quinas, pessoas e ferramentas recebem uma programa\u00e7\u00e3o real, que considera turnos, aus\u00eancias e horas extras. Uma opera\u00e7\u00e3o que exige tr\u00eas operadores recebe tr\u00eas pessoas com disponibilidade no turno. Um molde em uso em uma m\u00e1quina nunca \u00e9 alocado em outra ao mesmo tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menor custo nas trocas de produ\u00e7\u00e3o.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner conhece o tempo de troca entre cada par de produtos, nos dois sentidos. Na produ\u00e7\u00e3o de alimentos, a presen\u00e7a de um alerg\u00eanico pode determinar esse tempo: passar de um produto sem alerg\u00eanico para outro com alerg\u00eanico n\u00e3o exige limpeza, mas o caminho inverso exige uma limpeza completa. O motor de programa\u00e7\u00e3o sequencia as opera\u00e7\u00f5es para perder o m\u00ednimo de tempo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datas de entrega que voc\u00ea pode prometer.<\/p>\n\n\n<p class=\"fx-pain__b\">A programa\u00e7\u00e3o mostra, com meses de anteced\u00eancia, quando cada ordem de produ\u00e7\u00e3o realmente ser\u00e1 conclu\u00edda. Voc\u00ea informa os prazos aos clientes com base nesse plano.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Reprograma\u00e7\u00e3o autom\u00e1tica diante de urg\u00eancias e quebras.<\/p>\n\n\n<p class=\"fx-pain__b\">Quando uma m\u00e1quina para ou chega um pedido urgente, o Autopilot reprograma a produ\u00e7\u00e3o. Os bloqueios e as prioridades que voc\u00ea definiu continuam sendo respeitados.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O in\u00edcio depende do material dispon\u00edvel, n\u00e3o da falta dele.<\/p>\n\n\n<p class=\"fx-pain__b\">O SkyPlanner verifica o estoque e os pedidos de compra a receber. Uma opera\u00e7\u00e3o que depende de uma entrega do fornecedor \u00e9 programada para depois dessa data de entrega.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Os operadores veem sua fila de opera\u00e7\u00f5es.<\/p>\n\n\n<p class=\"fx-pain__b\">Cada operador v\u00ea as pr\u00f3ximas opera\u00e7\u00f5es no celular ou tablet e faz os apontamentos conforme o trabalho acontece. O escrit\u00f3rio acompanha o andamento em tempo real, e os apontamentos retornam ao Acumatica.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es de fabricantes sobre o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, na \u00e1rea de produ\u00e7\u00e3o de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas do Excel para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de opera\u00e7\u00f5es chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/utu\/\">Leia o depoimento da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Fabrica\u00e7\u00e3o de produtos farmac\u00eauticos<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e gerar um plano otimizado de tr\u00eas meses para todos os centros de trabalho leva menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o da Fredman Operations, ao lado de uma c\u00e9lula robotizada de paletiza\u00e7\u00e3o em Rauma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 meses<\/b><span>de visibilidade da capacidade dispon\u00edvel para a equipe de vendas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner oferece uma base confi\u00e1vel para todo o planejamento da produ\u00e7\u00e3o.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gerente de produ\u00e7\u00e3o<\/b><br>Fredman Operations \u00b7 Pap\u00e9is para embalagens pr\u00f3prias para contato com alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A equipe de vendas v\u00ea a capacidade dispon\u00edvel com seis meses de anteced\u00eancia, e as solicita\u00e7\u00f5es de altera\u00e7\u00e3o da programa\u00e7\u00e3o que levavam uma hora ou mais agora s\u00e3o respondidas em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/fredman-operations\/\">Leia o depoimento da Fredman Operations<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de pontualidade de entrega desde 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner nos d\u00e1 visibilidade da capacidade e torna o planejamento previs\u00edvel.