{"id":110421,"date":"2026-10-26T00:03:20","date_gmt":"2026-10-26T00:03:20","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110421"},"modified":"2026-10-26T00:05:31","modified_gmt":"2026-10-26T00:05:31","slug":"pfep","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/","title":{"rendered":"Plan for Every Part (PFEP): Deler klare til produksjon"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Plan for Every Part (PFEP): Deler klare til produksjon<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Plan for Every Part (PFEP): Deler klare til produksjon<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Delen finnes i bygget. Innkj\u00f8p ser den i lagerrapporten. Likevel venter operat\u00f8ren, fordi ingen har avtalt hvordan delen skal komme frem til denne arbeidsstasjonen, hvilken beholder den skal ligge i, eller hvem som fyller p\u00e5 n\u00e5r beholderen er tom.<\/p>\n\n\n<p>Plan for Every Part, forkortet PFEP, tetter disse hullene med en plan for hver enkelt del. Instruksjoner for forsyning, lagring, h\u00e5ndtering og levering til bruksstedet samles i et informasjonsgrunnlag som holdes oppdatert. Gevinsten er mindre leting, f\u00e6rre improviserte leveranser og f\u00e6rre avbrudd fordi en avtale om overlevering bare fantes i hodet til noen.<\/p>\n\n\n<p>Men en p\u00e5litelig plan for delene trenger ogs\u00e5 en p\u00e5litelig produksjonsplan. Bruk PFEP til \u00e5 definere hvordan materialene kommer frem dit arbeidet utf\u00f8res, og SkyPlanner APS til \u00e5 knytte materialtilgjengeligheten til ordrene, operasjonene og kapasiteten som trenger materialene. Da kan teamet bruke mindre tid p\u00e5 \u00e5 avstemme lister og mer tid p\u00e5 \u00e5 holde produksjonen i gang.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er en plan for hver enkelt del?<\/h2>\n\n\n<p>En plan for hver enkelt del beskriver i detalj hvordan hver del som brukes i produksjonen, skal skaffes til veie, lagres, h\u00e5ndteres og leveres til bruksstedet. Den vanlige forkortelsen er PFEP. Planen st\u00f8tter materialflyten i lean produksjon ved \u00e5 tydeliggj\u00f8re de praktiske kravene: hvilken del det gjelder, hvor mye som trengs, hvor den skal, hvordan den kommer dit, og hva som utl\u00f8ser p\u00e5fylling.<\/p>\n\n\n<p>Et delenummer og en lagerbeholdning er ikke nok. De identifiserer varen og den registrerte mengden, men sier ikke om en kartong fra leverand\u00f8ren kan g\u00e5 rett til linjen, om delen m\u00e5 beskyttes under h\u00e5ndtering, eller hvordan nattskiftet f\u00e5r en ny beholder.<\/p>\n\n\n<p>PFEP kombinerer disse opplysningene med beslutninger om praktisk gjennomf\u00f8ring og tydelig ansvar. En nyttig test er om noen som ikke kjenner delen, kan f\u00f8lge den avtalte veien fra mottak til bruk uten stadig \u00e5 m\u00e5tte sp\u00f8rre hvordan ting vanligvis gj\u00f8res.<\/p>\n\n\n<p>Skill mellom rollen til PFEP og rollen til beslektede verkt\u00f8y:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>En stykkliste angir hvilke komponenter og mengder som trengs for \u00e5 lage et produkt. PFEP angir hvordan forsyningen av disse komponentene skal foreg\u00e5, og hvordan de skal h\u00e5ndteres.<\/li><li>Lagerregistreringer viser beholdning og bevegelser. PFEP angir reglene og de fysiske l\u00f8sningene som ligger bak denne flyten.<\/li><li>Ved <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/kitting-i-produksjonen\/\">kitting<\/a> samles og kontrolleres delene til et bestemt arbeid. PFEP kan angi at en del skal leveres i et sett i stedet for \u00e5 ligge i en beholder ved linjen som fylles p\u00e5.<\/li><li>ABC-analyse bidrar til \u00e5 prioritere lageroppf\u00f8lgingen etter forbruksverdi. Klassifiseringen kan brukes som grunnlag for PFEP, men definerer ikke delens vei frem til operat\u00f8ren.<\/li><\/ul>\n\n\n<p>Disse verkt\u00f8yene b\u00f8r bruke de samme identifikatorene, ikke konkurrere som ulike versjoner av den samme listen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvilke opplysninger h\u00f8rer hjemme i en PFEP?