{"id":99335,"date":"2026-10-15T20:34:27","date_gmt":"2026-10-15T20:34:27","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99335"},"modified":"2026-10-19T15:12:41","modified_gmt":"2026-10-19T15:12:41","slug":"produksjon-til-lager","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/","title":{"rendered":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>En kunde trenger et standardprodukt i morgen. Ligger det allerede p\u00e5 lager, kan du klargj\u00f8re forsendelsen i stedet for \u00e5 be kunden vente p\u00e5 produksjonen. Det er fordelen med produksjon til lager: Du produserer f\u00f8r ordren kommer.<\/p>\n\n\n<p>De vanskeligste beslutningene m\u00e5 tas f\u00f8r salget. Hvilke produkter b\u00f8r ligge p\u00e5 ferdigvarelageret, hvor mye skal du produsere, og n\u00e5r m\u00e5 neste parti v\u00e6re klart? Lagerf\u00f8rer du feil variant, binder du kapital. Fyller du p\u00e5 riktig variant for sent, mister du leveringsfordelen du betalte for.<\/p>\n\n\n<p>En nyttig MTS-plan knytter disse beslutningene til den faktiske belastningen i fabrikken. SkyPlanner APS hjelper deg med \u00e5 planlegge lagerp\u00e5fyllingen sammen med de andre jobbene som bruker de samme maskinene og medarbeiderne. Da f\u00e5r lagerproduksjonen en realistisk plass i planen, i stedet for \u00e5 m\u00e5tte ta til takke med tiden som blir igjen etter hasteordrene.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er produksjon til lager?<\/h2>\n\n\n<p>Produksjon til lager (MTS) er en produksjonsstrategi der ferdigvarer produseres for forventet ettersp\u00f8rsel, f\u00f8r de konkrete kundeordrene kommer. Kundene f\u00e5r deretter varene levert fra det tilgjengelige ferdigvarelageret.<\/p>\n\n\n<p>Produksjonen kan styres av en prognose, regler for lagerp\u00e5fylling eller en kombinasjon av forventet ettersp\u00f8rsel og kundeforpliktelser. Det avgj\u00f8rende er at produksjonen ikke venter p\u00e5 hver enkelt salgsordre.<\/p>\n\n\n<p>Tenk deg en produsent som selger standard erstatningsfiltre. Kundene kj\u00f8per jevnlig filtre med de samme spesifikasjonene og forventer rask utsending. Produsenten lager filtrene f\u00f8r ordrene kommer, og fyller p\u00e5 ferdigvarelageret etter hvert som varene g\u00e5r ut. Et spesialtilpasset filter med usikker ettersp\u00f8rsel blir kanskje f\u00f8rst produsert n\u00e5r en kunde bestiller det.<\/p>\n\n\n<p>MTS beskrives ofte som en skyvstrategi, fordi forventet ettersp\u00f8rsel setter i gang produksjonen f\u00f8r salget. Det betyr ikke at alle maskiner skal g\u00e5 for fullt i h\u00e5p om at varene blir solgt. Det forretningsmessige m\u00e5let er tilgjengelighet: nok av de riktige ferdigvarene til \u00e5 betjene kundene, uten \u00e5 bygge opp et kostbart lager av varer med lav oml\u00f8pshastighet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Produksjon til lager eller produksjon mot ordre<\/h3>\n\n\n<p>Forskjellen ligger i hva som utl\u00f8ser produksjonen, og hva kunden m\u00e5 vente p\u00e5.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vurderingspunkt<\/th><th>Produksjon til lager<\/th><th>Produksjon mot ordre<\/th><\/tr><\/thead><tbody><tr><td>Hva utl\u00f8ser produksjonen?<\/td><td>Forventet ettersp\u00f8rsel eller behov for \u00e5 fylle p\u00e5 ferdigvarelageret<\/td><td>En konkret kundeordre<\/td><\/tr><tr><td>Hva m\u00e5 kunden vente p\u00e5?