{"id":111248,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111248"},"modified":"2026-10-27T16:33:41","modified_gmt":"2026-10-27T16:33:41","slug":"lagerdekning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/","title":{"rendered":"Lagerdekning i produksjonen: Holder lageret?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Lagerdekning i produksjonen: Holder lageret?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Lagerdekning i produksjonen: Holder lageret?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Lagerrapporten sier at du har nok komponenter til syv arbeidsdager. Neste levering er ventet p\u00e5 fredag. Likevel er det ikke nok til \u00e5 starte torsdagens produksjonsordre med mengden den krever.<\/p>\n\n\n<p>Det er ingen motsetning her: Syv dager med gjennomsnittlig forbruk er ikke det samme som \u00e5 dekke ordrene som faktisk skal gjennom fabrikken. En stor batch, materialer som venter p\u00e5 kvalitetsgodkjenning, eller lager som allerede er reservert til annet arbeid, kan endre svaret.<\/p>\n\n\n<p>Lagerdekning hjelper deg \u00e5 oppdage mangelen f\u00f8r den f\u00f8rer til produksjonsstans. I produksjonen er det nyttige sp\u00f8rsm\u00e5let konkret: <strong>Hvilket kommende behov kan vi ikke lenger dekke, og kommer p\u00e5fyll som kan brukes i produksjonen, tidsnok?<\/strong> SkyPlanner APS kobler materialtilgjengelighet til produksjonsplanen, slik at du kan ta hensyn til b\u00e5de maskinkapasitet, leveringsforpliktelser og lager n\u00e5r du velger tiltak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er lagerdekning i produksjonen?<\/h2>\n\n\n<p>Lagerdekning angir hvor lenge en bestemt lagermengde kan dekke behovet. Den uttrykkes ofte i dager eller uker. I produksjonen kan behovet gjelde komponenter eller r\u00e5varer til kommende produksjonsjobber, ikke ferdigvarer som selges til kunder.<\/p>\n\n\n<p>Tallet m\u00e5 ha et tydelig beregningsgrunnlag. Dekningen for \u00e9n komponent ved \u00e9n fabrikk er noe annet enn et lagerm\u00e5l for hele virksomheten. Dekning basert p\u00e5 det som allerede er tilgjengelig p\u00e5 lager, er ogs\u00e5 noe annet enn dekning som inkluderer forventede varemottak.<\/p>\n\n\n<p>Ved jevnt forbruk kan du bruke denne formelen for et raskt anslag:<\/p>\n\n\n<p><strong>Lagerdekning = brukbar lagermengde \u00f7 forbruk per dag<\/strong><\/p>\n\n\n<p>Bruk samme enheter og tidsgrunnlag gjennom hele beregningen. Med 420 brukbare komponenter p\u00e5 lager og et gjennomsnittlig forbruk p\u00e5 60 komponenter per arbeidsdag blir anslaget syv arbeidsdager. Ikke sammenlign dette direkte med en leverand\u00f8rledetid oppgitt i kalenderdager uten f\u00f8rst \u00e5 ta hensyn til forskjellen mellom kalenderne.<\/p>\n\n\n<p>Dette anslaget er nyttig for \u00e5 finne materialer som trenger oppf\u00f8lging. N\u00e5r forbruket varierer fra ordre til ordre, b\u00f8r du i stedet beregne dekningen fremover ut fra daterte behov. En komponent som brukes i store batcher, tas ikke ut fra lager i det jevne daglige tempoet som gjennomsnittet antyder.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lagerdekning er ikke lageroml\u00f8pshastighet eller DIO<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/lageromlopshastighet\/\">Lageroml\u00f8pshastighet<\/a> og gjennomsnittlig lagringstid i dager, eller DIO, beskriver lagerbevegelser eller lagringstid ut fra \u00f8konomiske data for en periode. De er nyttige for \u00e5 vurdere lagerstyringen, men forteller ikke planleggeren om en bestemt komponent vil v\u00e6re tilgjengelig til torsdagens jobb.<\/p>\n\n\n<p>Den vurderingen krever mengder for samme artikkel og datoene de trengs. Ikke del et antall komponenter p\u00e5 varekostnaden, og ikke anta at et historisk m\u00e5l p\u00e5 lagringstid viser at materialene vil v\u00e6re klare til fremtidige jobber.