{"id":110328,"date":"2026-10-25T22:17:09","date_gmt":"2026-10-25T22:17:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110328"},"modified":"2026-10-25T22:19:24","modified_gmt":"2026-10-25T22:19:24","slug":"conwip","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/","title":{"rendered":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Den f\u00f8rste maskinen er ledig, s\u00e5 enda en ordre settes i gang. Lenger ute i flyten er det allerede k\u00f8 ved etterbehandlingen. Utp\u00e5 ettermiddagen venter flere deler, mer materiale er bundet opp, og ordrene som skal leveres, har knapt kommet videre.<\/p>\n\n\n<p>Med CONWIP kan du slutte \u00e5 forsterke dette problemet. Metoden begrenser hvor mye arbeid som f\u00e5r slippe inn i en avgrenset produksjonsflyt. N\u00e5r en batch med produksjonstillatelse forlater sl\u00f8yfen, blir tillatelsen tilgjengelig for en ny batch. Arbeidet venter utenfor til det er plass.<\/p>\n\n\n<p>Denne disiplinen gj\u00f8r det vanskeligere \u00e5 starte arbeid un\u00f8dvendig tidlig. Den avgj\u00f8r ikke hvilken ventende ordre som b\u00f8r f\u00e5 neste tillatelse, og s\u00f8rger heller ikke for at det er plass til operasjonene p\u00e5 produksjonsruten n\u00e5r ressursene er opptatt. Bruk CONWIP til \u00e5 styre hva som slippes inn, og SkyPlanner APS til \u00e5 holde produksjonsplanen oppdatert slik at operasjonene henger sammen og underst\u00f8tter valget. Da f\u00e5r du mindre uferdig arbeid som krever oppmerksomhet, og mindre manuelt arbeid med \u00e5 samordne k\u00f8ene ved maskinene.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva er CONWIP i produksjonen?<\/h2>\n\n\n<p>CONWIP st\u00e5r for Constant Work in Process, ogs\u00e5 ofte kalt Constant Work in Progress, og viser til en konstant grense for varer i arbeid. Det er en metode for sugbasert produksjonsstyring som begrenser den samlede mengden arbeid med produksjonstillatelse innenfor en definert sl\u00f8yfe, i stedet for \u00e5 gi hver arbeidsstasjon sitt eget signal for etterfylling.<\/p>\n\n\n<p>Et begrenset antall kort eller elektroniske brikker gir tillatelse til \u00e5 slippe inn. Hver brikke representerer en avtalt arbeidsmengde, for eksempel \u00e9n definert produksjonsbatch. Brikken forblir knyttet til batchen gjennom sl\u00f8yfen og blir tilgjengelig igjen ved den avtalte hendelsen som markerer at batchen forlater sl\u00f8yfen.<\/p>\n\n\n<p>I motsetning til et etterfyllingskort for en bestemt del kan en CONWIP-brikke gi produksjonstillatelse til ulike produkter fra runde til runde. En prioritert ordrereserve svarer p\u00e5 \u00abhva b\u00f8r vi produsere?\u00bb. Den ledige brikken svarer p\u00e5 \u00abkan vi frigi mer arbeid?\u00bb.<\/p>\n\n\n<p>\u00abKonstant\u00bb beskriver den styrte \u00f8vre grensen for produksjonstillatelser, ikke et krav om at produksjonen alltid skal v\u00e6re full. Den faktiske arbeidsmengden kan ligge under grensen n\u00e5r ettersp\u00f8rselen er lavere eller ingenting er klart til oppstart. \u00c5 frigi en uegnet ordre bare for \u00e5 bruke en brikke motvirker hensikten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">F\u00f8lg en produksjonstillatelse gjennom sl\u00f8yfen<\/h2>\n\n\n<p>Regelen er enkel nok til \u00e5 forklare ved skiftstart:<\/p>\n\n\n<p>1. <strong>Hold ventende arbeid utenfor sl\u00f8yfen.<\/strong> Ha en oversikt over ordrer eller batcher som ikke er frigitt. En ordre kan v\u00e6re synlig i planen uten at arbeidet fysisk er satt i gang.<\/p>\n\n\n<p>2. <strong>Tildel en ledig brikke til startklart arbeid.<\/strong> Den som er ansvarlig for frigivelse, velger neste egnede ordre eller batch fra ordrereserven ut fra avtalte prioriteringer og kontroller av om arbeidet er startklart.<\/p>\n\n\n<p>3. <strong>La tillatelsen f\u00f8lge arbeidet.