{"id":111620,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111620"},"modified":"2026-10-28T00:45:28","modified_gmt":"2026-10-28T00:45:28","slug":"mtm-analyse","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/","title":{"rendered":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Et nytt montert produkt er klart for produksjonsplanlegging, men ingen har laget det ofte nok til at du har en p\u00e5litelig gjennomsnittstid. Likevel m\u00e5 du sammenligne utformingen av arbeidsstasjonene, ansl\u00e5 arbeidsbelastningen og avgj\u00f8re om det er plass til de f\u00f8rste ordrene i planen.<\/p>\n\n\n<p>Med Methods-Time Measurement (MTM) kan du analysere den manuelle arbeidsmetoden f\u00f8r ordin\u00e6r produksjon starter. I stedet for \u00e5 vente p\u00e5 historikk fra fullf\u00f8rte jobber beregner du en tid ut fra definerte bevegelser og etablerte tidsdata. Metoden kommer f\u00f8rst: En kortere tid har bare verdi hvis den beskriver arbeid som faktisk kan utf\u00f8res trygt og riktig.<\/p>\n\n\n<p>N\u00e5r tiden er godkjent for planlegging, hjelper SkyPlanner APS deg med \u00e5 ta den i bruk. Arcturus, systemets KI for produksjonsplanlegging, legger operasjonenes varighet inn i den felles produksjonsplanen. Slik gir en bedre metode et bedre plangrunnlag, i stedet for \u00e5 bli st\u00e5ende som et isolert tall i et teknisk dokument.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er MTM-analyse?<\/h2>\n\n\n<p>Methods-Time Measurement er et system med forh\u00e5ndsbestemte bevegelsestider som brukes til \u00e5 beskrive, analysere og vurdere manuelt arbeid. En analytiker deler en definert metode inn i bevegelser eller prosesselementer, bruker de relevante tidsdataene og reglene og fastsetter tiden for metoden ved et definert referanseniv\u00e5 for arbeidstempo.<\/p>\n\n\n<p>I en detaljert MTM-1-analyse inng\u00e5r bevegelser som \u00e5 strekke seg, gripe, flytte, plassere og slippe. Forholdene har betydning: \u00c5 plukke opp en lett tilgjengelig del er ikke samme oppgave som \u00e5 velge ut og plassere en komponent som er vanskelig \u00e5 h\u00e5ndtere. MTM synliggj\u00f8r disse forskjellene i stedet for \u00e5 skjule dem i ett samlet anslag.<\/p>\n\n\n<p>Tidsverdiene i MTM uttrykkes i tidsenheten TMU. \u00c9n TMU tilsvarer 0,036 sekunder; 1 000 TMU tilsvarer dermed 36 sekunder. TMU er en tidsenhet, ikke et prosentm\u00e5l for effektivitet.<\/p>\n\n\n<p>Referansetempoet er ogs\u00e5 viktig. MTM tar ikke utgangspunkt i \u00e5 m\u00e5le tiden til den raskeste operat\u00f8ren og kalle den standarden. Tidsdataene bygger allerede p\u00e5 et definert arbeidstempo. Ikke legg til en tempovurdering fra en stoppeklokkestudie bare fordi en annen studie brukte det.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e5r b\u00f8r du velge MTM fremfor andre metoder for \u00e5 fastsette tid?<\/h2>\n\n\n<p>MTM er s\u00e6rlig nyttig n\u00e5r beslutningen gjelder utforming av manuelt arbeid: et nytt produkt, en endret fikstur, en ny m\u00e5te \u00e5 plassere materialene p\u00e5 eller et valg mellom to monteringsrekkef\u00f8lger. Du kan sammenligne arbeidsinnholdet f\u00f8r du bestemmer deg for metoden.<\/p>\n\n\n<p>Det betyr ikke at MTM er det riktige svaret p\u00e5 alle sp\u00f8rsm\u00e5l om tid. Velg et datagrunnlag som passer til beslutningen:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Hvor lang tid b\u00f8r denne definerte manuelle metoden kreve? Nyttig for \u00e5 utforme og sammenligne arbeid f\u00f8r det finnes tilstrekkelig produksjonshistorikk.