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Start med det produksjonen faktisk kan bruke<\/h2>\n\n\n<p>Avstem inng\u00e5ende beholdning f\u00f8r du beregner lagerdekningen. En fysisk telling kan inkludere materialer som finnes p\u00e5 lager, men som ikke er tilgjengelige for arbeidet du vurderer.<\/p>\n\n\n<p>Skill mellom fire ting:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Fysisk lagerbeholdning:<\/strong> mengden som er registrert som fysisk til stede p\u00e5 den aktuelle lokasjonen.<\/li><li><strong>Utilgjengelig beholdning:<\/strong> materialer som venter p\u00e5 kvalitetsgodkjenning, skadde varer, utg\u00e5tte materialer eller materialer med en spesifikasjon som ikke kan brukes til jobben.<\/li><li><strong>Reservert beholdning:<\/strong> materialer som er satt av til annet arbeid, og som beregningen m\u00e5 ta hensyn til.<\/li><li><strong>Forventede varemottak:<\/strong> mengder som kan bli tilgjengelige senere, ikke varer som allerede finnes p\u00e5 lager.<\/li><\/ul>\n\n\n<p>Det avgj\u00f8rende er at inng\u00e5ende beholdning og behovslisten bygger p\u00e5 samme grunnlag. Hvis en reservasjon allerede er trukket fra inng\u00e5ende beholdning, m\u00e5 du ikke trekke fra det samme behovet igjen senere. Starter du derimot med brukbar beholdning f\u00f8r reservasjoner er trukket fra, m\u00e5 du ta med de utest\u00e5ende behovene som skal forbruke den.<\/p>\n\n\n<p>N\u00e5r et system for eksempel viser \u00abfri beholdning\u00bb, m\u00e5 du unders\u00f8ke hva som allerede er trukket fra for \u00e5 komme frem til tallet. Trekker du alle \u00e5pne ordrer fra en beholdning som allerede er redusert med disse ordrene, skaper du en mangel som ikke finnes.<\/p>\n\n\n<p>Skill ogs\u00e5 mellom et varsel om at beholdningen g\u00e5r under <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/sikkerhetslager\/\">sikkerhetslageret<\/a>, og en fysisk mangel. Det kan v\u00e6re n\u00f8dvendig \u00e5 handle n\u00e5r beholdningen faller under en fastsatt buffer, selv om alle jobber fortsatt er dekket. Oppgi hvilken grense dekningstallet gjelder: n\u00e5r bufferen n\u00e5s, eller n\u00e5r et behov ikke lenger kan dekkes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Beregn lagerdekningen fremover ut fra kommende jobber<\/h2>\n\n\n<p>For materialer med varierende produksjonsbehov g\u00e5r du gjennom behovene i tidsrekkef\u00f8lge. Start med den avstemte brukbare beholdningen. Trekk fra hvert behov som inng\u00e5r i beregningen n\u00e5r materialet trengs, og legg f\u00f8rst til et varemottak n\u00e5r mengden forventes \u00e5 kunne brukes.<\/p>\n\n\n<p>Den l\u00f8pende beregningen blir:<\/p>\n\n\n<p><strong>Forventet beholdning = brukbar inng\u00e5ende beholdning + mengder fra mottak som forventes \u00e5 v\u00e6re brukbare innen dette tidspunktet \u2212 behov som inng\u00e5r i beregningen frem til dette tidspunktet<\/strong><\/p>\n\n\n<p>Finn det f\u00f8rste behovet som den tilgjengelige mengden ikke kan dekke fullt ut. Det er dette tidspunktet som er avgj\u00f8rende for \u00e5 forebygge materialmangel, selv om et senere varemottak f\u00e5r beholdningen ved ukeslutt til \u00e5 se god ut.<\/p>\n\n\n<p>Bruk datoen materialet trengs, ikke automatisk datoen den ferdige ordren skal sendes. Et innkj\u00f8pt emne som trengs til maskinering p\u00e5 tirsdag, kan ikke vente til sammenstillingen sendes p\u00e5 fredag.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Eksempel: syv dagers dekning i gjennomsnitt, men mangel p\u00e5 torsdag<\/h3>\n\n\n<p>Tenk deg en produsent som sjekker \u00e9n innkj\u00f8pt komponent mandag morgen. Den fysiske beholdningen er 600 stykk. Av disse venter 100 p\u00e5 kvalitetsgodkjenning, og 80 er reservert til annet arbeid som ikke inng\u00e5r i dette eksemplet. Brukbar inng\u00e5ende beholdning for jobbene nedenfor er derfor 420 stykk.