{"id":111713,"date":"2026-10-28T03:02:21","date_gmt":"2026-10-28T03:02:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111713"},"modified":"2026-10-28T03:04:32","modified_gmt":"2026-10-28T03:04:32","slug":"tokassesystem","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/","title":{"rendered":"Tokassesystem: Ha sm\u00e5delene klare til produksjon"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tokassesystem: Ha sm\u00e5delene klare til produksjon<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Tokassesystem: Ha sm\u00e5delene klare til produksjon<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>En monteringsstasjon g\u00e5r tom for en liten del. Det finnes flere p\u00e5 lager et sted i fabrikken, men noen m\u00e5 finne dem, be om p\u00e5fyll og bringe delene til operat\u00f8ren. En rimelig komponent har nettopp f\u00f8rt til tap av verdifull produksjonstid.<\/p>\n\n\n<p>Et tokassesystem synliggj\u00f8r behovet f\u00f8r arbeidsstasjonen g\u00e5r tom. Operat\u00f8rene bruker deler fra \u00e9n kasse mens den andre st\u00e5r i reserve. N\u00e5r den f\u00f8rste kassen er tom, utl\u00f8ses p\u00e5fyll. Den andre forsyner produksjonen med deler frem til p\u00e5fyllet kommer.<\/p>\n\n\n<p>Det avgj\u00f8rende er ikke om dere har to kasser, men om p\u00e5fyllet er tilbake f\u00f8r reserven er brukt opp. For deler som produseres p\u00e5 maskiner som ogs\u00e5 brukes til andre oppdrag, hjelper SkyPlanner APS dere med \u00e5 svare p\u00e5 dette. Systemet legger godkjente p\u00e5fyllingsoppdrag inn i produksjonsplanen sammen med kundeordrene, i stedet for at de blir st\u00e5ende p\u00e5 en egen p\u00e5fyllingsliste.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er et tokassesystem?<\/h2>\n\n\n<p>Et <strong>tokassesystem<\/strong> er en visuell metode for etterfylling der to fastsatte mengder av samme artikkel inng\u00e5r i en gjentakende syklus med forbruk og p\u00e5fyll. \u00c9n kasse forsyner forbruksstedet med deler. N\u00e5r den er tom, brukes et kort, den tomme kassen eller et annet avtalt signal til \u00e5 be om p\u00e5fyll, og operat\u00f8ren begynner \u00e5 bruke fra den andre kassen.<\/p>\n\n\n<p>Den andre kassen dekker forbruket mens dere venter p\u00e5 p\u00e5fyll. Fordelen er enkel: Operat\u00f8ren trenger ikke \u00e5 telle alle delene som er igjen for \u00e5 vite n\u00e5r det er p\u00e5 tide \u00e5 be om mer. Den tomme kassen gj\u00f8r behovet tydelig.<\/p>\n\n\n<p>I produksjon er metoden s\u00e6rlig nyttig for festemidler, koblinger og andre sm\u00e5 komponenter som brukes regelmessig. P\u00e5fyllet kan komme fra et sentrallager, en ekstern leverand\u00f8r eller egen produksjon. Hvor delene kommer fra, avgj\u00f8r hvilket arbeid signalet setter i gang, men behovet for p\u00e5litelig oppf\u00f8lging er det samme.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Slik fungerer syklusen med like mengder i kassene<\/h3>\n\n\n<p>For en enkel pilot kan dere bruke to kasser med samme standardmengde:<\/p>\n\n\n<p>1. <strong>Bruk deler fra bare \u00e9n kasse.<\/strong> Merk den andre tydelig som reserve, ikke som en alternativ plukklokasjon.<\/p>\n\n\n<p>2. <strong>Gi signal n\u00e5r kassen som er i bruk, er tom.<\/strong> Flytt den tomme kassen eller kortet til det avtalte innsamlingsstedet, eller registrer en elektronisk foresp\u00f8rsel slik dere har avtalt.<\/p>\n\n\n<p>3. <strong>Ta den fulle reservekassen i bruk.<\/strong> Produksjonen fortsetter mens den p\u00e5fyllingsansvarlige s\u00f8rger for nye deler.<\/p>\n\n\n<p>4. <strong>Bekreft at p\u00e5fyllet blir fulgt opp.<\/strong> Den som har ansvaret for \u00e5 motta signalet, bekrefter mottaket og avklarer n\u00e5r brukbare deler forventes \u00e5 v\u00e6re tilbake.<\/p>\n\n\n<p>5. <strong>Sett den etterfylte kassen tilbake som reserve.<\/strong> Kontroller artikkel og mengde, s\u00f8rg for at merkingen er p\u00e5 plass, og avslutt p\u00e5fyllingsregistreringen. Fortsett \u00e5 bruke deler fra kassen som er i bruk, til den er tom.