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Fabrica\u00e7\u00e3o de produtos qu\u00edmicos e alimentos<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega se mant\u00e9m em 100% durante todo o per\u00edodo de uso do SkyPlanner, desde 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/historias-de-clientes\/opes-corporation\/\">Leia o depoimento da Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-acumatica-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como funciona a integra\u00e7\u00e3o com o Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>O Acumatica envia o trabalho a programar.<\/strong> O SkyPlanner recebe as ordens de produ\u00e7\u00e3o com suas opera\u00e7\u00f5es, centros de trabalho, m\u00e1quinas, ferramentas, turnos, itens de estoque e pedidos de compra.<\/li>\n\n\n<li><strong>O SkyPlanner cria a programa\u00e7\u00e3o e a mant\u00e9m atualizada.<\/strong> O motor Arcturus programa cada opera\u00e7\u00e3o em segundos e reprograma conforme a produ\u00e7\u00e3o muda.<\/li>\n\n\n<li><strong>As datas e os apontamentos retornam ao Acumatica.<\/strong> As datas planejadas de in\u00edcio e fim s\u00e3o gravadas nas opera\u00e7\u00f5es das ordens de produ\u00e7\u00e3o no Acumatica, e a ordem \u00e9 firmada para que o Acumatica preserve essas datas. Os apontamentos de produ\u00e7\u00e3o geram registros de m\u00e3o de obra e movimenta\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p>O Acumatica continua sendo o sistema de refer\u00eancia dos seus dados. Itens de estoque, listas de materiais, MRP, compras e custos permanecem onde est\u00e3o. O SkyPlanner fica respons\u00e1vel por uma coisa: a sequ\u00eancia e os hor\u00e1rios de cada opera\u00e7\u00e3o em cada recurso.<\/p>\n\n\n<p>O SkyPlanner se conecta pela REST API baseada em contratos do pr\u00f3prio Acumatica, usando os endpoints Manufacturing e Default. Assim, nada \u00e9 instalado na sua inst\u00e2ncia do Acumatica. Cada f\u00e1brica usa o Acumatica de uma forma, por isso a equipe SkyPlanner configura a integra\u00e7\u00e3o de acordo com o seu ambiente durante a implanta\u00e7\u00e3o e oferece suporte ap\u00f3s a entrada em opera\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, conforme seus processos e necessidades. Seu parceiro Acumatica ou seus pr\u00f3prios desenvolvedores tamb\u00e9m podem criar a integra\u00e7\u00e3o usando a API documentada do SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>).<\/p>\n\n\n<p>As entidades, o mapeamento de dados e as regras de grava\u00e7\u00e3o de retorno est\u00e3o no <a href=\"\/pt-br\/integracoes\/erp\/acumatica\/guia-de-integracao\/\">guia de integra\u00e7\u00e3o com o Acumatica para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-acumatica-schedules-and-what-skyplanner-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o Acumatica programa e o que o SkyPlanner acrescenta<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O Advanced Planning and Scheduling (APS) do Acumatica Manufacturing Edition faz um planejamento agregado, n\u00e3o uma programa\u00e7\u00e3o detalhada que respeita a capacidade real dos recursos. No Classic APS, voc\u00ea executa o formul\u00e1rio Rough Cut Planning (AM501000) para as ordens selecionadas (<a href=\"https:\/\/help.myob.com.au\/advanced\/Docs\/Published\/UserGuide\/MFG_APS_GeneralInfo.html\">fonte<\/a>). Na vers\u00e3o 2026 R2, o APS oferece dois motores, e <a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">o Acumatica afirma<\/a>: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (Os dois motores APS n\u00e3o podem ser ativados ao mesmo tempo.) A pr\u00f3pria documenta\u00e7\u00e3o do Acumatica estabelece os limites:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>O Classic APS respeita a capacidade apenas por 120 dias.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (No APS, o sistema usa planejamento com capacidade infinita para ordens de produ\u00e7\u00e3o cuja data de t\u00e9rmino ultrapassa esse prazo.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">fonte<\/a>)<\/li>\n\n\n<li><strong>O Classic APS aloca blocos fixos de tempo.<\/strong> &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (As opera\u00e7\u00f5es s\u00e3o sempre programadas em blocos cont\u00edguos, pulando os hor\u00e1rios sem expediente e as pausas previstas.)<\/li>\n\n\n<li><strong>O novo motor Optimized deixa m\u00e1quinas e ferramentas de fora.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (O Optimized APS programa centros de trabalho, em vez de m\u00e1quinas individuais, ferramentas ou disponibilidade de materiais.) Ele est\u00e1 listado em Experimental Features. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">fonte<\/a>)<\/li>\n\n\n<li><strong>Sem sequenciamento por caracter\u00edsticas do produto.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (O motor n\u00e3o usa os valores dos atributos para determinar a sequ\u00eancia das opera\u00e7\u00f5es na programa\u00e7\u00e3o.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">fonte<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Na produ\u00e7\u00e3o di\u00e1ria, a m\u00e3o de obra \u00e9 representada pelo tamanho e pela efici\u00eancia da equipe no turno de um centro de trabalho, n\u00e3o por pessoas identificadas. O tempo de setup \u00e9 um valor fixo por opera\u00e7\u00e3o, independentemente do que foi produzido antes. Para reprogramar, voc\u00ea precisa executar um processo pelo Rough Cut Planning ou pelo APS Maintenance Process. O resultado \u00e9 um plano agregado: tamanho de equipe em vez de pessoas, um \u00fanico tempo de setup por opera\u00e7\u00e3o e capacidade respeitada apenas por 120 dias.<\/p>\n\n\n<p>A verifica\u00e7\u00e3o de materiais no Classic APS \u00e9 tudo ou nada. Quando est\u00e1 ativada, todos os materiais precisam estar dispon\u00edveis na quantidade total antes que a ordem seja programada. As ordens s\u00e3o carregadas uma ap\u00f3s a outra em uma sequ\u00eancia fixa: primeiro a prioridade de despacho, depois a data de restri\u00e7\u00e3o e, por fim, o n\u00famero da ordem de produ\u00e7\u00e3o. Se quiser outra sequ\u00eancia, o planejador precisa alterar as prioridades e executar o processo novamente.<\/p>\n\n\n<p>Cada etapa e cada limite s\u00e3o explicados em <a href=\"\/pt-br\/integracoes\/erp\/acumatica\/programacao-producao\/\">O Acumatica oferece programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"acumatica-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Acumatica hoje e com o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Acumatica APS<\/th><th>Acumatica com SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Horizonte com capacidade respeitada<\/td><td>Planejamento agregado: o Classic respeita a capacidade apenas para ordens com t\u00e9rmino em at\u00e9 120 dias; al\u00e9m disso, considera capacidade infinita<\/td><td>Limites de cada m\u00e1quina, pessoa, ferramenta e material respeitados em hor\u00e1rios exatos, ao longo de todo o horizonte<\/td><\/tr><tr><td>Recursos<\/td><td>Classic: centros de trabalho, m\u00e1quinas e ferramentas; Optimized: apenas centros de trabalho<\/td><td>Centros de trabalho, m\u00e1quinas, pessoas e ferramentas, todos com seus limites respeitados<\/td><\/tr><tr><td>M\u00e3o de obra<\/td><td>Tamanho e efici\u00eancia da equipe por turno<\/td><td>Operadores identificados individualmente, com turnos, aus\u00eancias e horas extras<\/td><\/tr><tr><td>Sequenciamento<\/td><td>Prioridade de despacho, depois data de restri\u00e7\u00e3o e, por fim, n\u00famero da ordem<\/td><td>O motor sequencia por prioridades, prazos de entrega e setups<\/td><\/tr><tr><td>Trocas de produ\u00e7\u00e3o<\/td><td>Tempo de setup fixo por opera\u00e7\u00e3o<\/td><td>Matriz de tempos de prepara\u00e7\u00e3o: menor tempo total de setup<\/td><\/tr><tr><td>Materiais<\/td><td>Classic: todo o material deve estar dispon\u00edvel na quantidade total; caso contr\u00e1rio, a ordem aguarda<\/td><td>Estoque e pedidos de compra a receber, por data de entrega<\/td><\/tr><tr><td>Altera\u00e7\u00f5es<\/td><td>Execu\u00e7\u00e3o do Rough Cut Planning ou do APS Maintenance Process<\/td><td>Autopilot replaneja toda a f\u00e1brica respeitando suas prioridades<\/td><\/tr><tr><td>Vis\u00e3o do planejador<\/td><td>Production Schedule Board: altera\u00e7\u00e3o de datas e prioridades<\/td><td>Gantt interativo: mova opera\u00e7\u00f5es sem perder a consist\u00eancia do plano<\/td><\/tr><tr><td>Ch\u00e3o de f\u00e1brica<\/td><td>Apontamentos em Labor, Move e Materials no Acumatica<\/td><td>Operadores consultam sua fila e fazem apontamentos pelo celular ou tablet<\/td><\/tr><tr><td>In\u00edcio<\/td><td>APS &#8220;subject to licensing&#8221; (sujeito a licenciamento); Optimized \u00e9 experimental<\/td><td>Suas pr\u00f3prias ordens programadas no teste de 30 dias, com entrada em opera\u00e7\u00e3o em poucas semanas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-acumatica\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como escolher um sistema