{"id":111341,"date":"2026-10-27T18:49:22","date_gmt":"2026-10-27T18:49:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111341"},"modified":"2026-10-27T18:51:38","modified_gmt":"2026-10-27T18:51:38","slug":"min-maks-lagerstyring","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/","title":{"rendered":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Det begynner \u00e5 bli lite igjen i lagerkassen, s\u00e5 innkj\u00f8peren bestiller et nytt parti. Samtidig er produksjonen allerede i gang med en p\u00e5fyllingsordre for samme vare. Hver for seg virker begge beslutningene fornuftige. Til sammen skaper de et lager fabrikken ikke hadde behov for.<\/p>\n\n\n<p>Min-maks lagerstyring gir en fast regel for etterfylling: Et minimumsniv\u00e5 angir n\u00e5r du skal handle, og et maksimumsm\u00e5l angir hvilket niv\u00e5 du skal fylle opp til. Skal metoden fungere godt i produksjon, m\u00e5 du ta med b\u00e5de varer som allerede er p\u00e5 vei, og forpliktede behov \u2013 ikke bare det som ligger p\u00e5 hyllen.<\/p>\n\n\n<p>Deretter m\u00e5 du ta stilling til produksjonen. Hvis du produserer p\u00e5fyllet selv, m\u00e5 mengden f\u00e5 plass p\u00e5 maskinene sammen med kundeordrene. SkyPlanner APS legger den godkjente p\u00e5fyllingsordren inn i samme plan, med hensyn til kapasitet og materialer. Da ser du n\u00e5r den blir ferdig, uten \u00e5 m\u00e5tte sette opp en egen k\u00f8 manuelt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er min-maks lagerstyring?<\/h2>\n\n\n<p>Min-maks lagerstyring er en metode for etterfylling med to parametere for hver lagervare:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Minimum:<\/strong> terskelen som utl\u00f8ser en beslutning om etterfylling.<\/li><li><strong>Maksimum:<\/strong> m\u00e5let for lagerposisjonen som du fyller opp til.<\/li><\/ul>\n\n\n<p>Minimumsniv\u00e5et er ikke niv\u00e5et der du regner med \u00e5 g\u00e5 tom. Det skal gi tid til \u00e5 f\u00e5 inn p\u00e5fyll mens forbruket fortsetter. Maksimum er verken mengden du bestiller hver gang, eller en garanti for at den fysiske beholdningen aldri kan overstige niv\u00e5et.<\/p>\n\n\n<p>Med min-maks lagerstyring varierer bestillingsmengden med avstanden opp til m\u00e5let. Er m\u00e5let 600 stykk og den aktuelle lagerposisjonen 230, er utgangspunktet et p\u00e5fyll p\u00e5 370. Er lagerposisjonen 280, blir det i stedet 320.<\/p>\n\n\n<p>Dokumenter om etterfylling utl\u00f8ses \u00abunder minimum\u00bb eller \u00abved eller under minimum\u00bb. Systemer og interne regler kan behandle denne grensen ulikt. I eksemplene nedenfor utl\u00f8ses etterfylling n\u00e5r lagerposisjonen er <strong>under<\/strong> minimum.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Regn med lagerposisjonen, ikke bare lagerbeholdningen<\/h2>\n\n\n<p>Lagerbeholdningen viser hva som fysisk er p\u00e5 lager. Lagerposisjonen hjelper deg \u00e5 avgj\u00f8re om du trenger en ny p\u00e5fyllingsordre, n\u00e5r du ogs\u00e5 tar hensyn til ventede tilf\u00f8rsler og forpliktede behov.<\/p>\n\n\n<p>Hvis reglene for etterfylling inneb\u00e6rer at forpliktede behov trekkes fra, bruker du:<\/p>\n\n\n<p><strong>Lagerposisjon = brukbar lagerbeholdning + utest\u00e5ende p\u00e5fyll \u2212 forpliktede behov som inng\u00e5r i beregningen<\/strong><\/p>\n\n\n<p>Utest\u00e5ende p\u00e5fyll kan omfatte \u00e5pne innkj\u00f8psordrer, overf\u00f8ringer eller interne p\u00e5fyllingsordrer. Ta med hver tilf\u00f8rsel \u00e9n gang. Etter et delmottak skal du regne med mengden som gjenst\u00e5r \u00e5 motta, ikke den opprinnelige ordremengden.