{"id":107910,"date":"2026-10-23T19:50:04","date_gmt":"2026-10-23T19:50:04","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=107910"},"modified":"2026-10-23T19:52:15","modified_gmt":"2026-10-23T19:52:15","slug":"optimal-bestillingsmengde","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/","title":{"rendered":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Optimal bestillingsmengde (EOQ) er mengden som ved hver lagerp\u00e5fylling gir lavest samlede bestillings- og lagerholdskostnader i den grunnleggende EOQ-modellen.<\/strong> For en produsent som kj\u00f8per inn en komponent regelmessig, besvarer modellen sp\u00f8rsm\u00e5let: Hvor mye b\u00f8r vi bestille hver gang, gitt forbruket og kostnadene v\u00e5re?<\/p>\n\n\n<p>Formelen er <strong>EOQ = \u221a(2 \u00d7 D \u00d7 S \/ H)<\/strong>, der D er \u00e5rlig behov i enheter, S er den faste kostnaden per bestilling og H er lagerholdskostnaden per enhet per \u00e5r.<\/p>\n\n\n<p>Svaret er et nyttig utgangspunkt, ikke en ferdig innkj\u00f8psbeslutning. Leverand\u00f8rens pakningsst\u00f8rrelse eller minste bestillingsmengde kan avgj\u00f8re hvilken mengde som faktisk kan bestilles. Og et \u00f8konomisk gunstig innkj\u00f8p kan ikke dekke morgendagens produksjon hvis varene kommer neste uke. SkyPlanner APS knytter forventede materialankomster til produksjonsordrene som er avhengige av dem. Dermed kan innkj\u00f8p og produksjon arbeide ut fra samme plan i stedet for \u00e5 samkj\u00f8re separate lister.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hvorfor st\u00f8rre bestillinger kan koste mer<\/h2>\n\n\n<p>Hver lagerp\u00e5fylling medf\u00f8rer kostnader utover selve komponentene: innkj\u00f8psordren skal opprettes, varemottaket registreres og leveransen h\u00e5ndteres. Ved \u00e5 kj\u00f8pe st\u00f8rre mengder fordeles dette faste arbeidet p\u00e5 f\u00e6rre bestillinger.<\/p>\n\n\n<p>Men st\u00f8rre leveranser gir ogs\u00e5 mer lager mellom p\u00e5fyllingene. Dette lageret binder kapital og medf\u00f8rer kostnader til lagring, forsikring og ukurans. \u00c5 kj\u00f8pe dobbelt s\u00e5 mye er ikke automatisk l\u00f8nnsomt bare fordi antall bestillinger halveres.<\/p>\n\n\n<p>EOQ balanserer disse to virkningene. I grunnmodellen blir hele det bestilte partiet tilgjengelig for bruk p\u00e5 \u00e9n gang. Deretter synker lagerbeholdningen jevnt etter hvert som produksjonen forbruker den. Gjennomsnittlig sykluslager er derfor halvparten av bestillingsmengden. Et eventuelt sikkerhetslager kommer i tillegg og inng\u00e5r ikke i denne beregningen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bruk riktige verdier for de tre EOQ-variablene<\/h2>\n\n\n<p>Bruk konsekvente m\u00e5leenheter og tidsperioder. \u00c5rlig behov m\u00e5 kombineres med \u00e5rlig lagerholdskostnad. En m\u00e5nedlig kostnad kan ikke brukes i samme beregning uten omregning.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Variabel<\/th><th>Betydning for en innkj\u00f8pt komponent<\/th><th>Enhet<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Forventet \u00e5rlig forbruk av komponenten<\/td><td>Enheter\/\u00e5r<\/td><\/tr><tr><td>S<\/td><td>Fast kostnad ved \u00e5 bestille og motta \u00e9n lagerp\u00e5fylling<\/td><td>Valuta\/bestilling<\/td><\/tr><tr><td>H<\/td><td>Kostnad ved \u00e5 holde \u00e9n enhet p\u00e5 lager i ett \u00e5r<\/td><td>Valuta\/enhet\/\u00e5r<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">D: Bruk komponentforbruk, ikke salgsinntekter<\/h3>\n\n\n<p>For innkj\u00f8pte lagre er D antallet lagre produksjonen forventer \u00e5 forbruke i l\u00f8pet av \u00e5ret. Det er ikke salgsverdien av maskinene de brukes i, og heller ikke n\u00f8dvendigvis fjor\u00e5rets innkj\u00f8psmengde: Innkj\u00f8pene kan ha f\u00f8rt til at lagerbeholdningen \u00f8kte eller sank.