{"id":39199,"date":"2023-09-17T17:16:11","date_gmt":"2023-09-17T17:16:11","guid":{"rendered":"https:\/\/skyplanner.ai\/uncategorized-no\/erp-sikkerhet\/"},"modified":"2024-08-09T10:32:00","modified_gmt":"2024-08-09T10:32:00","slug":"erp-sikkerhet","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/","title":{"rendered":"ERP-sikkerhet"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-erp-security\">ERP-sikkerhet<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; ERP-sikkerhet<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Beregnet lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">18<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>S\u00e5 lenge virksomheter fortsetter \u00e5 basere seg p\u00e5 digitale plattformer, blir behovet for robust sikkerhet avgj\u00f8rende.\nI l\u00f8pet av utviklingen av forretningsverkt\u00f8y har <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-erp\/\">Planlegging av bedriftsressurser<\/a>, ofte kalt ERP, vokst frem som et viktig instrument for bedrifter over hele verden.\nI tillegg til \u00e5 hjelpe til med ulike funksjoner, spiller ERP en viktig rolle i produksjonsplanleggingen.  <\/p>\n\n\n\n<p>I den intrikate produksjonsverdenen sliter moderne industrier med presserende digitale bekymringer: fra potensielt tap av viktige bedriftsdata til marerittet med lekkasjer av konfidensiell informasjon.\nHer kommer ERP Security inn i bildet, vaktbikkja i Planlegging av bedriftsressurser-systemer som er klar til \u00e5 bekjempe disse utfordringene.\nFor de som navigerer i et produksjonsomr\u00e5de i stadig utvikling, lover denne sentrale <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/erp-funksjoner\/\">ERP-funksjonen<\/a> ikke bare beskyttelse, men ogs\u00e5 trygghet.\nEr du nysgjerrig?\nLes videre for \u00e5 finne ut mer om ERP-sikkerhetens store betydning og n\u00f8dvendighet i dagens digitale tidsalder.    <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-f3017ca9      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#hva-er-erp-sikkerhet\" class=\"uagb-toc-link__trigger\">Hva er ERP-sikkerhet?<\/a><li class=\"uagb-toc__list\"><a href=\"#viktigheten-av-erp-sikkerhet\" class=\"uagb-toc-link__trigger\">Viktigheten av ERP-sikkerhet<\/a><li class=\"uagb-toc__list\"><a href=\"#derfor-trenger-bedrifter-erp-sikkerhet\" class=\"uagb-toc-link__trigger\">Derfor trenger bedrifter ERP-sikkerhet<\/a><li class=\"uagb-toc__list\"><a href=\"#funksjoner-for-erp-sikkerhet\" class=\"uagb-toc-link__trigger\">Funksjoner for ERP-sikkerhet<\/a><li class=\"uagb-toc__list\"><a href=\"#fordeler-med-erp-sikkerhet\" class=\"uagb-toc-link__trigger\">Fordeler med ERP-sikkerhet<\/a><li class=\"uagb-toc__list\"><a href=\"#bransjer-som-drar-nytte-av-denne-funksjonen\" class=\"uagb-toc-link__trigger\">Bransjer som drar nytte av denne funksjonen<\/a><li class=\"uagb-toc__list\"><a href=\"#effektiv-bruk-av-erp-sikkerhet\" class=\"uagb-toc-link__trigger\">Effektiv bruk av ERP-sikkerhet<\/a><li class=\"uagb-toc__list\"><a href=\"#skyplanner-aps-revolusjonerer-produksjonen-og-styrker-sikkerheten-i-ett-sveip\" class=\"uagb-toc-link__trigger\">Skyplanner APS: Revolusjonerer produksjonen og styrker sikkerheten i ett sveip<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-bed2deec gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p><strong>ERP-sikkerhet er en kritisk komponent i ERP-systemer, med fokus p\u00e5 databeskyttelse og sikring av at kun autorisert tilgang benyttes.