{"id":99509,"date":"2026-10-16T00:41:10","date_gmt":"2026-10-16T00:41:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99509"},"modified":"2026-10-16T00:43:15","modified_gmt":"2026-10-16T00:43:15","slug":"montering-pa-bestilling","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/","title":{"rendered":"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Montering p\u00e5 bestilling (ATO) inneb\u00e6rer \u00e5 ha standardkomponenter eller delmontasjer klare, og f\u00f8rst montere det ferdige produktet n\u00e5r kunden har bestilt. Delene som brukes i flere varianter, klargj\u00f8res p\u00e5 forh\u00e5nd uten \u00e5 bindes til hver enkelt ferdigvariant.<\/p>\n\n\n<p>Det kan gi kundene flere valgmuligheter og kortere ventetid enn om alt m\u00e5 produseres fra grunnen av. Men selv om alle delene er p\u00e5 plass, betyr ikke det at en monteringsbenk er ledig. Ordren trenger fortsatt folk, utstyr og ofte testkapasitet f\u00f8r den kan forlate fabrikken.<\/p>\n\n\n<p>For produksjonsplanleggeren inneb\u00e6rer ATO derfor to oppgaver som henger sammen: \u00e5 holde de riktige modulene tilgjengelige og \u00e5 finne en realistisk plass i produksjonen til kombinasjonen kunden har valgt. SkyPlanner APS utf\u00f8rer beregningene for denne finplanleggingen. Slik f\u00e5r du hjelp til \u00e5 omsette klargjorte komponenter til en samordnet monteringsplan, fremfor enda en k\u00f8 som m\u00e5 omorganiseres manuelt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Slik fungerer montering p\u00e5 bestilling<\/h2>\n\n\n<p>ATO skiller mellom arbeid som utf\u00f8res for forventet ettersp\u00f8rsel, og arbeid som utf\u00f8res for en bestemt kunde. F\u00f8r ordren kommer inn, kj\u00f8per du inn komponenter eller produserer standardmoduler. Etter bestilling velger du den n\u00f8dvendige kombinasjonen, monterer den, gjennomf\u00f8rer eventuell testing eller kontroll og klargj\u00f8r produktet for forsendelse.<\/p>\n\n\n<p>Lageret av komponenter som brukes i flere varianter, ligger ved kundeordrens frikoblingspunkt: grensen der prognosestyrte forberedelser g\u00e5r over til ordrespesifikt arbeid. Det sentrale er ikke \u00e5 ha alle ferdige konfigurasjoner p\u00e5 lager, men et mindre utvalg komponenter som kan brukes i flere konfigurasjoner.<\/p>\n\n\n<p>Tenk deg en produsent som leverer modulbaserte pumpeenheter. Kundene velger blant godkjente kombinasjoner av pumper, motorer og styremoduler. Produsenten har disse komponentene p\u00e5 lager og monterer den valgte kombinasjonen p\u00e5 en standard sokkel n\u00e5r ordren kommer inn. Deretter gjenst\u00e5r de siste tilkoblingene, testing og pakking.<\/p>\n\n\n<p>Dette er ATO. Hvis den samme produsenten f\u00f8rst m\u00e5 konstruere et helt nytt pumpeoppsett, er ordren av en annen art. At standarddeler inng\u00e5r, betyr ikke i seg selv at alle kundetilpassede produkter monteres etter ATO-prinsippet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Montering p\u00e5 bestilling sammenlignet med produksjon mot ordre og mot lager<\/h3>\n\n\n<p>Det tydeligste skillet er hva som er klart n\u00e5r kunden bestiller.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategi<\/th><th>Klart f\u00f8r bestilling<\/th><th>Hovedarbeid etter bestilling<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/\">Produksjon mot lager (MTS)<\/a><\/td><td>Ferdigvarer produsert for forventet ettersp\u00f8rsel<\/td><td>Plukke, pakke og sende varer fra tilgjengelig lager<\/td><\/tr><tr><td>Montering p\u00e5 bestilling (ATO)<\/td><td>Standardkomponenter eller delmontasjer<\/td><td>Montere den valgte kombinasjonen, teste og klargj\u00f8re for forsendelse<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/ordreproduksjon\/\">Produksjon mot ordre (MTO)<\/a><\/td><td>En etablert konstruksjon og produksjonsrute; enkelte materialer kan v\u00e6re p\u00e5 lager<\/td><td>Produsere det bestilte produktet gjennom de n\u00f8dvendige operasjonene<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/\">Konstruksjon og produksjon mot ordre (ETO)<\/a><\/td><td>Kunnskap som kan gjenbrukes, og eventuelt standarddeler<\/td><td>Konstruere den kundespesifikke l\u00f8sningen og deretter produsere den<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Konfigurering p\u00e5 bestilling (CTO) beskriver valg av et produkt fra forh\u00e5ndsdefinerte alternativer som passer sammen. ATO beskriver hvordan klargjorte komponenter blir til et ferdig produkt etter bestilling. De to kan overlappe: Kunden kan konfigurere en pumpeenhet som fabrikken deretter monterer p\u00e5 bestilling.