{"id":99422,"date":"2026-10-15T22:10:24","date_gmt":"2026-10-15T22:10:24","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99422"},"modified":"2026-10-15T22:12:36","modified_gmt":"2026-10-15T22:12:36","slug":"engineer-to-order","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/","title":{"rendered":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Kunden trenger en maskin som enn\u00e5 ikke finnes i sin endelige form. Konstrukt\u00f8rene m\u00e5 utforme den, innkj\u00f8p m\u00e5 sikre delene, og produksjonen m\u00e5 finne plass til \u00e5 bygge den ved siden av prosjektene dere allerede har lovet \u00e5 levere.<\/p>\n\n\n<p>Det er dette engineer to order handler om. Utfordringen er ikke bare \u00e5 konstruere riktig produkt, men \u00e5 holde konstruksjonsvalg, materialleveranser og produksjonsplan samordnet mens produktet tar form. En ferdig tegning gj\u00f8r ikke et maskineringssenter ledig, og en kritisk komponent p\u00e5 lager skaper ikke ledig tid til montering.<\/p>\n\n\n<p>SkyPlanner APS hjelper deg med \u00e5 gj\u00f8re dette produksjonsbehovet om til en gjennomf\u00f8rbar plan. Arcturus, systemets KI for finplanlegging, beregner hvor operasjonene passer inn ut fra ressursene, materialene og prioriteringene dine. Resultatet vises i en Gantt-tidslinje, slik at du slipper \u00e5 bygge opp maskink\u00f8ene for hvert prosjekt p\u00e5 nytt manuelt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er engineer to order?<\/h2>\n\n\n<p>Engineer to order (ETO) er en produksjonsstrategi der en kundeordre utl\u00f8ser b\u00e5de konstruksjon og produksjon av produktet. Kundens krav m\u00e5 omsettes til et godkjent konstruksjonsunderlag f\u00f8r de ber\u00f8rte delene kan produseres.<\/p>\n\n\n<p>Konstruksjonsarbeidet kan gjelde en ny maskin, en kundetilpasset sammenstilling eller en omfattende tilpasning av et eksisterende produkt. ETO betyr ikke at alle festemidler, komponenter eller konstruksjonselementer m\u00e5 utvikles p\u00e5 nytt. Det avgj\u00f8rende er at l\u00f8sningen kunden bestiller, fortsatt krever konstruksjonsarbeid. Det er alts\u00e5 ikke nok \u00e5 velge et etablert produkt og starte produksjonen etter den fastlagte produksjonsruten.<\/p>\n\n\n<p>Se for deg en produsent som bygger en testrigg for en uvanlig komponent hos en kunde. Teamet m\u00e5 konstruere fiksturen, velge en egnet drivenhet og utforme oppsettet ut fra kundens testkrav. Standardmotorer og styringer kan gjenbrukes, men den ferdige riggen konstrueres spesielt for denne ordren.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Engineer to order eller produksjon mot ordre?<\/h3>\n\n\n<p>Begge starter med en kundeordre. Forskjellen ligger i hvor mye av produktet som allerede er definert.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategi<\/th><th>Hva skjer etter bestilling?<\/th><th>Det viktigste sp\u00f8rsm\u00e5let i planleggingen<\/th><\/tr><\/thead><tbody><tr><td>Engineer to order (ETO)<\/td><td>Konstruer den kundetilpassede l\u00f8sningen, og produser deretter det som er godkjent<\/td><td>N\u00e5r er arbeidet definert og klart til oppstart, og n\u00e5r kan produksjonen fullf\u00f8re det?<\/td><\/tr><tr><td>Produksjon mot ordre (MTO)<\/td><td>Produser et etablert produkt eller en etablert variant for ordren<\/td><td>Hvor passer de kjente operasjonene inn i produksjonsplanen?<\/td><\/tr><tr><td>Konfigurering mot ordre (CTO)<\/td><td>Velg blant forh\u00e5ndsdefinerte alternativer som er kompatible med hverandre<\/td><td>Kan delene til den valgte konfigurasjonen skaffes og produktet bygges i tide?<\/td><\/tr><tr><td>Produksjon mot lager (MTS)<\/td><td>Lever ordren fra ferdigvarer produsert for forventet ettersp\u00f8rsel<\/td><td>Er de riktige ferdigvarene p\u00e5 lager?