<\/strong>  I dagens digitale tidsalder med omfattende og sensitiv dataflyt er ERP-sikkerhet avgj\u00f8rende for \u00e5 opprettholde dataintegritet og konfidensialitet, og for \u00e5 forhindre uautoriserte brudd som kan v\u00e6re skadelig for virksomheten.\nEtter hvert som bedrifter blir mer digitalt integrerte, \u00f8ker risikoen for dataangrep og uautorisert tilgang, noe som gj\u00f8r ERP-sikkerhet nyttig og avgj\u00f8rende for \u00e5 beskytte digitale ressurser, opprettholde interessentenes tillit og sikre en smidig drift. <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-55817bd7 gb-headline-text\">Hva er ERP-sikkerhet?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>ERP-sikkerhet er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.  <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p><strong>ERP-sikkerhet er en omfattende samling av verkt\u00f8y, protokoller og retningslinjer som til sammen utgj\u00f8r en festning som beskytter en organisasjons digitale ressurser i ERP-systemet.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Viktigheten av ERP-sikkerhet<\/h2>\n\n\n\n<p>I den digitale tidsalderen er informasjonsmengden som str\u00f8mmer gjennom organisasjoner, svimlende.\nDet handler ikke bare om kvantitet, men ogs\u00e5 om kvaliteten og sensitiviteten til disse dataene. <strong>Hovedm\u00e5let med ERP-sikkerhet er \u00e5<\/strong> <strong>sikre integriteten, konfidensialiteten og tilgjengeligheten til disse dataene, og forhindre uautorisert tilgang eller brudd som kan f\u00f8re til katastrofale konsekvenser for en virksomhet. <\/strong>Med \u00f8kende trusler i det digitale landskapet er ERP-sikkerhet ikke bare en ekstra funksjon &#8211; det er en n\u00f8dvendighet som underbygger interessentenes tillit til en organisasjon. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Derfor trenger bedrifter ERP-sikkerhet<\/h2>\n\n\n\n<p>Moderne bedrifter opererer i et hypertilkoblet milj\u00f8.\nHver eneste transaksjon, kommunikasjon og beslutning er ofte avhengig av digitale data.\nMen denne digitaliseringen f\u00f8rer ogs\u00e5 med seg s\u00e5rbarheter.\nCyberangrep, uautorisert tilgang og datainnbrudd kan f\u00f8re til \u00f8konomiske tap og skade bedriftens omd\u00f8mme, svekke tilliten og utsette dem for juridiske forpliktelser.\nERP Security fungerer som en portvokter som s\u00f8rger for at data forblir beskyttet, at prosesser ikke hindres, og at selskaper kan fokusere p\u00e5 vekst uten den truende skyggen av digitale trusler.    <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-f68c7cb9 gb-headline-text\">Funksjoner for ERP-sikkerhet<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Brukerautentisering:<\/strong> Kontrollerer identiteten til brukerne f\u00f8r de f\u00e5r tilgang til ERP-systemet.<\/li>\n\n\n\n<li><strong>Tilgangskontroll:<\/strong> Fastsetter og administrerer brukerrettigheter, slik at de ansatte kun f\u00e5r tilgang til de dataene og verkt\u00f8yene som er relevante for deres rolle.<\/li>\n\n\n\n<li><strong>Datakryptering:<\/strong> Gj\u00f8r dataene uleselige for uautoriserte brukere, slik at de er sikre under lagring og overf\u00f8ring.<\/li>\n\n\n\n<li><strong>Revisjonsspor:<\/strong> Overv\u00e5ker og registrerer brukeraktiviteter, og gir innsikt i hvem som gjorde hva og n\u00e5r.<\/li>\n\n\n\n<li><strong>Deteksjon av inntrengning:<\/strong> Overv\u00e5ker systemet for mistenkelige aktiviteter, og varsler administratorer om potensielle brudd.<\/li>\n\n\n\n<li><strong>Implementering av brannmur:<\/strong> Fungerer som en barriere mellom ERP-systemet og potensielle trusler fra Internett.