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/tidsstudier-i-produksjon\/\">Tidsstudie med stoppeklokke<\/a>:<\/strong> Hvor lang tid tar de observerte arbeidselementene under angitte forhold, og hvilken standardtid kan fastsettes p\u00e5 dette grunnlaget? Nyttig n\u00e5r operasjonen allerede finnes og kan studeres.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/multimomentstudie\/\">Multimomentstudie<\/a>:<\/strong> Hvor stor andel av tiden g\u00e5r med til montering, omstilling, venting eller andre aktiviteter? Nyttig for \u00e5 forst\u00e5 hvordan en arbeidsperiode fordeler seg, ikke for \u00e5 m\u00e5le tiden for hver korte bevegelse.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/tidsregistrering-i-produksjonen\/\">Tidsregistrering per jobb<\/a>:<\/strong> Hva skjedde p\u00e5 denne konkrete ordren eller operasjonen? Nyttig for \u00e5 gjennomg\u00e5 erfaringer fra produksjonen og forklare avvik fra planen.<\/li><\/ul>\n\n\n<p>Disse tiln\u00e6rmingene kan utfylle hverandre. En MTM-analyse kan gi et forslag til metodetid, mens senere observasjoner i produksjonen kan avdekke et manglende element eller endrede forhold. Men et gjennomsnitt av registrerte timer som inkluderer venting p\u00e5 materialer, er ikke det samme som forh\u00e5ndsbestemt manuelt arbeidsinnhold.<\/p>\n\n\n<p>For en automatisk maskinsyklus m\u00e5 den prosessbestemte tiden fastsettes separat. MTM kan beskrive operat\u00f8rens arbeid med lasting, lossing og h\u00e5ndtering, men gj\u00f8r ikke maskinens skj\u00e6reprogram eller krav til herdetid om til en h\u00e5ndbevegelse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 og MTM-UAS: Velg riktig detaljniv\u00e5<\/h2>\n\n\n<p>MTM er en familie av systemer med ulike detaljniv\u00e5er. Valget p\u00e5virker b\u00e5de hva analysen beskriver, og hvor mye arbeid som kreves for \u00e5 utarbeide den.<\/p>\n\n\n<p><strong>MTM-1<\/strong> analyserer grunnbevegelser. Det egner seg for detaljert gjennomgang av kortvarig, gjentakende manuelt arbeid, der forholdene rundt hver enkelt bevegelse har betydning for utformingen av arbeidet.<\/p>\n\n\n<p><strong>MTM-2<\/strong> samler grunnbevegelser i st\u00f8rre grupper. For arbeid som egner seg for systemet, gir det en mindre detaljert analyse uten at hver MTM-1-bevegelse m\u00e5 registreres separat.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong>, Universal Analyzing System, bruker prosesselementer p\u00e5 et h\u00f8yere niv\u00e5 og forbindes med batchproduksjon. Det er ikke bare et annet navn p\u00e5 MTM-1.<\/p>\n\n\n<p>Velg system sammen med en kvalifisert analytiker ut fra prosessen, graden av gjentakelse og variasjon og beslutningen resultatet skal st\u00f8tte. Flere detaljer er verdt innsatsen n\u00e5r de kan p\u00e5virke beslutningen. Riktig bruk krever oppl\u00e6ring i det valgte systemet og bruk av gjeldende data og regler. En generell veiledning kan ikke erstatte dette.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Slik gir en MTM-analyse en tid du kan bruke i planleggingen<\/h2>\n\n\n<p>Et nyttig resultat er mer enn en varighet. Det er en dokumentert metode og en tid som ogs\u00e5 den neste planleggeren forst\u00e5r grunnlaget for.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Definer arbeidet og forutsetningene<\/h3>\n\n\n<p>Velg produktvariant, operasjon og metodeversjon. Beskriv verkt\u00f8y, fikstur, hvordan komponentene er plassert og tilgjengelige, arbeidsrekkef\u00f8lge, kvalitetskontroller og hva som markerer start og slutt. Angi om analysen gjelder ett stykk, \u00e9n syklus eller en batch.