{"id":101160,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101160"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"guia-de-integracao","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","title":{"rendered":"Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/pt-br\/integracoes\/\">Integra\u00e7\u00f5es<\/a> \/ <a href=\"\/pt-br\/integracoes\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Guia de integra\u00e7\u00e3o do SAP S\/4HANA <span class=\"hl\">para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Este guia mostra a parceiros SAP, equipes de TI e compradores t\u00e9cnicos como o SkyPlanner APS se conecta ao SAP S\/4HANA. O SkyPlanner se integra ao S\/4HANA nos dois sentidos pelas APIs OData liberadas pela SAP:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Recebe ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, capacidade dos centros de trabalho, estoque e pedidos de compra em aberto.<\/li>\n\n\n<li>Envia de volta as datas de in\u00edcio planejadas para cada opera\u00e7\u00e3o da ordem de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Lan\u00e7a os registros de tempo dos operadores como confirma\u00e7\u00f5es de ordens de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Os webhooks do SkyPlanner enviam as altera\u00e7\u00f5es na programa\u00e7\u00e3o assim que elas ocorrem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/pt-br\/vendas-de-contacto\/\">Agendar demonstra\u00e7\u00e3o<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Gr\u00e1fico de Gantt do SkyPlanner APS com trabalhos programados nos centros de trabalho e uma lista de ordens abaixo.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O S\/4HANA mant\u00e9m materiais, BOMs, roteiros de produ\u00e7\u00e3o, ordens de produ\u00e7\u00e3o, estoque e custeio. A equipe SkyPlanner configura a integra\u00e7\u00e3o conforme o seu ambiente S\/4HANA durante a implanta\u00e7\u00e3o e d\u00e1 suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. Para entender a justificativa de neg\u00f3cio, consulte a <a href=\"\/pt-br\/integracoes\/erp\/sap-s4hana\/\">p\u00e1gina de programa\u00e7\u00e3o da produ\u00e7\u00e3o com SAP S\/4HANA<\/a>. Para saber o que o S\/4HANA programa por conta pr\u00f3pria, leia <a href=\"\/pt-br\/integracoes\/erp\/sap-s4hana\/programacao-producao\/\">O SAP S\/4HANA oferece programa\u00e7\u00e3o da produ\u00e7\u00e3o que respeita a capacidade real das m\u00e1quinas e da equipe?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Op\u00e7\u00f5es de integra\u00e7\u00e3o com SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>O S\/4HANA disponibiliza suas interfaces de integra\u00e7\u00e3o como servi\u00e7os OData liberados, listados no SAP Business Accelerator Hub (api.sap.com). A integra\u00e7\u00e3o de programa\u00e7\u00e3o utiliza servi\u00e7os OData V2. IDocs e BAPIs continuam dispon\u00edveis, mas este guia usa as APIs OData liberadas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Autentica\u00e7\u00e3o por edi\u00e7\u00e3o<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>On-premise e Private Edition.<\/strong> Os servi\u00e7os s\u00e3o ativados no SAP Gateway pela transa\u00e7\u00e3o <code>\/IWFND\/MAINT_SERVICE<\/code>. O usu\u00e1rio de integra\u00e7\u00e3o precisa dos objetos de autoriza\u00e7\u00e3o correspondentes, como <code>C_AFRU_AWK<\/code> para confirma\u00e7\u00f5es, <code>C_AFKO_AWK<\/code> para os itens de movimenta\u00e7\u00e3o de mercadorias lan\u00e7ados com elas e <code>M_PLAF_ORG<\/code> para ordens planejadas.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Os servi\u00e7os s\u00e3o expostos apenas por meio de acordos de comunica\u00e7\u00e3o. Seguindo a <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">configura\u00e7\u00e3o de comunica\u00e7\u00e3o de entrada da SAP<\/a>, voc\u00ea cria um usu\u00e1rio de comunica\u00e7\u00e3o, um sistema de comunica\u00e7\u00e3o e um acordo de comunica\u00e7\u00e3o no aplicativo <strong>Communication Arrangements<\/strong>, com base em um cen\u00e1rio de comunica\u00e7\u00e3o SAP (<code>SAP_COM_xxxx<\/code>). O cen\u00e1rio define quais servi\u00e7os s\u00e3o expostos e quais m\u00e9todos de autentica\u00e7\u00e3o est\u00e3o dispon\u00edveis:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; baseada em token: fluxos bearer de OAuth, SAML ou OpenID Connect, com propaga\u00e7\u00e3o de identidade para um usu\u00e1rio de neg\u00f3cio &#8211; certificado de cliente &#8211; autentica\u00e7\u00e3o b\u00e1sica com um usu\u00e1rio t\u00e9cnico de comunica\u00e7\u00e3o<\/p>\n\n\n<p>A SAP recomenda autentica\u00e7\u00e3o por token ou certificado.<\/p>\n\n\n<p>Do lado do SkyPlanner, a integra\u00e7\u00e3o usa uma REST API com autentica\u00e7\u00e3o por token de API, documentada em Swagger\/OpenAPI (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">refer\u00eancia da API<\/a>). Assim, o middleware gerencia a autentica\u00e7\u00e3o do SAP de um lado e o token de API do SkyPlanner do outro.