<\/p>\n\n\n<p>Deretter bytter kassene rolle igjen. Unng\u00e5 \u00e5 fylle p\u00e5 kassen som er i bruk, litt etter litt. Det kan skjule at den g\u00e5r tom. Det er nettopp dette som skal utl\u00f8se p\u00e5fyll.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Velg deler med forbruk og forsyning som passer metoden<\/h2>\n\n\n<p>Start med deler som brukes regelmessig, er tydelig merket og har en p\u00e5litelig kilde til p\u00e5fyll. De best egnede delene er enkle \u00e5 h\u00e5ndtere i en standardmengde og har samme spesifikasjon fra jobb til jobb.<\/p>\n\n\n<p>En rimelig del kan v\u00e6re godt egnet selv om mangel p\u00e5 den stanser en kostbar operasjon. Innkj\u00f8psprisen sier ikke hva det koster \u00e5 g\u00e5 tom. \u00c5 fylle to store kasser med en dyr artikkel som sjelden brukes, kan derimot binde kapital uten \u00e5 l\u00f8se et tilbakevendende forsyningsproblem.<\/p>\n\n\n<p>V\u00e6r mer forsiktig n\u00e5r forbruket er uregelmessig eller preges av enkelte store ordrer. Ett enkelt uttak kan t\u00f8mme reserven lenge f\u00f8r det vanlige p\u00e5fyllet er tilbake. Ordrespesifikke komponenter, hyppige konstruksjonsendringer, kort holdbarhet eller strenge krav til partikontroll krever ogs\u00e5 mer enn to praktiske kasser. Oppretthold de n\u00f8dvendige rutinene for identifikasjon, lagerrotasjon og sporbarhet.<\/p>\n\n\n<p>Etterfylling med to kasser er <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/kanban-i-produksjon\/\">beslektet med kanban<\/a>, men <strong>to kasser betyr ikke to kanbankort<\/strong>. I en produksjonssl\u00f8yfe med to kort skilles det mellom tillatelse til \u00e5 produsere og tillatelse til \u00e5 flytte materialer. Tokassesystemet i denne artikkelen handler om den fysiske beholdningen og oppf\u00f8lgingen n\u00e5r \u00e9n av mengdene er brukt opp.<\/p>\n\n\n<p>Det er heller ikke det samme som \u00e5 velge <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/\">min\u2013maks lagerstyring<\/a>. Med min\u2013maks bestilles p\u00e5fyll n\u00e5r beholdningen n\u00e5r en bestillingsgrense, og mengden som bestilles, skal bringe beholdningen opp til et fastsatt maksimumsniv\u00e5. To kasser synliggj\u00f8r en bestemt forbruksgrense p\u00e5 forbruksstedet. En innsamlingsrute kan frakte tomme og fulle kasser, men ruten i seg selv verken bekrefter eller fullf\u00f8rer p\u00e5fyllet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dimensjoner reserven for hele tiden frem til p\u00e5fyllet er p\u00e5 plass<\/h2>\n\n\n<p>M\u00e5l tiden fra <strong>forbrukssignalet gis til brukbare deler er p\u00e5 plass ved den angitte arbeidsstasjonen<\/strong>. Ikke stopp klokken n\u00e5r en innkj\u00f8psordre sendes, en maskin er ferdig med skj\u00e6ringen eller en leveranse ankommer fabrikkporten.<\/p>\n\n\n<p>Denne tiden kan omfatte venting p\u00e5 at signalet fanges opp, kontroll og frigivelse av foresp\u00f8rselen, plukking eller produksjon, kontroll av delene, transport og plassering av delene p\u00e5 riktig sted. For egenproduserte deler kan ventetiden p\u00e5 en maskin som deles med andre oppdrag, ha st\u00f8rre betydning enn selve bearbeidingstiden.<\/p>\n\n\n<p>Som et utgangspunkt multipliserer dere forventet forbruk per driftsperiode med antall driftsperioder som g\u00e5r f\u00f8r p\u00e5fyllet er p\u00e5 plass. Legg deretter til en buffer som dekker variasjonene i ettersp\u00f8rsel og p\u00e5fyllingstid som prosessen m\u00e5 t\u00e5le. Sikkerhetslageret er den ekstra beskyttelsen som inng\u00e5r i mengden, ikke n\u00f8dvendigvis hele den andre kassen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Et eksempel p\u00e5 et tokassesystem<\/h3>\n\n\n<p>Tenk dere en monteringsstasjon som bruker 40 klips per produksjonsskift. Hver kasse inneholder 240 brukbare klips. N\u00e5r \u00e9n kasse er tom og operat\u00f8ren bytter til den andre, rekker den fulle kassen til seks produksjonsskift med dette forbruket.