<\/li>\n\n\n\n<li><strong>Sikkerhetskopiering og gjenoppretting:<\/strong> Garanterer konsistente sikkerhetskopier av data og rask gjenoppretting ved systemnedbrudd eller dataavvik.<\/li>\n\n\n\n<li><strong>Regelmessige oppdateringer:<\/strong> Holder ERP-systemet oppdatert for \u00e5 motvirke de nyeste truslene og s\u00e5rbarhetene.<\/li>\n\n\n\n<li><strong>Styring av samsvar:<\/strong> Sikrer at organisasjonens ERP-system overholder bransjens forskrifter og standarder for datasikkerhet.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-3df7d9a2 gb-headline-text\">Fordeler med ERP-sikkerhet<\/h2>\n\n\n\n<p>Planlegging av bedriftsressurser-systemer er grunnlaget for mange moderne virksomheter, og ERP-sikkerhet er en viktig komponent.\nHer ser vi p\u00e5 \u00e5tte forskjellige fordeler ved \u00e5 prioritere ERP-sikkerhet: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d10f49c0 gb-headline-text\">Beskyttelse av sensitive data:&nbsp;<\/h4>\n\n\n\n<p>ERP-sikkerhet s\u00f8rger for at sensitive bedriftsdata, som \u00f8konomiske rapporter, forretningshemmeligheter og informasjon om de ansatte, forblir konfidensielle.\nDette bevarer selskapets konkurransefortrinn og opprettholder tilliten hos interessentene. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e5957489 gb-headline-text\">Overholdelse av forskrifter:&nbsp;<\/h4>\n\n\n\n<p>Mange bransjer er underlagt strenge lovp\u00e5lagte krav til databeskyttelse.\nERP Security s\u00f8rger for at virksomhetene overholder kravene, slik at de unng\u00e5r potensielle juridiske konsekvenser og store b\u00f8ter. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-680d3e13 gb-headline-text\">Forbedret omd\u00f8mme for virksomheten:&nbsp;<\/h4>\n\n\n\n<p>Bedrifter som er kjent for sine robuste sikkerhetsprotokoller, blir ofte satt h\u00f8yere.\nEt godt rammeverk for ERP-sikkerhet kan styrke virksomhetens omd\u00f8mme og skape tillit blant kunder, leverand\u00f8rer og partnere. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7b0d8820 gb-headline-text\">Forebygging av \u00f8konomiske tap:&nbsp;<\/h4>\n\n\n\n<p>Cyberangrep kan f\u00e5 betydelige \u00f8konomiske konsekvenser, fra direkte tyveri av penger til kostnader forbundet med utbedring av sikkerhetsbrudd.\nERP-sikkerhet fungerer som en barriere mot slike trusler og beskytter bedriftens \u00f8konomi. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-589d9705 gb-headline-text\">Kontinuitet i driften:&nbsp;<\/h4>\n\n\n\n<p>Et sikkerhetsbrudd kan stanse driften og f\u00f8re til forsinkelser i produksjon, tjenesteleveranser eller andre kjernefunksjoner.\nMed god ERP-sikkerhet kan virksomheter sikre uavbrutt drift, selv i m\u00f8te med \u00f8kende digitale trusler. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a8637974 gb-headline-text\">Overv\u00e5king av trusler i sanntid:&nbsp;<\/h4>\n\n\n\n<p>Moderne ERP-sikkerhetsfunksjoner er ofte utstyrt med sanntidsoverv\u00e5king, noe som gj\u00f8r det mulig \u00e5 oppdage og reagere umiddelbart p\u00e5 eventuelle sikkerhetsavvik og dermed redusere potensielle skader.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4d60a9db gb-headline-text\">Adgangskontroll:&nbsp;<\/h4>\n\n\n\n<p>ERP Security gj\u00f8r det mulig for bedrifter \u00e5 definere hvem som har tilgang til hvilken informasjon i systemet.\nDette forhindrer ikke bare uautorisert tilgang, men sikrer ogs\u00e5 at de ansatte kan arbeide effektivt med data som er relevante for deres roller. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-903a3af5 gb-headline-text\">Trygghet i sinnet:<\/h4>\n\n\n\n<p>Med robust ERP-sikkerhet p\u00e5 plass kan bedriftsledere fokusere p\u00e5 vekst og strategi, vel vitende om at deres digitale ressurser er beskyttet.