{"id":39140,"date":"2023-08-01T13:22:23","date_gmt":"2023-08-01T13:22:23","guid":{"rendered":"https:\/\/skyplanner.ai\/uncategorized-no\/lokal-mes-pa-stedet\/"},"modified":"2026-10-11T04:52:30","modified_gmt":"2026-10-11T04:52:30","slug":"lokal-mes-pa-stedet","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/","title":{"rendered":"Lokalt installert MES-system"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"gb-headline gb-headline-dcd63509 gb-headline-text\">Lokalt installert&nbsp;MES-system<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/no\/\">Hjem<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/no\/ressurser\/\">Ressurser<\/a>&nbsp;\u00bb&nbsp;Lokalt installert&nbsp;MES-system<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">0<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>I en kompleks produksjonshverdag er et lokalt installert system for produksjonsgjennomf\u00f8ring (MES) et kraftig verkt\u00f8y som effektiviserer driften og l\u00f8fter ytelsen til toppniv\u00e5. Et lokalt installert MES-system kombinerer kontroll, sikkerhet og optimalisering, noe som gj\u00f8r det til et uunnv\u00e6rlig verkt\u00f8y for enhver fremtidsrettet produksjonsplanlegger. Likevel blir det fulle potensialet ofte ikke utnyttet, fordi kunnskapen om systemet er mangelfull eller preget av misforst\u00e5elser.<\/p>\n\n\n\n<p>La oss se n\u00e6rmere p\u00e5 lokalt installerte MES-systemer og hvorfor dette kraftige verkt\u00f8yet kan endre m\u00e5ten produksjonen drives p\u00e5. Bli med p\u00e5 en l\u00e6rerik gjennomgang av avansert produksjonsplanlegging.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-0b213a2a      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#en-n\u00e6rmere-titt-p\u00e5-lokalt-installerte-mes-systemer\" class=\"uagb-toc-link__trigger\">En n\u00e6rmere titt p\u00e5 lokalt installerte MES-systemer<\/a><li class=\"uagb-toc__list\"><a href=\"#lokalt-installert-eller-skybasert-mes-system-viktige-vurderinger\" class=\"uagb-toc-link__trigger\">Lokalt installert eller skybasert MES-system: Viktige vurderinger<\/a><li class=\"uagb-toc__list\"><a href=\"#komponentene-i-et-lokalt-installert-mes-system\" class=\"uagb-toc-link__trigger\">Komponentene i et lokalt installert MES-system<\/a><li class=\"uagb-toc__list\"><a href=\"#derfor-er-lokalt-installerte-mes-systemer-attraktive-kontroll-sikkerhet-og-tilpasning\" class=\"uagb-toc-link__trigger\">Derfor er lokalt installerte MES-systemer attraktive: kontroll, sikkerhet og tilpasning<\/a><li class=\"uagb-toc__list\"><a href=\"#slik-innf\u00f8rer-du-et-lokalt-installert-mes-system-trinn-for-trinn\" class=\"uagb-toc-link__trigger\">Slik innf\u00f8rer du et lokalt installert MES-system, trinn for trinn<\/a><li class=\"uagb-toc__list\"><a href=\"#bransjer-som-har-nytte-av-lokalt-installerte-mes-systemer\" class=\"uagb-toc-link__trigger\">Bransjer som har nytte av lokalt installerte MES-systemer<\/a><li class=\"uagb-toc__list\"><a href=\"#skyplanners-aps-system-et-gjennombrudd-for-lokalt-installerte-mes-systemer\" class=\"uagb-toc-link__trigger\">SkyPlanners APS-system: Et gjennombrudd for lokalt installerte MES-systemer<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-7615d6cf gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>Et lokalt installert MES-system er en l\u00f8sning for \u00e5 styre og kontrollere produksjonsprosesser p\u00e5 bedriftens egen IT-infrastruktur. Virksomheter med sensitive data eller strenge myndighetskrav foretrekker denne l\u00f8sningen, som gir bedre datasikkerhet, st\u00f8rre kontroll og flere tilpasningsmuligheter. Selv om oppstartskostnadene er h\u00f8yere og virksomheten