<\/p>\n\n\n<p>Ta med behovet fra alle produkter som bruker komponenten, og legg inn passende tillegg for forventet svinn i prosessen. Kontroller om \u00e5rsbehovet gjenspeiler et noenlunde jevnt forbruk. En komponent som bare brukes i to store kundeprosjekter, trenger en innkj\u00f8psplan med datoer, ikke en jevn forbruksrate konstruert ut fra \u00e5rstotalen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S: Skill bestillingskostnaden fra innkj\u00f8psprisen<\/h3>\n\n\n<p>S dekker den faste kostnaden knyttet til hver lagerp\u00e5fylling, for eksempel ordrebehandling, en fast leveringsavgift og arbeid ved varemottak. Det er ikke fakturaverdien av alle komponentene i bestillingen.<\/p>\n\n\n<p>Bruk et kostnadsanslag som kan begrunnes for bestillingen du vurderer. Hvis flere varer deler en innkj\u00f8psordre eller lastebil, blir S for h\u00f8y dersom hver vare belastes med hele fraktkostnaden. Frakt som varierer med vekten, er heller ikke uten videre en fast kostnad per bestilling. Tilpass anslaget til avtalene med leverand\u00f8ren og rutinene for varemottak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">H: Regn om lagerholdssatsen fra prosent til penger<\/h3>\n\n\n<p>Hvis en komponent koster $20 og den \u00e5rlige lagerholdssatsen er 25 %, blir lagerholdskostnaden:<\/p>\n\n\n<p><strong>H = $20 \u00d7 0,25 = $5 per komponent per \u00e5r<\/strong><\/p>\n\n\n<p>Sett $5 inn i EOQ-formelen, ikke 25 eller 0,25. Ta med relevante kostnader til kapital, lagring og lagerrisiko i beregningsgrunnlaget, uten \u00e5 telle samme kostnad to ganger.<\/p>\n\n\n<p>En generell regnskapsmessig kostnadsfordeling betyr ikke automatisk at mindre innkj\u00f8pspartier gir en tilsvarende besparelse i penger. Beregningen er mest nyttig n\u00e5r innkj\u00f8p og \u00f8konomi er enige om hvilke kostnader som p\u00e5virkes av mengdevalget.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Regneeksempel: Innkj\u00f8p av lagre til produksjonen<\/h2>\n\n\n<p>Tenk deg en produsent som kj\u00f8per inn et standardlager til flere produkter. F\u00f8lgende forutsetninger legges til grunn:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\u00c5rlig forbruk D: <strong>12 000 lagre<\/strong>.<\/li><li>Fast bestillingskostnad S: <strong>$75 per lagerp\u00e5fylling<\/strong>.<\/li><li>Innkj\u00f8pspris per enhet: <strong>$20<\/strong>.<\/li><li>\u00c5rlig lagerholdssats: <strong>25 %<\/strong>, som gir H p\u00e5 <strong>$5 per lager<\/strong>.<\/li><\/ul>\n\n\n<p>Dette er eksempeltall, ikke referanseverdier for produksjonskostnader eller resultater fra en SkyPlanner-kunde.<\/p>\n\n\n<p><strong>EOQ = \u221a[(2 \u00d7 12 000 \u00d7 75) \/ 5] = \u221a360 000 = 600 lagre<\/strong><\/p>\n\n\n<p>Med 600 lagre per bestilling gir modellen 12 000 \/ 600 = <strong>20 bestillinger per \u00e5r<\/strong> og et gjennomsnittlig sykluslager p\u00e5 600 \/ 2 = <strong>300 lagre<\/strong>.