<\/p>\n\n\n<p>Hvis hele p\u00e5fyllingen tar fire produksjonsskift, bruker stasjonen 160 klips mens den venter. N\u00e5r p\u00e5fyllet er tilbake, er det fortsatt 80 klips igjen i kassen som er i bruk. Restmengden er bufferen mot variasjon i dette eksemplet, ikke en anbefalt buffer for alle fabrikker.<\/p>\n\n\n<p>Anta n\u00e5 at det bare tar kort tid \u00e5 lage klipsene, men at k\u00f8en ved produksjonsmaskinen gj\u00f8r at de ikke er tilbake f\u00f8r det har g\u00e5tt mer enn seks produksjonsskift. Da svikter systemet til tross for riktige kasser og et synlig signal. Dere m\u00e5 f\u00e5 p\u00e5fyllet raskere p\u00e5 plass, \u00f8ke bufferen eller velge en annen l\u00f8sning for etterfylling.<\/p>\n\n\n<p>Bruk kalenderne konsekvent. Hvis monteringen bruker deler p\u00e5 nattskiftet, mens lageret, leverand\u00f8ren eller p\u00e5fyllingsprosessen ikke er i drift, t\u00e6res det fortsatt p\u00e5 bufferen i dette tidsrommet. Beregn ut fra det faktiske forbruket mens dere venter p\u00e5 nye deler, ikke en uklar blanding av kalenderdager og arbeidstimer.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00e5 begge kassene inneholde samme mengde?<\/h3>\n\n\n<p>Nei. Dere kan ha en st\u00f8rre mengde i kassen som er i bruk, og en mindre reserve som er dimensjonert for \u00e5 dekke forbruket frem til p\u00e5fyllet kommer. Men da m\u00e5 dere skrive ned en annen regel for \u00e5 gjenopprette beholdningen: Ved mottak fyller dere f\u00f8rst reserven opp til fastsatt mengde og legger resten i kassen som er i bruk.<\/p>\n\n\n<p>Ikke la kasser med ulike mengder bytte rolle som om de ga samme beskyttelse. Ved f\u00f8rste innf\u00f8ring gj\u00f8r like mengder det enklere \u00e5 forst\u00e5 og kontrollere byttet. Velg ulike mengder bare n\u00e5r besparelsen i lagerbeholdning eller plass rettferdiggj\u00f8r den ekstra disiplinen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Utpek en ansvarlig for hvert signal om tom kasse<\/h2>\n\n\n<p>Et kort i en bakke er en foresp\u00f8rsel, ikke et bevis p\u00e5 at noen har fulgt den opp. F\u00f8r piloten starter, m\u00e5 dere avtale hvem som mottar signalet, hvor raskt mottaket skal bekreftes, og hvem som f\u00f8lger opp n\u00e5r p\u00e5fyllet blir forsinket. Fordel ansvaret p\u00e5 tvers av skiftene, og utpek en stedfortreder n\u00e5r den som vanligvis har ansvaret, er borte.<\/p>\n\n\n<p>Signalet m\u00e5 v\u00e6re tydelig nok til at mottakeren kan handle uten \u00e5 m\u00e5tte ringe. Oppgi del og eventuell revisjon, standard p\u00e5fyllingsmengde, forsyningskilde, returlokasjon og identifikator for kassen eller kortet. Den som h\u00e5ndterer p\u00e5fyllet, m\u00e5 kunne skille foresp\u00f8rselen fra en som allerede er under behandling.<\/p>\n\n\n<p>Bruk for eksempel avtalte statuser som forespurt, godkjent og returnert. Et papirsignal kan fungere helt fint s\u00e5 lenge den ansvarlige mottakeren bekrefter det, og \u00e5pne foresp\u00f8rsler forblir synlige. Hvis samme foresp\u00f8rsel ogs\u00e5 registreres elektronisk, m\u00e5 de to registreringene kobles sammen i stedet for \u00e5 utl\u00f8se et nytt p\u00e5fyll.<\/p>\n\n\n<p>Den fysiske syklusen og lagerregistreringene m\u00e5 ogs\u00e5 stemme overens. \u00c5 flytte en kasse f\u00f8rer ikke i seg selv til en elektronisk lagertransaksjon eller til at det opprettes en produksjonsordre. Avklar n\u00e5r den valgte arbeidsflyten skal registrere forbruk, intern overf\u00f8ring, mottak og eventuelle produksjonsforesp\u00f8rsler. Hvis beholdningen allerede er redusert gjennom produksjonsrapporteringen, m\u00e5 dere unng\u00e5 \u00e5 trekke den fra en gang til bare fordi den tomme kassen hentes.<\/p>\n\n\n<p>N\u00e5r delene kommer tilbake, m\u00e5 du kontrollere antall brukbare deler, identitet og plassering f\u00f8r du lukker foresp\u00f8rselen. Skadde deler i en kasse som ser full ut, gir ikke den tiltenkte beskyttelsen. P\u00e5fyllingen er f\u00f8rst fullf\u00f8rt n\u00e5r de riktige, brukbare delene er tilgjengelige der de skal brukes \u2013 ikke bare n\u00e5r noen markerer en tidligere oppgave som ferdig.