selv har ansvaret for vedlikehold, gir systemet enest\u00e5ende kontroll over dataene og forutsigbare kostnader over tid. Alternativet er et skybasert MES-system, som kan ha lavere oppstartskostnader, men kan svekke kontrollen over dataene. Et lokalt installert MES-system omfatter ulike komponenter innen maskinvare, programvare og nettverk og kan innf\u00f8res gjennom en grundig, trinnvis prosess. L\u00f8sningen er nyttig i bransjer som bilindustri, legemiddelindustri og elektronikkproduksjon. Integrasjon med programvare for avansert planlegging og finplanlegging (APS), som SkyPlanner, kan optimalisere produksjonen ytterligere. Valget mellom et lokalt installert og et skybasert MES-system avhenger av virksomhetens konkrete behov, ressurser og m\u00e5l.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-2e08b697 gb-headline-text\">En n\u00e6rmere titt p\u00e5 lokalt installerte MES-systemer<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-b57a55d8 gb-headline-text\">Hva er et lokalt installert MES-system?<\/h4>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg. <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Som navnet antyder, er denne typen MES installert lokalt i virksomhetens egen fysiske infrastruktur, i stedet for \u00e5 driftes i skyen.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7fa18c99 gb-headline-text\">Hvorfor velge et lokalt installert MES-system?<\/h4>\n\n\n\n<p>Bedrifter kan velge et lokalt installert MES-system for \u00e5 f\u00e5 bedre datasikkerhet og kontroll, s\u00e6rlig hvis de h\u00e5ndterer sensitive data eller er underlagt strenge myndighetskrav. Siden systemet ligger i bedriftens egen infrastruktur, har bedriften direkte ansvar for datah\u00e5ndteringen og er ikke avhengig av eksterne tjenesteleverand\u00f8rer. <a href=\"\/no\/ressurser\/handtering-av-produktdata-pdm\/\">Les mer om h\u00e5ndtering av produktdata.&nbsp;<\/a><\/p>\n\n\n\n<p>Et lokalt installert MES-system gir ogs\u00e5 st\u00f8rre muligheter for \u00e5 tilpasse l\u00f8sningen til konkrete behov i driften. Virksomheten har direkte kontroll over programvaren og kan derfor legge til tilpassede funksjoner eller endre eksisterende funksjoner uten \u00e5 vente p\u00e5 oppdateringer eller godkjenning fra leverand\u00f8ren.<\/p>\n\n\n\n<p><strong>Samlet sett er et lokalt installert MES-system et kraftig verkt\u00f8y for virksomheter som \u00f8nsker kontroll, sikkerhet og p\u00e5litelig ytelse i styringen av produksjonen.<\/strong> Selv om l\u00f8sningen medf\u00f8rer bestemte ansvarsoppgaver og en investering ved oppstart, gj\u00f8r selvstendigheten og tilpasningsmulighetene den til et foretrukket valg for mange bedrifter. Husk at valget av <a href=\"\/no\/ressurser\/mes-system-hva-det-er-og-hva-det-gjor\/\">MES <\/a>avhenger av dine konkrete behov, og at alle faktorer m\u00e5 vurderes f\u00f8r du bestemmer deg.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-dfe25423 gb-headline-text\">Lokalt installert eller skybasert MES-system: Viktige vurderinger<\/h2>\n\n\n\n<p>N\u00e5r du skal velge mellom et lokalt installert og et skybasert MES-system, er det viktig \u00e5 vurdere noen sentrale egenskaper.<\/p>\n\n\n\n<p>Et lokalt installert MES-system krever en h\u00f8yere investering ved oppstart, men gir forutsigbare kostnader over tid. Virksomheten har imidlertid selv ansvar for vedlikehold og skalering av systemet, noe som kan gj\u00f8re l\u00f8sningen mer kompleks \u00e5 h\u00e5ndtere. Til gjengjeld gir et lokalt installert MES-system enest\u00e5ende kontroll over dataene, noe som er uvurderlig for virksomheter som h\u00e5ndterer sensitive data.