<\/p>\n\n\n<p>Involver dem som utf\u00f8rer eller skal utf\u00f8re arbeidet. De kan oppdage en ubekvem strekkbevegelse, en n\u00f8dvendig kontroll eller et beholderbytte som ikke kommer frem p\u00e5 en ryddig tegning. S\u00f8rg for at metoden ivaretar sikker h\u00e5ndtering og produktkvalitet. \u00c5 fjerne n\u00f8dvendig arbeid er ingen forbedring.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Analyser arbeidsrekkef\u00f8lgen med det valgte systemet<\/h3>\n\n\n<p>En kvalifisert analytiker beskriver arbeidet med de relevante elementene og forholdene som p\u00e5virker dem. Analysen m\u00e5 ta h\u00f8yde for det som faktisk skjer, ogs\u00e5 arbeid som bare utf\u00f8res med bestemte intervaller.<\/p>\n\n\n<p>F\u00f8lg systemets regler for rekkef\u00f8lge og samtidige aktiviteter. N\u00e5r to hender beveger seg samtidig, betyr det ikke n\u00f8dvendigvis at bevegelsestidene skal legges etter hverandre. Du skal heller ikke finne p\u00e5 en bevegelsestid for \u00e5 fylle et hull i en ufullstendig metodebeskrivelse.<\/p>\n\n\n<p>Skill mellom omstilling og gjentakende arbeid. Klargj\u00f8ring av en fikstur \u00e9n gang for hele batchen skal ikke regnes som en klargj\u00f8ringsoppgave for hvert enkelt stykk.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Sammenlign metodene, ikke bare totaltidene<\/h3>\n\n\n<p>Bruk analysen til \u00e5 unders\u00f8ke hvorfor \u00e9n metode krever mindre arbeid. Kan komponenten legges frem i samme retning hver gang? Kan en fikstur fjerne behovet for gjentatt omplassering? Kan en endret rekkef\u00f8lge eliminere h\u00e5ndtering uten \u00e5 fjerne en kontroll?<\/p>\n\n\n<p>Sammenlign alternativer med samme avgrensning og kvalitetskrav. En metode som ser raskere ut fordi etterfylling eller kontroll er flyttet ut av analysen, har ikke n\u00f8dvendigvis redusert arbeidet. Det er her MTM blir et verkt\u00f8y for \u00e5 utforme arbeidet, fremfor et anslag som bare ser formelt ut.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Avklar hva tiden som godkjennes for bruk, inkluderer<\/h3>\n\n\n<p>Kontroller tidsgrunnlaget f\u00f8r du kaller resultatet en standardtid for produksjonen. Kartlegg gjentakende st\u00f8ttearbeid, og avklar hvordan personlige behov, restitusjon og uunng\u00e5elige forsinkelser skal h\u00e5ndteres. Dokumenter hvilke tidstillegg som er inkludert, og hvordan de beregnes. Ikke ta utgangspunkt i en universell prosentsats.<\/p>\n\n\n<p>Synliggj\u00f8r avbrudd som kan unng\u00e5s, som problemer det m\u00e5 gj\u00f8res noe med. Venting p\u00e5 en manglende komponent skal ikke ubemerket bli en del av hver sekvens der operat\u00f8ren strekker seg etter og griper en del. Samtidig vil en planlagt varighet som utelater n\u00f8dvendig gjentakende arbeid, f\u00e5 den nye metoden til \u00e5 fremst\u00e5 som enklere \u00e5 planlegge enn den faktisk er.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Valider og godkjenn metoden f\u00f8r bruk<\/h3>\n\n\n<p>F\u00f8r metoden tas i bruk, m\u00e5 dere kontrollere at den kan utf\u00f8res med det tiltenkte utstyret, m\u00e5ten materialene legges frem p\u00e5 og de gjeldende kvalitetskravene. N\u00e5r dere har en pilotserie eller en tidlig produksjonsserie \u00e5 vurdere, b\u00f8r dere unders\u00f8ke avvik fra sammenlignbart arbeid. Innl\u00e6ring, en endret fikstur og et manglende element i analysen krever ulike tiltak.