<\/p>\n\n\n<p>Avgrens beregningen f\u00f8r du begynner: \u00e9n vare, ett lagersted eller en avtalt gruppe lagersteder, \u00e9n m\u00e5leenhet og konsekvente tidsgrenser for tilf\u00f8rsler og behov. Hold varer i karantene og annen ubrukbar beholdning utenfor. Ikke trekk fra samme forpliktede behov to ganger. Hvis reservasjoner allerede er trukket fra startsaldoen, skal de ikke trekkes fra igjen.<\/p>\n\n\n<p>Det varierer hvilke behovskategorier som trekkes fra i ulike l\u00f8sninger. Det viktige er \u00e5 vite hva tallet omfatter, og bruke terskler som er satt ut fra det samme grunnlaget. Et minimumsniv\u00e5 beregnet etter \u00e9n definisjon kan ikke uten videre brukes med en annen. Det m\u00e5 vurderes p\u00e5 nytt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Et eksempel p\u00e5 min-maks lagerstyring i produksjon<\/h3>\n\n\n<p>Tenk deg en produsent som lagerf\u00f8rer en standardbrakett for gjentakende ordrer. Minimum er 300 stykk, og maksimumsm\u00e5let er 600. Reglene for etterfylling inneb\u00e6rer at forpliktede behov innenfor en avtalt planleggingsperiode trekkes fra.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Grunnlag<\/th><th>Mengde<\/th><th>Behandling<\/th><\/tr><\/thead><tbody><tr><td>Brukbare braketter p\u00e5 lager<\/td><td>180<\/td><td>Tas med som dagens beholdning<\/td><\/tr><tr><td>Utest\u00e5ende p\u00e5fyll som allerede er godkjent<\/td><td>200<\/td><td>Legges til \u00e9n gang som utest\u00e5ende p\u00e5fyll<\/td><\/tr><tr><td>Forpliktede behov som inng\u00e5r i denne vurderingen<\/td><td>150<\/td><td>Trekkes fra \u00e9n gang<\/td><\/tr><tr><td>Lagerposisjon<\/td><td>230<\/td><td>Sammenlignes med minimum p\u00e5 300<\/td><\/tr><tr><td>Ny p\u00e5fyllingsmengde<\/td><td>370<\/td><td>\u00d8ker lagerposisjonen fra 230 til 600<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Beregningen er <strong>180 + 200 \u2212 150 = 230<\/strong>. Siden 230 er under 300, tilsier regelen at det skal etterfylles. Utgangspunktet for bestillingsmengden er <strong>600 \u2212 230 = 370 stykk<\/strong>.<\/p>\n\n\n<p>Hvis du overser den eksisterende ordren p\u00e5 200 stykk, blir forslaget 570 stykk. Da bestiller du 200 stykk to ganger for \u00e5 dekke samme behov. Hvis du derimot overser de forpliktede behovene, blir lagerposisjonen 380, og etterfylling utl\u00f8ses ikke i det hele tatt.<\/p>\n\n\n<p>M\u00e5let beskriver nettoposisjonen etter at den nye ordren er lagt til, ikke n\u00f8dvendigvis beholdningen du vil ha n\u00e5r varene kommer inn. Forbruket fortsetter mens varene kj\u00f8pes inn eller produseres.<\/p>\n\n\n<h3 class=\"wp-block-heading\">En ordre p\u00e5 vei kan likevel komme for sent<\/h3>\n\n\n<p>Lagerposisjonen gir svar p\u00e5 hvor mye du trenger. Den viser ikke i seg selv at hvert behov er dekket p\u00e5 datoen det oppst\u00e5r.<\/p>\n\n\n<p>Anta at det i braketteksemplet trengs 120 stykk p\u00e5 tirsdag og ytterligere 30 p\u00e5 onsdag. De 180 brukbare brakettene dekker begge behovene. Men hvis alle de 200 brakettene fra den eksisterende p\u00e5fyllingsordren blir forsinket til etter at et nytt behov oppst\u00e5r, kan dette senere behovet fortsatt v\u00e6re udekket, selv om ordren er tatt med i den samlede lagerposisjonen.<\/p>\n\n\n<p>Sjekk datoene i tillegg til totalmengdene. \u00c5 fremskynde eller omplanlegge en eksisterende ordre kan v\u00e6re en mer fornuftig l\u00f8sning enn \u00e5 opprette enda en full p\u00e5fyllingsordre. En <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/\">sjekk av lagerdekningen<\/a> fordelt p\u00e5 datoer utfyller min-maks lagerstyring. Den erstatter ikke metodens terskel og m\u00e5l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Slik fastsetter du minimums- og maksimumsniv\u00e5er<\/h2>\n\n\n<p>Start med en vare som forbrukes jevnlig, og som har p\u00e5litelige data om forbruk og etterfylling. Fastsett niv\u00e5ene i sammenheng, men la hvert av dem ha sin egen funksjon.