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>En spesiell overflatebehandling eller et bestemt antall gj\u00f8r ikke automatisk en jobb til ETO. Hvis det godkjente konstruksjonsunderlaget og produksjonsmetoden allerede dekker behovet, <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/ordreproduksjon\/\">kan produksjon mot ordre v\u00e6re en bedre beskrivelse<\/a>. M\u00e5 konstrukt\u00f8rene utvikle en ny l\u00f8sning, er ETO mer treffende.<\/p>\n\n\n<p>\u00c9n fabrikk kan bruke flere strategier. Standardvarer kan holdes p\u00e5 lager, produkter som bestilles p\u00e5 nytt, kan produseres mot ordre, og nye prosjektprodukter kan konstrueres og produseres etter kundens bestilling. Operasjonene kan likevel konkurrere om de samme maskinene og medarbeiderne.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e5r er ETO verdt merarbeidet?<\/h2>\n\n\n<p>ETO er hensiktsmessig n\u00e5r et etablert produkt eller en forh\u00e5ndsdefinert konfigurasjon ikke dekker kundens behov, og verdien av \u00e5 l\u00f8se behovet forsvarer konstruksjonsarbeidet. Spesialmaskiner, kundetilpasset testutstyr og industrielle sammenstillinger for bestemte bruksomr\u00e5der er gode eksempler.<\/p>\n\n\n<p>Den kommersielle fordelen ligger i tilpasningen: Dere kan levere en l\u00f8sning kunden ikke bare kan velge fra en katalog. \u00c5 gjenbruke utpr\u00f8vde moduler der det passer, bidrar til \u00e5 unng\u00e5 at kundetilpasningen f\u00f8rer til un\u00f8dvendig nyutvikling.<\/p>\n\n\n<p>Prisen er tidsbruk og usikkerhet. Konstruksjon, godkjenninger og innkj\u00f8p gir mer arbeid f\u00f8r produksjonen kan fullf\u00f8res. N\u00e5r konstruksjonen utvikler seg underveis, kan materialbehov, bearbeidingstid og kostnader endre seg. Ferdigvarer bygges ikke for lager i h\u00e5p om fremtidig salg, men kapital kan likevel bli bundet i innkj\u00f8pte komponenter og uferdig prosjektarbeid.<\/p>\n\n\n<p>F\u00f8r dere aksepterer ordren, b\u00f8r dere avtale hva kunden kj\u00f8per, hvilke beslutninger som fortsatt er \u00e5pne, hvem som godkjenner konstruksjonen, og hvordan senere endringer p\u00e5virker pris og levering. S\u00f8rg for at kunden aksepterer en ledetid som omfatter konstruksjon og anskaffelser, ikke bare bearbeiding i maskinene.<\/p>\n\n\n<p>Hvis den samme l\u00f8sningen stadig ettersp\u00f8rres i nye ordrer, b\u00f8r dere vurdere om noe av arbeidet kan bli til en standardkonstruksjon eller et konfigurerbart alternativ. Bruk ETO til kravene som faktisk krever konstruksjonsarbeid.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Samordne konstruksjon, innkj\u00f8p og produksjon f\u00f8r overleveringen<\/h2>\n\n\n<p>En ETO-plan blir s\u00e5rbar n\u00e5r hver avdeling har en dato som virker realistisk, men ingen sjekker om datoene passer sammen. Konstruksjonsavdelingen forventer \u00e5 frigi en tegning, innkj\u00f8p forventer at en komponent kommer, og produksjonen antar at begge deler er klare til et tidsrom som et annet prosjekt allerede har tatt.<\/p>\n\n\n<p>En bedre arbeidsflyt kobler det som m\u00e5 v\u00e6re klart til oppstart, med tilgjengelig kapasitet helt fra starten.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Avklar omfanget og forutsetningene for frigivelse til produksjon<\/h3>\n\n\n<p>Finn ut hvilke deler av konstruksjonsarbeidet som styrer leveransen: kundegodkjenninger, kritiske grensesnitt, innkj\u00f8pt utstyr og produksjonsunderlag som andre trenger for \u00e5 komme videre. Gi hver uavklart beslutning en ansvarlig og en forventet avklaringsdato.