<\/p>\n\n\n<p>Dette er nyttige skiller, ikke merkelapper som m\u00e5 gjelde for hele virksomheten. Du kan ha en popul\u00e6r standardenhet p\u00e5 lager, montere kombinasjoner med mindre forutsigbar ettersp\u00f8rsel p\u00e5 bestilling og konstruere spesiall\u00f8sninger separat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e5r er ATO riktig produksjonsstrategi?<\/h2>\n\n\n<p>ATO er mest attraktivt n\u00e5r kundene \u00f8nsker variasjon, men store deler av produktet kan standardiseres. L\u00f8nnsomheten avhenger av om et h\u00e5ndterbart utvalg komponenter kan dekke et \u00f8konomisk interessant utvalg ferdigprodukter.<\/p>\n\n\n<p>Se etter fire forutsetninger:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Alternativene bruker faktisk de samme komponentene.<\/strong> En motor eller styremodul kan brukes i flere ferdige konfigurasjoner, i stedet for \u00e5 bli liggende og vente p\u00e5 ett lite sannsynlig salg.<\/li><li><strong>Kombinasjonene er allerede definert.<\/strong> Konstruksjonsavdelingen har fastsl\u00e5tt hvilke komponenter som fungerer sammen, og hvordan det valgte produktet skal monteres og kontrolleres.<\/li><li><strong>Det gjenst\u00e5ende arbeidet kan fullf\u00f8res innen kundens leveringsfrist.<\/strong> Montering, k\u00f8tid, testing og klargj\u00f8ring for forsendelse kan gjennomf\u00f8res innenfor ventetiden kunden aksepterer.<\/li><li><strong>Ettersp\u00f8rselen etter komponenter er forutsigbar nok til \u00e5 planlegge p\u00e5fyll.<\/strong> Du trenger ikke \u00e5 forutsi hver ferdigkombinasjon n\u00f8yaktig, men du trenger fortsatt en realistisk forsyningsplan for delene som inng\u00e5r.<\/li><\/ul>\n\n\n<p>Gevinsten er at du i mindre grad binder deg til feil ferdigvariant. I stedet for \u00e5 bygge en bestemt kombinasjon av pumpe og motor og h\u00e5pe at den blir solgt, holder du valget \u00e5pent til ordren kommer inn. Moduler som brukes i flere varianter, kan redusere kapitalbindingen i ferdigvarelageret og samtidig la kunden velge et egnet produkt.<\/p>\n\n\n<p>\u00c5 utf\u00f8re arbeid med lang ledetid p\u00e5 forh\u00e5nd kan ogs\u00e5 forkorte kundens ventetid sammenlignet med \u00e5 starte disse operasjonene f\u00f8rst etter salget. Standardmoduler legger til rette for gjentakbare innkj\u00f8ps-, produksjons- og kvalitetskontrollprosesser, mens det ordrespesifikke arbeidet samles mot slutten.<\/p>\n\n\n<p>Ulempen er at lagerrisikoen flytter seg i stedet for \u00e5 forsvinne. En styremodul som erstattes av en ny modell, kan fortsatt bli ukurant. En kraftig \u00f8kning i ettersp\u00f8rselen etter \u00e9n motor kan forsinke flere produktvarianter. Og det er vanskelig \u00e5 levere raskt fra et bredt sortiment hvis hvert valg krever en egen, tidkrevende testprosedyre.<\/p>\n\n\n<p>Hvis kundene krever umiddelbar forsendelse, kan ferdigvarelager v\u00e6re et bedre valg for de mest popul\u00e6re produktene. Hvis nesten hver ordre krever ny konstruksjon eller unike deler med lang ledetid, gir ATO et mindre forsprang. Velg strategien for produktfamilier der bruk av felles komponenter faktisk reduserer arbeidet som m\u00e5 gj\u00f8res mens kunden venter.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvorfor leveringen kan bli forsinket selv om delene er klare<\/h2>\n\n\n<p>La oss g\u00e5 tilbake til den tenkte produsenten av pumpeenheter. B\u00e5de pumpen, motoren og styremodulen som trengs, er tilgjengelige. Det er ledig kapasitet i monteringen, s\u00e5 ordren ser enkel ut \u00e5 gjennomf\u00f8re.<\/p>\n\n\n<p>Den ferdige enheten m\u00e5 imidlertid gjennom en teststasjon som allerede er opptatt med andre ordrer. \u00c5 fullf\u00f8re monteringen tidlig flytter bare k\u00f8en til testingen. Kunden kan ikke bruke en enhet som ikke er testet, s\u00e5 ferdig montering er ikke det samme som levering.