<\/td><td>Plukking, pakking og utsending, hvis de n\u00f8dvendige varene er p\u00e5 lager<\/td><td>B\u00e5de produksjon og klargj\u00f8ring for levering<\/td><\/tr><tr><td>St\u00f8rste risiko<\/td><td>Usolgte eller ukurante ferdigvarer, eller varer med utl\u00f8pt holdbarhet<\/td><td>K\u00f8er og ledetid i produksjonen etter salget<\/td><\/tr><tr><td>Passer typisk for<\/td><td>Gjentakende ettersp\u00f8rsel etter standardprodukter som m\u00e5 leveres raskt<\/td><td>Varianter med mindre forutsigbar ettersp\u00f8rsel eller kundespesifikke krav<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Du kan bruke begge strategiene i samme fabrikk. Lagerf\u00f8r standardsortimentet og <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/ordreproduksjon\/\">produser uvanlige varianter mot ordre<\/a>. Produktene kan likevel konkurrere om de samme produksjonsressursene. Derfor m\u00e5 begge typer arbeid samles i \u00e9n produksjonsplan.<\/p>\n\n\n<p>MTS er heller ikke det samme som masseproduksjon. MTS beskriver hvorfor produksjonen starter, mens <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/batchproduksjon\/\">batchproduksjon<\/a>, masseproduksjon og kontinuerlig produksjon beskriver hvordan arbeidet er organisert. Et parti som skal fylle p\u00e5 lageret, kan v\u00e6re produksjon til lager selv i en fabrikk som ogs\u00e5 h\u00e5ndterer sm\u00e5, kundespesifikke ordrer.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e5r l\u00f8nner det seg \u00e5 produsere til lager?<\/h2>\n\n\n<p>Vurder MTS for hvert produkt eller hver produktfamilie, ikke bare fordi fabrikken tradisjonelt har jobbet slik. Disse fire sp\u00f8rsm\u00e5lene gir et bedre beslutningsgrunnlag.<\/p>\n\n\n<p><strong>Kj\u00f8per kundene de samme spesifikasjonene om igjen?<\/strong> Et stabilt standardsortiment er enklere \u00e5 lagerf\u00f8re enn hundrevis av kombinasjoner som sjelden ettersp\u00f8rres. Stor ettersp\u00f8rsel etter en produktfamilie betyr ikke at alle st\u00f8rrelser, farger eller overflateutf\u00f8relser vil selge like godt.<\/p>\n\n\n<p><strong>Kan du forutse ettersp\u00f8rselen godt nok gjennom ledetiden for lagerp\u00e5fylling?<\/strong> Du trenger et realistisk bilde av hva som vil bli tatt ut av lageret f\u00f8r neste parti kan v\u00e6re tilgjengelig. Historiske salgstall hjelper, men kampanjer, sesongvariasjoner og kjente kundeforpliktelser kan endre bildet. Vurder produktmiksen, ikke bare det samlede salgsvolumet.<\/p>\n\n\n<p><strong>Er kundene villige til \u00e5 vente p\u00e5 produksjonen?<\/strong> Hvis markedet forventer utsending f\u00f8r du med sikkerhet kan ha fullf\u00f8rt alle trinnene i produksjonsruten, kan det \u00e5 produsere p\u00e5 forh\u00e5nd hjelpe deg med \u00e5 vinne og beholde kunder. Hvis kundene aksepterer ledetiden i produksjonen, kan det ha mindre verdi \u00e5 holde ferdigvarer p\u00e5 lager.<\/p>\n\n\n<p><strong>Beholder produktet bruksverdien mens det ligger p\u00e5 lager?<\/strong> Holdbarhet, konstruksjonsendringer, lagringsforhold og kapitalen som bindes i lageret, spiller alle inn. Et produkt som er klart til levering, har bare verdi hvis det fortsatt er det kunden \u00f8nsker.<\/p>\n\n\n<p>MTS kan redusere produksjonskostnadene gjennom effektive serier og f\u00e6rre omstillinger. Det kan ogs\u00e5 gj\u00f8re at kundens ventetid p\u00e5 levering blir uavhengig av ledetiden i produksjonen. Men gevinstene m\u00e5 v\u00e6re st\u00f8rre enn kostnadene til lagring, h\u00e5ndtering, finansiering og tap p\u00e5 lagerbeholdningen. En billigere enhet som aldri blir solgt, er ingen besparelse.<\/p>\n\n\n<p>Med et variert sortiment er en selektiv tiln\u00e6rming ofte mer fornuftig enn \u00e9n strategi for hele fabrikken: Fyll p\u00e5 varer som selger jevnt, vurder p\u00e5 nytt produkter som stadig blir liggende p\u00e5 lager, og bruk en annen produksjonsstrategi der ettersp\u00f8rselen er for usikker.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fra forventet ettersp\u00f8rsel til neste p\u00e5fyllingsparti<\/h2>\n\n\n<p>I praksis er MTS en l\u00f8pende prosess: Vurder ettersp\u00f8rselen og den brukbare lagerbeholdningen, bestem hva som skal fylles p\u00e5, sett det inn i produksjonsplanen, og oppdater planen etter hvert som forbruket og produksjonen endrer seg.