de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Acumatica<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acumatica APS faz planejamento agregado: executa o Rough Cut Planning, considera capacidade finita por 120 dias, representa a m\u00e3o de obra pelo tamanho da equipe e usa um tempo de setup por opera\u00e7\u00e3o. A possibilidade de us\u00e1-lo depende da sua licen\u00e7a. A Acumatica informa que &#8220;Advanced planning and scheduling is subject to licensing&#8221; (o planejamento e a programa\u00e7\u00e3o avan\u00e7ados est\u00e3o sujeitos a licenciamento) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">fonte<\/a>). O recurso faz parte do Manufacturing Edition, e seu novo motor Optimized \u00e9 um recurso experimental da vers\u00e3o 2026 R2. Uma vez habilitado, ele aloca as ordens conforme o tamanho da equipe, em uma sequ\u00eancia fixa de prioridades, e o planejador precisa execut\u00e1-lo novamente ap\u00f3s cada altera\u00e7\u00e3o. Uma f\u00e1brica que est\u00e1 deixando as planilhas precisa de uma programa\u00e7\u00e3o que se mantenha atualizada e chegue aos operadores. Em qualquer uma das op\u00e7\u00f5es, os dados do Acumatica continuam sendo a refer\u00eancia principal.<\/p>\n\n\n<p><strong>Escolha SkyPlanner em vez de Acumatica APS quando:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Voc\u00ea quer uma programa\u00e7\u00e3o que respeite a capacidade real de m\u00e1quinas e pessoas, n\u00e3o um planejamento aproximado da capacidade.<\/strong> A disponibilidade de cada m\u00e1quina, pessoa, ferramenta e material \u00e9 respeitada em cada hor\u00e1rio, ao longo de todo o horizonte, inclusive para ordens al\u00e9m de 120 dias.<\/li>\n\n\n<li><strong>O plano \u00e9 limitado pela disponibilidade de cada operador, n\u00e3o pelo tamanho da equipe.<\/strong> A programa\u00e7\u00e3o considera turnos, aus\u00eancias e opera\u00e7\u00f5es com v\u00e1rios operadores, pessoa por pessoa.<\/li>\n\n\n<li><strong>As trocas de produ\u00e7\u00e3o determinam quanto voc\u00ea produz.<\/strong> A matriz de tempos de prepara\u00e7\u00e3o organiza as sequ\u00eancias de al\u00e9rgenos, cores ou materiais na ordem que exige o menor tempo de setup.<\/li>\n\n\n<li><strong>M\u00e1quinas, ferramentas e materiais precisam ser verificados em conjunto.<\/strong> Todas as restri\u00e7\u00f5es s\u00e3o consideradas em uma \u00fanica programa\u00e7\u00e3o atualizada, sem precisar escolher um motor.<\/li>\n\n\n<li><strong>O plano muda v\u00e1rias vezes por semana.<\/strong> Autopilot replaneja a cada altera\u00e7\u00e3o, Running Time Lock congela as opera\u00e7\u00f5es das pr\u00f3ximas horas, e as novas datas s\u00e3o enviadas de volta ao Acumatica.<\/li>\n\n\n<li><strong>Os operadores devem trabalhar a partir da pr\u00f3pria fila.<\/strong> Mobile Confirmations disponibiliza a programa\u00e7\u00e3o no celular ou tablet, e os apontamentos s\u00e3o enviados de volta ao Acumatica.<\/li>\n\n\n<li><strong>Voc\u00ea quer resultados em poucas semanas.<\/strong> Suas pr\u00f3prias ordens s\u00e3o programadas durante o teste de 30 dias, e a equipe SkyPlanner configura a integra\u00e7\u00e3o e oferece suporte.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Como come\u00e7ar<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Inicie o teste gr\u00e1tis.<\/strong> 30 dias, at\u00e9 20 centros de trabalho, todos os recursos do Basic, sem cart\u00e3o de cr\u00e9dito.<\/li>\n\n\n<li><strong>Modele sua produ\u00e7\u00e3o.<\/strong> Cadastre centros de trabalho, m\u00e1quinas, pessoas e turnos no SkyPlanner ou importe esses dados. Voc\u00ea pode contar com assist\u00eancia na configura\u00e7\u00e3o inicial.<\/li>\n\n\n<li><strong>Carregue suas ordens.<\/strong> Exporte as ordens de produ\u00e7\u00e3o em aberto e suas opera\u00e7\u00f5es de uma Generic Inquiry do Acumatica para o Excel. Importe os dados e compare a programa\u00e7\u00e3o do SkyPlanner com seu plano atual.<\/li>\n\n\n<li><strong>Conecte o Acumatica.<\/strong> A equipe SkyPlanner configura a integra\u00e7\u00e3o bidirecional e oferece suporte depois da entrada em opera\u00e7\u00e3o.<\/li>\n\n<\/ol>\n\n\n<p><strong>Pre\u00e7os.<\/strong> A cobran\u00e7a \u00e9 mensal, e voc\u00ea pode adicionar ou remover centros de trabalho ou cancelar a qualquer momento. Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a> para saber mais.