<\/p>\n\n\n\n<p>Et skybasert MES-system har derimot lavere startkostnader, men inneb\u00e6rer l\u00f8pende abonnementsavgifter. Leverand\u00f8ren tar seg av vedlikeholdet, og det er ofte enklere \u00e5 skalere l\u00f8sningen. Kontrollen over dataene svekkes imidlertid fordi de lagres p\u00e5 leverand\u00f8rens servere.<\/p>\n\n\n\n<p>Til syvende og sist avhenger valget av virksomhetens konkrete behov, ressurser og m\u00e5l.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-438db71a gb-headline-text\">Slik fungerer et lokalt installert MES-system, trinn for trinn<\/h4>\n\n\n\n<p>Et lokalt installert system for produksjonsgjennomf\u00f8ring (MES) er et kraftig verkt\u00f8y som bidrar til \u00e5 samordne produksjonsprosessene. Her er en trinnvis gjennomgang av hvordan det fungerer:<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e1f7601d gb-headline-text\">Installasjon og integrasjon<\/h4>\n\n\n\n<p>F\u00f8rst installeres MES-systemet p\u00e5 servere i bedriftens egne lokaler. Deretter integreres det med utstyr, maskiner og eksisterende systemer, som CRM (system for kunderelasjonsh\u00e5ndtering) og HRMS (system for personaladministrasjon).<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-16d1ca33 gb-headline-text\">Datainnsamling<\/h4>\n\n\n\n<p>N\u00e5r det lokalt installerte MES-systemet er ferdig integrert, begynner det \u00e5 samle inn sanntidsdata fra ulike punkter i produksjonsanlegget. Dataene samles inn og behandles kontinuerlig for \u00e5 gi innsikt i produksjonsprosessene i sanntid.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f312ef01 gb-headline-text\">Finplanlegging og produksjonsplanlegging<\/h4>\n\n\n\n<p>Med tilgang til store mengder historiske data og sanntidsdata bidrar det lokalt installerte MES-systemet til \u00e5 utarbeide effektive produksjonsplaner. Til dette form\u00e5let samvirker det ofte med et <a href=\"\/no\/\">system for avansert produksjonsplanlegging og finplanlegging (APS)<\/a>.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5266caf3 gb-headline-text\">Gjennomf\u00f8ring og overv\u00e5king<\/h4>\n\n\n\n<p>Under gjennomf\u00f8ringen overv\u00e5ker det lokalt installerte MES-systemet produksjonsprosessen i sanntid. Det f\u00f8lger fremdriften opp mot produksjonsplanen, identifiserer mulige flaskehalser og sender varsler om avvik eller problemer.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ccf7e6ea gb-headline-text\">Kvalitetsstyring<\/h4>\n\n\n\n<p>Det lokalt installerte MES-systemet overv\u00e5ker ogs\u00e5 produktkvaliteten. Det kontrollerer om det finnes avvik, og sikrer at produktene oppfyller de fastsatte kvalitetsstandardene.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-255a2500 gb-headline-text\">Styring av bemanning og lager<\/h4>\n\n\n\n<p>Systemet styrer bemanning og lager effektivt. Det bidrar til \u00e5 planlegge bemanningen og opprettholde optimale lagerniv\u00e5er, slik at ressursene brukes effektivt og svinnet holdes p\u00e5 et minimum.<\/p>\n\n\n\n<p>Et lokalt installert MES-system overv\u00e5ker, styrer og optimaliserer ulike deler av produksjonsprosessen. Det er involvert hele veien fra planlegging og gjennomf\u00f8ring til kvalitetskontroll og \u00f8ker b\u00e5de driftseffektiviteten og produktiviteten.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-62569379 gb-headline-text\">Komponentene i et lokalt installert MES-system<\/h2>\n\n\n\n<p>Et lokalt installert system for produksjonsgjennomf\u00f8ring (MES) er et komplekst system der flere viktige komponenter virker sammen. Her ser vi n\u00e6rmere p\u00e5 disse komponentene, fordelt p\u00e5 maskinvare, programvare og nettverk:<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-150225ca gb-headline-text\">Maskinvarekomponenter<\/h4>\n\n\n\n<p>Maskinvaren danner grunnlaget for et lokalt installert MES-system. Den omfatter:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Servere:<\/strong>&nbsp;Dette er de sentrale lagringsenhetene der MES-programvaren installeres. De h\u00e5ndterer behandling og lagring av data.