<\/h2>\n\n\n<p>Ta med opplysningene som trengs for \u00e5 beslutte hvordan forsyningen skal fungere, og holde beslutningen oppdatert. Tabellen nedenfor er et praktisk utgangspunkt, ikke et krav om et bestemt antall kolonner.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Informasjonsgruppe<\/th><th>Opplysninger som m\u00e5 avklares<\/th><th>Hva opplysningene gir grunnlag for<\/th><\/tr><\/thead><tbody><tr><td>Delens identitet<\/td><td>Unik kode, beskrivelse, aktuell revisjon, lagerenhet og omregningsfaktor fra innkj\u00f8psenhet<\/td><td>Varemottak, lager og produksjon identifiserer samme brukbare vare og mengde.<\/td><\/tr><tr><td>Behov og bruk<\/td><td>Produkter eller operasjoner som bruker delen, forbruksm\u00f8nster og brukssteder<\/td><td>Forsyningen tilpasses hvor og n\u00e5r forbruket faktisk skjer.<\/td><\/tr><tr><td>Forsyningskilde og p\u00e5fylling<\/td><td>Leverand\u00f8r eller intern forsyningskilde, tid for p\u00e5fylling, bestillingshyppighet og begrensninger ved bestilling<\/td><td>Teamet vet hva som utl\u00f8ser ny forsyning, og hvor lang tid den tar.<\/td><\/tr><tr><td>Emballasje og h\u00e5ndtering<\/td><td>Antall per leverand\u00f8rpakning, antall per intern beholder, m\u00e5l, vekt og behov for beskyttelse<\/td><td>Beholderne passer til lagerplassen, h\u00e5ndteringsmetoden og arbeidsplassen.<\/td><\/tr><tr><td>Lagring og levering<\/td><td>Lageradresse, plassering ved linjen, leveringsmetode, leveringshyppighet og ansvarlig rolle<\/td><td>Delen har en avtalt fysisk vei fra mottak til forbruk.<\/td><\/tr><tr><td>Styring og vedlikehold<\/td><td>Signal for p\u00e5fylling, regler for bufferlager, kontaktperson ved avvik, dataansvarlig og siste validering<\/td><td>Noen griper inn f\u00f8r forsyningen svikter, og holder instruksjonene oppdatert.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Hold opplysninger om selve delen atskilt fra lokale forsyningsl\u00f8sninger. Hvis den samme tetningen brukes i flere celler, kan hver celle trenge sitt eget antall per beholder, sin egen leveringshyppighet og sitt eget signal for p\u00e5fylling. \u00c9n varekode kan derfor ha flere tilknyttede registreringer for ulike brukssteder, uten at det oppst\u00e5r motstridende definisjoner av delen.<\/p>\n\n\n<p>Skill ogs\u00e5 mellom faste regler og dagens situasjon. Leverand\u00f8rens standard ledetid er planleggingsdata, mens et nytt ankomsttidspunkt for en forsinket forsendelse er et aktuelt avvik. \u00d8nsket beholdning ved linjen er en fast regel, mens den brukbare mengden som finnes der n\u00e5, er driftsinformasjon. Begge deler er viktige, men en oppdatering av det ene retter ikke automatisk opp det andre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bygg den f\u00f8rste PFEP-en rundt en faktisk materialflyt<\/h2>\n\n\n<p>Begynn med et avgrenset produksjonsomr\u00e5de eller en produktfamilie der gjentatte mangler, leting eller un\u00f8dvendig h\u00e5ndtering gj\u00f8r problemet synlig. M\u00e5let p\u00e5 sikt kan v\u00e6re \u00e5 dekke alle deler, men en avgrenset pilot lar teamet teste metoden f\u00f8r usikre antakelser spres til hele fabrikken.<\/p>\n\n\n<h3 class=\"wp-block-heading\">F\u00f8lg delen, ikke bare registreringene<\/h3>\n\n\n<p>F\u00f8lg utvalgte deler fra mottak via lager til stedet der de faktisk brukes. Involver innkj\u00f8p, lageransatte, de som h\u00e5ndterer materialene, og de som bruker delene. Sammenlign det som skjer, med registreringene i ERP-systemet, lokale lister og instruksjoner.<\/p>\n\n\n<p>Se s\u00e6rlig etter uformelle ordninger: en ekstra lagerplass, en mindre beholder som brukes p\u00e5 ett skift, eller en arbeidsleder som bestiller n\u00e5r noen sp\u00f8r. Dette er ofte de manglende leddene som ikke kommer frem i et ryddig uttrekk av varedata.