<\/p>\n\n\n<h3 class=\"wp-block-heading\">APIs para programa\u00e7\u00e3o da produ\u00e7\u00e3o<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Servi\u00e7o<\/th><th>Entidades e a\u00e7\u00f5es utilizadas<\/th><th>Finalidade<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; a\u00e7\u00f5es <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Ordens, opera\u00e7\u00f5es, componentes, PRTs, status e grava\u00e7\u00e3o da programa\u00e7\u00e3o no SAP<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>Centros de trabalho, categorias de capacidade, intervalos e turnos<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Roteiros de produ\u00e7\u00e3o padr\u00e3o para planejar antes da cria\u00e7\u00e3o das ordens<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>Estrutura de produto multin\u00edvel<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Materiais (chamados de Product na API). A SAP agora recomenda a API Product (Version 2) para a maioria das entidades de produto<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>Resultados do MRP Live antes da convers\u00e3o<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Estoque por centro e dep\u00f3sito, para verificar a disponibilidade de materiais<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Pedidos de compra em aberto para materiais a receber<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; a\u00e7\u00f5es <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Confirma\u00e7\u00f5es e movimenta\u00e7\u00f5es de mercadorias do ch\u00e3o de f\u00e1brica<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Na API de ordens de produ\u00e7\u00e3o, as opera\u00e7\u00f5es s\u00e3o identificadas pelas chaves <code>OrderInternalBillOfOperations<\/code> e <code>OrderIntBillOfOperationsItem<\/code>, n\u00e3o pelo n\u00famero da opera\u00e7\u00e3o que o planejador v\u00ea. A a\u00e7\u00e3o <code>GetConfProposal<\/code> da API de confirma\u00e7\u00f5es identifica a mesma opera\u00e7\u00e3o por <code>OrderID<\/code> e <code>OrderOperation<\/code>. Armazene as chaves internas e o n\u00famero da opera\u00e7\u00e3o no SkyPlanner desde a primeira carga.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Eventos<\/h3>\n\n\n<p>O S\/4HANA emite os <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">eventos de neg\u00f3cio<\/a> <strong>Production Order Created<\/strong> e <strong>Production Order Changed<\/strong> com <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code> e <code>ProductionPlant<\/code> no payload. O payload cont\u00e9m apenas chaves, por isso a integra\u00e7\u00e3o rel\u00ea a ordem e suas opera\u00e7\u00f5es. O evento Changed \u00e9 disparado a cada altera\u00e7\u00e3o na ordem, portanto aplique debounce. No sentido inverso, os webhooks do SkyPlanner enviam notifica\u00e7\u00f5es em tempo real quando a programa\u00e7\u00e3o ou o estado de uma opera\u00e7\u00e3o muda.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Comece com arquivos<\/h3>\n\n\n<p>Para o teste, exporte ordens de produ\u00e7\u00e3o e centros de trabalho dos relat\u00f3rios de lista do S\/4HANA para Excel ou CSV e importe os arquivos no SkyPlanner. Isso valida a programa\u00e7\u00e3o antes de qualquer interven\u00e7\u00e3o no Gateway ou nos acordos de comunica\u00e7\u00e3o.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapeamento de dados: do SAP S\/4HANA para o SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Entidade \/ endpoint do S\/4HANA<\/th><th>Objeto do SkyPlanner<\/th><th>Dire\u00e7\u00e3o<\/th><th>Frequ\u00eancia<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (material)<\/td><td>Produto ou material<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carga inicial, depois cargas incrementais agendadas<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Estrutura do produto, subprodutos<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carga inicial, depois sincroniza\u00e7\u00f5es agendadas<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>Centro de trabalho<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carga inicial e a cada altera\u00e7\u00e3o<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Capacidade e turnos<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carga inicial, depois sincroniza\u00e7\u00f5es agendadas<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Etapas do processo e tempos padr\u00e3o<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Carga inicial, depois sincroniza\u00e7\u00f5es agendadas<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (liberada ou criada)<\/td><td>Ordem com prazo de entrega<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Quase em tempo real nos eventos Created\/Changed ou por consultas peri\u00f3dicas agendadas<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>Opera\u00e7\u00e3o (etapa do processo em um centro de trabalho)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Junto com a ordem<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (recursos\/ferramentas