<\/strong> Bearbeiding, forflytning og venting innenfor grensen binder den samme tillatelsen. Den blir ikke ledig n\u00e5r arbeidet flyttes fra maskinering til etterbehandling.<\/p>\n\n\n<p>4. <strong>Returner brikken ved det definerte utpasseringspunktet.<\/strong> Bekreft at batchen har oppfylt vilk\u00e5ret for \u00e5 forlate sl\u00f8yfen, avstem statusen og gj\u00f8r tillatelsen tilgjengelig igjen.<\/p>\n\n\n<p>Hvis alle brikkene er tildelt, m\u00e5 neste batch vente. Ledig kapasitet ved den f\u00f8rste operasjonen er ingen grunn til \u00e5 opprette en ekstra tillatelse.<\/p>\n\n\n<p>Definer n\u00f8yaktig n\u00e5r arbeidet forlater sl\u00f8yfen. I en sl\u00f8yfe som slutter ved sluttgodkjenning, returneres for eksempel brikken etter godkjenningen. I en sl\u00f8yfe som omfatter ferdigvarelageret, returneres den kanskje f\u00f8rst n\u00e5r produktet tas ut til bruk lenger ned i flyten. Disse utformingene styrer ulike mengder. \u00abProduksjonen er ferdig\u00bb og \u00abproduktet har forlatt sl\u00f8yfen\u00bb er ikke samme hendelse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Velg en meningsfull avgrensning og telleenhet<\/h2>\n\n\n<p>CONWIP er verdt \u00e5 vurdere n\u00e5r ulike produkter kan f\u00f8lge en gjenkjennelig felles flyt, men det ville v\u00e6re tungvint \u00e5 vedlikeholde en egen etterfyllingssl\u00f8yfe for hvert produkt. Produksjon mot ordre kan passe godt til denne logikken: Neste brikke kan brukes til et annet kundespesifikt produkt i stedet for \u00e5 fylle opp lageret av det forrige.<\/p>\n\n\n<p>Start med en produktfamilie eller et produksjonsomr\u00e5de der det er mulig \u00e5 observere hva som kommer inn og g\u00e5r ut. Avgrensningen b\u00f8r omfatte k\u00f8ene du vil styre, ikke stoppe rett f\u00f8r den krevende operasjonen. Hvis alle brikkene returneres etter maskinering, f\u00f8r delene g\u00e5r inn i et overbelastet etterbehandlingsomr\u00e5de, har sl\u00f8yfen ikke begrenset det uferdige arbeidet som hoper seg opp der.<\/p>\n\n\n<p>Ulike produksjonsruter krever ekstra oppmerksomhet. Hvis batcher hopper over operasjoner, sendes til underleverand\u00f8rer eller inng\u00e5r i en montasje, m\u00e5 du definere hva som skjer med produksjonstillatelsene deres. \u00c9n felles teller for hele fabrikken er ikke n\u00f8dvendigvis hensiktsmessig for uavhengige ruter med sv\u00e6rt ulike sluttpunkter. Pr\u00f8v f\u00f8rst ut metoden i en sammenhengende flyt f\u00f8r du utvider avgrensningen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00c9n batch krever ikke alltid like mye kapasitet<\/h3>\n\n\n<p>Skriv ned hva en brikke representerer. Hvis den betyr \u00e9n batch, m\u00e5 du definere tillatt batchst\u00f8rrelse eller st\u00f8rrelsesintervall og hvordan deling av en batch skal h\u00e5ndteres. Ellers kan det samme antallet kort skjule langt mer arbeid, ganske enkelt fordi batchene har blitt st\u00f8rre.<\/p>\n\n\n<p>Selv med en konsekvent regel kan ulike produkter kreve ulik bearbeidingstid. En batch med kort maskineringstid og en batch som krever langvarig spesialisert etterbehandling, kan binde \u00e9n brikke hver uten \u00e5 belaste kapasiteten like mye. F\u00f8lg derfor med p\u00e5 gjenst\u00e5ende arbeidsbelastning p\u00e5 felles ressurser i tillegg til antallet brikker, s\u00e6rlig n\u00e5r produktmiksen endres.<\/p>\n\n\n<p>En grense for den samlede mengden varer i arbeid setter heller ikke en maksimal k\u00f8lengde ved hver stasjon. Arbeidet kan hope seg opp foran en tungt belastet operasjon mens en annen stasjon mangler arbeid. Ha tydelige grenser for fysisk plass og sikkerhet, og unders\u00f8k vedvarende opphopning i stedet for \u00e5 anta at sl\u00f8yfen balanserer alle ressursene for deg.