<\/p>\n\n\n<p>For \u00e5 se hvorfor 600 er \u00f8konomisk gunstig, kan vi sammenligne de \u00e5rlige kostnadene som varierer med bestillingsmengden Q:<\/p>\n\n\n<p><strong>\u00c5rlig bestillingskostnad = (D \/ Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>\u00c5rlig kostnad for \u00e5 holde sykluslageret = (Q \/ 2) \u00d7 H<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Bestillingsmengde<\/th><th>\u00c5rlig bestillingskostnad<\/th><th>\u00c5rlig kostnad for \u00e5 holde sykluslageret<\/th><th>Samlet \u00e5rlig kostnad<\/th><\/tr><\/thead><tbody><tr><td>300 lagre<\/td><td>$3 000<\/td><td>$750<\/td><td>$3 750<\/td><\/tr><tr><td>600 lagre<\/td><td>$1 500<\/td><td>$1 500<\/td><td>$3 000<\/td><\/tr><tr><td>900 lagre<\/td><td>$1 000<\/td><td>$2 250<\/td><td>$3 250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ved optimal mengde uten begrensninger er bestillingskostnaden lik kostnaden for \u00e5 holde sykluslageret. \u00d8kes mengden til 900, blir det mindre bestillingsarbeid, men lagerholdskostnaden \u00f8ker mer enn besparelsen.<\/p>\n\n\n<p>Bel\u00f8pet p\u00e5 $3 000 er <strong>ikke den samlede \u00e5rlige kostnaden ved \u00e5 kj\u00f8pe inn lagrene<\/strong>. Selve varene koster fortsatt 12 000 \u00d7 $20 = $240 000 per \u00e5r. I dette eksemplet er bel\u00f8pet det samme uansett bestillingsmengde og p\u00e5virker derfor ikke hvilken Q som er best. Hvis enhetsprisen varierer med mengden, m\u00e5 innkj\u00f8pskostnaden tas med i sammenligningen igjen.<\/p>\n\n\n<p>Dette er anslag for \u00e5rlige kostnader over tid. Et resultat som 13,33 bestillinger per \u00e5r ved partier p\u00e5 900 enheter beskriver gjennomsnittlig bestillingsfrekvens, ikke et krav om \u00e5 legge inn en br\u00f8kdel av en innkj\u00f8psordre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tilpass den beregnede mengden til det leverand\u00f8ren kan levere<\/h2>\n\n\n<p>Den grunnleggende EOQ-modellen forutsetter jevnt og kjent behov, stabile bestillings- og lagerholdskostnader, konstant ledetid for p\u00e5fylling, at hele leveransen blir tilgjengelig for bruk p\u00e5 \u00e9n gang, og at det ikke oppst\u00e5r varemangel. Den forutsetter ogs\u00e5 at det ikke finnes kvantumsrabatter eller bindende mengdebegrensninger. Modellen er mest p\u00e5litelig for varer som kj\u00f8pes regelmessig, og der innkj\u00f8psm\u00f8nsteret ligger n\u00e6r disse forutsetningene.<\/p>\n\n\n<p>Sammenlign deretter mengdene du faktisk kan kj\u00f8pe.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pakningsst\u00f8rrelser og minste bestillingsmengder<\/h3>\n\n\n<p>Anta at leverand\u00f8ren selger lagrene i pakninger p\u00e5 250. Da er det ikke mulig \u00e5 bestille 600 lagre. Bruk samme kostnadsformel til \u00e5 sammenligne de n\u00e6rmeste mengdene som tilsvarer hele pakninger:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>500 lagre:<\/strong> $1 800 i bestillingskostnader + $1 250 i lagerholdskostnader = <strong>$3 050 per \u00e5r<\/strong>.<\/li><li><strong>750 lagre:<\/strong> $1 200 i bestillingskostnader + $1 875 i lagerholdskostnader = <strong>$3 075 per \u00e5r<\/strong>.<\/li><\/ul>\n\n\n<p>Uten andre begrensninger gir 500 lavest kostnad i denne modellen. Ved automatisk \u00e5 runde opp ville du oversett dette.<\/p>\n\n\n<p>Anta n\u00e5 at leverand\u00f8ren ogs\u00e5 krever en minste bestillingsmengde p\u00e5 750. Da er 500 enheter ikke lenger et mulig valg. \u00c5 velge 750 koster $75 mer per \u00e5r enn den optimale mengden uten begrensninger, alts\u00e5 2,5 % mer i modellen. Det gir et tydelig grunnlag for \u00e5 vurdere om det er verdt innsatsen \u00e5 forhandle om en lavere minste bestillingsmengde.