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kontroller detaljene som p\u00e5virker beslutningen<\/h3>\n\n\n<p>Kontroller koder, revisjoner, enheter og plasseringer f\u00f8r dere bestemmer mengdene for p\u00e5fylling. Skill tydelig mellom innkj\u00f8pspakninger og interne beholdere. Registrer tiden fra et internt signal om p\u00e5fylling til brukbare deler er p\u00e5 plass ved arbeidsstasjonen, ikke bare tiden trucken bruker p\u00e5 \u00e5 kj\u00f8re.<\/p>\n\n\n<p>Tiden for p\u00e5fylling fra leverand\u00f8r m\u00e5 skilles fra tiden for intern levering. Hyppige interne leveringsrunder kan ikke kompensere for en leverand\u00f8rbestilling som ikke er lagt inn. Varer som ankommer lasterampen, er heller ikke umiddelbart klare til bruk ved maskinen dersom de f\u00f8rst m\u00e5 kontrolleres eller pakkes om.<\/p>\n\n\n<p>Merk ukjente opplysninger for videre unders\u00f8kelse, og utpek en ansvarlig. En ledetid som ikke er fylt ut, er et synlig problem. En oppdiktet ledetid kan derimot ubemerket bli grunnlaget for en d\u00e5rlig forsyningsregel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Velg forsyningsregler, og test dem<\/h3>\n\n\n<p>Bestem om delen skal lagres ved bruksstedet, etterfylles via et supermarket (et kontrollert mellomlager), leveres i et sett eller forsynes til en bestemt ordre. Tilpass reglene til forbruk, plass, h\u00e5ndteringsarbeid og risiko for mangel i stedet for \u00e5 behandle alle varer likt.<\/p>\n\n\n<p>Fastsett antall per beholder og hva som utl\u00f8ser p\u00e5fylling, ut fra forbruket i det aktuelle tidsrommet for p\u00e5fylling. Ta h\u00f8yde for usikkerhet med en passende sikkerhetsmargin. Kontroller ogs\u00e5 plassforhold og begrensninger ved h\u00e5ndtering. En st\u00f8rre beholder er ingen nyttig buffer hvis den hindrer tilgangen eller \u00f8ker faren for skader.<\/p>\n\n\n<p>Test l\u00f8sningen i det daglige arbeidet. Er signalet synlig for den som skal fylle p\u00e5? Kan nye deler komme frem f\u00f8r den tilgjengelige beholdningen er brukt opp? Hva skjer n\u00e5r produktmiksen endres, eller den som vanligvis gj\u00f8r jobben, er borte? Juster reglene f\u00f8r l\u00f8sningen tas i bruk flere steder.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Eksempel: Hvorfor en full kartong ikke alltid hindrer mangel i cellen<\/h2>\n\n\n<p>Tenk deg en produsent som bruker den samme tetningen i to monteringsceller. Innkj\u00f8p bestiller kartonger, lageret registrerer beholdningen i stykk, og de som h\u00e5ndterer materialene, fordeler tetningene i mindre, beskyttende beholdere til arbeidsbenkene.<\/p>\n\n\n<p>Det f\u00f8rste PFEP-utkastet angir leverand\u00f8r, antall per kartong og hovedlagerplass. Det ser komplett ut helt til produktsammensetningen endres. Den ene cellen bruker tetninger langt raskere, mens etterfyllingsrunden fortsetter som f\u00f8r. Tetningene finnes p\u00e5 lager, men cellen m\u00e5 vente.<\/p>\n\n\n<p>L\u00f8sningen er ikke bare \u00e5 \u00abkj\u00f8pe flere tetninger\u00bb. Teamet legger inn de enkelte forbruksstedene, antall per intern beholder, signalene for etterfylling og hvem som har ansvar for levering. De kontrollerer omregningen mellom enhetene og avklarer hvem som endrer forsyningsopplegget n\u00e5r produktsammensetningen endres.<\/p>\n\n\n<p>N\u00e5 har tetningen en plan for den praktiske forsyningen, ikke bare en innkj\u00f8psbeskrivelse. Neste steg er \u00e5 koble ordrene som bruker tetningen, til tilgjengelig materiale og produksjonskapasitet. Ellers kan en planlegger fortsatt love begge cellene de samme tetningene eller flytte en ordre uten \u00e5 se konsekvensene for det p\u00e5f\u00f8lgende arbeidet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00f8rg for at alle viktige endringer blir fulgt opp i planen<\/h2>\n\n\n<p>PFEP blir mindre p\u00e5litelig n\u00e5r vedlikeholdet blir en valgfri oppgave som tas etter at alt som haster, er ferdig. Gj\u00f8r oppdatering av planen til en del av endringene som p\u00e5virker forsyningen.