<\/p>\n\n\n<p>Ta vare p\u00e5 analysen, opplysninger om hvilket system som ble brukt, metodeversjonen, forutsetningene, inkluderte tidstillegg, godkjenningen og datoen metoden gjelder fra. Vurder tiden p\u00e5 nytt n\u00e5r metoden eller forutsetningene endres. Poenget er ikke \u00e5 holde fast ved et imponerende tall p\u00e5 ubestemt tid, men \u00e5 opprettholde en p\u00e5litelig sammenheng mellom arbeidet og planen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Eksempel: En bedre monteringsmetode planlegger ikke seg selv<\/h2>\n\n\n<p>Tenk deg en manuell monteringsstasjon der delene kommer i ulike retninger. Den foresl\u00e5tte metoden bruker et forbedret brett som legger delene til rette, og en posisjoneringsfikstur. Det reduserer behovet for \u00e5 velge ut og flytte p\u00e5 delene. Teamet kontrollerer metoden og godkjenner den for bruk.<\/p>\n\n\n<p>La oss si at tiden som brukes i planleggingen, dermed g\u00e5r ned fra to minutter til ett og et halvt minutt per stykk. Dette er illustrerende, godkjente planleggingsverdier, ikke verdier hentet fra et MTM-datakort. Vi forutsetter at \u00e9n person utf\u00f8rer arbeidet i rekkef\u00f8lge p\u00e5 \u00e9n stasjon, uten overlappende maskinsyklus, og at tidene og den tilgjengelige arbeidskalenderen er samordnet med hensyn til tidstillegg.<\/p>\n\n\n<p>For en ordre p\u00e5 120 stykk med uendret omstillingstid p\u00e5 30 minutter:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tidligere metode:<\/strong> 120 \u00d7 2 minutter + 30 minutter = 270 minutter, eller fire og en halv time.<\/li><li><strong>Ny metode:<\/strong> 120 \u00d7 1,5 minutter + 30 minutter = 210 minutter, eller tre og en halv time.<\/li><\/ul>\n\n\n<p>Ordren trenger \u00e9n time mindre p\u00e5 denne stasjonen. Det frigj\u00f8r nyttig kapasitet, men betyr ikke automatisk at ordren kan sendes \u00e9n time tidligere. Den ferdigmonterte enheten m\u00e5 kanskje fortsatt vente p\u00e5 en testbenk, en annen ordre kan oppta neste operasjon, eller den frigjorte timen kan falle utenfor tidsrommet en annen jobb trenger.<\/p>\n\n\n<p>Neste steg er derfor ikke \u00e5 \u00abtrekke en time fra leveringstidspunktet\u00bb, men \u00e5 \u00abberegne p\u00e5 nytt hvordan denne ordren og det \u00f8vrige arbeidet kan gjennomf\u00f8res med de tilgjengelige ressursene\u00bb. Den beregningen gj\u00f8r SkyPlanner for deg.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ta godkjente metodetider i bruk med SkyPlanner<\/h2>\n\n\n<p>I SkyPlanner kan du angi varigheten for en operasjon som tid per stykk, produksjonsrate eller fast tid. Omstillingstid og tid til nedrigging legges inn separat. I det helt manuelle eksempelet kan derfor den godkjente planleggingstiden per stykk og omstillingstiden for partiet holdes atskilt ogs\u00e5 n\u00e5r ordremengden endres.<\/p>\n\n\n<p>Avklar f\u00f8rst hvilke ressurser som m\u00e5 reserveres i det aktuelle tidsrommet. Manuelt arbeidsinnhold, tiden maskinen er opptatt, og operasjonens samlede varighet er ulike st\u00f8rrelser. Hvis en maskin g\u00e5r mens operat\u00f8ren klargj\u00f8r en annen del, kan summering av alle aktivitetene f\u00f8re til at maskinen reserveres for lenge. Hvis du bare bruker den manuelle arbeidstiden, kan du utelate tid der utstyret ikke er tilgjengelig for en annen jobb. Knytt metoden til ressursene operasjonen faktisk trenger.<\/p>\n\n\n<p>Samordne ogs\u00e5 tidstilleggene i varigheten med kalenderen. En pause som allerede er trukket fra den tilgjengelige kapasiteten, skal ikke trekkes fra enda en gang gjennom et tidstillegg for samme pause. Ta vare p\u00e5 den godkjente studiedokumentasjonen, og dokumenter hvordan de ulike delene omsettes til verdier som brukes i planleggingen.