<\/li>\n\n\n\n<li><strong>Arbeidsstasjoner:<\/strong>&nbsp;Dette er datamaskinene brukerne benytter for \u00e5 arbeide med MES-programvaren. De gir tilgang til systemets funksjoner, fra dataanalyse til rapportgenerering.<\/li>\n\n\n\n<li><strong>Industri-PC-er og PLS-er:<\/strong>&nbsp;Industrielle datamaskiner (PC-er) og programmerbare logiske styringer (PLS-er) kobler MES-systemet til maskinene i produksjonen. De gj\u00f8r det mulig \u00e5 samle inn sanntidsdata fra disse maskinene.<\/li>\n<\/ol>\n\n\n\n<h4 class=\"gb-headline gb-headline-c1f911b8 gb-headline-text\">Programvarekomponenter<\/h4>\n\n\n\n<p>Det meste av funksjonaliteten i et lokalt installert MES-system ligger i programvaren:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>MES-kjerneprogramvare:<\/strong>&nbsp;Dette er kjernen i systemet, med funksjoner som finplanlegging, kvalitetsstyring og lagerstyring.<\/li>\n\n\n\n<li><strong>Databaseh\u00e5ndteringssystem:<\/strong>&nbsp;Dette systemet h\u00e5ndterer lagring, gjenfinning og behandling av data som MES-systemet samler inn. <a href=\"\/no\/ressurser\/styring-av-produktinformasjon-nokkelen-til-okt-salg\/\">Les om betydningen av produktinformasjonsh\u00e5ndtering. <\/a><\/li>\n\n\n\n<li><strong>Brukergrensesnitt:<\/strong>&nbsp;Denne komponenten lar brukerne arbeide med systemet og gir tilgang til funksjoner som datavisualisering, rapportgenerering og systemstyring.<\/li>\n<\/ol>\n\n\n\n<h4 class=\"gb-headline gb-headline-4cbb5f27 gb-headline-text\">Nettverkskomponenter<\/h4>\n\n\n\n<p>Nettverkskomponentene kobler sammen alle delene av et lokalt installert MES-system:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Lokalnettverk (LAN):<\/strong>&nbsp;Et LAN kobler sammen servere, arbeidsstasjoner og andre enheter i virksomheten og gj\u00f8r dataoverf\u00f8ring og kommunikasjon mulig.<\/li>\n\n\n\n<li><strong>Datakabler:<\/strong>&nbsp;Disse kablene kobler systemkomponentene fysisk sammen og muliggj\u00f8r datakommunikasjon.<\/li>\n\n\n\n<li><strong>Tr\u00e5dl\u00f8se nettverk:<\/strong>&nbsp;Tr\u00e5dl\u00f8se nettverk gir en fleksibel tilkoblingsmulighet for enheter som ikke er koblet til med datakabler.<\/li>\n\n\n\n<li><strong>Brannmurer og sikkerhetssystemer:<\/strong>&nbsp;Brannmurer og sikkerhetssystemer beskytter sensitive data mot u\u00f8nsket og uautorisert tilgang og mulige cybertrusler. <a href=\"\/no\/ressurser\/handtering-av-produktdata-pdm\/\">H\u00e5ndtering av produktdata kan bidra til dette arbeidet. <\/a><\/li>\n<\/ol>\n\n\n\n<p>Hver komponent spiller en viktig rolle i driften av et lokalt installert MES-system. Sammen danner de et integrert system som kan overv\u00e5ke, styre og optimalisere komplekse produksjonsprosesser.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-d6aeceb8 gb-headline-text\">Derfor er lokalt installerte MES-systemer attraktive: kontroll, sikkerhet og tilpasning<\/h2>\n\n\n\n<p>Et lokalt installert system for produksjonsgjennomf\u00f8ring (MES) er et s\u00e6rlig attraktivt valg for mange bedrifter. Tre sentrale fordeler forklarer hvorfor: bedre kontroll, solid sikkerhet og omfattende tilpasningsmuligheter.