<\/p>\n\n\n<p>Innkj\u00f8p kan ha ansvar for leverand\u00f8rvilk\u00e5r, bestillingsbegrensninger og bekreftede endringer i ledetiden for etterfylling. Logistikk kan ha ansvar for lagerplasser, beholdere og leveringsopplegg. Teknisk avdeling og kvalitetsavdelingen kan ha ansvar for relevante spesifikasjonsendringer og godkjente krav til h\u00e5ndtering. Produksjonen kan bekrefte forbrukssteder og endringer i forbruksm\u00f8nsteret. \u00c9n PFEP-koordinator holder oversikt over den samlede strukturen og uavklarte avvik.<\/p>\n\n\n<p>Koordinatoren skal ikke m\u00e5tte oppdage alle endringer selv. Utpek en ansvarlig for hver feltgruppe, og knytt oppdateringer til hendelser som:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>En ny del, leverand\u00f8r, revisjon eller godkjent erstatningsdel.<\/li><li>Endringer i emballasje, innkj\u00f8psenhet eller antall per intern beholder.<\/li><li>Flytting av en celle, et nytt forbrukssted eller endringer i skiftordning eller produktsammensetning.<\/li><li>Gjentatte materialmangler, skadde deler eller et uforklart lageravvik.<\/li><\/ul>\n\n\n<p>Registrer hvem som godkjenner hver endring, n\u00e5r den trer i kraft, og hvilke instrukser eller systemer som m\u00e5 oppdateres som f\u00f8lge av den. \u00c5 bytte etiketten p\u00e5 reolen uten \u00e5 oppdatere leveringsinstruksen er ikke en fullf\u00f8rt oppdatering.<\/p>\n\n\n<p>Du trenger ikke kopiere alle feltene til en ny database. Definer en autoritativ kilde for hver type informasjon, og gj\u00f8r koblingen til PFEP tydelig. Hvis innkj\u00f8psvilk\u00e5rene ligger i ERP-systemet og de fysiske lagerplassene i WMS-systemet, b\u00f8r dere unng\u00e5 kopier som kan redigeres uavhengig av hverandre uten at noen har ansvar for synkroniseringen. M\u00e5let er entydig og p\u00e5litelig informasjon, selv n\u00e5r flere systemer bidrar.<\/p>\n\n\n<p>G\u00e5 gjennom avvik ofte nok til \u00e5 kunne handle, og kontroller de fysiske l\u00f8sningene med jevne mellomrom. At en registrering nylig er redigert, beviser ikke at beholderen fortsatt passer, eller at leveringsruten fortsatt fungerer.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Koble materialtilgjengelighet til produksjonen med SkyPlanner<\/h2>\n\n\n<p>PFEP gj\u00f8r materialflyten mer p\u00e5litelig. SkyPlanner gj\u00f8r det enklere \u00e5 h\u00e5ndtere konsekvensene materialtilgjengeligheten har for produksjonen.<\/p>\n\n\n<p>I SkyPlanner f\u00f8lger materialene som er knyttet til et produkt, med videre til ordrelinjene for produktet. Lagerinformasjon kan vedlikeholdes via integrasjon eller direkte i SkyPlanners Warehouse-modul. N\u00e5r planlegging som tar hensyn til materialtilgjengelighet er aktivert, bruker Arcturus, SkyPlanners KI for produksjonsplanlegging, materialtilgjengeligheten i samme beregning som kapasiteten p\u00e5 arbeidsstasjonene, skift, avhengigheter mellom operasjoner og reglene du har konfigurert.<\/p>\n\n\n<p>Denne koblingen er verdifull n\u00e5r flere ordrer bruker samme materiale eller konkurrerer om de samme maskinene. I stedet for \u00e5 kontrollere en materialliste og bygge opp hver maskink\u00f8 p\u00e5 nytt hver for seg, kan du gjennomg\u00e5 den samlede planen i Gantt-diagrammet. Hvis forutsetningene endres, kan du beregne planen p\u00e5 nytt og se hvordan arbeidet passer inn, og hvilke leveringsl\u00f8fter som m\u00e5 f\u00f8lges opp. Du setter prioriteringene; Arcturus tar seg av <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">beregningen av produksjonsplanen<\/a>.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sitt \u00e5pne REST API. Du kan beholde systemet som h\u00e5ndterer innkj\u00f8ps- og artikkeldata, og samtidig koble relevante identifikatorer, materialbehov og tilgjengelighet til detaljert produksjonsplanlegging. Instruksene for h\u00e5ndtering og levering i PFEP styrer fortsatt det fysiske arbeidet: En registrert lagerbeholdning bekrefter ikke at en uskadd beholder har n\u00e5dd riktig arbeidsbenk.