\nDenne tryggheten er uvurderlig i dagens hektiske forretningsmilj\u00f8. <\/p>\n\n\n\n<p>I en verden som i stadig st\u00f8rre grad preges av digitale transaksjoner og nettbaserte operasjoner, fremst\u00e5r ERP-sikkerhet ikke bare som en funksjon, men som en viktig pilar som st\u00f8tter opp om virksomhetens integritet og b\u00e6rekraft.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Bransjer som drar nytte av denne funksjonen<\/h2>\n\n\n\n<p><strong>Helsevesenet:<\/strong> I helsesektoren sliter institusjonene med \u00e5 beskytte sensitive pasientjournaler, sykehistorier og faktureringsopplysninger.\nP\u00e5 grunn av strenge standarder for etterlevelse av helsekrav kan uautorisert tilgang f\u00f8re til alvorlige brudd p\u00e5 personvernet, tap av pasientenes tillit og store juridiske komplikasjoner.\nVed \u00e5 ta i bruk ERP Security kan helseinstitusjoner ikke bare sikre at kun autoriserte personer f\u00e5r tilgang til disse sensitive dataene, men de styrker ogs\u00e5 pasientenes konfidensialitet, tilfredsstiller lovp\u00e5lagte krav og skaper tillit.  <\/p>\n\n\n\n<p><strong>Finansielle tjenester og bankvirksomhet:<\/strong> Banker og finansinstitusjoner befinner seg i frontlinjen n\u00e5r det gjelder cybertrusler, og de har i oppgave \u00e5 beskytte store mengder konfidensielle finansielle data.\nKonsekvensene av sikkerhetsbrudd her spenner fra alvorlige \u00f8konomiske tap til identitetstyveri og betydelige regulatoriske konsekvenser.\nERP Security er et bolverk mot disse utfordringene, og beskytter finansielle data, legger til rette for konfidensielle transaksjoner og bidrar til \u00e5 overholde finansbransjens strenge standarder.  <\/p>\n\n\n\n<p><strong>Produksjonsindustrien:<\/strong> Produsenter har et dobbelt ansvar for \u00e5 bevare immaterielle rettigheter og samtidig opprettholde effektive produksjonsplaner og logistikk i forsyningskjeden.\nUautorisert utlevering av denne informasjonen kan f\u00f8re til tyveri av immaterielle rettigheter, produksjonsforstyrrelser eller til og med industrispionasje.\nVed hjelp av ERP-sikkerhet kan produksjonsbedrifter sikre at deres propriet\u00e6re design forblir uangripelig, garantere en jevn flyt i produksjonsprosessene og opprettholde integriteten i forsyningskjeden.  <\/p>\n\n\n\n<p><strong>E-handel og detaljhandel:<\/strong> For e-handelsplattformer er det enorme reservoaret av kundedata &#8211; fra kredittkortopplysninger til kj\u00f8pshistorikk &#8211; b\u00e5de en ressurs og en risiko.\nEthvert datainnbrudd kan f\u00f8re til \u00f8konomisk svindel, svekke forbrukernes tillit og hindre salg.\nMed ERP Security ved roret kan nettbutikker s\u00f8rge for at kundedataene forblir uangripelige, slik at transaksjonene g\u00e5r som smurt, og slik at kundene f\u00e5r et shoppingmilj\u00f8 som styrker tilliten og lojaliteten.  <\/p>\n\n\n\n<p><strong>Energi og forsyningsvirksomhet:<\/strong> Virksomheter i energi- og forsyningssektoren er forvaltere av kritisk infrastruktur som str\u00f8mnett og vannsystemer.\nEthvert cyberangrep kan f\u00f8re til massive driftsavbrudd, sette den offentlige sikkerheten i fare og for\u00e5rsake \u00f8konomiske forstyrrelser.\nVed \u00e5 styrke ERP-systemene sine med robuste sikkerhetstiltak kan disse enhetene avverge ondsinnede angrep, sikre kontinuerlig tjenesteleveranse og opprettholde publikums tillit.  <\/p>\n\n\n\n<p>Ved \u00e5 utnytte den beskyttende kraften i ERP-sikkerhet beskytter hver av disse bransjene ikke bare sine digitale ressurser, men styrker ogs\u00e5 den operasjonelle integriteten og interessentenes tillit.