de produ\u00e7\u00e3o)<\/td><td>Ferramentas, programadas como recursos compartilhados com capacidade finita<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Junto com a ordem<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Necessidades de materiais e estoque<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Agendada, com intervalo acordado na defini\u00e7\u00e3o de escopo<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): quantidade em aberto e data de entrega da remessa<\/td><td>Pedidos de compra \/ materiais a receber com data prevista de entrega<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Agendada, com intervalo acordado na defini\u00e7\u00e3o de escopo<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (opcional)<\/td><td>Ordens planejadas antes da convers\u00e3o<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Ap\u00f3s cada execu\u00e7\u00e3o do MRP Live<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (in\u00edcio da opera\u00e7\u00e3o, programa\u00e7\u00e3o para a frente)<\/td><td>Programa\u00e7\u00e3o<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>A cada altera\u00e7\u00e3o na programa\u00e7\u00e3o, via webhook<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (quantidade boa, refugo, atividades)<\/td><td>Apontamentos de tempo e quantidades<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>A cada evento de apontamento ou em lotes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Padr\u00f5es de integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Carga de dados mestres.<\/strong> Carregue materiais, BOMs, centros de trabalho com seus intervalos de capacidade e turnos, e roteiros de produ\u00e7\u00e3o. Defina nesta etapa qual sistema ser\u00e1 respons\u00e1vel pelos turnos. Uma divis\u00e3o que funciona: o calend\u00e1rio de f\u00e1brica fica no S\/4HANA, enquanto as escalas detalhadas de turnos, as aus\u00eancias e as horas extras ficam no SkyPlanner, onde os planejadores fazem altera\u00e7\u00f5es diariamente.<\/p>\n\n\n<p><strong>2. Sincroniza\u00e7\u00e3o de ordens.<\/strong> Assine os eventos Production Order Created\/Changed ou consulte periodicamente <code>A_ProductionOrder_2<\/code> pelo registro de data e hora da altera\u00e7\u00e3o quando os eventos de neg\u00f3cio n\u00e3o estiverem configurados. Filtre por centro, tipo de ordem e status. Envie as ordens assim que forem criadas para que o SkyPlanner possa planejar com anteced\u00eancia e libere-as no S\/4HANA (<code>ReleaseOrder<\/code> ou <code>ReleaseOperation<\/code>) depois que o SkyPlanner as programar.<\/p>\n\n\n<p><strong>3. Grava\u00e7\u00e3o da programa\u00e7\u00e3o no SAP.<\/strong> Quando um webhook do SkyPlanner informa uma altera\u00e7\u00e3o na programa\u00e7\u00e3o, a integra\u00e7\u00e3o chama <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> em <code>API_PRODUCTION_ORDER_2_SRV<\/code> para cada opera\u00e7\u00e3o alterada. Ela envia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code> e <code>OrderIntBillOfOperationsItem<\/code> como chaves<\/li>\n\n\n<li><code>OpSchedulingMode<\/code> F (para a frente), com o in\u00edcio definido pelo SkyPlanner em <code>OpSchedldStartDate<\/code> e <code>OpSchedldStartTime<\/code><\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> DISP (despacho) e o campo obrigat\u00f3rio <code>OpSchedulingStrategy<\/code> com valor M<\/li>\n\n\n<li>o ETag em <code>if-match<\/code><\/li>\n\n<\/ul>\n\n\n<p>Todas as opera\u00e7\u00f5es de uma ordem s\u00e3o enviadas em um \u00fanico change set, na sequ\u00eancia definida pelo SkyPlanner. Assim, o S\/4HANA despacha todo o plano da ordem em uma \u00fanica chamada. O modo K nunca \u00e9 usado: ele mant\u00e9m as datas originais das opera\u00e7\u00f5es e ignora as datas enviadas.<\/p>\n\n\n<p>O SkyPlanner calcula a dura\u00e7\u00e3o das opera\u00e7\u00f5es com os mesmos valores padr\u00e3o dos roteiros de produ\u00e7\u00e3o e as mesmas f\u00f3rmulas de capacidade dos centros de trabalho usados pelo S\/4HANA. Por isso, a data de t\u00e9rmino que o S\/4HANA calcula a partir da data de in\u00edcio enviada fica alinhada ao plano do SkyPlanner. Ap\u00f3s cada change set, a integra\u00e7\u00e3o l\u00ea as opera\u00e7\u00f5es novamente e sinaliza qualquer diverg\u00eancia de data, que o planejador v\u00ea antes do pr\u00f3ximo turno.<\/p>\n\n\n<p><strong>4. Confirma\u00e7\u00f5es do ch\u00e3o de f\u00e1brica.<\/strong> Cada apontamento de tempo do Mobile Confirmations ou do Production Timer se torna uma confirma\u00e7\u00e3o no S\/4HANA. O webhook do SkyPlanner dispara um lan\u00e7amento de <code>ProdnOrdConf2<\/code> com quantidade boa, refugo e tempos de atividade. A integra\u00e7\u00e3o chama primeiro <code>GetConfProposal<\/code>, para que o S\/4HANA proponha quantidades, atividades, datas e dados de pessoal. <code>GetGdsMvtProposal<\/code> prop\u00f5e as movimenta\u00e7\u00f5es de mercadorias.<\/p>\n\n\n<p><strong>Materiais a receber.