<\/p>\n\n\n<p>Hos <a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/eskomatic\/\">Eskomatic, som utf\u00f8rer maskinering p\u00e5 oppdrag<\/a>, gjorde et eldre ERP-system og i stor grad manuelle arbeidsk\u00f8er det vanskelig \u00e5 f\u00e5 oversikt, s\u00e6rlig over materialtilgjengeligheten. Med SkyPlanner koblet til det eksisterende ERP-systemet fikk teamet bedre oversikt over materialene, automatisk planlegging av kapasitetsbelastningen og en visuell arbeidsk\u00f8. Eskomatic rapporterer om f\u00e6rre produksjonsstopp som f\u00f8lge av materialmangel og mer presis fastsettelse av leveringsdatoer.<\/p>\n\n\n<p>Det er den praktiske grunnen til \u00e5 koble p\u00e5litelig informasjon om deler til produksjonsplanleggingen: f\u00e6rre overraskelser ved planlagt oppstart og mindre tid brukt p\u00e5 \u00e5 n\u00f8ste opp i konsekvensene manuelt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e5l planens bidrag til \u00e5 holde arbeidet i gang<\/h2>\n\n\n<p>Vurder piloten ut fra hva som endrer seg p\u00e5 forbruksstedet, ikke bare hvor mange felt som er fylt ut. F\u00f8lg med p\u00e5 avbrudd som skyldes manglende eller feil deler, hasteleveranser, tid brukt p\u00e5 leting og arbeidet som kreves for \u00e5 fylle p\u00e5 deler i omr\u00e5det. Vurder lagerbeholdning og plassbruk sammen med disse resultatene, slik at en tilsynelatende forbedring ikke bare skyldes at alle ledige kroker er fylt med varer.<\/p>\n\n\n<p>N\u00e5r en materialmangel gjentar seg, m\u00e5 dere finne ut hvor det sviktet. Var registreringen feil, ble signalet om etterfylling oversett, var leverand\u00f8ren forsinket, eller bygde planen p\u00e5 utdatert informasjon om tilgjengelighet? Hver \u00e5rsak krever sitt tiltak. Oppdater regelen eller den operative informasjonen som faktisk sviktet.<\/p>\n\n\n<p>Velg SkyPlanner n\u00e5r planleggerne fortsatt m\u00e5 fordele materialer manuelt mellom konkurrerende ordrer og maskink\u00f8er, selv med p\u00e5litelig informasjon om delene. <a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo av SkyPlanner<\/a>, og ta med et eksempel med \u00e9n del som stadig mangler, en ordre som bruker den, og en annen ordre som konkurrerer om de samme ressursene. Bruk situasjonen til \u00e5 utforske hvordan planlegging som tar hensyn til materialtilgjengelighet, kan gj\u00f8re neste produksjonsbeslutning enklere. Hvis du heller vil utforske p\u00e5 egen h\u00e5nd f\u00f8rst, kan du <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8ve SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Plan for Every Part (PFEP): Deler klare til produksjon Hjem &raquo; Ressurser &raquo; Plan for Every Part (PFEP): Deler klare til produksjon Delen finnes i bygget. Innkj\u00f8p ser den i lagerrapporten. Likevel venter operat\u00f8ren, fordi ingen har avtalt hvordan delen skal komme frem til denne arbeidsstasjonen, hvilken beholder den skal ligge i, eller hvem som &#8230; <a title=\"Plan for Every Part (PFEP): Deler klare til produksjon\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/\" aria-label=\"Read more about Plan for Every Part (PFEP): Deler klare til produksjon\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":110424,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-110421","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlegging","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Plan for Every Part (PFEP): Deler klare til produksjon<\/title>\n<meta name=\"description\" content=\"Deler p\u00e5 lager, men ikke der de trengs? Lag en PFEP med klare forsyningsregler og ansvar, og knytt materialtilgjengelighet til produksjonsplanlegging.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plan for Every Part (PFEP): Deler klare til produksjon\" \/>\n<meta property=\"og:description\" content=\"Deler p\u00e5 lager, men ikke der de trengs? Lag en PFEP med klare forsyningsregler og ansvar, og knytt materialtilgjengelighet til produksjonsplanlegging.