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-8302c3b5 gb-headline-text\">Effektiv bruk av ERP-sikkerhet<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Regelmessige revisjoner:<\/strong> G\u00e5 jevnlig gjennom sikkerheten i ERP-systemet for \u00e5 avdekke svake punkter og opprettholde moderne sikkerhetsstandarder.<\/li>\n\n\n\n<li><strong>Rollebasert tilgangskontroll (RBAC):<\/strong> Implementer RBAC for \u00e5 sikre at de ansatte kun har tilgang til de dataene de trenger for sine spesifikke roller.\nDette minimerer risikoen forbundet med interne trusler og datalekkasjer. <\/li>\n\n\n\n<li><strong>Oppdater og oppdater jevnlig:<\/strong> Hold alltid ERP-systemet ditt oppdatert.\nProdusenter utgir ofte oppdateringer for kjente s\u00e5rbarheter.\nRegelmessige oppdateringer bidrar til \u00e5 holde systemet sikkert mot kjente trusler.  <\/li>\n\n\n\n<li><strong>To-faktor autentisering (2FA):<\/strong> Innf\u00f8r 2FA for tilgang til ERP-systemet.\nDette gir et ekstra beskyttelsesniv\u00e5 som sikrer at brudd p\u00e5 passord ikke f\u00f8rer til uautoriserte oppf\u00f8ringer. <\/li>\n\n\n\n<li><strong>Oppl\u00e6ring av ansatte:<\/strong> Opplys de ansatte om beste praksis for ERP-sikkerhet.\nVed \u00e5 gj\u00f8re dem oppmerksomme p\u00e5 phishing-fors\u00f8k, passordadministrasjon og andre sikkerhetstrusler kan man komme langt i \u00e5 holde systemet sikkert. <\/li>\n\n\n\n<li><strong>Ta sikkerhetskopi av data:<\/strong> Ha alltid en strategi for sikkerhetskopiering p\u00e5 plass.\nSikkerhetskopier sikrer at du kan gjenopprette dataene dine og opprettholde kontinuiteten i virksomheten i tilfelle et sikkerhetsbrudd eller en systemfeil. <\/li>\n\n\n\n<li><strong>Overv\u00e5k systemaktiviteten:<\/strong> Bruk overv\u00e5kingsverkt\u00f8y for \u00e5 holde \u00f8ye med systemaktiviteten.\nUvanlig aktivitet kan v\u00e6re en indikator p\u00e5 et sikkerhetsbrudd eller fors\u00f8k p\u00e5 sikkerhetsbrudd, noe som gj\u00f8r det mulig \u00e5 gripe inn raskt. <\/li>\n\n\n\n<li><strong>Begrens ekstern tilgang:<\/strong> Hvis de ansatte trenger ekstern tilgang til ERP-systemet, m\u00e5 du s\u00f8rge for at det skjer via sikre kanaler, for eksempel VPN.\nUnng\u00e5 direkte fjerntilgang n\u00e5r det er mulig. <\/li>\n\n\n\n<li><strong>S\u00f8k veiledning fra eksperter:<\/strong> Hvis du trenger mer informasjon om noen aspekter ved ERP-sikkerhet, b\u00f8r du r\u00e5df\u00f8re deg med eksperter.\nDette kan v\u00e6re fra ERP-leverand\u00f8ren eller sikkerhetskonsulenter som spesialiserer seg p\u00e5 ERP-sikkerhet. <\/li>\n\n\n\n<li><strong>Ha en responsplan:<\/strong> Ha alltid en beredskapsplan klar.\nHvis du vet hvilke umiddelbare tiltak som m\u00e5 iverksettes i tilfelle et sikkerhetsbrudd, kan du redusere potensielle skader og fremskynde gjenopprettingen. <\/li>\n<\/ol>\n\n\n\n<p>ERP-systemer konsoliderer kritiske forretningsdata og -prosesser, men ERP-sikkerhet s\u00f8rger for at denne konsolideringen ikke blir en s\u00e5rbarhet.\nEn proaktiv tiln\u00e6rming, oppdatering og oppl\u00e6ring av det menneskelige elementet er n\u00f8kkelen til \u00e5 utnytte alle fordelene ved ERP samtidig som man opprettholder et sikkert milj\u00f8. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner avansert planlegging og planstyring L&#xF8;sninger p&#xE5; produksjonsproblemer\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-231df0c4 gb-headline-text\">Skyplanner APS: Revolusjonerer produksjonen og styrker sikkerheten i ett sveip<\/h2>\n\n\n\n<p>I takt med at industrien fortsetter sin iherdige jakt p\u00e5 optimalisering, blir verkt\u00f8y som <a href=\"https:\/\/skyplanner.ai\/no\/\">avanserte planleggings- og planleggingssystemer (APS), som for eksempel Skyplanner<\/a>, uunnv\u00e6rlige <a href=\"https:\/\/skyplanner.ai\/no\/\">.