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Avklar hva som faktisk er tilgjengelig<\/h3>\n\n\n<p>Skill mellom tilgjengelige ferdigvarer og mengder som allerede er reservert, venter p\u00e5 frigivelse eller av andre grunner ikke kan brukes. Sjekk ogs\u00e5 \u00e5pne produksjonsordrer: Et parti som allerede er under produksjon, er en fremtidig tilgang, ikke en grunn til \u00e5 bestille samme mengde en gang til.<\/p>\n\n\n<p>Se p\u00e5 n\u00e5r varene blir klare. Et parti som blir ferdig etter at lageret forventes \u00e5 g\u00e5 tomt, sikrer ikke de tidligere leveringene bare fordi mengden ligger i systemet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Bestem mengden og n\u00e5r varene m\u00e5 v\u00e6re tilgjengelige<\/h3>\n\n\n<p>Bruk de avtalte retningslinjene for lagerstyring til \u00e5 avgj\u00f8re hvilke varer som skal etterfylles. Et bestillingspunkt kan utl\u00f8se en vurdering n\u00e5r beholdningen n\u00e5r en fastsatt grense, mens periodisk gjennomgang kan brukes til \u00e5 fastsette etterfylling med avtalte mellomrom. <a href=\"\/no\/ressurser\/sikkerhetslager\/\">Sikkerhetslager<\/a> gir en buffer mot usikkerhet. Ingen av disse tiltakene fjerner behovet for \u00e5 kontrollere ettersp\u00f8rselen, ledetiden i produksjonen og beholdningen du allerede har.<\/p>\n\n\n<p>Gj\u00f8r beslutningen konkret, slik at produksjonen vet hva som skal gj\u00f8res: Angi et produkt, en mengde og datoen da ferdigvarene m\u00e5 v\u00e6re tilgjengelige. Sett av tid til operasjonene og eventuell kontroll, frigivelse eller pakking som m\u00e5 til f\u00f8r varene kan brukes til \u00e5 oppfylle ordrer.<\/p>\n\n\n<p>En <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/master-production-schedule\/\">hovedproduksjonsplan<\/a> gir den overordnede oversikten over utvalgte produkter og mengder fordelt over tid. Det neste sp\u00f8rsm\u00e5let er mer konkret: Kan dette p\u00e5fyllingspartiet komme gjennom produksjonsruten i tide?<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vurder partiet opp mot annet arbeid<\/h3>\n\n\n<p>Ta med alle andre jobber som allerede bruker de samme ressursene, ikke bare andre MTS-partier. Sjekk materialer, aktuelle arbeidsstasjoner, skift, operat\u00f8rtilgjengelighet, bearbeidingstid og omstillinger. F\u00f8lg produksjonsruten gjennom de etterf\u00f8lgende operasjonene. En tidlig start p\u00e5 den f\u00f8rste maskinen betyr ikke at ferdigvarene er p\u00e5 lager i tide.<\/p>\n\n\n<p>En st\u00f8rre serie kan fordele omstillingskostnadene p\u00e5 flere enheter, men beslaglegger ogs\u00e5 kapasitet lenger og gir st\u00f8rre lagerbeholdning. Velg en mengde som passer b\u00e5de lagerreglene og situasjonen i produksjonen, i stedet for \u00e5 fylle opp en maskin bare fordi den er ledig i dag.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Derfor trenger lagerp\u00e5fyllingen plass i den felles produksjonsplanen<\/h2>\n\n\n<p>Tenk deg en produsent som lagerf\u00f8rer standardbeholdere og produserer spesialvarianter mot ordre. Neste parti standardbeholdere m\u00e5 v\u00e6re klart f\u00f8r dagens lager forventes \u00e5 g\u00e5 tomt. Partiet m\u00e5 gjennom forming og en pakkelinje som ogs\u00e5 brukes til andre produkter.<\/p>\n\n\n<p>S\u00e5 kommer en liten hasteordre p\u00e5 en spesialvariant. Den har en navngitt kunde og en lovet utsendingsdato. P\u00e5fyllingspartiet er enn\u00e5 ikke knyttet til bestemte kunder, s\u00e5 det virker harml\u00f8st \u00e5 skyve det bakover i planen.<\/p>\n\n\n<p>Formingen er det fortsatt plass til. Pakkingen er det ikke. N\u00e5r hasteordren har overtatt plassen, blir standardpartiet ferdig for sent til \u00e5 fylle p\u00e5 lageret f\u00f8r den forventede mangelen oppst\u00e5r. Dagens hastelevering har i det stille skapt morgendagens tilgjengelighetsproblem.