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Forbruk av reserven er normalt, men forsinket p\u00e5fylling er et avvik<\/h3>\n\n\n<p>Det er forventet at den andre kassen tas i bruk. Den skal derimot ikke g\u00e5 tom f\u00f8r p\u00e5fyllet er p\u00e5 plass.<\/p>\n\n\n<p>Bestem n\u00e5r saken skal eskaleres, tidlig nok til at dere kan handle mens det fortsatt er deler igjen. Hvis den p\u00e5fyllingsansvarlige ikke kan bekrefte at delene er tilbake f\u00f8r den gjenv\u00e6rende beholdningen tar slutt, m\u00e5 den som kan endre forsyningen eller produksjonsbeslutningen, involveres. En hasteoverf\u00f8ring kan v\u00e6re riktig, men registrer den og gjenopprett de fastsatte mengdene i begge kassene etterp\u00e5. \u00c5 l\u00e5ne fra en annen stasjon uten \u00e5 si fra flytter bare mangelen.<\/p>\n\n\n<p>Under piloten b\u00f8r dere g\u00e5 gjennom manglende bekreftelser, faktisk tid fra signal til delene er tilbake, gjenv\u00e6rende reserve ved retur og eventuelle hastetiltak. Bruk observasjonene til \u00e5 forbedre rutinene for innhenting og p\u00e5fylling f\u00f8r dere reduserer beholdningen. Vurder mengdene p\u00e5 nytt n\u00e5r ettersp\u00f8rsel, skiftordning, leverand\u00f8rytelse eller produksjonsrute endres.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Planlegg produksjon til p\u00e5fyll sammen med andre oppdrag som konkurrerer om kapasiteten<\/h2>\n\n\n<p>For innkj\u00f8pte festemidler kan p\u00e5fyllingen hovedsakelig best\u00e5 av plukking, leverand\u00f8rlevering og interntransport. For en klips, brakett eller avstandshylse som produseres internt, konkurrerer p\u00e5fyllingen ogs\u00e5 med kundeordrer om maskiner og tid. En p\u00e5fyllingsliste som ser bort fra disse forpliktelsene, gir ikke et troverdig tidspunkt for n\u00e5r delene er tilbake.<\/p>\n\n\n<p><strong>Velg SkyPlanner n\u00e5r p\u00e5fyllingen din trenger produksjonskapasitet som ogs\u00e5 brukes til annet arbeid.<\/strong> N\u00e5r p\u00e5fyllingen er godkjent som produksjonsordre, <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">planlegger Arcturus, SkyPlanners KI for finplanlegging, operasjonene sammen med det \u00f8vrige arbeidet<\/a>. Den tar hensyn til konfigurerte arbeidsstasjoner, kapasitet, skift, avhengigheter mellom operasjoner og prioriteringer. Gantt-planen viser den beregnede rekkef\u00f8lgen og planlagt ferdigstillelse.<\/p>\n\n\n<p>Da slipper du \u00e5 vedlikeholde \u00e9n k\u00f8 for kundeordrer og en annen for p\u00e5fyllingspartier, for s\u00e5 \u00e5 pr\u00f8ve \u00e5 samordne dem manuelt. Du kan se om det er plass til p\u00e5fyllingen i planen f\u00f8r reserven forventes \u00e5 g\u00e5 tom, og hvordan en endret prioritering p\u00e5virker andre forpliktelser.<\/p>\n\n\n<p>La oss g\u00e5 tilbake til eksemplet med klipsene. Det nyttige sp\u00f8rsm\u00e5let i planleggingen er om det godkjente p\u00e5fyllingspartiet kan fullf\u00f8re produksjonsruten tidsnok til kontroll og levering tilbake til monteringen. Hvis maskinen som deles med annet arbeid, allerede er opptatt, kan du ta stilling til kapasitetskonflikten f\u00f8r monteringen g\u00e5r tom. Du setter prioriteringene; Arcturus beregner planen innenfor disse rammene.<\/p>\n\n\n<p>N\u00e5r materialhensyn er aktivert i finplanleggingen og lagerinformasjonen holdes oppdatert, tar SkyPlanner ogs\u00e5 hensyn til materialene som trengs til p\u00e5fyllingen. En ledig maskin er ikke nok hvis r\u00e5materialet til partiet mangler. For innkj\u00f8pte deler kan oppdaterte ankomstdatoer p\u00e5 innkj\u00f8psordrene tas med i planleggingen av arbeidet som trenger delene. Beregn planen p\u00e5 nytt n\u00e5r datoene endres.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system gjennom sitt \u00e5pne REST API. Du kan knytte eksisterende ordre- og lagerinformasjon til produksjonsplanen i stedet for \u00e5 planlegge p\u00e5fyllingen i en isolert l\u00f8sning. Behold et enkelt signal fra kassen ved arbeidsstasjonen, og gi arbeidet bak signalet en plan som tar hensyn til resten av fabrikken.