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Qual \u00e9 o melhor complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para Acumatica?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real de m\u00e1quinas e pessoas e se integra ao Acumatica nos dois sentidos. Ele recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, centros de trabalho, m\u00e1quinas, ferramentas, itens de estoque e pedidos de compra, e devolve as datas planejadas das opera\u00e7\u00f5es e os apontamentos de produ\u00e7\u00e3o. A programa\u00e7\u00e3o respeita os limites de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material. Uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca sequencia as opera\u00e7\u00f5es para obter o menor tempo de setup. Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o. Os pre\u00e7os come\u00e7am em 199 \u20ac por m\u00eas, e o teste gr\u00e1tis dura 30 dias.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>O Acumatica oferece programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade finita?<\/summary>\n<p class=\"sp-faq__a\">Apenas no n\u00edvel de planejamento aproximado da capacidade. O Advanced Planning and Scheduling do Manufacturing Edition \u00e9 executado como Rough Cut Planning. O Classic APS planeja com capacidade infinita as ordens com t\u00e9rmino al\u00e9m de 120 dias, e o motor experimental Optimized programa apenas centros de trabalho. SkyPlanner APS respeita a disponibilidade real de cada m\u00e1quina, pessoa, ferramenta e material em todo o horizonte de programa\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Precisamos instalar algo no Acumatica?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o. SkyPlanner funciona na nuvem, em paralelo ao Acumatica, e se conecta pela REST API padr\u00e3o do Acumatica, baseada em contratos. A integra\u00e7\u00e3o se autentica por meio de uma aplica\u00e7\u00e3o conectada que voc\u00ea registra no Acumatica.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner substitui o Acumatica Manufacturing Edition?<\/summary>\n<p class=\"sp-faq__a\">N\u00e3o, ele o complementa. O Acumatica continua respons\u00e1vel pelos itens de estoque, listas de materiais, MRP, compras, estoque, custeio e finan\u00e7as. SkyPlanner programa suas ordens de produ\u00e7\u00e3o conforme a capacidade real e envia as datas de volta.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Devemos usar Acumatica APS ou SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Escolha SkyPlanner quando quiser uma programa\u00e7\u00e3o que respeite a capacidade real, em vez de um planejamento aproximado da capacidade. No Acumatica, a programa\u00e7\u00e3o com capacidade finita \u00e9 executada pelo Rough Cut Planning, e o Classic APS considera capacidade infinita al\u00e9m de 120 dias. O APS depende de licenciamento, representa a m\u00e3o de obra pelo tamanho da equipe, usa um tempo de setup fixo por opera\u00e7\u00e3o e s\u00f3 recalcula quando um planejador executa o Rough Cut Planning ou o APS Maintenance Process. SkyPlanner respeita a disponibilidade de cada m\u00e1quina, pessoa, ferramenta e material em cada hor\u00e1rio, ao longo de todo o horizonte. Ele sequencia as trocas com uma matriz de tempos de prepara\u00e7\u00e3o que considera o sentido de cada troca, replaneja automaticamente com Autopilot e disponibiliza a fila de cada operador no celular ou tablet. Voc\u00ea entra em opera\u00e7\u00e3o em poucas semanas, a partir de 199 \u20ac por m\u00eas, com um teste de 30 dias usando seus pr\u00f3prios dados. Se o APS permanecer ativo, SkyPlanner firma cada ordem que programa, e a programa\u00e7\u00e3o com capacidade finita do Acumatica n\u00e3o reprograma ordens firmadas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto custa o SkyPlanner para uma f\u00e1brica que usa Acumatica?<\/summary>\n<p class=\"sp-faq__a\">A partir de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos, mais 20 \u20ac por m\u00eas por centro de trabalho adicional. Um centro de trabalho \u00e9 um recurso de produ\u00e7\u00e3o com sua pr\u00f3pria fila de opera\u00e7\u00f5es programadas. A integra\u00e7\u00e3o \u00e9 or\u00e7ada antecipadamente, junto com seu plano, conforme seus processos e necessidades. Assim, voc\u00ea conhece o custo total antes de come\u00e7ar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quanto tempo leva a implanta\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A implanta\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da configura\u00e7\u00e3o. A equipe mapeia seus centros de trabalho, m\u00e1quinas e opera\u00e7\u00f5es da BOM, conecta as ordens de produ\u00e7\u00e3o e os pedidos de compra e envia de volta as datas planejadas. Tudo \u00e9 testado em compara\u00e7\u00e3o com seu plano atual antes da entrada em opera\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar o SkyPlanner antes de integrar com o Acumatica?