<\/p>\n\n\n<h2 class=\"wp-block-heading\">CONWIP, Kanban og drum buffer rope styrer ulike ting<\/h2>\n\n\n<p>Metodene kan brukes sammen, men signalene deres svarer p\u00e5 ulike sp\u00f8rsm\u00e5l:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Metode<\/th><th>Grunnprinsipp for styringen<\/th><th>Viktig forskjell<\/th><\/tr><\/thead><tbody><tr><td>CONWIP<\/td><td>Begrens mengden arbeid med produksjonstillatelse i en definert, samlet sl\u00f8yfe. Tildel returnerte tillatelser til utvalgt arbeid fra ordrereserven.<\/td><td>Neste produkt kan v\u00e6re et annet enn det som nettopp forlot sl\u00f8yfen.<\/td><\/tr><tr><td>Delspesifikk Kanban i produksjonen<\/td><td>Etterfyll en bestemt del i en bestemt mengde n\u00e5r forbrukssignalet kommer.<\/td><td>Signalet angir hva som m\u00e5 etterfylles.<\/td><\/tr><tr><td>Drum buffer rope<\/td><td>Tilpass frigivelsestidspunktet til flaskehalsens plan og bufferen som trengs for at arbeidet skal n\u00e5 frem dit i tide.<\/td><td>Flaskehalsens behov styrer n\u00e5r arbeidet frigis.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Velg metode ut fra flyten du trenger \u00e5 styre. For standardkomponenter som tas fra lager, kan <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/kanban-i-produksjon\/\">delspesifikk Kanban<\/a> passe. En familie av varierende kundeordrer kan ha nytte av at tillatelsene i CONWIP kan brukes p\u00e5 nytt til andre produkter. En flyt med en tydelig flaskehals kan <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/drum-buffer-rope\/\">ha behov for drum buffer rope<\/a>.<\/p>\n\n\n<p>Ingen av disse signalene skaper kapasitet. Du trenger fortsatt en gjennomf\u00f8rbar rekkef\u00f8lge for operasjonene som arbeidet med produksjonstillatelse m\u00e5 gjennom.<\/p>\n\n\n<h2 class=\"wp-block-heading\">En returnert brikke krever fortsatt et planleggingsvalg<\/h2>\n\n\n<p>Se for deg et maskineringsverksted med en CONWIP-sl\u00f8yfe fra starten av maskineringen til og med sluttkontrollen. En batch godkjennes i kontrollen og forlater sl\u00f8yfen. Brikken er n\u00e5 ledig, og to startklare kundebatcher venter utenfor.<\/p>\n\n\n<p>Den ene trenger en kort maskineringsoperasjon etterfulgt av en lang poleringsoperasjon. Den andre trenger mer maskinering, men ingen polering. Det er allerede lang k\u00f8 ved poleringsstasjonen, mens maskineringen har ledig kapasitet i dag.<\/p>\n\n\n<p>Begge batchene oppfyller regelen for \u00e5 f\u00e5 en brikke. Men de passer ulikt inn sammen med arbeidet som gjenst\u00e5r i produksjonen.<\/p>\n\n\n<p>Hvis batchen som krever mye polering, frigis fordi den f\u00f8rste operasjonen er kort, kan den forlenge k\u00f8en som allerede forsinker leveranser. Den andre batchen kan utnytte ledig kapasitet bedre, men ikke hvis valget g\u00e5r p\u00e5 bekostning av en viktigere kundeforpliktelse. Planleggeren m\u00e5 se de gjenst\u00e5ende produksjonsrutene, leveringsfristene og annet arbeid som konkurrerer om kapasiteten, i sammenheng \u2013 ikke bare den f\u00f8rste ledige maskinen eller den minste batchen.<\/p>\n\n\n<p>Det er dette skillet som gj\u00f8r CONWIP nyttig, og ikke bare begrensende. Brikken gir tillatelse til \u00e5 slippe inn. At arbeidet er startklart, betyr at det kan utf\u00f8res. En sammenhengende plan viser hvor operasjonene passer inn, og hva ferdigstillelsen betyr for andre forpliktelser.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bruk SkyPlanner til \u00e5 se frigivelsesvalget i sammenheng med hele produksjonsruten<\/h2>\n\n\n<p>SkyPlanner APS utf\u00f8rer denne <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">finplanleggingen p\u00e5 tvers av hele ordreboken<\/a>. Du definerer prosesstrinn, varigheter, aktuelle arbeidsstasjoner, skift og prioriteringer. Arcturus, KI-motoren for finplanlegging i SkyPlanner, plasserer operasjonene ut fra den definerte kapasiteten og avhengighetene. N\u00e5r materialbasert planlegging er aktivert, p\u00e5virker ogs\u00e5 materialtilgangen planen.