<\/a>\nHvordan spiller APS inn i ERP-sikkerheten?\nSvaret ligger i kombinasjonen av automatisering og sentralisert datah\u00e5ndtering.    <\/p>\n\n\n\n<p>Skyplanner APS, med sin innebygde AI ved navn Arcturus, effektiviserer ikke bare den intrikate dansen med produksjonsplanlegging, men integreres ogs\u00e5 s\u00f8ml\u00f8st med <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/erp-for-produksjon-en-omfattende-guide\/\">ERP-<\/a> eller <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/mes-system-hva-det-er-og-hva-det-gjor\/\">MES-systemet<\/a> ditt.\nDermed reduseres fragmenteringen av data p\u00e5 tvers av flere plattformer, noe som ofte er en s\u00e5rbarhet n\u00e5r det gjelder sikkerhet. <\/p>\n\n\n\n<p>Skyplanner er ikke bare dyktig innen produksjonsplanlegging, men forbedrer ogs\u00e5 ERP-sikkerheten ved \u00e5 tilby en automatisert, konsolidert plattform der datainput og endringer spores og optimaliseres i sanntid.\nVed \u00e5 si farvel til regneark og manuelle inntastinger minimerer virksomheten menneskelige feil, som er en av de viktigste \u00e5rsakene til sikkerhetsbrudd.\nVed \u00e5 ha \u00e9n enkelt, optimalisert plattform for b\u00e5de planlegging og sikkerhet sikrer man dessuten at eventuelle avvik eller potensielle trusler oppdages og h\u00e5ndteres raskt, takket v\u00e6re Arcturus&#8217; \u00e5rv\u00e5kne overv\u00e5king.  <\/p>\n\n\n\n<p>Hvis du \u00f8nsker \u00e5 oppgradere produksjonsprosessen din og samtidig styrke sikkerheten, <a href=\"https:\/\/skyplanner.ai\/no\/funksjoner\/\">er Skyplanner APS l\u00f8sningen<\/a> for deg.\nVi har et dedikert og profesjonelt team som st\u00e5r klare til \u00e5 hjelpe deg, og vi er her for \u00e5 sikre at produksjonsplanleggingen din er effektiv og sikker.\nTa steget inn i neste generasjons produksjonsoptimalisering, og la oss hjelpe deg med \u00e5 navigere p\u00e5 denne reisen.    <a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\"><\/a><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Ta kontakt med oss!<\/a>  Opplev den kombinasjonen av effektivitet og sikkerhet som bare Skyplanner kan tilby.<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ERP-sikkerhet Hjem &raquo; Ressurser &raquo; ERP-sikkerhet S\u00e5 lenge virksomheter fortsetter \u00e5 basere seg p\u00e5 digitale plattformer, blir behovet for robust sikkerhet avgj\u00f8rende. I l\u00f8pet av utviklingen av forretningsverkt\u00f8y har Planlegging av bedriftsressurser, ofte kalt ERP, vokst frem som et viktig instrument for bedrifter over hele verden. I tillegg til \u00e5 hjelpe til med ulike funksjoner, &#8230; <a title=\"ERP-sikkerhet\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/\" aria-label=\"Read more about ERP-sikkerhet\">Les mer<\/a><\/p>\n","protected":false},"author":6,"featured_media":39200,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2737,505],"tags":[],"class_list":["post-39199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-no","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ERP-sikkerhet &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"ERP Security er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERP-sikkerhet\" \/>\n<meta property=\"og:description\" content=\"ERP Security