<\/strong> Os pedidos de compra em aberto fazem parte da sincroniza\u00e7\u00e3o de entrada. O SkyPlanner considera o material comprado dispon\u00edvel na data de entrega prevista no pedido de compra. Os trabalhos que aguardam componentes comprados s\u00e3o programados para o dia da chegada do material, sem ficarem bloqueados pelo saldo atual de estoque.<\/p>\n\n\n<p>O S\/4HANA continua sendo a fonte oficial dos recebimentos: quando uma entrada de mercadorias \u00e9 lan\u00e7ada, o estoque aumenta e a quantidade em aberto do item do pedido de compra diminui. A sincroniza\u00e7\u00e3o seguinte atualiza o estoque no SkyPlanner e marca como Delivered o pedido de compra totalmente recebido. Ap\u00f3s um recebimento parcial, a quantidade restante em aberto continua prevista para a data da respectiva linha de remessa. O tratamento de pedidos de compra pelo SkyPlanner est\u00e1 descrito na <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o do SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>5. Regras de responsabilidade.<\/strong> O S\/4HANA \u00e9 respons\u00e1vel por quantidades, BOM, roteiro de produ\u00e7\u00e3o, custeio e status. O SkyPlanner \u00e9 respons\u00e1vel pela sequ\u00eancia, pela aloca\u00e7\u00e3o aos centros de trabalho e pelas datas das opera\u00e7\u00f5es. Nunca permita que os dois gravem no mesmo campo. Se os planejadores ainda movem opera\u00e7\u00f5es no Capacity Scheduling Board, defina o que prevalece. Ou a pr\u00f3xima sincroniza\u00e7\u00e3o de ordens leva a altera\u00e7\u00e3o para o SkyPlanner, ou esse centro de trabalho fica fora do escopo do SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">O que o projeto inclui<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A implementa\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em semanas ap\u00f3s o in\u00edcio da implanta\u00e7\u00e3o, mesmo em empresas de grande porte. A maioria das f\u00e1bricas come\u00e7a com o teste gr\u00e1tis de 30 dias usando arquivos CSV ou Excel exportados. Assim, a programa\u00e7\u00e3o \u00e9 validada com os pr\u00f3prios dados antes do in\u00edcio do trabalho com as APIs. O projeto de S\/4HANA abrange ent\u00e3o:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Defini\u00e7\u00e3o de escopo:<\/strong> f\u00e1bricas, tipos de ordem, edi\u00e7\u00e3o e modelo de autentica\u00e7\u00e3o, al\u00e9m do sistema respons\u00e1vel por cada campo.<\/li>\n\n\n<li><strong>Acesso ao SAP:<\/strong> ativa\u00e7\u00e3o de servi\u00e7os no Gateway ou configura\u00e7\u00e3o de um acordo de comunica\u00e7\u00e3o, al\u00e9m dos usu\u00e1rios t\u00e9cnicos e objetos de autoriza\u00e7\u00e3o.<\/li>\n\n\n<li><strong>Mapeamento de dados mestres:<\/strong> categorias de capacidade, intervalos e turnos dos centros de trabalho; correspond\u00eancia entre os valores padr\u00e3o dos roteiros de produ\u00e7\u00e3o e as dura\u00e7\u00f5es no SkyPlanner; unidades de medida.<\/li>\n\n\n<li><strong>Carga inicial:<\/strong> materiais, BOMs, roteiros de produ\u00e7\u00e3o e centros de trabalho com suas capacidades.<\/li>\n\n\n<li><strong>Sincroniza\u00e7\u00e3o de ordens e pedidos de compra:<\/strong> ordens de produ\u00e7\u00e3o e opera\u00e7\u00f5es por eventos Created\/Changed ou consultas peri\u00f3dicas; estoque e pedidos de compra em aberto em intervalos programados.<\/li>\n\n\n<li><strong>Grava\u00e7\u00e3o da programa\u00e7\u00e3o no SAP:<\/strong> <code>ScheduleProductionOrderOperation<\/code> com tratamento de ETag e fila de novas tentativas.<\/li>\n\n\n<li><strong>Confirma\u00e7\u00f5es do ch\u00e3o de f\u00e1brica:<\/strong> apontamentos de tempo lan\u00e7ados como confirma\u00e7\u00f5es <code>ProdnOrdConf2<\/code>.<\/li>\n\n\n<li><strong>Testes em paralelo com o plano atual:<\/strong> a programa\u00e7\u00e3o do SkyPlanner roda em paralelo com o nivelamento existente at\u00e9 que os planejadores confiem nela.<\/li>\n\n\n<li><strong>Entrada em produ\u00e7\u00e3o.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pontos de aten\u00e7\u00e3o no SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A grava\u00e7\u00e3o no SAP exige uma chamada de a\u00e7\u00e3o com ETag.<\/strong> A forma documentada de programar uma opera\u00e7\u00e3o \u00e9 usar <code>ScheduleProductionOrderOperation<\/code>, n\u00e3o um PATCH em <code>A_ProductionOrderOperation_2<\/code>. O modo F programa para a frente a partir de um in\u00edcio, e o modo B programa para tr\u00e1s a partir de um t\u00e9rmino. J\u00e1 K e S mant\u00eam as datas existentes e ignoram as que voc\u00ea envia. O ETag em <code>if-match<\/code> \u00e9 gerado a partir de <code>LastChangeDateTime<\/code> da ordem (YYYYMMDDHHMMSS), portanto qualquer altera\u00e7\u00e3o na ordem o torna desatualizado. Implemente a leitura antes da grava\u00e7\u00e3o e uma fila de novas tentativas.<\/li>\n\n\n<li><strong>A capacidade n\u00e3o est\u00e1 no cabe\u00e7alho do centro de trabalho.