<\/p>\n\n\n<p>Arcturus planlegger operasjonene ut fra disse varighetene og de konfigurerte arbeidsstasjonene, skiftene, avhengighetene og prioriteringene. Gantt-tidslinjen viser hvordan arbeidet henger sammen. N\u00e5r du innf\u00f8rer en godkjent metodeendring, oppdaterer du de ber\u00f8rte planleggingsverdiene og <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">beregner planen p\u00e5 nytt<\/a> for \u00e5 se virkningen p\u00e5 etterf\u00f8lgende operasjoner og andre ordrer som konkurrerer om kapasiteten.<\/p>\n\n\n<p>Du slipper det manuelle arbeidet med \u00e5 bygge opp separate k\u00f8er p\u00e5 nytt etter hver revisjon. Enda viktigere er det at du kan bruke en faglig begrunnet tid for en ny metode i fremtidig planlegging, f\u00f8r du har en lang historikk med fullf\u00f8rte jobber. Du avgj\u00f8r hvilken metode som er godkjent, og hvilke leveringsforpliktelser som skal prioriteres. SkyPlanner beregner den samlede planen.<\/p>\n\n\n<p>Senere gir den faktiske produksjonen deg ytterligere grunnlag for vurdering. SkyPlanner st\u00f8tter ogs\u00e5 estimering av operasjonsvarighet ut fra historiske tidsregistreringer. Hold denne kilden atskilt fra MTM: Den ene estimerer ut fra registrert produksjon, mens den andre vurderer en definert manuell metode ved hjelp av forh\u00e5ndsbestemte data.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hvorfor en felles plan er viktig<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/utu\/\">UTU, en finsk produsent av elektriske tavler og koblingsanlegg<\/a>, planla tidligere i egne regneark for hver avdeling. Endringer i rekkef\u00f8lgen i ERP-systemet n\u00e5dde ikke alltid frem til produksjonsgulvet, og det var vanskelig \u00e5 f\u00e5 et realistisk bilde av kapasiteten.<\/p>\n\n\n<p>Med SkyPlanner koblet til Oracle NetSuite samlet UTU linjene og avdelingene ved fabrikken i Ulvila i ett system. Teamet forteller at en oppdatert arbeidsk\u00f8 n\u00e5r frem til mont\u00f8rene p\u00e5 sekunder, og at prosjektleveransene planlegges mer presist. Erfaringen viser verdien av \u00e5 samle hele arbeidsmengden i en felles plan, fremfor \u00e5 overlate til hver avdeling \u00e5 samordne sin egen k\u00f8.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fra en p\u00e5litelig metodetid til en p\u00e5litelig produksjonsplan<\/h2>\n\n\n<p>Bruk MTM n\u00e5r du trenger \u00e5 utforme og begrunne manuelt arbeid f\u00f8r produksjonshistorikken kan gi deg svaret. Velg deretter SkyPlanner n\u00e5r den godkjente tiden skal f\u00e5 en realistisk plass i planleggingen av ordrene. En god metode viser hva arbeidet krever. Planlegging med begrenset kapasitet viser hvor og n\u00e5r det er plass til det.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system gjennom sitt \u00e5pne REST API, slik at bedre produksjonsplanlegging kan bygge p\u00e5 produksjonsinformasjonen du allerede har.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demonstrasjon av SkyPlanner<\/a>, og ta med en godkjent metodetid, den tilh\u00f8rende operasjonsruten og andre ordrer som konkurrerer om den samme kapasiteten. Se hvordan en metodeendring p\u00e5virker produksjonsplanen og leveringsdatoene, ikke bare varigheten av \u00e9n operasjon. Vil du heller utforske selv f\u00f8rst, kan du <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8ve SkyPlanner med demodata<\/a> eller bruke den KI-st\u00f8ttede \u00abKom i gang\u00bb-funksjonen i assistenten.