<\/p>\n\n\n<p>Tenk deg n\u00e5 at flere kunder velger alternativet som tar lengre tid \u00e5 teste. Antall ordrer kan v\u00e6re uendret, men belastningen p\u00e5 teststasjonen har \u00f8kt. En plan som bygger p\u00e5 samme gjennomsnittlige ledetid for alle konfigurasjoner, kan overse denne endringen.<\/p>\n\n\n<p>Det nyttige sp\u00f8rsm\u00e5let er ikke bare: \u00abHar vi delene?\u00bb Det er: \u00abN\u00e5r kan denne kombinasjonen g\u00e5 gjennom alle gjenst\u00e5ende operasjoner, sammen med arbeidet vi allerede har lovet \u00e5 levere?\u00bb<\/p>\n\n\n<p>Det krever at materialtilgang, operasjonsrekkef\u00f8lge og felles kapasitet ses i sammenheng. SkyPlanner plasserer disse operasjonene i \u00e9n og samme produksjonsplan. Da blir testk\u00f8en synlig mens du fortsatt kan endre planen eller diskutere en annen leveringsdato.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Planlegg b\u00e5de f\u00f8r og etter monteringspunktet<\/h2>\n\n\n<p>En velfungerende ATO-prosess kobler p\u00e5fyll av komponenter til finplanlegging av kundeordrer. Hvis du bare forbedrer den ene siden, kan den andre fortsatt forsinke leveringen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Fyll p\u00e5 modulene som produktmiksen faktisk krever<\/h3>\n\n\n<p>Planlegg felles komponenter ut fra den samlede ettersp\u00f8rselen p\u00e5 tvers av ferdigvariantene. G\u00e5 gjennom disponibel lagerbeholdning, planlagte mottak og forventet forbruk, inkludert bekreftede ordrer, i tr\u00e5d med den avtalte lagerstrategien. Unng\u00e5 \u00e5 telle samme kundebehov p\u00e5 nytt n\u00e5r det erstatter en del av prognosen.<\/p>\n\n\n<p>Moduler som brukes ofte og har lang ledetid, fortjener s\u00e6rlig oppmerksomhet. En manglende, rimelig kobling kan stoppe en kostbar montasje like effektivt som en manglende motor. Vurder mangler ut fra hvordan de p\u00e5virker komplette ordrer, ikke bare ut fra komponentenes verdi.<\/p>\n\n\n<p>Hvis dere produserer moduler internt, m\u00e5 ogs\u00e5 arbeidet med lagerp\u00e5fyll f\u00e5 kapasitet. En serie standardsokler kan konkurrere med kundespesifikt arbeid om maskinering eller kontroll. P\u00e5fyll som stadig mister plassen i planen, f\u00f8rer til slutt til komponentmangel i sluttmonteringen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sjekk hvilke komponenter som kan brukes til den valgte ordren<\/h3>\n\n\n<p>Omsett kundens valg til riktige komponentmengder og n\u00f8dvendige operasjoner. Sjekk hvilke deler som kan brukes til denne ordren, ikke bare om de finnes et sted p\u00e5 lageret. Eksisterende reservasjoner, varer som venter p\u00e5 godkjenning etter kontroll, og forventede leveranser p\u00e5virker hva som faktisk kan brukes.<\/p>\n\n\n<p>Skill mellom forventede leveranser og mottatt lagerbeholdning. Hvis en modul fortsatt er i bestilling, avhenger monteringsplanen av n\u00e5r den kommer. En endret leverand\u00f8rdato m\u00e5 inn i produksjonsplanen f\u00f8r teamet forbereder arbeid som ikke kan starte.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Finplanlegg hele den gjenst\u00e5ende produksjonsruten<\/h3>\n\n\n<p>Ta med montering, eventuelt konfigurasjonsavhengig arbeid, testing, kontroll og pakking der det er n\u00f8dvendig. Legg til grunn de faktiske kravene til bearbeiding og omstilling, hvilke arbeidsstasjoner som kan brukes, skift og tilgjengelige operat\u00f8rer. Sammenlign beregnet ferdigtidspunkt i produksjonen med fristen for forsendelse, og sett av tid til transport separat.<\/p>\n\n\n<p>Planlegg dette sammen med andre ordrer og relevant arbeid for lagerp\u00e5fyll. To ordrer kan ikke begge ha teststasjonen for seg selv samtidig bare fordi alle n\u00f8dvendige komponenter er tilgjengelige for begge.