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f4966c58 gb-headline-text\">Enest\u00e5ende kontroll<\/h4>\n\n\n\n<p>N\u00e5r bedriften velger et lokalt installert MES-system, f\u00e5r den full kontroll over systemet og dataene. Systemet kj\u00f8rer p\u00e5 servere i bedriftens egne lokaler, slik at virksomheten selv sitter med styringen. Alt ansvar ligger hos virksomheten, enten det gjelder systemoppdateringer, vedlikeholdsproblemer eller oppf\u00f8lging av databehandlingen. Denne graden av kontroll kan v\u00e6re avgj\u00f8rende for bedrifter som h\u00e5ndterer sensitive data eller m\u00e5 oppfylle strenge krav til etterlevelse.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e7bb5b2f gb-headline-text\">Solid sikkerhet<\/h4>\n\n\n\n<p>Et lokalt installert MES-system gir ogs\u00e5 solid sikkerhet. Fordi dataene lagres i virksomhetens egne lokaler, er de skjermet mot mange av risikoene ved internettbasert lagring. Risikoen for datainnbrudd eller cyberangrep er fortsatt til stede, men kan h\u00e5ndteres bedre og reduseres med egnede interne sikkerhetstiltak. Dette h\u00f8yere beskyttelsesniv\u00e5et kan v\u00e6re en betydelig fordel for virksomheter som prioriterer datasikkerhet eller opererer i strengt regulerte bransjer.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ed574fa6 gb-headline-text\">Omfattende tilpasningsmuligheter<\/h4>\n\n\n\n<p>En av de mest overbevisende fordelene ved et lokalt installert MES-system er muligheten til \u00e5 tilpasse det. Bedrifter kan endre systemet etter sine konkrete driftsbehov og krav. De kan legge til eller fjerne funksjoner, endre systemets oppsett eller justere mekanismene for databehandling. Denne fleksibiliteten gj\u00f8r det mulig \u00e5 bygge et system som passer n\u00f8yaktig til bedriftens m\u00e5te \u00e5 drive p\u00e5, og som kan \u00f8ke produktiviteten og effektiviteten.<\/p>\n\n\n\n<p>Selv om et lokalt installert MES-system kan kreve en st\u00f8rre startinvestering og l\u00f8pende vedlikehold, gj\u00f8r fordelene innen kontroll, sikkerhet og tilpasning det til et foretrukket valg for mange virksomheter. Systemet kan tilpasses n\u00f8yaktig til bedriftens behov og m\u00e5l, og er derfor et attraktivt alternativ blant de mange l\u00f8sningene for produksjonsstyring.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-57733000 gb-headline-text\">Forutsigbare kostnader<\/h4>\n\n\n\n<p>Selv om startkostnaden er h\u00f8y, er de l\u00f8pende utgiftene vanligvis faste og forutsigbare.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4a3aca21 gb-headline-text\">Uavhengig av internettforbindelsen<\/h4>\n\n\n\n<p>Siden systemet er installert lokalt, kan driften fortsette selv n\u00e5r internettforbindelsen er nede.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-0ef86ce6 gb-headline-text\">Datakonfidensialitet<\/h4>\n\n\n\n<p>Lokal lagring sikrer full konfidensialitet for sensitive data og oppfyller strenge myndighetskrav.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ca634fd2 gb-headline-text\">Direkte systemintegrasjon<\/h4>\n\n\n\n<p>Enkel og direkte integrasjon med virksomhetens eksisterende systemer, som CRM og HRMS.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-64859129 gb-headline-text\">En langsiktig investering<\/h4>\n\n\n\n<p>Til tross for den h\u00f8ye startinvesteringen er et lokalt installert MES-system kostnadseffektivt p\u00e5 lang sikt, takket v\u00e6re lang levetid og gode tilpasningsmuligheter.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-9587e196 gb-headline-text\">Slik innf\u00f8rer du et lokalt installert MES-system, trinn for trinn<\/h2>\n\n\n\n<p>\u00c5 innf\u00f8re et lokalt installert MES-system kan v\u00e6re en krevende oppgave. Her deler vi prosessen opp i h\u00e5ndterbare trinn:<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f55596a9 gb-headline-text\">Trinn 1: Kartlegg kravene<\/h4>\n\n\n\n<p>F\u00f8rste trinn er \u00e5 forst\u00e5 og dokumentere virksomhetens behov. Kartlegg hvilke prosesser MES-systemet skal h\u00e5ndtere, og hvilke data det skal behandle. Vurder ogs\u00e5 hvilke integrasjoner som trengs med eksisterende systemer.