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sett minimum slik at det dekker ventetiden p\u00e5 p\u00e5fyll<\/h3>\n\n\n<p>Ved rimelig jevn ettersp\u00f8rsel er dette et praktisk utgangspunkt:<\/p>\n\n\n<p><strong>Minimum = forventet behov i ledetiden for etterfylling + sikkerhetslager<\/strong><\/p>\n\n\n<p>Bruk tiden frem til varene kan brukes, ikke bare leverand\u00f8rens transporttid eller maskinens bearbeidingstid. Godkjenning, innkj\u00f8p, venting p\u00e5 produksjonskapasitet og varemottak kan alle bidra til ventetiden.<\/p>\n\n\n<p>Tenk deg en vare med et forbruk p\u00e5 40 stykk per arbeidsdag. Etterfylling tar fem arbeidsdager, og bedriften har valgt en sikkerhetsbuffer p\u00e5 80 stykk. Forventet behov i ledetiden er 200 stykk. Det gir et forel\u00f8pig minimum p\u00e5 <strong>280 stykk<\/strong>.<\/p>\n\n\n<p>Bufferen p\u00e5 80 stykk er en forutsetning i dette eksemplet, ikke et anbefalt serviceniv\u00e5. Fastsett sikkerhetslageret ut fra variasjon og konsekvensene av \u00e5 g\u00e5 tom. En rimelig komponent som stopper sluttmonteringen, kan fortjene mer oppmerksomhet enn innkj\u00f8psverdien skulle tilsi.<\/p>\n\n\n<p>Det har ogs\u00e5 betydning hvor ofte niv\u00e5ene kontrolleres. \u00c5 f\u00f8lge niv\u00e5et kontinuerlig etter en fast regel er ikke det samme som \u00e5 sjekke en rapport \u00e9n gang i uken. Hvis niv\u00e5et kan falle under terskelen rett etter en kontroll, m\u00e5 du ta h\u00f8yde for den ekstra ventetiden f\u00f8r noen legger inn ordren. Ellers kan et tilsynelatende tilstrekkelig minimum utl\u00f8se handling for sent.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Velg maksimum ut fra \u00f8nsket syklus for etterfylling<\/h3>\n\n\n<p>Maksimum bestemmer hvilket niv\u00e5 du fyller lagerposisjonen opp til n\u00e5r terskelen passeres. Et h\u00f8yere maksimum gir som regel st\u00f8rre p\u00e5fyll og st\u00f8rre risiko knyttet til lagerholdet. Et lavere maksimum gir som regel hyppigere etterfylling og flere bestillinger eller omstillinger.<\/p>\n\n\n<p>I eksemplet med et forbruk p\u00e5 40 enheter per dag antar vi at du velger et maksimumsniv\u00e5 p\u00e5 600. Differansen mellom dette og minimumsniv\u00e5et p\u00e5 280 enheter er 320 enheter, tilsvarende \u00e5tte arbeidsdager med dette gjennomsnittsforbruket. Det gj\u00f8r det lettere \u00e5 forst\u00e5 den foresl\u00e5tte p\u00e5fyllingssyklusen, men beviser ikke at 600 er det rimeligste eller beste m\u00e5lniv\u00e5et.<\/p>\n\n\n<p>Vurder m\u00e5lniv\u00e5et opp mot lagerplass, holdbarhet, risiko for ukurans, arbeidskapital og partist\u00f8rrelser i produksjonen eller hos leverand\u00f8ren. En vare med lav oml\u00f8pshastighet og kort holdbarhet kan gi kostbart svinn selv om min-maks-intervallet ser fornuftig ut.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ta hensyn til bestillingsbegrensninger f\u00f8r ordren frigis<\/h3>\n\n\n<p>Den beregnede differansen er et utgangspunkt for mengden. Leverand\u00f8rens minimumskvantum, pakningsst\u00f8rrelser og begrensninger p\u00e5 produksjonspartier kan endre hvor mye du faktisk kan bestille.<\/p>\n\n\n<p>Hvis forslaget er 370 braketter, men de bare leveres i pakninger p\u00e5 50, gir avrunding oppover 400. Da havner du 30 enheter over det opprinnelige m\u00e5lniv\u00e5et. Vurder om du skal godta avviket, endre leveringsavtalen eller revidere p\u00e5fyllingsreglene. Ikke behandle \u00abmaksimalt lagerm\u00e5l\u00bb og \u00abmaksimal bestillingsmengde\u00bb som \u00e9n og samme innstilling: Det f\u00f8rste beskriver \u00f8nsket lagerposisjon, mens det andre begrenser den enkelte ordren.<\/p>\n\n\n<p>Registrer godkjent p\u00e5fylling som utest\u00e5ende tilf\u00f8rsel s\u00e5 snart som mulig. Det hindrer at den samme differansen bestilles p\u00e5 nytt ved neste gjennomgang eller av en annen innkj\u00f8per.