<\/p>\n\n\n<p>Jobbene som inng\u00e5r i beregningen, krever 120 stykk p\u00e5 mandag, 180 p\u00e5 tirsdag og 160 p\u00e5 torsdag. Disse behovene er ikke allerede trukket fra den inng\u00e5ende beholdningen p\u00e5 420 stykk. En innkj\u00f8psleveranse p\u00e5 200 stykk forventes \u00e5 v\u00e6re klar til bruk fredag morgen.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tidspunkt i planen<\/th><th>Behov eller mottak klart til bruk<\/th><th>Forventet beholdning<\/th><\/tr><\/thead><tbody><tr><td>Mandag morgen<\/td><td>Brukbar inng\u00e5ende beholdning<\/td><td>420 stykk<\/td><\/tr><tr><td>Mandagens jobb<\/td><td>Behov: 120 stykk<\/td><td>300 stykk<\/td><\/tr><tr><td>Tirsdagens jobb<\/td><td>Behov: 180 stykk<\/td><td>120 stykk<\/td><\/tr><tr><td>Torsdagens jobb<\/td><td>Behov: 160 stykk<\/td><td>Mangler 40 stykk<\/td><\/tr><tr><td>Fredagens varemottak<\/td><td>200 stykk blir klare til bruk<\/td><td>160 stykk etter at alle oppf\u00f8rte behov er dekket<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Med det siste gjennomsnittsforbruket p\u00e5 60 stykk per arbeidsdag ser inng\u00e5ende beholdning ut til \u00e5 gi syv arbeidsdagers dekning. De faktiske jobbene avdekker noe som haster mer: Det mangler 40 stykk til torsdagens behov. Fredagens varemottak dekker ikke dette i tide.<\/p>\n\n\n<p>Den siste raden er en fremskriving for planleggingen, ikke en p\u00e5stand om at produksjonen kan ta ut varer fra en negativ beholdning. Den forutsetter at det udekkede behovet fra torsdag fortsatt skal oppfylles. N\u00e5r jobben flyttes, m\u00e5 det faktiske materialbehovet og ferdigstillelsesdatoen flyttes med den.<\/p>\n\n\n<p>N\u00e5 kan innkj\u00f8p f\u00e5 en presis beskjed: Skaff minst de 40 manglende stykkene, klare til bruk f\u00f8r operasjonen som trenger dem p\u00e5 torsdag, eller avtal en annen produksjonsplan. \u00abVi har lager for syv dager\u00bb ville ikke formidlet hvor mye det haster.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ta med p\u00e5fyll f\u00f8rst n\u00e5r det kan brukes<\/h2>\n\n\n<p>En innkj\u00f8psordre kan dekke mengden som vil mangle, uten \u00e5 sikre at materialene er tilgjengelige i tide. Sjekk om den forventede datoen gjelder ankomst til fabrikken, ferdig registrert varemottak eller materialer frigitt til produksjon. Varemottak, kontroll og intern transport kan gi et tidsgap mellom disse hendelsene.<\/p>\n\n\n<p>For en kritisk jobb kan selv en inndeling per dag bli for grov. En levering som ventes sent p\u00e5 torsdag, kan ikke dekke en operasjon torsdag morgen. Bruk mer presise tidspunkter n\u00e5r forskjellen p\u00e5virker beslutningen.<\/p>\n\n\n<p>Skill tydelig mellom to oversikter: hva dagens brukbare beholdning dekker alene, og hva planen dekker n\u00e5r p\u00e5litelige forventede varemottak tas med. Da ser du b\u00e5de hvor avhengig planen er av p\u00e5fyll, og hva en forsinkelse vil bety.<\/p>\n\n\n<p>Hvis behovene er dekket i hele perioden du har unders\u00f8kt, rapporterer du \u00abdekket ut planleggingshorisonten\u00bb. Det betyr ikke at lageret vil vare i det uendelige. Hvis det ikke er noe forventet forbruk, gir heller ikke divisjon med null et meningsfullt grunnlag for \u00e5 beslutte p\u00e5fyll.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hvor stor lagerdekning er nok?<\/h3>\n\n\n<p>Det finnes ikke ett m\u00e5ltall som passer for alle materialer i produksjonen. Hvor stor buffer som trengs, avhenger av tiden det tar \u00e5 f\u00e5 p\u00e5fyll, variasjon, kritikalitet, holdbarhet og konsekvensene av en mangel.