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-47f47ba1 gb-headline-text\">Trinn 2: Velg leverand\u00f8r<\/h4>\n\n\n\n<p>N\u00e5r kravene er definert, er det p\u00e5 tide \u00e5 velge en egnet MES-leverand\u00f8r. Sammenlign leverand\u00f8renes l\u00f8sninger, st\u00f8ttetjenester og fleksibiliteten i systemene deres.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-580d6955 gb-headline-text\">Trinn 3: Utform og planlegg systemet<\/h4>\n\n\n\n<p>N\u00e5r leverand\u00f8ren er valgt, er neste trinn \u00e5 utforme systemet. I denne fasen planlegger dere systemets oppbygning, n\u00f8dvendige tilpasninger og integrasjon med andre systemer.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-step-4-installation-and-configuration\">Trinn 4: Installer og konfigurer<\/h4>\n\n\n\n<p>N\u00e5r planen er klar, installerer leverand\u00f8ren MES-programvaren p\u00e5 virksomhetens servere. Deretter konfigureres systemet i henhold til den planlagte utformingen.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f108fce2 gb-headline-text\">Trinn 5: Integrer systemet<\/h4>\n\n\n\n<p>I dette trinnet integreres MES-systemet med andre systemer, som CRM eller HRMS. Det kobles ogs\u00e5 til maskinene i produksjonen for \u00e5 samle inn data i sanntid.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f9168bc2 gb-headline-text\">Trinn 6: L\u00e6r opp brukerne<\/h4>\n\n\n\n<p>F\u00f8r systemet settes i drift, trenger brukerne oppl\u00e6ring for \u00e5 kunne bruke det effektivt. Gjennomf\u00f8r grundig oppl\u00e6ring slik at alle forst\u00e5r hvordan det nye systemet skal brukes.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f1d5cfcc gb-headline-text\">Trinn 7: Test systemet<\/h4>\n\n\n\n<p>Testing er avgj\u00f8rende for \u00e5 avdekke problemer og feil i systemet. Test MES-systemet under ulike forhold, og rett opp eventuelle problemer som dukker opp.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-39625e8c gb-headline-text\">Trinn 8: Sett systemet i drift<\/h4>\n\n\n\n<p>N\u00e5r testingen er fullf\u00f8rt og problemene er l\u00f8st, er det p\u00e5 tide \u00e5 sette systemet i drift. Ta det nye, lokalt installerte MES-systemet i bruk i den daglige driften, og f\u00f8lg det n\u00f8ye opp i starten for \u00e5 fange opp uventede problemer.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a17cbf06 gb-headline-text\">Trinn 9: Kontinuerlig forbedring<\/h4>\n\n\n\n<p>Etter innf\u00f8ringen er det viktig \u00e5 evaluere systemets ytelse regelmessig og gj\u00f8re n\u00f8dvendige justeringer eller forbedringer. Kontinuerlig forbedring sikrer at MES-systemet forblir effektivt og tilpasset virksomhetens skiftende behov.<\/p>\n\n\n\n<p>\u00c5 innf\u00f8re et lokalt installert MES-system krever grundig planlegging, n\u00f8yaktig gjennomf\u00f8ring og vedvarende innsats. Med en tydelig, trinnvis fremgangsm\u00e5te kan bedrifter lykkes med innf\u00f8ringen og dra nytte av et velfungerende og effektivt MES-system.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-9ba1ade1 gb-headline-text\">Bransjer som har nytte av lokalt installerte MES-systemer<\/h2>\n\n\n\n<p>Lokalt installerte MES-systemer kan gi betydelige fordeler i flere bransjer. Her er tre eksempler:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Bilindustrien:<\/strong>&nbsp;Komplekse produksjonsprosesser og behovet for n\u00f8yaktig kvalitetskontroll gj\u00f8r at bilindustrien har stor nytte av lokalt installerte MES-systemer. Systemet bidrar til \u00e5 koordinere flere produksjonstrinn, holde oversikt over lagerbeholdningen og opprettholde strenge kvalitetsstandarder.