<\/p>\n\n\n<p>Hvis det ikke er plass til arbeidet, m\u00e5 du vurdere et reelt tiltak: en godkjent alternativ arbeidsstasjon, mer kapasitet, endret prioritet eller en senere lovet leveringsdato. Vurder konsekvensene for andre kunder f\u00f8r du anser en hasteordre som l\u00f8st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Planlegg p\u00e5 nytt n\u00e5r materialtilgang eller kapasitet endres<\/h3>\n\n\n<p>En forsinket komponent kan f\u00f8re til at en ordre mister sin planlagte tid i monteringen. En annen ordre kan da overta plassen, s\u00e5 den endelige leveringsforsinkelsen blir ikke n\u00f8dvendigvis like lang som leverand\u00f8rens forsinkelse. Rekkef\u00f8lgen p\u00e5 de etterf\u00f8lgende operasjonene m\u00e5 ogs\u00e5 beregnes p\u00e5 nytt.<\/p>\n\n\n<p>Det samme gjelder ved driftsstans p\u00e5 en teststasjon eller bortfall av skiftkapasitet. \u00c5 holde hver k\u00f8 oppdatert manuelt tar tid fra planleggingen og gj\u00f8r det vanskeligere \u00e5 se konsekvensene p\u00e5 tvers av fabrikken. Det er her den automatiske finplanleggingen i SkyPlanner blir s\u00e6rlig verdifull.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se komponenter og monteringskapasitet i sammenheng med SkyPlanner<\/h2>\n\n\n<p>SkyPlanner samler arbeidsstasjoner, skift, operat\u00f8rer, materialer og prioriteringer i \u00e9n produksjonsplan. Du definerer prosesstrinnene, varighetene og ressursbehovene for produktet. Arcturus, systemets KI for finplanlegging, beregner rekkef\u00f8lgen ut fra kapasiteten, avhengighetene og reglene som er satt opp.<\/p>\n\n\n<p>I eksempelet med pumpeaggregatet blir montering og testing sammenkoblede operasjoner, i stedet for separate datoer hos hver avdeling. <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/gantt-diagram-for-produksjonsplanlegging\/\">Gantt-tidslinjen<\/a> viser hvor arbeidet utf\u00f8res, hvilke andre jobber som bruker de samme ressursene, og n\u00e5r arbeidet forventes \u00e5 v\u00e6re ferdig. Du ser om delene som er klare, faktisk blir til et ferdig aggregat i tide \u2013 ikke bare om monteringsteamet har nok \u00e5 gj\u00f8re.<\/p>\n\n\n<p>N\u00e5r planlegging som tar hensyn til materialtilgang, er aktivert, tar Arcturus ogs\u00e5 h\u00f8yde for lagerbeholdning og innkommende materialer ved beregning av starttidspunkter. Leveringsdatoene p\u00e5 innkj\u00f8psordrene angir n\u00e5r materialene forventes \u00e5 v\u00e6re tilgjengelige. Lagerbeholdningen oppdateres n\u00e5r mottaket bekreftes. Hvis leverand\u00f8ren endrer datoen, oppdaterer du denne opplysningen og beregner planen p\u00e5 nytt, i stedet for \u00e5 fortsette med det gamle grunnlaget for monteringen.<\/p>\n\n\n<p>For delprodukter som produseres som en del av en ordre, st\u00f8tter SkyPlanner produksjonsavhengigheter som s\u00f8rger for at de planlegges ferdig f\u00f8r hovedproduktet skal monteres. Lagerf\u00f8rte komponenter kan knyttes til som materialer. Da tas tilgjengeligheten deres med i planleggingen, sammen med operasjonene som gjenst\u00e5r, n\u00e5r hensyn til materialtilgang er aktivert.<\/p>\n\n\n<p>Du velger prioriteringene og bruker l\u00e5ser for \u00e5 holde fast ved planleggingsbeslutninger. Arcturus utf\u00f8rer beregningen innenfor disse f\u00f8ringene. N\u00e5r en hasteordre kommer inn eller kapasiteten endres, bruker du mindre tid p\u00e5 \u00e5 sette opp k\u00f8ene ved arbeidsstasjonene p\u00e5 nytt, og mer tid p\u00e5 \u00e5 avgj\u00f8re hvilke leveringsforpliktelser du skal sikre.<\/p>\n\n\n<p>Dette hjelper deg ogs\u00e5 med \u00e5 utnytte tilgjengelig kapasitet bedre. Du kan skille mellom arbeid som venter p\u00e5 komponenter, og arbeid som venter p\u00e5 ledig kapasitet til montering eller testing. Dermed kan du ta tak i begrensningen som faktisk avgj\u00f8r n\u00e5r arbeidet blir ferdig. \u00c5 kj\u00f8pe flere deler l\u00f8ser ikke problemet med en overbelastet testk\u00f8.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sitt <a href=\"https:\/\/skyplanner.ai\/no\/integrasjoner\/\">\u00e5pne REST API<\/a>. Koble eksisterende ordre-, produkt- og produksjonsdata til finplanleggingen, og behold systemene som allerede styrer virksomheten. Bedre planlegging av monteringen trenger ikke \u00e5 starte med \u00e5 bytte ERP-system.