er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-17T17:16:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-09T10:32:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"ERP-sikkerhet\",\"datePublished\":\"2023-09-17T17:16:11+00:00\",\"dateModified\":\"2024-08-09T10:32:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/\"},\"wordCount\":1936,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"articleSection\":[\"ERP\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/\",\"name\":\"ERP-sikkerhet &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"datePublished\":\"2023-09-17T17:16:11+00:00\",\"dateModified\":\"2024-08-09T10:32:00+00:00\",\"description\":\"ERP Security er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"width\":2560,\"height\":1708,\"caption\":\"ERP Security\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/erp-sikkerhet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP-sikkerhet\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ERP-sikkerhet &#8211; SkyPlanner","description":"ERP Security er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/","og_locale":"nb_NO","og_type":"article","og_title":"ERP-sikkerhet","og_description":"ERP Security er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-17T17:16:11+00:00","article_modified_time":"2024-08-09T10:32:00+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"SkyPlanner","Ansl. lesetid":"10 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"ERP-sikkerhet","datePublished":"2023-09-17T17:16:11+00:00","dateModified":"2024-08-09T10:32:00+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/"},"wordCount":1936,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","articleSection":["ERP","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/","name":"ERP-sikkerhet &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","datePublished":"2023-09-17T17:16:11+00:00","dateModified":"2024-08-09T10:32:00+00:00","description":"ERP Security er en spesialisert undergruppe i et ERP-system som er dedikert til \u00e5 beskytte data og sikre autorisert tilgang.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","width":2560,"height":1708,"caption":"ERP Security"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/erp-sikkerhet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"ERP-sikkerhet"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg",2560,1708,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-768x513.jpg",768,513,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-1536x1025.jpg",1536,1025,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-2048x1367.jpg",2048,1367,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/no\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"ERP-sikkerhet Hjem &raquo; Ressurser &raquo; ERP-sikkerhet S\u00e5 lenge virksomheter fortsetter \u00e5 basere seg p\u00e5 digitale plattformer, blir behovet for robust sikkerhet avgj\u00f8rende. I l\u00f8pet av utviklingen av forretningsverkt\u00f8y har Planlegging av bedriftsressurser, ofte kalt ERP, vokst frem som et viktig instrument for bedrifter over hele verden. I tillegg til \u00e5 hjelpe til med ulike funksjoner,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/39199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=39199"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/39199\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/39200"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=39199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=39199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=39199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}