<\/li>\n\n\n\n<li><strong>Legemiddelindustrien:<\/strong>&nbsp;Strenge myndighetskrav og behovet for sikker databehandling gj\u00f8r lokalt installerte MES-systemer ideelle for legemiddelindustrien. Systemet gir solid datasikkerhet og gj\u00f8r det mulig \u00e5 oppfylle gjeldende krav.<\/li>\n\n\n\n<li><strong>Elektronikkproduksjon:<\/strong>&nbsp;Lokalt installerte MES-systemer egner seg godt til kompleks elektronikkproduksjon med mange ulike produksjonstrinn og h\u00f8ye krav til presisjon. Systemet gir sanntidsoverv\u00e5king, feildeteksjon og prosessoptimalisering.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-42a74b96 gb-headline-text\">SkyPlanners APS-system: Et gjennombrudd for lokalt installerte MES-systemer<\/h2>\n\n\n\n<p>Det lokalt installerte MES-systemet registrerer fremdriften i produksjonen, mens ERP-systemet inneholder ordredataene. SkyPlanner APS tilf\u00f8rer finplanlegging gjennom sitt \u00e5pne REST API: <a href=\"\/no\/funksjoner\/\">SkyPlanner<\/a> bruker disse dataene til \u00e5 beregne hva som skal kj\u00f8res som neste jobb, p\u00e5 hvilken arbeidsstasjon og n\u00e5r. KI-motoren Arcturus planlegger arbeidet ut fra kapasitet, skift, operat\u00f8rer, materialer og prioriteringene produksjonsplanleggerne har satt. Den beregnede planen vises p\u00e5 Gantt-tidslinjen. N\u00e5r en hasteordre kommer inn eller den tilgjengelige kapasiteten endres, beregner Arcturus planen p\u00e5 nytt. Dermed kan planleggerne se den oppdaterte rekkef\u00f8lgen og tidspunktene for jobbene uten \u00e5 m\u00e5tte bygge opp planen p\u00e5 nytt, jobb for jobb.<\/p>\n\n\n\n<p>Vil du forbedre produksjonen og \u00f8ke salget, er dette det rette tidspunktet for \u00e5 utforske l\u00f8sningene fra SkyPlanner. <a href=\"\/no\/kontakt-salg\/\">Kontakt teamet v\u00e5rt<\/a> og finn ut hvordan l\u00f8sningene deres, utviklet med solid fagkompetanse, kan hjelpe virksomheten din med \u00e5 vokse og lykkes.&nbsp;<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Lokalt installert&nbsp;MES-system Hjem&nbsp;\u00bb&nbsp;Ressurser&nbsp;\u00bb&nbsp;Lokalt installert&nbsp;MES-system I en kompleks produksjonshverdag er et lokalt installert system for produksjonsgjennomf\u00f8ring (MES) et kraftig verkt\u00f8y som effektiviserer driften og l\u00f8fter ytelsen til toppniv\u00e5. Et lokalt installert MES-system kombinerer kontroll, sikkerhet og optimalisering, noe som gj\u00f8r det til et uunnv\u00e6rlig verkt\u00f8y for enhver fremtidsrettet produksjonsplanlegger. Likevel blir det fulle potensialet ofte ikke &#8230; <a title=\"Lokalt installert MES-system\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/\" aria-label=\"Read more about Lokalt installert MES-system\">Les mer<\/a><\/p>\n","protected":false},"author":6,"featured_media":39142,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2736,505],"tags":[],"class_list":["post-39140","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mes-systemer-no","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lokalt installert MES-system &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lokalt installert MES-system\" \/>\n<meta property=\"og:description\" content=\"Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-01T13:22:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-11T04:52:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Lokalt installert