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Deletilgang og finplanlegging i sammenheng hos KJH-Comp<\/h3>\n\n\n<p>KJH-Comp er en finsk underleverand\u00f8r innen platebearbeiding som produserer sveisede konstruksjoner og ferdigmonterte, testede produkter. Tidligere ga ERP-systemet C9000 og regneark en grov oversikt over ukebelastningen, mens den daglige fordelingen av arbeid p\u00e5 maskinene fortsatt ble gjort manuelt. To arbeidsledere brukte hver minst halvparten av tiden sin p\u00e5 kapasitetsplanlegging.<\/p>\n\n\n<p>Med SkyPlanner registreres ordrene fortsatt i det eksisterende ERP-systemet, mens planlegging med begrenset kapasitet og fordeling av arbeid p\u00e5 maskinene er automatisert. I l\u00f8sningen hos KJH-Comp kontrollerer et plukktrinn f\u00f8r sveising at alle n\u00f8dvendige deler, ogs\u00e5 innkj\u00f8pte deler, er klare f\u00f8r jobben legges i k\u00f8en. Tidligere ble dette kontrollert manuelt.<\/p>\n\n\n<p>Bedriften opplyser at ansvaret for finplanleggingen gikk fra to arbeidsledere til \u00e9n, mens den andre fikk andre oppgaver. De forteller ogs\u00e5 at flaskehalser i kapasiteten blir synlige tidligere. For den som planlegger montering, er l\u00e6rdommen at deletilgang og en realistisk produksjonsrekkef\u00f8lge m\u00e5 ses i sammenheng. <a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/kjh-comp\/\">KJH-Comps erfaringer med SkyPlanner<\/a> viser denne endringen i praksis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lag en gjennomf\u00f8rbar plan for din neste monteringsordre<\/h2>\n\n\n<p>ATO er et godt valg n\u00e5r felles komponenter gir kundene relevante valgmuligheter uten at du m\u00e5 lagerf\u00f8re alle ferdige kombinasjoner. Ta vare p\u00e5 denne fordelen ved \u00e5 planlegge arbeidet etter at ordren kommer inn, like n\u00f8ye som lageret i forkant.<\/p>\n\n\n<p>Velg SkyPlanner n\u00e5r samordningen av ordrer med alle komponenter klare, monteringsteam og ressurser i de p\u00e5f\u00f8lgende trinnene har blitt en daglig byrde med stadige omplanlegginger. Arcturus beregner planen, Gantt-visningen gj\u00f8r konsekvensene tydelige, og du beholder kontrollen over prioriteringene.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demonstrasjon av SkyPlanner<\/a>, og ta med en typisk monteringsordre, komponentbehovene og ressursen som oftest forsinker ferdigstillelsen. Legg til en annen ordre som konkurrerer om den samme ressursen. Dette gir oss et konkret utgangspunkt for \u00e5 vise hvordan SkyPlanner kan spare tid p\u00e5 omplanlegging og gj\u00f8re det enklere \u00e5 vurdere leveringsdatoer.<\/p>\n\n\n<p>Vil du utforske selv f\u00f8rst? <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">Pr\u00f8v SkyPlanner med demodata<\/a> og se hvordan operasjoner og kapasitet samles i \u00e9n plan.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide Hjem &raquo; Ressurser &raquo; Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide Montering p\u00e5 bestilling (ATO) inneb\u00e6rer \u00e5 ha standardkomponenter eller delmontasjer klare, og f\u00f8rst montere det ferdige produktet n\u00e5r kunden har bestilt. Delene som brukes i flere varianter, klargj\u00f8res p\u00e5 forh\u00e5nd uten &#8230; <a title=\"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/\" aria-label=\"Read more about Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":99530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-99509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Montering p\u00e5 bestilling: Fra klare deler til montering i tide<\/title>\n<meta name=\"description\" content=\"Montering p\u00e5 bestilling gir valg uten alle ferdigvarianter p\u00e5 lager. Se n\u00e5r det passer, og hvordan SkyPlanner kobler klargjorte deler til monteringskapasitet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide\" \/>\n<meta property=\"og:description\" content=\"Montering p\u00e5 bestilling gir valg uten alle ferdigvarianter p\u00e5 lager. Se n\u00e5r det passer, og hvordan SkyPlanner kobler klargjorte deler til monteringskapasitet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T00:41:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T00:43:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1942\" \/>\n\t<meta