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e5r min-maks fungerer \u2013 og n\u00e5r terskelverdier ikke er nok<\/h2>\n\n\n<p>Min-maks lagerstyring egner seg for lagervarer med gjentakende forbruk og en p\u00e5fyllingsprosess du kan f\u00f8lge opp: vanlige komponenter, standard delmontasjer eller forbruksvarer som brukes ofte. Styrken ligger i en konsekvent praksis. Alle kan se hvorfor p\u00e5fylling er n\u00f8dvendig, og hvordan mengden er fastsatt.<\/p>\n\n\n<p>Metoden blir mindre p\u00e5litelig n\u00e5r gjennomsnittet skjuler store behov p\u00e5 bestemte datoer. En komponent som bare brukes i enkelte kundepartier, kan kreve tidsfaset materialplanlegging fremfor et fast lagerintervall. For en reservedel som brukes sporadisk, kan lagerholdet ogs\u00e5 m\u00e5tte vurderes ut fra hvor kritisk delen er. Et lavt gjennomsnittsforbruk sier ikke noe om hvor kostbart det blir \u00e5 mangle reservedelen.<\/p>\n\n\n<p>Skill mellom disse beslektede metodene:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/sikkerhetslager\/\">Sikkerhetslager<\/a><\/strong> er bufferen mot usikkerhet. Det kan inng\u00e5 i fastsettelsen av minimumsniv\u00e5et, men definerer ikke hele min-maks-policyen.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/\">Optimal bestillingsmengde (EOQ)<\/a><\/strong> beregner en partist\u00f8rrelse ut fra forutsetninger om bestillings- og lagerholdskostnader. Med min-maks etterfyller du i stedet en mengde som tilsvarer den varierende differansen opp til et \u00f8vre m\u00e5lniv\u00e5.<\/li><li><strong>Produksjon mot lager<\/strong> inneb\u00e6rer \u00e5 produsere f\u00f8r kundeordrene kommer. Min-maks er \u00e9n mulig m\u00e5te \u00e5 styre p\u00e5fyllingen p\u00e5 innenfor denne strategien.<\/li><\/ul>\n\n\n<p>G\u00e5 gjennom niv\u00e5ene n\u00e5r forbruk, leverand\u00f8rytelse, ledetid i produksjonen eller produktets levetid endres. Unders\u00f8k gjentatte lagermangler og for store beholdninger f\u00f8r du bare utvider intervallet: Forsinkede varemottak, un\u00f8yaktige lagersaldoer og dobbeltbestillinger krever ulike tiltak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">F\u00e5 godkjent p\u00e5fylling inn i produksjonsplanen<\/h2>\n\n\n<p>For en egenprodusert del er \u00abbestill 370\u00bb bare halve beslutningen. Det sier ikke om brakettene blir ferdige f\u00f8r lageret g\u00e5r tomt, eller hvilke kundejobber som m\u00e5 flyttes for \u00e5 gi plass.<\/p>\n\n\n<p>Tenk deg at den godkjente p\u00e5fyllingen trenger det samme maskineringssenteret som en kundeordre som skal leveres denne uken. Setter du p\u00e5fyllingen \u00f8verst p\u00e5 en separat liste, skjules konflikten. F\u00e5r den derimot plass i den felles produksjonsplanen, blir avveiningen synlig mens det fortsatt er tid til \u00e5 ta en beslutning.<\/p>\n\n\n<p>Velg <strong>SkyPlanner APS<\/strong> for \u00e5 gj\u00f8re den <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">felles produksjonsplanen enklere \u00e5 h\u00e5ndtere<\/a>. Arcturus, systemets KI for produksjonsplanlegging, beregner planen ut fra konfigurerte arbeidsstasjoner, skift, prioriteringer, avhengigheter mellom operasjoner og materialer. Gantt-planen viser hvor p\u00e5fyllingen passer inn blant de andre ordrene, og n\u00e5r den forventes \u00e5 v\u00e6re ferdig. Du bruker mindre tid p\u00e5 \u00e5 samordne lagerlisten med k\u00f8en ved hver maskin og f\u00e5r et tydeligere grunnlag for \u00e5 sikre leveringene.<\/p>\n\n\n<p>SkyPlanner kan varsle om lav beholdning, slik at du blir bedt om \u00e5 opprette en p\u00e5fyllingsordre. Avklar min-maks-niv\u00e5er, p\u00e5fyllingsmengde og godkjenning med ansvarlig planlegger eller gjennom ERP\/MRP-systemet ditt. Bruk deretter SkyPlanner til \u00e5 planlegge det godkjente arbeidet sammen med kundeordrene, slik at lagerbeslutningen blir en del av fabrikkens felles produksjonsplan.