MES-system\",\"datePublished\":\"2023-08-01T13:22:23+00:00\",\"dateModified\":\"2026-10-11T04:52:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/\"},\"wordCount\":2231,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/On-Premises-MES.png\",\"articleSection\":[\"MES-systemer\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/\",\"name\":\"Lokalt installert MES-system &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/On-Premises-MES.png\",\"datePublished\":\"2023-08-01T13:22:23+00:00\",\"dateModified\":\"2026-10-11T04:52:30+00:00\",\"description\":\"Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/On-Premises-MES.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/On-Premises-MES.png\",\"width\":6000,\"height\":4000,\"caption\":\"On Premises MES\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lokal-mes-pa-stedet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lokalt installert MES-system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lokalt installert MES-system &#8211; SkyPlanner","description":"Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/","og_locale":"nb_NO","og_type":"article","og_title":"Lokalt installert MES-system","og_description":"Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/","og_site_name":"SkyPlanner","article_published_time":"2023-08-01T13:22:23+00:00","article_modified_time":"2026-10-11T04:52:30+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"SkyPlanner","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Lokalt installert MES-system","datePublished":"2023-08-01T13:22:23+00:00","dateModified":"2026-10-11T04:52:30+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/"},"wordCount":2231,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES.png","articleSection":["MES-systemer","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/","name":"Lokalt installert MES-system &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES.png","datePublished":"2023-08-01T13:22:23+00:00","dateModified":"2026-10-11T04:52:30+00:00","description":"Et lokalt installert MES-system er et omfattende system for \u00e5 styre og kontrollere produksjonsoperasjoner i et produksjonsanlegg.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES.png","width":6000,"height":4000,"caption":"On Premises MES"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lokal-mes-pa-stedet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Lokalt installert MES-system"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES.png",6000,4000,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/On-Premises-MES.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/no\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Lokalt installert&nbsp;MES-system Hjem&nbsp;\u00bb&nbsp;Ressurser&nbsp;\u00bb&nbsp;Lokalt installert&nbsp;MES-system I en kompleks produksjonshverdag er et lokalt installert system for produksjonsgjennomf\u00f8ring (MES) et kraftig verkt\u00f8y som effektiviserer driften og l\u00f8fter ytelsen til toppniv\u00e5. Et lokalt installert MES-system kombinerer kontroll, sikkerhet og optimalisering, noe som gj\u00f8r det til et uunnv\u00e6rlig verkt\u00f8y for enhver fremtidsrettet produksjonsplanlegger. Likevel blir det fulle potensialet ofte ikke&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/39140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=39140"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/39140\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/39142"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=39140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=39140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=39140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}