<\/strong> A capacidade dispon\u00edvel \u00e9 determinada pela categoria de capacidade (001 m\u00e1quina, 002 m\u00e3o de obra), pelo calend\u00e1rio de f\u00e1brica e pelos intervalos e turnos que se sobrep\u00f5em a ele. As f\u00f3rmulas de capacidade convertem os valores padr\u00e3o do roteiro de produ\u00e7\u00e3o em necessidades de prepara\u00e7\u00e3o, processamento e desmontagem. Leia <code>A_WorkCenterCapacityInterval_2<\/code> e as entidades de turno e defina de comum acordo como converter as f\u00f3rmulas em dura\u00e7\u00f5es no SkyPlanner.<\/li>\n\n\n<li><strong>Os valores padr\u00e3o precisam de revis\u00e3o.<\/strong> Roteiros de produ\u00e7\u00e3o mantidos para custeio costumam ter tempos m\u00e9dios de prepara\u00e7\u00e3o ou prepara\u00e7\u00e3o registrada na categoria de capacidade errada.<\/li>\n\n\n<li><strong>As regras de confirma\u00e7\u00e3o s\u00e3o r\u00edgidas.<\/strong> A SAP recomenda chamadas em lote para lan\u00e7amentos em massa. Cada conjunto de altera\u00e7\u00f5es \u00e9 processado por inteiro ou rejeitado por inteiro; assim, um \u00fanico apontamento de tempo incorreto bloqueia os demais lan\u00e7amentos do conjunto. Os cancelamentos em um lote devem ser executados na ordem inversa de <code>ConfirmationCount<\/code>. N\u00e3o \u00e9 poss\u00edvel misturar tipos de confirma\u00e7\u00e3o em uma mesma ordem, lan\u00e7ar movimenta\u00e7\u00f5es de mercadorias sem uma confirma\u00e7\u00e3o ou confirmar opera\u00e7\u00f5es cujos pontos de acionamento exigem uma caixa de di\u00e1logo.<\/li>\n\n\n<li><strong>Verifique se o PP\/DS est\u00e1 ativo.<\/strong> O PP\/DS embarcado exige a atividade de Customizing <strong>Activate Advanced Planning and Scheduling<\/strong> e o SAP HANA integrated liveCache. A SAP o vende como um produto separado, <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Onde ele estiver ativo, defina por material quem faz a programa\u00e7\u00e3o: os materiais marcados para planejamento avan\u00e7ado ficam sob responsabilidade do PP\/DS. A SAP tamb\u00e9m informa sobre a API de ordens planejadas: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (A integra\u00e7\u00e3o autom\u00e1tica com esse m\u00f3dulo n\u00e3o \u00e9 habilitada por esta API.)<\/li>\n\n\n<li><strong>Unidades de medida.<\/strong> As unidades das quantidades das opera\u00e7\u00f5es, das quantidades b\u00e1sicas dos roteiros de produ\u00e7\u00e3o e das confirma\u00e7\u00f5es podem ser diferentes. Fa\u00e7a a convers\u00e3o explicitamente usando a unidade da opera\u00e7\u00e3o, n\u00e3o a unidade b\u00e1sica do material.<\/li>\n\n\n<li><strong>Diferen\u00e7as entre edi\u00e7\u00f5es.<\/strong> O <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> mostra a tabela cl\u00e1ssica de planejamento CM21\/CM22 sendo substitu\u00edda por Manage Work Center Capacity, Capacity Scheduling Table e Capacity Scheduling Board. A Public Edition disponibiliza APIs apenas por cen\u00e1rios de comunica\u00e7\u00e3o, e as vers\u00f5es dos servi\u00e7os oferecidas podem diferir das dispon\u00edveis no ambiente local. A API de roteiros de produ\u00e7\u00e3o n\u00e3o permite excluir roteiros nem atualizar atribui\u00e7\u00f5es de materiais. Durante a defini\u00e7\u00e3o de escopo, a equipe SkyPlanner fixa as vers\u00f5es dos servi\u00e7os para o sistema de cada cliente, usando a entrada do API Business Accelerator Hub correspondente \u00e0quela vers\u00e3o.<\/li>\n\n\n<li><strong>Restri\u00e7\u00f5es que os roteiros de produ\u00e7\u00e3o n\u00e3o contemplam.<\/strong> Mantenha no SkyPlanner as trocas de produ\u00e7\u00e3o dependentes da sequ\u00eancia, os conflitos de ferramentas e as opera\u00e7\u00f5es com v\u00e1rios operadores, n\u00e3o nos valores padr\u00e3o dos roteiros de produ\u00e7\u00e3o. A matriz de tempos de prepara\u00e7\u00e3o armazena os tempos de troca de produ\u00e7\u00e3o por par de produtos. As ferramentas dos PRTs da ordem s\u00e3o recursos finitos, dispon\u00edveis para um centro de trabalho por vez, e uma opera\u00e7\u00e3o pode exigir v\u00e1rias pessoas ao mesmo tempo.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quem configura a integra\u00e7\u00e3o<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Os pontos de aten\u00e7\u00e3o acima explicam por que a configura\u00e7\u00e3o \u00e9 o trabalho principal. Cada f\u00e1brica usa o S\/4HANA de uma forma: tipos de ordem, categorias de capacidade, valores padr\u00e3o dos roteiros de produ\u00e7\u00e3o, user exits e edi\u00e7\u00e3o influenciam o mapeamento.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A equipe SkyPlanner configura a integra\u00e7\u00e3o<\/strong> conforme o seu ambiente S\/4HANA durante a implanta\u00e7\u00e3o, usando as APIs liberadas do S\/4HANA e a API REST e os webhooks do SkyPlanner. A equipe d\u00e1 suporte \u00e0 integra\u00e7\u00e3o ap\u00f3s a entrada em produ\u00e7\u00e3o. Esse \u00e9 o caminho padr\u00e3o e oferece um \u00fanico respons\u00e1vel pelo sistema de programa\u00e7\u00e3o da produ\u00e7\u00e3o e pela conex\u00e3o com o S\/4HANA.