<\/p>\n\n\n<p>I det tenkte verkstedet betyr det \u00e5 vurdere maskineringen og poleringen av den ventende batchen sammen med arbeidet som allerede er planlagt p\u00e5 disse ressursene. Gantt-planen viser sammenhengen mellom operasjonene og forventet ferdigstillelse. N\u00e5r prioriteringer eller kapasitet endres, kan Arcturus beregne planen p\u00e5 nytt, slik at du slipper \u00e5 rette opp k\u00f8en ved hver maskin separat.<\/p>\n\n\n<p>Du styrer prioriteringene; KI-en h\u00e5ndterer fordelingen av operasjoner som henger sammen. Det sparer planleggingsarbeid og gj\u00f8r det lettere \u00e5 se hvordan en frigivelse til produksjon p\u00e5virker leveringene. Et frigjort kort blir dermed en anledning til \u00e5 vurdere neste egnede ordre, ikke en beskjed om \u00e5 starte det som st\u00e5r n\u00e6rmest maskinen.<\/p>\n\n\n<p>I SkyPlanner kan du ogs\u00e5 angi en tidligste startdato som hindrer at en ordrelinje planlegges f\u00f8r avtalt dato. Dette er en grense for finplanleggingen, ikke det sirkulerende CONWIP-kortet eller selve den fysiske frigivelsen av en batch. Avklar ansvarsfordelingen n\u00e5r dere innf\u00f8rer l\u00f8sningen: Hvem godkjenner frigivelsen, hvor registreres kortet, og hvordan blir beslutningen formidlet til produksjonsplanen?<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system via sitt \u00e5pne REST API. Behold ordre- og produksjonsstyringssystemene som fungerer godt for dere, og knytt informasjonen fra dem til en felles plan som tar hensyn til begrenset kapasitet. Det gj\u00f8r det enklere \u00e5 avgj\u00f8re hvilket arbeid som b\u00f8r kj\u00f8res f\u00f8rst, uten \u00e5 vedlikeholde en egen versjon av planen for hver avdeling.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hva endret seg hos Eskomatic med bedre oversikt over hvilke jobber som var klare til oppstart?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/eskomatic\/\">Eskomatic, som utf\u00f8rer maskinering p\u00e5 oppdrag<\/a>, organiserte tidligere arbeidsk\u00f8ene i stor grad manuelt. Begrenset oversikt over materialene gjorde det vanskeligere \u00e5 oppdage mangler f\u00f8r planlagt oppstart.<\/p>\n\n\n<p>Da SkyPlanner ble koblet til bedriftens eksisterende ERP-system, fikk Eskomatic en visuell arbeidsk\u00f8 i Gantt-format, automatisk planlegging av belastningen og bedre oversikt over materialene. Eskomatic rapporterer at de kan fastsette leveringsdatoer mer presist, og at materialmangel f\u00f8rer til f\u00e6rre produksjonsstans.<\/p>\n\n\n<p>For et verksted som styrer hva som slippes inn i produksjonen, er dette et verdifullt supplement til faste rutiner for frigivelse: f\u00e6rre avbrudd som kunne v\u00e6rt unng\u00e5tt, og et tydeligere grunnlag for \u00e5 love n\u00e5r arbeidet blir ferdig.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fastsett en f\u00f8rste grense, og l\u00e6r av flyten<\/h2>\n\n\n<p>Det finnes ikke ett bestemt antall kort som gj\u00f8r alle CONWIP-sl\u00f8yfer effektive. Hvor mye arbeid som trengs i systemet, avhenger av produksjonsruten, tilgjengelig driftskapasitet, variasjon, reglene for batchst\u00f8rrelser og produktmiksen. En \u00f8vre grense som fungerer for korte, gjentakende batcher, kan sl\u00e5 annerledes ut n\u00e5r det kommer tidkrevende spesialoppdrag.<\/p>\n\n\n<p>Ta utgangspunkt i den faktiske flyten. M\u00e5l mengden arbeid innenfor den foresl\u00e5tte avgrensningen, batchst\u00f8rrelser, tiden fra frigivelse til utgang, ferdigprodusert mengde og leveringspresisjon. Finn ut om en ressurs st\u00e5r uten arbeid fordi den mangler oppstartsklare oppgaver, eller om en overbelastet stasjon ganske enkelt f\u00e5r mer enn den rekker \u00e5 fullf\u00f8re. Bruk observasjonene til \u00e5 velge en startgrense sammen med dem som skal drive sl\u00f8yfen.<\/p>\n\n\n<p>F\u00f8lg disse tre forholdene samlet under piloten:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Flyt:<\/strong> ferdigstilt arbeid og tiden fra frigivelse til utgang, ikke bare antall oppstarter.