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T00:03:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T00:05:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Plan for Every Part (PFEP): Deler klare til produksjon\",\"datePublished\":\"2026-10-26T00:03:20+00:00\",\"dateModified\":\"2026-10-26T00:05:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/\"},\"wordCount\":2270,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"articleSection\":[\"APS og planlegging\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/\",\"name\":\"Plan for Every Part (PFEP): Deler klare til produksjon\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"datePublished\":\"2026-10-26T00:03:20+00:00\",\"dateModified\":\"2026-10-26T00:05:31+00:00\",\"description\":\"Deler p\u00e5 lager, men ikke der de trengs? Lag en PFEP med klare forsyningsregler og ansvar, og knytt materialtilgjengelighet til produksjonsplanlegging.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Seals move from a supplier carton through storage to separate containers at two assembly benches\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/pfep\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Plan for Every Part (PFEP): Deler klare til produksjon\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Plan for Every Part (PFEP): Deler klare til produksjon","description":"Deler p\u00e5 lager, men ikke der de trengs? Lag en PFEP med klare forsyningsregler og ansvar, og knytt materialtilgjengelighet til produksjonsplanlegging.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/","og_locale":"nb_NO","og_type":"article","og_title":"Plan for Every Part (PFEP): Deler klare til produksjon","og_description":"Deler p\u00e5 lager, men ikke der de trengs? Lag en PFEP med klare forsyningsregler og ansvar, og knytt materialtilgjengelighet til produksjonsplanlegging.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T00:03:20+00:00","article_modified_time":"2026-10-26T00:05:31+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Plan for Every Part (PFEP): Deler klare til produksjon","datePublished":"2026-10-26T00:03:20+00:00","dateModified":"2026-10-26T00:05:31+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/"},"wordCount":2270,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","articleSection":["APS og planlegging","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/","name":"Plan for Every Part (PFEP): Deler klare til produksjon","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","datePublished":"2026-10-26T00:03:20+00:00","dateModified":"2026-10-26T00:05:31+00:00","description":"Deler p\u00e5 lager, men ikke der de trengs? Lag en PFEP med klare forsyningsregler og ansvar, og knytt materialtilgjengelighet til produksjonsplanlegging.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","width":1672,"height":941,"caption":"Seals move from a supplier carton through storage to separate containers at two assembly benches"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/pfep\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Plan for Every Part (PFEP): Deler klare til produksjon"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Plan for Every Part (PFEP): Deler klare til produksjon Hjem &raquo; Ressurser &raquo; Plan for Every Part (PFEP): Deler klare til produksjon Delen finnes i bygget. Innkj\u00f8p ser den i lagerrapporten. Likevel venter operat\u00f8ren, fordi ingen har avtalt hvordan delen skal komme frem til denne arbeidsstasjonen, hvilken beholder den skal ligge i, eller hvem som&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/110421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=110421"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/110421\/revisions"}],"predecessor-version":[{"id":110483,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/110421\/revisions\/110483"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/110424"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=110421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=110421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=110421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}