<\/p>\n\n\n<p>Tidlige planer vil inneholde anslag. La det v\u00e6re tydelig at dette er forutsetninger, i stedet for \u00e5 behandle enhver forventet dato som en godkjent frigivelse til produksjon. Et leveringsl\u00f8fte som bygger p\u00e5 et uavklart grensesnitt, krever en annen oppf\u00f8lging enn et som bygger p\u00e5 en utpr\u00f8vd sammenstilling dere har laget f\u00f8r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ta hensyn til innkj\u00f8p av varer med lang leveringstid n\u00e5r konstruksjonen diskuteres<\/h3>\n\n\n<p>En kritisk motor, et st\u00f8pegods eller en styringskomponent m\u00e5 kanskje bestilles f\u00f8r alle produktdetaljene er p\u00e5 plass. Konstruksjon og innkj\u00f8p b\u00f8r avklare hvilke spesifikasjoner som er sikre nok til \u00e5 bestille etter, og hvilken risiko som gjenst\u00e5r hvis konstruksjonen endres.<\/p>\n\n\n<p>Valget st\u00e5r ikke bare mellom \u00e5 \u00abkj\u00f8pe tidlig\u00bb og \u00e5 \u00abvente til hele konstruksjonen er ferdig\u00bb. Kj\u00f8per dere for tidlig, kan dere bli sittende med ubrukelige deler. Kj\u00f8per dere for sent, kan et ellers klart prosjekt stoppe opp. Knytt leverand\u00f8renes datoer til operasjonene som trenger delene, og oppdater planen n\u00e5r en leverand\u00f8r endrer avtalt leveringsdato.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Frigi avklart arbeid med brukbart produksjonsunderlag<\/h3>\n\n\n<p>N\u00e5r produktet tillater det, kan dere frigi en godkjent del uten \u00e5 vente p\u00e5 alle detaljer som ikke ber\u00f8rer den. En ferdig avklart ramme kan v\u00e6re klar mens den kundetilpassede fiksturen fortsatt konstrueres. Det kan redusere ventetiden, forutsatt at senere beslutninger ikke gj\u00f8r det frigitte arbeidet ugyldig.<\/p>\n\n\n<p>Ved hver frigivelse m\u00e5 det f\u00f8lge med gjeldende tegningsrevisjon, materialer, antall, operasjoner, egnede ressurser og realistiske omstillings- og bearbeidingstider. Gj\u00f8r det tydelig hvilket arbeid som er godkjent for produksjon, og hva som fortsatt er forel\u00f8pig. F\u00f8r reviderte instrukser sendes til produksjonsgulvet, m\u00e5 dere avklare hvordan en konstruksjonsendring p\u00e5virker arbeid som allerede er bestilt, frigitt eller p\u00e5begynt.<\/p>\n\n\n<p>Her blir konstruksjonsunderlaget til konkrete behov i finplanleggingen. <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/produksjonsrute\/\">Produksjonsruten<\/a> beskriver arbeidet, men reserverer ikke kapasiteten som trengs for \u00e5 utf\u00f8re det.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sjekk hele forl\u00f8pet frem til levering opp mot de andre prosjektene<\/h3>\n\n\n<p>Planlegg de frigitte operasjonene sammen med resten av fabrikkens arbeid. Ta med delene som m\u00e5 v\u00e6re klare samtidig til montering, n\u00f8dvendig kontroll eller testing og tiden som trengs etter produksjon til klargj\u00f8ring for forsendelse eller installasjon.<\/p>\n\n\n<p>Ikke planlegg som om hvert prosjekt har sitt eget monteringsteam n\u00e5r teamet i virkeligheten er felles. En prosjektplan kan vise en fornuftig rekkef\u00f8lge selv om den samlede fabrikkplanen er overbelastet. Kunden trenger en ferdigdato som er realistisk med de felles ressursene, ikke bare en dato beregnet ved \u00e5 legge produksjonstiden til datoen da konstruksjonsunderlaget frigis til produksjon.<\/p>\n\n\n<h2 class=\"wp-block-heading\">En forsinket konstruksjon kan p\u00e5virke flere prosjekter<\/h2>\n\n\n<p>La oss g\u00e5 tilbake til den tenkte produsenten av testriggen. Rammen er godkjent, en drivenhet er bestilt, og adapterplaten venter fortsatt p\u00e5 m\u00e5l for kundens grensesnitt. Maskineringen m\u00e5 v\u00e6re ferdig f\u00f8r sluttmontering, og andre prosjekter bruker det samme maskineringssenteret og monteringsteamet.<\/p>\n\n\n<p>Kunden endrer grensesnittet. Konstrukt\u00f8rene reviderer adapterplaten, og frigivelsen blir utsatt. I mellomtiden tar et annet prosjekt den ledige maskineringstiden som var tiltenkt adapterplaten.<\/p>\n\n\n<p>Det er ikke nok \u00e5 flytte datoen for adapterplaten isolert. Neste ledige maskineringstid kan komme etter det planlagte tidsrommet for montering. Drivenheten kan komme i tide og rammen v\u00e6re ferdig, uten at riggen kan g\u00e5 videre til sluttmontering. \u00c5 starte flere deler som ikke l\u00f8ser denne avhengigheten, hjelper ikke.