<\/li><li><strong>Belastning:<\/strong> hvor arbeidet venter, hvor lenge det har v\u00e6rt i systemet, og hvor mange gjenst\u00e5ende timer som konkurrerer om kritiske ressurser.<\/li><li><strong>Levering:<\/strong> om ordrene som skal leveres, blir ferdige i tide, og hvilke hastetiltak som eventuelt m\u00e5 til for \u00e5 oppn\u00e5 det.<\/li><\/ul>\n\n\n<p>Hvis k\u00f8ene fortsatt er for lange, test en kontrollert reduksjon i antall frigivelsestillatelser mens dere f\u00f8lger med p\u00e5 produsert mengde og leveranser. Hvis produksjonen faller, unders\u00f8k om grensen gj\u00f8r at en viktig ressurs mangler arbeid, om materialer mangler, eller om rekkef\u00f8lgen er uheldig. \u00c5 legge til kort hver gang det oppst\u00e5r problemer, kan skjule \u00e5rsaken og samtidig bringe mengden varer i arbeid tilbake til det opprinnelige, for h\u00f8ye niv\u00e5et.<\/p>\n\n\n<p>Ikke returner et kort bare fordi en batch venter p\u00e5 omarbeiding eller er sperret i p\u00e5vente av kvalitetsavklaring inne i sl\u00f8yfen. Definer hvordan kassasjon, delvis ferdigstillelse og oppdelte batcher skal avstemmes i kortregnskapet. En hasteordre m\u00e5 ha gyldig frigivelsestillatelse eller et uttrykkelig godkjent og registrert unntak \u2013 ikke et usynlig ekstrakort. Avklar hvem som har ansvar for tapte kort, og avstem antallet f\u00f8r et kort erstattes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Still krav til neste jobb som skal settes i gang<\/h2>\n\n\n<p>En nyttig CONWIP-pilot har en synlig avgrensning, en meningsfull telleenhet, en tydelig hendelse som utl\u00f8ser retur av kortet, og noen som har ansvar for \u00e5 velge oppstartsklart arbeid fra ordrereserven. M\u00e5let er ikke at sl\u00f8yfen alltid skal v\u00e6re full. Det er \u00e5 ha mindre un\u00f8dvendig arbeid p\u00e5 produksjonsgulvet, samtidig som de riktige ordrene stadig blir ferdigstilt.<\/p>\n\n\n<p>Velg SkyPlanner n\u00e5r vedlikeholdet av rute- og kapasitetsplanen bak disse beslutningene tar hele arbeidsdagen til planleggerne. Reglene for frigivelse s\u00f8rger for kontrollert tilgang til produksjonen; SkyPlanner gj\u00f8r den felles planen enklere \u00e5 vedlikeholde n\u00e5r produktmiks og prioriteringer endres.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo av SkyPlanner<\/a>, og ta med en ventende ordre, den gjenst\u00e5ende produksjonsruten, arbeidet som allerede er innenfor den foresl\u00e5tte sl\u00f8yfen, og regelen for frigivelse. Bruk dette som utgangspunkt for \u00e5 unders\u00f8ke hva som b\u00f8r settes i gang f\u00f8rst, og hva det betyr for leveringene. Hvis du f\u00f8rst vil utforske planleggingsvisningen, kan du <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8ve SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst Hjem &raquo; Ressurser &raquo; CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst Den f\u00f8rste maskinen er ledig, s\u00e5 enda en ordre settes i gang. Lenger ute i flyten er det allerede k\u00f8 ved etterbehandlingen. Utp\u00e5 ettermiddagen venter flere deler, mer materiale er bundet &#8230; <a title=\"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/\" aria-label=\"Read more about CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":110332,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2533,505],"tags":[],"class_list":["post-110328","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-og-planlegging","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst<\/title>\n<meta name=\"description\" content=\"For mange ordrer i produksjon? Begrens frigitt arbeid med CONWIP, velg neste startklare ordre og knytt hver oppstart til en realistisk produksjonsplan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst\" \/>\n<meta