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart Hjem &raquo; Ressurser &raquo; MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart Et nytt montert produkt er klart for produksjonsplanlegging, men ingen har laget det ofte nok til at du har en p\u00e5litelig gjennomsnittstid. Likevel m\u00e5 du sammenligne utformingen av arbeidsstasjonene, ansl\u00e5 arbeidsbelastningen og avgj\u00f8re om det er plass til de f\u00f8rste ordrene &#8230; <a title=\"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/\" aria-label=\"Read more about MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2561,505],"tags":[],"class_list":["post-111620","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produksjon","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart<\/title>\n<meta name=\"description\" content=\"Se hvordan MTM-analyse beregner tidsbehovet for en ny manuell metode f\u00f8r produksjonsstart. Lag en gjennomf\u00f8rbar plan med godkjente tider i SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart\" \/>\n<meta property=\"og:description\" content=\"Se hvordan MTM-analyse beregner tidsbehovet for en ny manuell metode f\u00f8r produksjonsstart. Lag en gjennomf\u00f8rbar plan med godkjente tider i SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:45:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:45:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/\"},\"wordCount\":2207,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Effektiv produksjon\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/\",\"name\":\"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:45:28+00:00\",\"description\":\"Se hvordan MTM-analyse beregner tidsbehovet for en ny manuell metode f\u00f8r produksjonsstart. Lag en gjennomf\u00f8rbar plan med godkjente tider i SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/mtm-analyse\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart","description":"Se hvordan MTM-analyse beregner tidsbehovet for en ny manuell metode f\u00f8r produksjonsstart. Lag en gjennomf\u00f8rbar plan med godkjente tider i SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/","og_locale":"nb_NO","og_type":"article","og_title":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart","og_description":"Se hvordan MTM-analyse beregner tidsbehovet for en ny manuell metode f\u00f8r produksjonsstart. Lag en gjennomf\u00f8rbar plan med godkjente tider i SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:45:28+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:45:28+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/"},"wordCount":2207,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Effektiv produksjon","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/","name":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:45:28+00:00","description":"Se hvordan MTM-analyse beregner tidsbehovet for en ny manuell metode f\u00f8r produksjonsstart. Lag en gjennomf\u00f8rbar plan med godkjente tider i SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/mtm-analyse\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart Hjem &raquo; Ressurser &raquo; MTM-analyse: Planlegg arbeidet f\u00f8r produksjonsstart Et nytt montert produkt er klart for produksjonsplanlegging, men ingen har laget det ofte nok til at du har en p\u00e5litelig gjennomsnittstid. Likevel m\u00e5 du sammenligne utformingen av arbeidsstasjonene, ansl\u00e5 arbeidsbelastningen og avgj\u00f8re om det er plass til de f\u00f8rste ordrene&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=111620"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111620\/revisions"}],"predecessor-version":[{"id":111684,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111620\/revisions\/111684"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=111620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=111620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=111620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}