<\/p>\n\n\n<p>En fornuftig f\u00f8rste sjekk er om den brukbare tilgangen dekker behovet frem til neste p\u00e5litelige p\u00e5fyll kan tas i bruk, med bufferen lagerpolicyen krever. En rimelig komponent som kan stoppe en hel montering, kan fortjene mer oppmerksomhet enn en langt dyrere vare som er enkel \u00e5 erstatte.<\/p>\n\n\n<p>Ikke kj\u00f8p mer av alle varer bare for \u00e5 forbedre tallet for lagerdekning. Unders\u00f8k om den tilsynelatende risikoen skyldes en reell mangel i tilgangen, feil lagerbeholdning, utdaterte behov eller en urealistisk mottaksdato.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Velg tiltak som sikrer produksjon og leveranser<\/h2>\n\n\n<p>N\u00e5r du har funnet det f\u00f8rste behovet som ikke er dekket, m\u00e5 du avgj\u00f8re hvilken endring som l\u00f8ser problemet. I eksemplet kan en tidligere dellevering dekke mangelen p\u00e5 40 stykker. I andre situasjoner kan l\u00f8sningen v\u00e6re et godkjent alternativt materiale, en endret batchst\u00f8rrelse eller en annen rekkef\u00f8lge p\u00e5 jobbene.<\/p>\n\n\n<p>Alle alternativene f\u00e5r konsekvenser for produksjonen. Et alternativt materiale trenger n\u00f8dvendig teknisk godkjenning. En mindre batch kan gi mer omstillingsarbeid. \u00c5 fremskynde en annen ordre kan holde maskinen i gang, men samtidig forsinke leveransen til kunden som opprinnelig skulle f\u00e5 sitt materiale bearbeidet i dette tidsrommet.<\/p>\n\n\n<p>Derfor b\u00f8r vurderingen av lagerdekning f\u00f8lges opp i <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">produksjonsplanleggingen<\/a>, ikke stoppe ved et innkj\u00f8pstiltak. Selv om leverand\u00f8ren fremskynder de manglende delene, kan det planlagte tidsrommet p\u00e5 maskinen ha g\u00e5tt tapt, og de etterf\u00f8lgende operasjonene lar seg kanskje ikke lenger fullf\u00f8re f\u00f8r utsending.<\/p>\n\n\n<p>Vurder begge sp\u00f8rsm\u00e5lene samlet: <strong>Vil materialet v\u00e6re klart, og kan resten av arbeidet fortsatt fullf\u00f8res i tide?<\/strong> Da unng\u00e5r du at en isolert sett fornuftig lagerbeslutning skaper et annet leveringsproblem uten at det blir oppdaget.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lag en gjennomf\u00f8rbar plan i SkyPlanner ut fra materialtilgangen<\/h2>\n\n\n<p>SkyPlanner APS tar med materialer og forventede innkj\u00f8psleveranser i den samme planberegningen som arbeidsstasjoner, skift, prioriteringer og avhengigheter mellom operasjoner. N\u00e5r planlegging med materialhensyn er aktivert gjennom regelen Ta hensyn til materialene, kontrollerer SkyPlanner tilgjengeligheten til materialene som er definert for arbeidet, n\u00e5r jobbene som bruker dem, planlegges.<\/p>\n\n\n<p>Fordelen er at materialbeslutningen ikke blir liggende i en separat lagerliste. Arcturus, SkyPlanners KI for produksjonsplanlegging, beregner produksjonsplanen ut fra de oppdaterte opplysningene om tilgjengelighet og kapasiteten som er konfigurert. Gantt-tidslinjen viser den beregnede arbeidsrekkef\u00f8lgen, slik at du kan se konsekvensene for leveransene uten \u00e5 bygge opp hver maskink\u00f8 p\u00e5 nytt manuelt.<\/p>\n\n\n<p>Leveringsdatoene p\u00e5 innkj\u00f8psordrene har en praktisk funksjon i denne planen. SkyPlanner bruker leveringsdatoen som er registrert p\u00e5 en innkj\u00f8psordre, som forventet tidspunkt for n\u00e5r materialet er tilgjengelig. N\u00e5r materialet ankommer og innkj\u00f8psordren bekreftes som Levert, oppdateres lagerbeholdningen. Dermed holdes forventet tilgang og mottatt beholdning atskilt.