property=\"og:description\" content=\"For mange ordrer i produksjon? Begrens frigitt arbeid med CONWIP, velg neste startklare ordre og knytt hver oppstart til en realistisk produksjonsplan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T22:17:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T22:19:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst\",\"datePublished\":\"2026-10-25T22:17:09+00:00\",\"dateModified\":\"2026-10-25T22:19:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/\"},\"wordCount\":2320,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"articleSection\":[\"APS og planlegging\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/\",\"name\":\"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"datePublished\":\"2026-10-25T22:17:09+00:00\",\"dateModified\":\"2026-10-25T22:19:24+00:00\",\"description\":\"For mange ordrer i produksjon? Begrens frigitt arbeid med CONWIP, velg neste startklare ordre og knytt hver oppstart til en realistisk produksjonsplan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A blue authorization card returns to waiting batches outside a bounded machining and inspection flow\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/conwip\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst","description":"For mange ordrer i produksjon? Begrens frigitt arbeid med CONWIP, velg neste startklare ordre og knytt hver oppstart til en realistisk produksjonsplan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/","og_locale":"nb_NO","og_type":"article","og_title":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst","og_description":"For mange ordrer i produksjon? Begrens frigitt arbeid med CONWIP, velg neste startklare ordre og knytt hver oppstart til en realistisk produksjonsplan.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T22:17:09+00:00","article_modified_time":"2026-10-25T22:19:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"12 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst","datePublished":"2026-10-25T22:17:09+00:00","dateModified":"2026-10-25T22:19:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/"},"wordCount":2320,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","articleSection":["APS og planlegging","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/","name":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","datePublished":"2026-10-25T22:17:09+00:00","dateModified":"2026-10-25T22:19:24+00:00","description":"For mange ordrer i produksjon? Begrens frigitt arbeid med CONWIP, velg neste startklare ordre og knytt hver oppstart til en realistisk produksjonsplan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","width":1672,"height":941,"caption":"A blue authorization card returns to waiting batches outside a bounded machining and inspection flow"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/conwip\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst Hjem &raquo; Ressurser &raquo; CONWIP i produksjonen: Styr hva som settes i gang f\u00f8rst Den f\u00f8rste maskinen er ledig, s\u00e5 enda en ordre settes i gang. Lenger ute i flyten er det allerede k\u00f8 ved etterbehandlingen. Utp\u00e5 ettermiddagen venter flere deler, mer materiale er bundet&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/110328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=110328"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/110328\/revisions"}],"predecessor-version":[{"id":110392,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/110328\/revisions\/110392"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/110332"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=110328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=110328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=110328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}