<\/p>\n\n\n<p>Det riktige er ikke alltid \u00e5 prioritere lagerp\u00e5fyllingen f\u00f8rst. Du kan endre rekkef\u00f8lgen, bruke en egnet alternativ ressurs, legge til et godkjent skift eller justere en leveringsforpliktelse. Det viktige er \u00e5 se konsekvensen f\u00f8r du tar beslutningen.<\/p>\n\n\n<p><strong>Prioriteten til en lagerordre b\u00f8r gjenspeile tilgjengeligheten den sikrer, ikke at den mangler et kundenavn.<\/strong> Et tomt lager kan ramme flere senere ordrer, mens et p\u00e5fyllingsparti trygt kan vente hvis dagens beholdning dekker behovet lenge nok. Planleggeren trenger oversikt over b\u00e5de p\u00e5fyllingsbehovet og arbeidet som konkurrerer om kapasiteten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">La SkyPlanner beregne tidspunktene mens du sikrer tilgjengeligheten<\/h2>\n\n\n<p>SkyPlanner samler arbeidsstasjoner, skift, operat\u00f8rer, materialer og prioriteringer i \u00e9n produksjonsplan. Arcturus, den kunstige intelligensen som brukes til finplanlegging, beregner hvor operasjonene f\u00e5r plass ut fra kapasiteten, avhengighetene og planleggingsreglene som er satt opp. <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/gantt-diagram-for-produksjonsplanlegging\/\">Gantt-tidslinjen<\/a> viser hvordan arbeidet fordeles p\u00e5 ressursene, og n\u00e5r jobbene forventes \u00e5 v\u00e6re ferdige.<\/p>\n\n\n<p>For beholderprodusenten betyr det at p\u00e5fyllingspartiet og hasteordren p\u00e5 spesialvarianten vises i samme plan. Du kan f\u00f8lge operasjonene gjennom forming og pakking, i stedet for \u00e5 behandle hver k\u00f8 som et eget problem. N\u00e5r prioriteringene endres, beregner Arcturus tidspunktene p\u00e5 nytt, og Gantt-visningen viser virkningen p\u00e5 det \u00f8vrige arbeidet.<\/p>\n\n\n<p>Da slipper planleggeren \u00e5 bygge opp k\u00f8en for hver maskin p\u00e5 nytt for h\u00e5nd. Det blir ogs\u00e5 enklere \u00e5 utnytte ledig kapasitet: Du ser hvor arbeidet kan utf\u00f8res, og hvor den reelle konflikten fortsatt ligger, i stedet for \u00e5 starte mer produksjon i tidligere trinn som bare ender med \u00e5 vente ved pakkingen.<\/p>\n\n\n<p>Du avgj\u00f8r hvilke forpliktelser som er viktigst, og setter prioriteringene deretter. L\u00e5ser beskytter planleggingsbeslutninger som skal ligge fast. N\u00e5r planlegging med hensyn til materialtilgjengelighet er aktivert, inng\u00e5r ogs\u00e5 materialtilgangen i beregningen. Da planlegges ikke p\u00e5fyllingspartiet som om manglende innsatsvarer allerede var klare.<\/p>\n\n\n<p><strong>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sitt <a href=\"https:\/\/skyplanner.ai\/no\/integrasjoner\/\">\u00e5pne REST API<\/a>.<\/strong> La beslutninger om lagerp\u00e5fylling og produksjonsdata fra de eksisterende systemene dine inng\u00e5 i beregningen av produksjonsplanen. ERP-systemet eller prosessen for lagerplanlegging kan fastsette lagerbehovet. SkyPlanner samordner operasjonene som trengs for \u00e5 dekke det, med resten av arbeidet i fabrikken.<\/p>\n\n\n<p>Gevinsten er at du kan handle tidligere. Hvis forventet ferdigstillelse ikke lenger dekker lagerbehovet i tide, kan du l\u00f8se kapasitetskonflikten eller revurdere beslutningen om p\u00e5fylling mens det fortsatt er tid til \u00e5 reagere. Bedre finplanlegging hjelper deg \u00e5 sikre tilgjengeligheten uten \u00e5 gj\u00f8re stadig st\u00f8rre bufferlagre til svaret p\u00e5 alle forstyrrelser.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Opes: Forutsigbar ettersp\u00f8rsel krever fortsatt fleksibel produksjon<\/h2>\n\n\n<p>Den finske spesialprodusenten Opes Corporation produserer til lager, vanligvis basert p\u00e5 forutsigbare kundeforpliktelser som dekker tre m\u00e5neder. I sin <a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/opes-corporation\/\">omtale av SkyPlanner<\/a> viser selskapet hvorfor god oversikt er viktig selv n\u00e5r ettersp\u00f8rselen er relativt stabil.