<\/li>\n\n\n<li><strong>Seu parceiro SAP<\/strong> tamb\u00e9m pode desenvolver a integra\u00e7\u00e3o com base na documenta\u00e7\u00e3o Swagger\/OpenAPI do SkyPlanner e no conhecimento dos seus tipos de ordem e da configura\u00e7\u00e3o Basis.<\/li>\n\n\n<li><strong>Seus pr\u00f3prios desenvolvedores<\/strong> podem implementar a integra\u00e7\u00e3o diretamente ou por meio do SAP Integration Suite ou do SAP BTP, usando a REST API documentada, autentica\u00e7\u00e3o por token de API e webhooks (<a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">tutorial de integra\u00e7\u00e3o<\/a>). Uma chave de API \u00e9 suficiente para come\u00e7ar, e a equipe do SkyPlanner participa quando eles quiserem ajuda.<\/li>\n\n<\/ul>\n\n\n<p>O SkyPlanner j\u00e1 opera em conjunto com o SAP: a equipe interna de TI da Laboratory &amp; Allied conectou o SAP Business One on HANA ao SkyPlanner, com a ajuda da equipe SkyPlanner. A documenta\u00e7\u00e3o dos recursos est\u00e1 dispon\u00edvel publicamente na <a href=\"\/pt-br\/docs\/tutorial-de-integracao\/\">documenta\u00e7\u00e3o do SkyPlanner<\/a>.<\/p>\n\n\n<p>Qualquer que seja o caminho escolhido, valide primeiro a programa\u00e7\u00e3o no teste gr\u00e1tis de 30 dias (at\u00e9 20 centros de trabalho, sem cart\u00e3o de cr\u00e9dito). A integra\u00e7\u00e3o ser\u00e1 ent\u00e3o desenvolvida para um plano em que seus planejadores j\u00e1 confiam. Ap\u00f3s o teste, os pre\u00e7os partem de 199 \u20ac por m\u00eas, com 5 centros de trabalho inclu\u00eddos e cobran\u00e7a mensal. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, de acordo com seu processo e suas necessidades, junto com o plano contratado. Assim, voc\u00ea conhece o custo total antes de come\u00e7ar.<\/p>\n\n\n<p>Consulte os <a href=\"\/pt-br\/precos\/\">pre\u00e7os<\/a>, os <a href=\"\/pt-br\/funcionalidades\/\">recursos<\/a> e as <a href=\"\/pt-br\/historias-de-clientes\/\">avalia\u00e7\u00f5es de clientes<\/a> para ter uma vis\u00e3o completa.<\/p>\n\n\n<p><a href=\"\/pt-br\/teste\/\">Iniciar teste gr\u00e1tis<\/a> <a href=\"\/pt-br\/vendas-de-contacto\/\">Falar com vendas<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Avalia\u00e7\u00f5es do SkyPlanner por fabricantes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos da UTU, no ch\u00e3o de f\u00e1brica de pain\u00e9is el\u00e9tricos em Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economizadas por semana<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cCom o SkyPlanner, nosso planejamento da produ\u00e7\u00e3o saiu das planilhas de Excel e passou para a otimiza\u00e7\u00e3o da produ\u00e7\u00e3o em tempo real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, especialista em cadeia de suprimentos<\/b><br>UTU \u00b7 Pain\u00e9is el\u00e9tricos e equipamentos de manobra<\/p>\n\n\n<p class=\"ind-cust__result\">O planejamento da produ\u00e7\u00e3o economiza 2 horas de trabalho por semana, e uma nova fila de trabalho chega \u00e0 linha em segundos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/customers\/utu\/\">Ler a avalia\u00e7\u00e3o da UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operadores com vestimentas para sala limpa em uma linha de envase de frascos na f\u00e1brica farmac\u00eautica da Laboratory &amp; Allied em Nair\u00f3bi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>de efici\u00eancia na produ\u00e7\u00e3o<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cA efici\u00eancia na produ\u00e7\u00e3o aumentou 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, respons\u00e1vel por TI<\/b><br>Laboratory &amp; Allied \u00b7 Ind\u00fastria farmac\u00eautica<\/p>\n\n\n<p class=\"ind-cust__result\">A efici\u00eancia na produ\u00e7\u00e3o aumentou 90%, e a cria\u00e7\u00e3o de um plano otimizado para tr\u00eas meses, abrangendo todos os centros de trabalho, leva menos de 30 minutos.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/customers\/laboratory-allied\/\">Leia o depoimento da Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vista a\u00e9rea da f\u00e1brica de sistemas de seguran\u00e7a para telhados da Piristeel em Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>de pontualidade de entrega<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner trouxe visibilidade para identificar gargalos e tornou a gest\u00e3o da produ\u00e7\u00e3o mais clara.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gerente de produ\u00e7\u00e3o<\/b><br>Piristeel \u00b7 Sistemas de seguran\u00e7a para telhados e de capta\u00e7\u00e3o de \u00e1guas pluviais<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega chegou a 99,2% neste ano, e a programa\u00e7\u00e3o economiza at\u00e9 quatro horas de trabalho por dia.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/customers\/piristeel\/\">Leia o depoimento da Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Soldador da KJH-Comp desbastando uma estrutura de a\u00e7o soldada na f\u00e1brica de Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>de pontualidade de entrega, antes em cerca de 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cO SkyPlanner tem um papel decisivo na manuten\u00e7\u00e3o da nossa pontualidade de entrega.