<\/p>\n\n\n<p>N\u00e5r planlegging med materialhensyn er aktivert og opplysningene om de aktuelle materialene holdes oppdatert, tar beregningen ogs\u00e5 hensyn til om materialene er tilgjengelige n\u00e5r arbeidet som bruker dem, skal utf\u00f8res. Ankomstdatoer p\u00e5 innkj\u00f8psordrene inng\u00e5r i planleggingen for innkj\u00f8pte materialer. Hvis en ankomstdato eller prioritering endres, kan du beregne den felles planen p\u00e5 nytt og se konsekvensene i stedet for \u00e5 flytte hver ber\u00f8rte jobb manuelt.<\/p>\n\n\n<p><strong>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sitt \u00e5pne REST API.<\/strong> Du kan beholde systemet som styrer p\u00e5fyllingsreglene, og koble godkjente ordrer derfra til en produksjonsplan som tar hensyn til faktisk kapasitet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Slik ser det ut ved produksjon mot lager<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/opes-corporation\/\">Opes Corporation<\/a> produserer mot lager basert p\u00e5 forutsigbare kundeforpliktelser. F\u00f8r SkyPlanner brukte selskapet Excel og et separat lagerprogram, og dataene l\u00e5 p\u00e5 ulike steder. Gjennom en trinnvis integrasjon med Visma Nova ble denne informasjonen koblet til produksjonsplanleggingen.<\/p>\n\n\n<p>If\u00f8lge selskapet gir SkyPlanner teamet et tydelig bilde av kapasiteten. N\u00e5r det kommer sm\u00e5 hasteordrer eller pr\u00f8vekj\u00f8ringer i forbindelse med produktutvikling, viser den oppdaterte produksjonsplanen hvordan leveringstidene p\u00e5virkes. Endringer kan gj\u00f8res raskere, og planleggerne kan se hvordan arbeidet henger sammen.<\/p>\n\n\n<p>L\u00e6rdommen for p\u00e5fylling er denne: Et stabilt behov for lagervarer fjerner ikke behovet for \u00e5 h\u00e5ndtere avvik. Med en felles produksjonsplan kan teamet vurdere tilleggsarbeid opp mot eksisterende forpliktelser, fremfor \u00e5 styre hver k\u00f8 isolert.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Test p\u00e5fyllingsreglene med en konkret p\u00e5fylling<\/h2>\n\n\n<p>Velg \u00e9n vare som brukes regelmessig. Kontroller brukbar beholdning, utest\u00e5ende tilf\u00f8rsel, forpliktelsene som skal inng\u00e5 i beregningen, og ledetiden. Fastsett bestillingspunkt og m\u00e5lniv\u00e5 p\u00e5 dette grunnlaget, beregn differansen og sjekk n\u00e5r mengden faktisk trengs.<\/p>\n\n\n<p>Ta deretter med den godkjente p\u00e5fyllingen og en kundeordre som konkurrerer om kapasiteten, til en SkyPlanner-demo. Be om \u00e5 f\u00e5 se hvordan produksjonsrutene deres deler kapasitet, n\u00e5r p\u00e5fyllingen blir ferdig, og hva som skjer hvis en materialleveranse blir forsinket. Da ser du hva som skal til for \u00e5 gj\u00f8re en p\u00e5fyllingsbeslutning klar for produksjon, utover selve lagerberegningen.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo av SkyPlanner<\/a> for \u00e5 se n\u00e6rmere p\u00e5 situasjonen i din fabrikk, eller <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8v SkyPlanner med demodata<\/a> f\u00f8rst. M\u00e5let er enkelt: Fyll p\u00e5 det du trenger, unng\u00e5 \u00e5 bestille det to ganger, og gi arbeidet en plan fabrikken kan f\u00f8lge.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille? Hjem &raquo; Ressurser &raquo; Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille? Det begynner \u00e5 bli lite igjen i lagerkassen, s\u00e5 innkj\u00f8peren bestiller et nytt parti. Samtidig er produksjonen allerede i gang med en p\u00e5fyllingsordre for samme vare. Hver for seg virker begge beslutningene fornuftige. &#8230; <a title=\"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/\" aria-label=\"Read more about Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-111341","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlegging","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?