<\/p>\n\n\n<p>Planleggeren m\u00e5 vurdere de gjenst\u00e5ende operasjonene samlet. Kan en godkjent alternativ arbeidsstasjon maskinere adapterplaten? Kan en avtalt endring i prioritet sikre monteringstiden likevel, og hvilken annen leveranse vil det i s\u00e5 fall p\u00e5virke? Er ekstra kapasitet berettiget, eller b\u00f8r kunden f\u00e5 en ny leveringsdato?<\/p>\n\n\n<p>Dette er produksjonsbeslutninger, ikke beslutninger om tegningsh\u00e5ndtering. En samordnet produksjonsplan lar deg vurdere dem f\u00f8r en forsinket frigivelse kommer som en overraskelse ved sluttmontering.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gi frigitt arbeid en realistisk plass i planen med SkyPlanner<\/h2>\n\n\n<p>SkyPlanner samler arbeidsstasjoner, skift, operat\u00f8rer, materialer og prioriteringer i \u00e9n produksjonsplan. Produktets prosesstrinn beskriver produksjonsarbeidet og hvor lang tid det tar. Arcturus finplanlegger operasjonene ut fra konfigurert kapasitet, avhengigheter og regler. <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/gantt-diagram-for-produksjonsplanlegging\/\">Gantt-tidslinjen viser<\/a> hvor de utf\u00f8res, og n\u00e5r de forventes \u00e5 v\u00e6re ferdige.<\/p>\n\n\n<p>For en ETO-planlegger betyr det at det frigitte arbeidet p\u00e5 testriggen vises sammen med de andre prosjektene som bruker de samme ressursene. Du kan f\u00f8lge arbeidet fra maskinering til montering og se forventet ferdigstillelse, i stedet for \u00e5 vedlikeholde separate datoer for hver avdeling.<\/p>\n\n\n<p>En tidligste startdato angir n\u00e5r produksjonen tidligst kan begynne. I denne arbeidsflyten oppgis datoen av planleggeren eller det tilkoblede ERP-systemet, basert p\u00e5 avtalte opplysninger om hva som er klart. Hvis forventet frigivelse av adapteren endres, oppdaterer du de ber\u00f8rte jobbene og beregner produksjonsplanen p\u00e5 nytt. Deretter vurderer du det nye tidspunktet for ferdigstillelse f\u00f8r du bekrefter hva endringen betyr for leveransen.<\/p>\n\n\n<p>N\u00e5r planlegging med hensyn til materialtilgang er aktivert, tar Arcturus ogs\u00e5 hensyn til n\u00e5r materialene er tilgjengelige. Leveringsdatoene p\u00e5 innkj\u00f8psordrene angir forventet tilgjengelighet. N\u00e5r en innkj\u00f8psordre bekreftes som levert, oppdateres lagerbeholdningen. En endret leveringsdato fra en leverand\u00f8r kan dermed inng\u00e5 i planleggingsgrunnlaget, i stedet for \u00e5 bli liggende i en e-post til innkj\u00f8p mens produksjonen fortsatt planlegger ut fra den gamle datoen.<\/p>\n\n\n<p>Du bestemmer prioriteringene og bruker l\u00e5sing for \u00e5 beholde planleggingsbeslutninger som skal ligge fast. Arcturus utf\u00f8rer beregningene innenfor disse rammene. Det reduserer behovet for manuell omplanlegging og hjelper deg med \u00e5 utnytte tilgjengelig kapasitet mer effektivt. Samtidig er det fortsatt du som vurderer hvilke leveringsforpliktelser som veier tyngst for virksomheten.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sitt <a href=\"https:\/\/skyplanner.ai\/no\/integrasjoner\/\">\u00e5pne REST API<\/a>. Koble eksisterende ordre- og produksjonsdata til beregningen av produksjonsplanen, samtidig som dere beholder tydelige ansvarsgrenser for godkjenning av konstruksjonen og oppgavene i ERP-systemet. Bedre finplanlegging av ETO-produksjon trenger ikke \u00e5 begynne med at dere bytter ut systemene som allerede h\u00e5ndterer produktinformasjon og ordrer.<\/p>\n\n\n<p>Velg SkyPlanner n\u00e5r samordning av produksjonen p\u00e5 tvers av prosjekter har blitt en daglig, manuell belastning. Gevinsten er et tydeligere svar p\u00e5 sp\u00f8rsm\u00e5let kundene stadig stiller: N\u00e5r kan dette prosjektet bli ferdig, gitt det som er klart, og arbeidet dere allerede har forpliktet dere til?