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, diretor-geral<\/b><br>KJH-Comp \u00b7 Fabrica\u00e7\u00e3o de componentes em chapas met\u00e1licas e manufatura sob contrato<\/p>\n\n\n<p class=\"ind-cust__result\">A pontualidade de entrega subiu de cerca de 50% para at\u00e9 98%, e a programa\u00e7\u00e3o agora precisa de um supervisor em vez de dois.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/pt-br\/customers\/kjh-comp\/\">Leia o depoimento da KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como o SkyPlanner APS se conecta ao SAP S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner APS se integra ao SAP S\/4HANA nos dois sentidos. Ordens de produ\u00e7\u00e3o, opera\u00e7\u00f5es, roteiros de produ\u00e7\u00e3o, centros de trabalho, estoque e pedidos de compra s\u00e3o recebidos pelas APIs OData liberadas pela SAP. As datas das opera\u00e7\u00f5es s\u00e3o gravadas de volta por meio de <code>ScheduleProductionOrderOperation<\/code>, e as horas apontadas, como confirma\u00e7\u00f5es <code>ProdnOrdConf2<\/code>, com envio acionado pelos webhooks do SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quem desenvolve e mant\u00e9m a integra\u00e7\u00e3o?<\/summary>\n<p class=\"sp-faq__a\">A equipe do SkyPlanner configura a integra\u00e7\u00e3o de acordo com seu ambiente S\/4HANA durante a implanta\u00e7\u00e3o e oferece suporte ap\u00f3s a entrada em produ\u00e7\u00e3o. O or\u00e7amento da integra\u00e7\u00e3o \u00e9 apresentado antecipadamente, com base no seu processo e nas suas necessidades. Se o seu parceiro SAP ou seus pr\u00f3prios desenvolvedores criarem a integra\u00e7\u00e3o usando a API REST, a responsabilidade por ela ser\u00e1 deles, e a equipe do SkyPlanner ajudar\u00e1 quando necess\u00e1rio.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como as datas das opera\u00e7\u00f5es s\u00e3o gravadas de volta no S\/4HANA? O sistema mant\u00e9m a sequ\u00eancia?<\/summary>\n<p class=\"sp-faq__a\">Por meio da a\u00e7\u00e3o <code>ScheduleProductionOrderOperation<\/code> em <code>API_PRODUCTION_ORDER_2_SRV<\/code>, no modo de programa\u00e7\u00e3o para a frente, com status de despacho e a data e hora de in\u00edcio definidas pelo SkyPlanner. As opera\u00e7\u00f5es de cada ordem s\u00e3o enviadas em um \u00fanico conjunto de altera\u00e7\u00f5es, na sequ\u00eancia do SkyPlanner. As dura\u00e7\u00f5es s\u00e3o calculadas a partir dos mesmos valores padr\u00e3o do roteiro de produ\u00e7\u00e3o usados pelo S\/4HANA, e a integra\u00e7\u00e3o rel\u00ea cada opera\u00e7\u00e3o e sinaliza qualquer diferen\u00e7a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Como as confirma\u00e7\u00f5es chegam ao S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">Os operadores apontam o trabalho no SkyPlanner, e um webhook \u00e9 disparado. Em seguida, a integra\u00e7\u00e3o lan\u00e7a uma confirma\u00e7\u00e3o por meio de <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code> com quantidade boa, refugo e tempos de atividade.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A integra\u00e7\u00e3o funciona com o S\/4HANA Cloud Public Edition?<\/summary>\n<p class=\"sp-faq__a\">Sim. O acesso ocorre por meio de um acordo de comunica\u00e7\u00e3o para os cen\u00e1rios de comunica\u00e7\u00e3o correspondentes. Durante a defini\u00e7\u00e3o de escopo, a equipe do SkyPlanner seleciona a vers\u00e3o da API de ordens de produ\u00e7\u00e3o compat\u00edvel com a sua vers\u00e3o do Public Edition. J\u00e1 as instala\u00e7\u00f5es locais e o Private Edition usam a ativa\u00e7\u00e3o de servi\u00e7os no Gateway.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>J\u00e1 temos PP\/DS. Precisamos do SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">O SkyPlanner atende \u00e0s f\u00e1bricas e unidades que n\u00e3o t\u00eam licen\u00e7a de PP\/DS ou equipe para oper\u00e1-lo. N\u00e3o exige ativa\u00e7\u00e3o no Customizing, liveCache nem servidor de otimiza\u00e7\u00e3o, apenas APIs OData liberadas no lado SAP. O mecanismo Arcturus gera a programa\u00e7\u00e3o da produ\u00e7\u00e3o em segundos, respeitando a capacidade real das m\u00e1quinas e da equipe, e o Autopilot reprograma automaticamente quando h\u00e1 mudan\u00e7as na produ\u00e7\u00e3o.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podemos testar antes de iniciar a integra\u00e7\u00e3o? Quanto tempo leva o projeto?