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Slik endret bedre oversikt over materialtilgangen arbeidet hos Eskomatic<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/eskomatic\/\">Eskomatic, en finsk bedrift som utf\u00f8rer maskinering p\u00e5 oppdrag<\/a>, organiserte tidligere jobbk\u00f8ene i stor grad manuelt. Begrenset oversikt over materialtilgangen gjorde at mangler kunne bli oppdaget for tett opp mot planlagt jobbstart.<\/p>\n\n\n<p>Ved \u00e5 koble SkyPlanner til sitt eksisterende ERP-system fikk bedriften en tydeligere, visuell jobbk\u00f8 og automatisk planlegging av kapasitetsbelastningen. Eskomatic rapporterer om mer presise leveringsdatoer og f\u00e6rre produksjonsstopp som f\u00f8lge av materialmangel.<\/p>\n\n\n<p>Erfaringen deres viser verdien av \u00e5 knytte materialtilgang til den daglige finplanleggingen: Planleggerne kan reagere tidligere i stedet for \u00e5 rydde opp i problemene n\u00e5r arbeidet allerede skulle v\u00e6rt i gang. N\u00e5r p\u00e5fyll til et tokassesystem produseres p\u00e5 maskiner som ogs\u00e5 brukes til annet arbeid, er det praktiske behovet det samme \u2013 et forventet returtidspunkt som er forankret i den faktiske produksjonsplanen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Start med \u00e9n del og kontroller at hele kretsl\u00f8pet fungerer<\/h2>\n\n\n<p>Pr\u00f8v ut systemet med \u00e9n del som brukes regelmessig, p\u00e5 ett forbrukssted. Bekreft startmengden i begge kassene, avstem eventuelle \u00e5pne p\u00e5fyllingsforesp\u00f8rsler, merk plasseringene og \u00f8v p\u00e5 byttet av tom kasse sammen med operat\u00f8rene og de p\u00e5fyllingsansvarlige. F\u00f8lg flere komplette kretsl\u00f8p, inkludert skiftoverleveringer, f\u00f8r dere utvider.<\/p>\n\n\n<p>Ta vare p\u00e5 det som gj\u00f8r tokassesystemet verdifullt: et tydelig signal og en enkel rutine for operat\u00f8ren. Legg planleggingsinnsatsen der den betyr noe \u2013 i \u00e5 sikre at prosessen bak signalet faktisk kan levere.<\/p>\n\n\n<p>Vil du se hvordan SkyPlanner kan planlegge p\u00e5fyll som produseres internt? <a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo<\/a> med utgangspunkt i \u00e9n del dere bruker regelmessig, hvor lenge reserven rekker, og en kundejobb som konkurrerer om samme ressurs. Du kan unders\u00f8ke p\u00e5fyllingens plass i den felles planen og virkningen p\u00e5 annet arbeid. Eller <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8v SkyPlanner med demodata<\/a>. Hvis du foretrekker en veiledet innf\u00f8ring, kan du bruke assistentens KI-st\u00f8ttede \u00abKom i gang\u00bb-veiledning.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tokassesystem: Ha sm\u00e5delene klare til produksjon Hjem &raquo; Ressurser &raquo; Tokassesystem: Ha sm\u00e5delene klare til produksjon En monteringsstasjon g\u00e5r tom for en liten del. Det finnes flere p\u00e5 lager et sted i fabrikken, men noen m\u00e5 finne dem, be om p\u00e5fyll og bringe delene til operat\u00f8ren. En rimelig komponent har nettopp f\u00f8rt til tap av &#8230; <a title=\"Tokassesystem: Ha sm\u00e5delene klare til produksjon\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/\" aria-label=\"Read more about Tokassesystem: Ha sm\u00e5delene klare til produksjon\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111722,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2561,505],"tags":[],"class_list":["post-111713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produksjon","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tokassesystem: Ha sm\u00e5delene klare til produksjon<\/title>\n<meta name=\"description\" content=\"Tom kasse skal utl\u00f8se p\u00e5fyll, ikke produksjonsstans. Etabler et p\u00e5litelig tokassesystem og bruk SkyPlanner til \u00e5 planlegge produksjonen av egne deler.