<\/p>\n\n\n<h2 class=\"wp-block-heading\">UTU: mer oversiktlig finplanlegging av prosjektleveranser<\/h2>\n\n\n<p>UTUs fabrikk i Ulvila produserer elektrotavler og koblingsanlegg, fra standardprodukter til store prosjektleveranser. F\u00f8r SkyPlanner planla avdelingene i Excel-regneark som ble oppdatert manuelt. Endringer i produksjonsrekkef\u00f8lgen i ERP-systemet n\u00e5dde ikke alltid frem til produksjonsgulvet, og det var vanskelig \u00e5 f\u00e5 oversikt over den reelle kapasiteten.<\/p>\n\n\n<p>Hos UTU er SkyPlanner koblet til Oracle NetSuite og l\u00f8nnssystemet, slik at alle fabrikkens linjer og avdelinger er samlet i ett planleggingssystem. UTU trekker frem kombinasjonen av automatisk finplanlegging og Gantt-visningen: Planen, den faktiske fremdriften, kapasiteten og belastningen er synlige p\u00e5 samme sted. En oppdatert jobbk\u00f8 n\u00e5r mont\u00f8rene i l\u00f8pet av sekunder.<\/p>\n\n\n<p>Selskapet beskriver en mer presis finplanlegging av prosjektprodukter som nettstasjoner og mellomspenningsanlegg. Det kan ta hensyn til kapasitetsendringer, blant annet sykefrav\u00e6r, i den langsiktige planen. UTU ansl\u00e5r ogs\u00e5 at de sparer rundt to arbeidstimer hver uke fordi regnearkene ikke lenger m\u00e5 oppdateres manuelt.<\/p>\n\n\n<p>Erfaringene viser den praktiske verdien for prosjektbasert produksjon: En oppdatert, felles produksjonsplan gj\u00f8r arbeidet enklere \u00e5 samordne og gir et sikrere grunnlag for \u00e5 diskutere leveranser. <a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/utu\/\">UTUs erfaringer med SkyPlanner<\/a> viser hva som endret seg for planleggerne og mont\u00f8rene.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ta neste prosjekt inn i den felles produksjonsplanen<\/h2>\n\n\n<p>Med ETO kan du konstruere og produsere ut fra kundens spesifikke behov. For at arbeidet skal v\u00e6re l\u00f8nnsomt og kunne leveres, m\u00e5 den godkjente konstruksjonen ses i sammenheng med delene og kapasiteten som trengs for \u00e5 fullf\u00f8re det. En dato for frigivelse til produksjon er bare nyttig n\u00e5r fabrikken kan handle p\u00e5 grunnlag av den.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo av SkyPlanner<\/a> og ta med ett kundetilpasset prosjekt, de forventede datoene for frigivelse til produksjon og ressursen prosjektet deler med andre ordrer. Ta ogs\u00e5 med en nylig endring i konstruksjonen eller hos en leverand\u00f8r. Det gir oss et konkret utgangspunkt for \u00e5 vise hvordan Arcturus og Gantt-planen kan redusere arbeidet med omplanlegging og gj\u00f8re det enklere \u00e5 vurdere leveringsdatoer.<\/p>\n\n\n<p>Vil du utforske selv f\u00f8rst? <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">Pr\u00f8v SkyPlanner med demodata<\/a> og se hvordan ordrer, operasjoner og kapasitet samles i \u00e9n produksjonsplan.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan Hjem &raquo; Ressurser &raquo; Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan Kunden trenger en maskin som enn\u00e5 ikke finnes i sin endelige form. Konstrukt\u00f8rene m\u00e5 utforme den, innkj\u00f8p m\u00e5 sikre delene, og produksjonen m\u00e5 finne plass til \u00e5 bygge den ved siden av prosjektene &#8230; <a title=\"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/\" aria-label=\"Read more about Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":99425,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-99422","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan<\/title>\n<meta name=\"description\" content=\"Ferdig konstruert betyr ikke ledig kapasitet. Se n\u00e5r engineer to order passer, og hvordan SkyPlanner kobler frigitt arbeid, materialer og produksjonskapasitet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan\" \/>\n<meta