<\/p>\n\n\n<p>Selskapet brukte tidligere Excel og et eget lagerprogram, slik at informasjonen l\u00e5 p\u00e5 ulike steder. Da SkyPlanner ble innf\u00f8rt hos Opes, ble det integrert med Visma Nova. Opes forteller om bedre oversikt over kapasiteten og raskere endringer i produksjonsplanen n\u00e5r pr\u00f8vekj\u00f8ringer i produktutviklingen eller sm\u00e5 hasteordrer skal inn i produksjonen. Teamet kan se n\u00e5r jobbene blir ferdige, og hvordan endringer p\u00e5virker leveringstidspunktene.<\/p>\n\n\n<p>Dette er den relevante l\u00e6rdommen for produksjon til lager: Forutsigbar ettersp\u00f8rsel betyr ikke at avbruddene forsvinner. N\u00e5r jobbk\u00f8en og kapasiteten vises samlet, blir det enklere \u00e5 f\u00e5 plass til uventet arbeid ved siden av produksjonen som holder ferdigvarene tilgjengelige.<\/p>\n\n\n<p>Opes forteller ogs\u00e5 om enklere produksjonsrapportering og raskere oppl\u00e6ring av nye planleggere. Verdien ligger i en produksjonsplan som flere kan forst\u00e5 og justere, fremfor kunnskap som bare finnes hos den som laget planen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gj\u00f8r det enklere \u00e5 f\u00e5 neste parti klart til lager<\/h2>\n\n\n<p>Produksjon til lager fungerer n\u00e5r leveringsfordelen er verdt kapitalen som bindes i lageret. Velg produkter som med rimelig sikkerhet vil bli etterspurt igjen, vurder hvor mye du faktisk trenger p\u00e5 lager, og legg en realistisk plan for p\u00e5fyllingen gjennom produksjonen.<\/p>\n\n\n<p>F\u00f8lg begge sider av resultatet: varenes tilgjengelighet og tilfeller av tomt lager, men ogs\u00e5 varer som blir liggende lenge, kapitalbinding i lageret og produksjonsinnsatsen som kreves for \u00e5 opprettholde serviceniv\u00e5et. H\u00f8y maskinutnyttelse alene forteller deg ikke om MTS-strategien l\u00f8nner seg.<\/p>\n\n\n<p>Velg SkyPlanner n\u00e5r det har blitt en daglig, manuell belastning \u00e5 samordne lagerp\u00e5fylling med jobber som konkurrerer om kapasiteten. Arcturus beregner produksjonsplanen. Du styrer prioriteringene og vurderer konsekvensene i Gantt-visningen.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demonstrasjon av SkyPlanner<\/a>, og ta med et produkt dere jevnlig lagerf\u00f8rer, produksjonsruten for produktet og en hastejobb som nylig skj\u00f8v p\u00e5 lagerp\u00e5fyllingen. Da f\u00e5r du et konkret utgangspunkt for \u00e5 se hvordan en felles produksjonsplan kan sikre tilgjengeligheten og utnytte kapasiteten bedre. Vil du heller utforske p\u00e5 egen h\u00e5nd f\u00f8rst, kan du <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8ve SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente Hjem &raquo; Ressurser &raquo; Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente En kunde trenger et standardprodukt i morgen. Ligger det allerede p\u00e5 lager, kan du klargj\u00f8re forsendelsen i stedet for \u00e5 be kunden vente p\u00e5 produksjonen. Det er fordelen med produksjon til lager: Du &#8230; <a title=\"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/\" aria-label=\"Read more about Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":99338,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-99335","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlegging","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente<\/title>\n<meta name=\"description\" content=\"Produksjon til lager kan gi raskere levering hvis p\u00e5fyllet kommer i tide. Se n\u00e5r MTS passer, og hvordan du planlegger lagerp\u00e5fylling med SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente\" \/>\n<meta