<\/summary>\n<p class=\"sp-faq__a\">Sim. Durante o teste gratuito de 30 dias, importe ordens de produ\u00e7\u00e3o e centros de trabalho a partir de arquivos exportados do S\/4HANA. Depois que a programa\u00e7\u00e3o estiver funcionando, desenvolva a integra\u00e7\u00e3o via API. A implementa\u00e7\u00e3o normalmente \u00e9 conclu\u00edda em poucas semanas ap\u00f3s o in\u00edcio da implanta\u00e7\u00e3o. Para definir o escopo do seu ambiente, <a href=\"\/pt-br\/vendas-de-contacto\/\">fale com a equipe comercial<\/a> ou <a href=\"\/pt-br\/teste\/\">inicie o teste gratuito<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integra\u00e7\u00f5es \/ ERP \/ SAP S\/4HANA Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia mostra a parceiros SAP, equipes de TI e compradores t\u00e9cnicos como o SkyPlanner APS se conecta ao SAP S\/4HANA. O SkyPlanner se integra ao S\/4HANA nos dois sentidos pelas APIs OData liberadas pela SAP: &#8230; <a title=\"Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\" aria-label=\"Read more about Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\">Leia mais<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100803,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101160","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integra\u00e7\u00e3o SAP S\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner<\/title>\n<meta name=\"description\" content=\"Integre SkyPlanner APS ao SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, retorno via ScheduleProductionOrderOperation, mapeamento de dados e riscos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Integre SkyPlanner APS ao SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, retorno via ScheduleProductionOrderOperation, mapeamento de dados e riscos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/\",\"name\":\"Integra\u00e7\u00e3o SAP S\\\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Integre SkyPlanner APS ao SAP S\\\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, retorno via ScheduleProductionOrderOperation, mapeamento de dados e riscos.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sap-s4hana\\\/guia-de-integracao\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS para seu ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS para SAP S\\\/4HANA: programa\u00e7\u00e3o da produ\u00e7\u00e3o\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/integracoes\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Guia de integra\u00e7\u00e3o do SAP S\\\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/pt-br\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integra\u00e7\u00e3o SAP S\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner","description":"Integre SkyPlanner APS ao SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, retorno via ScheduleProductionOrderOperation, mapeamento de dados e riscos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","og_locale":"pt_BR","og_type":"article","og_title":"Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS","og_description":"Integre SkyPlanner APS ao SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, retorno via ScheduleProductionOrderOperation, mapeamento de dados e riscos.","og_url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. tempo de leitura":"20 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","url":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/","name":"Integra\u00e7\u00e3o SAP S\/4HANA para programa\u00e7\u00e3o APS | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Integre SkyPlanner APS ao SAP S\/4HANA: APIs OData, acordos de comunica\u00e7\u00e3o, retorno via ScheduleProductionOrderOperation, mapeamento de dados e riscos.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/guia-de-integracao\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/pt-br\/"},{"@type":"ListItem","position":2,"name":"Integra\u00e7\u00f5es de software ERP e MES com o SkyPlanner","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS para seu ERP","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS para SAP S\/4HANA: programa\u00e7\u00e3o da produ\u00e7\u00e3o","item":"https:\/\/skyplanner.ai\/pt-br\/integracoes\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/pt-br\/#website","url":"https:\/\/skyplanner.ai\/pt-br\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/pt-br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/pt-br\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/pt-br\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/pt-br\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/pt-br\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integra\u00e7\u00f5es \/ ERP \/ SAP S\/4HANA Guia de integra\u00e7\u00e3o do SAP S\/4HANA para programa\u00e7\u00e3o da produ\u00e7\u00e3o com SkyPlanner APS Este guia mostra a parceiros SAP, equipes de TI e compradores t\u00e9cnicos como o SkyPlanner APS se conecta ao SAP S\/4HANA. O SkyPlanner se integra ao S\/4HANA nos dois sentidos pelas APIs OData liberadas pela SAP:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/101160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/comments?post=101160"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/101160\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/pages\/100803"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/pt-br\/wp-json\/wp\/v2\/media?parent=101160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}