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tokassesystem: Ha sm\u00e5delene klare til produksjon\" \/>\n<meta property=\"og:description\" content=\"Tom kasse skal utl\u00f8se p\u00e5fyll, ikke produksjonsstans. Etabler et p\u00e5litelig tokassesystem og bruk SkyPlanner til \u00e5 planlegge produksjonen av egne deler.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T03:02:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T03:04:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tokassesystem: Ha sm\u00e5delene klare til produksjon\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:04:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/\"},\"wordCount\":2404,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"articleSection\":[\"Effektiv produksjon\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/\",\"name\":\"Tokassesystem: Ha sm\u00e5delene klare til produksjon\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:04:32+00:00\",\"description\":\"Tom kasse skal utl\u00f8se p\u00e5fyll, ikke produksjonsstans. Etabler et p\u00e5litelig tokassesystem og bruk SkyPlanner til \u00e5 planlegge produksjonen av egne deler.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/tokassesystem\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tokassesystem: Ha sm\u00e5delene klare til produksjon\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tokassesystem: Ha sm\u00e5delene klare til produksjon","description":"Tom kasse skal utl\u00f8se p\u00e5fyll, ikke produksjonsstans. Etabler et p\u00e5litelig tokassesystem og bruk SkyPlanner til \u00e5 planlegge produksjonen av egne deler.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/","og_locale":"nb_NO","og_type":"article","og_title":"Tokassesystem: Ha sm\u00e5delene klare til produksjon","og_description":"Tom kasse skal utl\u00f8se p\u00e5fyll, ikke produksjonsstans. Etabler et p\u00e5litelig tokassesystem og bruk SkyPlanner til \u00e5 planlegge produksjonen av egne deler.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T03:02:21+00:00","article_modified_time":"2026-10-28T03:04:32+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"12 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tokassesystem: Ha sm\u00e5delene klare til produksjon","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:04:32+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/"},"wordCount":2404,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","articleSection":["Effektiv produksjon","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/","name":"Tokassesystem: Ha sm\u00e5delene klare til produksjon","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:04:32+00:00","description":"Tom kasse skal utl\u00f8se p\u00e5fyll, ikke produksjonsstans. Etabler et p\u00e5litelig tokassesystem og bruk SkyPlanner til \u00e5 planlegge produksjonen av egne deler.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","width":1536,"height":864,"caption":"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/tokassesystem\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Tokassesystem: Ha sm\u00e5delene klare til produksjon"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tokassesystem: Ha sm\u00e5delene klare til produksjon Hjem &raquo; Ressurser &raquo; Tokassesystem: Ha sm\u00e5delene klare til produksjon En monteringsstasjon g\u00e5r tom for en liten del. Det finnes flere p\u00e5 lager et sted i fabrikken, men noen m\u00e5 finne dem, be om p\u00e5fyll og bringe delene til operat\u00f8ren. En rimelig komponent har nettopp f\u00f8rt til tap av&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=111713"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111713\/revisions"}],"predecessor-version":[{"id":111776,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111713\/revisions\/111776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/111722"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=111713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=111713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=111713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}