<\/p>\n\n\n<p>La oss g\u00e5 tilbake til mangelen p\u00e5 torsdag. N\u00e5r mottaket ventes p\u00e5 fredag, m\u00e5 du s\u00f8rge for at denne ankomstinformasjonen er oppdatert, og beregne planen p\u00e5 nytt. Se hvor det ber\u00f8rte arbeidet n\u00e5 passer inn blant de andre ordrene, ogs\u00e5 med tanke p\u00e5 operasjonene som f\u00f8lger etter. Hvis innkj\u00f8p sikrer en tidligere levering, bruker du den reviderte tilgjengeligheten til \u00e5 vurdere den nye planen, i stedet for \u00e5 anta at den opprinnelig lovede leveringsdatoen automatisk kan overholdes.<\/p>\n\n\n<p>Du setter prioriteringene; Arcturus tar seg av planberegningen. Det gir planlegging og innkj\u00f8p et felles grunnlag for \u00e5 velge tiltak, samtidig som mindre tid g\u00e5r med til \u00e5 samordne lagerlister og separate maskinplaner.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hva dette endret for Eskomatic<\/h3>\n\n\n<p>Eskomatic, som utf\u00f8rer maskinering p\u00e5 oppdrag, hadde i stor grad manuelt h\u00e5ndterte arbeidsk\u00f8er og begrenset oversikt over materialtilgangen i sitt eldre produksjonsstyringssystem. En mangel kunne bli oppdaget s\u00e5 tett opp mot planlagt jobbstart at det var lite handlingsrom igjen.<\/p>\n\n\n<p>Da Eskomatic tok i bruk SkyPlanner, ble den daglige planleggingen mer oversiktlig med en visuell arbeidsk\u00f8 i Gantt-diagrammet, automatisk planlegging av belastningen og bedre oversikt over materialmangler. <a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/eskomatic\/\">Eskomatic rapporterer<\/a> om f\u00e6rre produksjonsstopp som f\u00f8lge av manglende materialer og mer presis fastsetting av leveringsdatoer.<\/p>\n\n\n<p>Erfaringen viser hvorfor det er viktig \u00e5 knytte materialene til produksjonsplanen: Planleggerne kan h\u00e5ndtere konsekvensene for arbeidet og kundel\u00f8ftene, i stedet for \u00e5 oppdage mangelen ved maskinen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se hva en forsinket materialleveranse ville bety i din fabrikk<\/h2>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system gjennom sitt \u00e5pne REST API. Du kan koble eksisterende ordre- og materialdata til produksjonsplanlegging som tar hensyn til begrenset kapasitet, i stedet for \u00e5 vedlikeholde separate k\u00f8er som m\u00e5 samordnes manuelt.<\/p>\n\n\n<p>Til en m\u00e5lrettet demo av SkyPlanner kan du ta med \u00e9n viktig komponent, jobbene som bruker den, og et nylig eksempel p\u00e5 en forsinket materialleveranse. Be om \u00e5 f\u00e5 se hvordan den registrerte ankomstdatoen p\u00e5virker den felles planen og leveringsdatoene. Det er en praktisk m\u00e5te \u00e5 vurdere verdien utover selve tallet for lagerdekning.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo av SkyPlanner<\/a> for \u00e5 se n\u00e6rmere p\u00e5 din produksjonssituasjon, eller <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8v SkyPlanner med demodata<\/a> for \u00e5 utforske arbeidsflyten for produksjonsplanlegging f\u00f8rst.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Lagerdekning i produksjonen: Holder lageret? Hjem &raquo; Ressurser &raquo; Lagerdekning i produksjonen: Holder lageret? Lagerrapporten sier at du har nok komponenter til syv arbeidsdager. Neste levering er ventet p\u00e5 fredag. Likevel er det ikke nok til \u00e5 starte torsdagens produksjonsordre med mengden den krever. Det er ingen motsetning her: Syv dager med gjennomsnittlig forbruk er &#8230; <a title=\"Lagerdekning i produksjonen: Holder lageret?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/\" aria-label=\"Read more about Lagerdekning i produksjonen: Holder lageret?\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-111248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlegging","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lagerdekning i produksjonen: Holder lageret?