property=\"og:description\" content=\"Ferdig konstruert betyr ikke ledig kapasitet. Se n\u00e5r engineer to order passer, og hvordan SkyPlanner kobler frigitt arbeid, materialer og produksjonskapasitet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T22:10:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T22:12:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan\",\"datePublished\":\"2026-10-15T22:10:24+00:00\",\"dateModified\":\"2026-10-15T22:12:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/\"},\"wordCount\":2230,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/\",\"name\":\"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"datePublished\":\"2026-10-15T22:10:24+00:00\",\"dateModified\":\"2026-10-15T22:12:36+00:00\",\"description\":\"Ferdig konstruert betyr ikke ledig kapasitet. Se n\u00e5r engineer to order passer, og hvordan SkyPlanner kobler frigitt arbeid, materialer og produksjonskapasitet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineer-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A custom test-rig frame, drive and adapter await assembly beside a shared machining centre.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/engineer-to-order\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan","description":"Ferdig konstruert betyr ikke ledig kapasitet. Se n\u00e5r engineer to order passer, og hvordan SkyPlanner kobler frigitt arbeid, materialer og produksjonskapasitet.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/","og_locale":"nb_NO","og_type":"article","og_title":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan","og_description":"Ferdig konstruert betyr ikke ledig kapasitet. Se n\u00e5r engineer to order passer, og hvordan SkyPlanner kobler frigitt arbeid, materialer og produksjonskapasitet.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T22:10:24+00:00","article_modified_time":"2026-10-15T22:12:36+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan","datePublished":"2026-10-15T22:10:24+00:00","dateModified":"2026-10-15T22:12:36+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/"},"wordCount":2230,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","articleSection":["APS &amp; Scheduling","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/","name":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","datePublished":"2026-10-15T22:10:24+00:00","dateModified":"2026-10-15T22:12:36+00:00","description":"Ferdig konstruert betyr ikke ledig kapasitet. Se n\u00e5r engineer to order passer, og hvordan SkyPlanner kobler frigitt arbeid, materialer og produksjonskapasitet.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png","width":1672,"height":941,"caption":"A custom test-rig frame, drive and adapter await assembly beside a shared machining centre."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/engineer-to-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineer-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan Hjem &raquo; Ressurser &raquo; Engineer to order: Fra konstruksjon til en gjennomf\u00f8rbar plan Kunden trenger en maskin som enn\u00e5 ikke finnes i sin endelige form. Konstrukt\u00f8rene m\u00e5 utforme den, innkj\u00f8p m\u00e5 sikre delene, og produksjonen m\u00e5 finne plass til \u00e5 bygge den ved siden av prosjektene&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=99422"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99422\/revisions"}],"predecessor-version":[{"id":99480,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99422\/revisions\/99480"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/99425"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=99422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=99422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=99422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}