<\/title>\n<meta name=\"description\" content=\"Sett min-maks-niv\u00e5er uten dobbeltbestilling. L\u00e6r hva som skal telles, hvor mye du skal etterfylle, og hvordan SkyPlanner planlegger godkjent arbeid.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?\" \/>\n<meta property=\"og:description\" content=\"Sett min-maks-niv\u00e5er uten dobbeltbestilling. L\u00e6r hva som skal telles, hvor mye du skal etterfylle, og hvordan SkyPlanner planlegger godkjent arbeid.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T18:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T18:51:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:51:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/\"},\"wordCount\":2208,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"articleSection\":[\"APS og planlegging\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/\",\"name\":\"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:51:38+00:00\",\"description\":\"Sett min-maks-niv\u00e5er uten dobbeltbestilling. L\u00e6r hva som skal telles, hvor mye du skal etterfylle, og hvordan SkyPlanner planlegger godkjent arbeid.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/min-maks-lagerstyring\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?","description":"Sett min-maks-niv\u00e5er uten dobbeltbestilling. L\u00e6r hva som skal telles, hvor mye du skal etterfylle, og hvordan SkyPlanner planlegger godkjent arbeid.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/","og_locale":"nb_NO","og_type":"article","og_title":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?","og_description":"Sett min-maks-niv\u00e5er uten dobbeltbestilling. L\u00e6r hva som skal telles, hvor mye du skal etterfylle, og hvordan SkyPlanner planlegger godkjent arbeid.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T18:49:22+00:00","article_modified_time":"2026-10-27T18:51:38+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:51:38+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/"},"wordCount":2208,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","articleSection":["APS og planlegging","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/","name":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:51:38+00:00","description":"Sett min-maks-niv\u00e5er uten dobbeltbestilling. L\u00e6r hva som skal telles, hvor mye du skal etterfylle, og hvordan SkyPlanner planlegger godkjent arbeid.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","width":1672,"height":941,"caption":"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/min-maks-lagerstyring\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille? Hjem &raquo; Ressurser &raquo; Min-maks lagerstyring: N\u00e5r og hvor mye skal du bestille? Det begynner \u00e5 bli lite igjen i lagerkassen, s\u00e5 innkj\u00f8peren bestiller et nytt parti. Samtidig er produksjonen allerede i gang med en p\u00e5fyllingsordre for samme vare. Hver for seg virker begge beslutningene fornuftige.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=111341"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111341\/revisions"}],"predecessor-version":[{"id":111406,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111341\/revisions\/111406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/111344"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=111341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=111341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=111341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}