<\/title>\n<meta name=\"description\" content=\"Finn f\u00f8rste materialmangel f\u00f8r produksjonen stopper. Beregn lagerdekning for kommende jobber og knytt materialtilgjengelighet til planen i SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lagerdekning i produksjonen: Holder lageret?\" \/>\n<meta property=\"og:description\" content=\"Finn f\u00f8rste materialmangel f\u00f8r produksjonen stopper. Beregn lagerdekning for kommende jobber og knytt materialtilgjengelighet til planen i SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:33:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Lagerdekning i produksjonen: Holder lageret?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:33:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/\"},\"wordCount\":2160,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS og planlegging\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/\",\"name\":\"Lagerdekning i produksjonen: Holder lageret?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:33:41+00:00\",\"description\":\"Finn f\u00f8rste materialmangel f\u00f8r produksjonen stopper. Beregn lagerdekning for kommende jobber og knytt materialtilgjengelighet til planen i SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/lagerdekning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lagerdekning i produksjonen: Holder lageret?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lagerdekning i produksjonen: Holder lageret?","description":"Finn f\u00f8rste materialmangel f\u00f8r produksjonen stopper. Beregn lagerdekning for kommende jobber og knytt materialtilgjengelighet til planen i SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/","og_locale":"nb_NO","og_type":"article","og_title":"Lagerdekning i produksjonen: Holder lageret?","og_description":"Finn f\u00f8rste materialmangel f\u00f8r produksjonen stopper. Beregn lagerdekning for kommende jobber og knytt materialtilgjengelighet til planen i SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:33:41+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Lagerdekning i produksjonen: Holder lageret?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:33:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/"},"wordCount":2160,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS og planlegging","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/","name":"Lagerdekning i produksjonen: Holder lageret?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:33:41+00:00","description":"Finn f\u00f8rste materialmangel f\u00f8r produksjonen stopper. Beregn lagerdekning for kommende jobber og knytt materialtilgjengelighet til planen i SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/lagerdekning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Lagerdekning i produksjonen: Holder lageret?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Lagerdekning i produksjonen: Holder lageret? Hjem &raquo; Ressurser &raquo; Lagerdekning i produksjonen: Holder lageret? Lagerrapporten sier at du har nok komponenter til syv arbeidsdager. Neste levering er ventet p\u00e5 fredag. Likevel er det ikke nok til \u00e5 starte torsdagens produksjonsordre med mengden den krever. Det er ingen motsetning her: Syv dager med gjennomsnittlig forbruk er&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=111248"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111248\/revisions"}],"predecessor-version":[{"id":111312,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/111248\/revisions\/111312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=111248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=111248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=111248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}