<\/summary>\n<p class=\"sp-faq__a\">Sim. O teste de 30 dias usa uma exporta\u00e7\u00e3o para Excel de uma Generic Inquiry do Acumatica. Voc\u00ea visualiza uma <a href=\"\/pt-br\/recursos-pt-br\/programacao-da-producao-com-capacidade-finita\/\">programa\u00e7\u00e3o da sua pr\u00f3pria produ\u00e7\u00e3o que respeita a capacidade real<\/a> antes de come\u00e7ar qualquer trabalho de integra\u00e7\u00e3o.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica Manufacturing Edition que respeita a capacidade real de m\u00e1quinas e equipes. Ele considera os limites de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material &#8230; <a title=\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/\" aria-label=\"Read more about SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100685,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102800","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o Acumatica: programa\u00e7\u00e3o com APS e capacidade real<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS para Acumatica: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com limites de cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac por m\u00eas.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS para Acumatica: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com limites de cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac por m\u00eas.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/acumatica\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/acumatica\\\/\",\"name\":\"Integra\u00e7\u00e3o Acumatica: programa\u00e7\u00e3o com APS e capacidade real\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS para Acumatica: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com limites de cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac por m\u00eas.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/acumatica\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/acumatica\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/acumatica\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o Acumatica: programa\u00e7\u00e3o com APS e capacidade real","description":"SkyPlanner APS para Acumatica: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com limites de cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac por m\u00eas.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/","og_locale":"pt_BR","og_type":"article","og_title":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real","og_description":"SkyPlanner APS para Acumatica: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com limites de cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac por m\u00eas.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"16 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/","name":"Integra\u00e7\u00e3o Acumatica: programa\u00e7\u00e3o com APS e capacidade real","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS para Acumatica: integra\u00e7\u00e3o bidirecional e programa\u00e7\u00e3o com limites de cada m\u00e1quina, pessoa, ferramenta e material. A partir de 199 \u20ac por m\u00eas.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/acumatica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS para Acumatica: programa\u00e7\u00e3o da produ\u00e7\u00e3o com capacidade real O SkyPlanner APS \u00e9 um complemento de programa\u00e7\u00e3o da produ\u00e7\u00e3o para o Acumatica Manufacturing Edition que respeita a capacidade real de m\u00e1quinas e equipes. Ele considera os limites de cada centro de trabalho, m\u00e1quina, operador, ferramenta e material&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/102800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=102800"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/102800\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100685"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=102800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}