property=\"og:image:height\" content=\"809\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide\",\"datePublished\":\"2026-10-16T00:41:10+00:00\",\"dateModified\":\"2026-10-16T00:43:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/\"},\"wordCount\":2320,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/\",\"name\":\"Montering p\u00e5 bestilling: Fra klare deler til montering i tide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"datePublished\":\"2026-10-16T00:41:10+00:00\",\"dateModified\":\"2026-10-16T00:43:15+00:00\",\"description\":\"Montering p\u00e5 bestilling gir valg uten alle ferdigvarianter p\u00e5 lager. Se n\u00e5r det passer, og hvordan SkyPlanner kobler klargjorte deler til monteringskapasitet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"width\":1942,\"height\":809},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/montering-pa-bestilling\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Montering p\u00e5 bestilling: Fra klare deler til montering i tide","description":"Montering p\u00e5 bestilling gir valg uten alle ferdigvarianter p\u00e5 lager. Se n\u00e5r det passer, og hvordan SkyPlanner kobler klargjorte deler til monteringskapasitet.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/","og_locale":"nb_NO","og_type":"article","og_title":"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide","og_description":"Montering p\u00e5 bestilling gir valg uten alle ferdigvarianter p\u00e5 lager. Se n\u00e5r det passer, og hvordan SkyPlanner kobler klargjorte deler til monteringskapasitet.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T00:41:10+00:00","article_modified_time":"2026-10-16T00:43:15+00:00","og_image":[{"width":1942,"height":809,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"12 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide","datePublished":"2026-10-16T00:41:10+00:00","dateModified":"2026-10-16T00:43:15+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/"},"wordCount":2320,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","articleSection":["APS &amp; Scheduling","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/","name":"Montering p\u00e5 bestilling: Fra klare deler til montering i tide","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","datePublished":"2026-10-16T00:41:10+00:00","dateModified":"2026-10-16T00:43:15+00:00","description":"Montering p\u00e5 bestilling gir valg uten alle ferdigvarianter p\u00e5 lager. Se n\u00e5r det passer, og hvordan SkyPlanner kobler klargjorte deler til monteringskapasitet.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","width":1942,"height":809},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/montering-pa-bestilling\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png",1942,809,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-300x125.png",300,125,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-768x320.png",768,320,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-1024x427.png",1024,427,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-1536x640.png",1536,640,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png",1942,809,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-360x150.png",360,150,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide Hjem &raquo; Ressurser &raquo; Montering p\u00e5 bestilling: Fra klargjorte deler til montering i tide Montering p\u00e5 bestilling (ATO) inneb\u00e6rer \u00e5 ha standardkomponenter eller delmontasjer klare, og f\u00f8rst montere det ferdige produktet n\u00e5r kunden har bestilt. Delene som brukes i flere varianter, klargj\u00f8res p\u00e5 forh\u00e5nd uten&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=99509"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99509\/revisions"}],"predecessor-version":[{"id":99567,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99509\/revisions\/99567"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/99530"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=99509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=99509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=99509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}