property=\"og:description\" content=\"Produksjon til lager kan gi raskere levering hvis p\u00e5fyllet kommer i tide. Se n\u00e5r MTS passer, og hvordan du planlegger lagerp\u00e5fylling med SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T20:34:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T15:12:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente\",\"datePublished\":\"2026-10-15T20:34:27+00:00\",\"dateModified\":\"2026-10-19T15:12:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/\"},\"wordCount\":2167,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"articleSection\":[\"APS og planlegging\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/\",\"name\":\"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"datePublished\":\"2026-10-15T20:34:27+00:00\",\"dateModified\":\"2026-10-19T15:12:41+00:00\",\"description\":\"Produksjon til lager kan gi raskere levering hvis p\u00e5fyllet kommer i tide. Se n\u00e5r MTS passer, og hvordan du planlegger lagerp\u00e5fylling med SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Standard stock containers and special orders share a packing line beside a finished-stock rack.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/produksjon-til-lager\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente","description":"Produksjon til lager kan gi raskere levering hvis p\u00e5fyllet kommer i tide. Se n\u00e5r MTS passer, og hvordan du planlegger lagerp\u00e5fylling med SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/","og_locale":"nb_NO","og_type":"article","og_title":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente","og_description":"Produksjon til lager kan gi raskere levering hvis p\u00e5fyllet kommer i tide. Se n\u00e5r MTS passer, og hvordan du planlegger lagerp\u00e5fylling med SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T20:34:27+00:00","article_modified_time":"2026-10-19T15:12:41+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente","datePublished":"2026-10-15T20:34:27+00:00","dateModified":"2026-10-19T15:12:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/"},"wordCount":2167,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","articleSection":["APS og planlegging","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/","name":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","datePublished":"2026-10-15T20:34:27+00:00","dateModified":"2026-10-19T15:12:41+00:00","description":"Produksjon til lager kan gi raskere levering hvis p\u00e5fyllet kommer i tide. Se n\u00e5r MTS passer, og hvordan du planlegger lagerp\u00e5fylling med SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","width":1774,"height":887,"caption":"Standard stock containers and special orders share a packing line beside a finished-stock rack."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/produksjon-til-lager\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente Hjem &raquo; Ressurser &raquo; Produksjon til lager: Fyll p\u00e5 f\u00f8r kundene m\u00e5 vente En kunde trenger et standardprodukt i morgen. Ligger det allerede p\u00e5 lager, kan du klargj\u00f8re forsendelsen i stedet for \u00e5 be kunden vente p\u00e5 produksjonen. Det er fordelen med produksjon til lager: Du&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=99335"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99335\/revisions"}],"predecessor-version":[{"id":99393,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/99335\/revisions\/99393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/99338"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=99335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=99335"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=99335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}