<\/p>\n\n\n<p>MOQ er leverand\u00f8rens nedre mengdegrense. EOQ er mengden som if\u00f8lge kj\u00f8perens beregning gir lavest kostnad. De besvarer ulike sp\u00f8rsm\u00e5l.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kvantumsrabatter og leveringsavtaler<\/h3>\n\n\n<p>En lavere enhetspris kan gj\u00f8re en st\u00f8rre bestilling l\u00f8nnsom, men sammenlign hele virkningen: \u00e5rlige innkj\u00f8pskostnader, bestillingskostnader, lagerholdskostnader og eventuell mengdeavhengig frakt. Bruk den faktiske rabattstrukturen. En pris som gjelder alle enheter, er noe annet enn en rabatt som bare gjelder enhetene over en bestemt grense.<\/p>\n\n\n<p>En rammeordre med flere avrop endrer ogs\u00e5 hva som regnes som en bestilling, og hvor mye du faktisk holder p\u00e5 lager. Ikke behandle hele kontraktsmengden som ett umiddelbart varemottak n\u00e5r leveranser og belastninger skjer hver for seg.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lagerplass, holdbarhet og ujevnt behov<\/h3>\n\n\n<p>Kontroller at partiet f\u00e5r plass i det tilgjengelige lagerarealet, og at det kan forbrukes f\u00f8r holdbarheten utl\u00f8per, konstruksjonen endres eller kundens behov opph\u00f8rer. En mengde som ikke kan brukes, er ikke \u00f8konomisk bare fordi den gir laveste kostnad p\u00e5 en forenklet kostnadskurve.<\/p>\n\n\n<p>N\u00e5r behovet varierer med sesongen eller kommer som store, uregelmessige uttak, b\u00f8r du bruke tidsfordelte behov og en egnet p\u00e5fyllingsstrategi. Ved usikkerhet om behovet eller leverand\u00f8rens leveringstidspunkt m\u00e5 sikkerhetslageret vurderes separat. \u00c5 \u00f8ke EOQ erstatter ikke en vurdering av risikoen for materialmangel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EOQ forteller hvor mye du skal bestille, ikke n\u00e5r<\/h2>\n\n\n<p>I eksempelet med lagrene forbrukes 12 000 enheter over 250 arbeidsdager. Det gir <strong>48 lagre per arbeidsdag<\/strong>. Med dette forbruket dekker et parti p\u00e5 600 lagre <strong>12,5 arbeidsdager<\/strong>. Dette er partiets forbrukssyklus, ikke leverand\u00f8rens ledetid.<\/p>\n\n\n<p>Ved lagerp\u00e5fylling med kontinuerlig overv\u00e5king brukes vanligvis f\u00f8lgende bestillingspunkt:<\/p>\n\n\n<p><strong>Bestillingspunkt = forventet behov i ledetiden for p\u00e5fylling + sikkerhetslager<\/strong><\/p>\n\n\n<p>Hvis det tar \u00e5tte arbeidsdager f\u00f8r p\u00e5fyllingen er tilgjengelig for bruk, og du i tillegg velger en buffer p\u00e5 96 lagre som et regneeksempel:<\/p>\n\n\n<p><strong>Bestillingspunkt = (48 \u00d7 8) + 96 = 480 lagre<\/strong><\/p>\n\n\n<p>N\u00e5 er beslutningene tydelig atskilt: Med denne styringsregelen bestiller du <strong>600<\/strong> n\u00e5r bestillingspunktet p\u00e5 <strong>480<\/strong> n\u00e5s. Bufferen p\u00e5 96 er en forutsetning i eksempelet, ikke et resultat av EOQ-beregningen. Bruk <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/sikkerhetslager\/\">veiledningen om sikkerhetslager<\/a> til \u00e5 vurdere hvor stor buffer usikkerheten krever.<\/p>\n\n\n<p>Bruk lagerposisjonen til \u00e5 avgj\u00f8re n\u00e5r bestillingspunktet er n\u00e5dd: brukbar beholdning p\u00e5 lager pluss utest\u00e5ende p\u00e5fylling, minus behov som allerede er utest\u00e5ende eller reservert etter reglene i lagerregnskapet. Unng\u00e5 \u00e5 trekke fra samme forpliktelse to ganger. Ser du bare p\u00e5 den fysiske lagerbeholdningen, kan du ende med \u00e5 bestille p\u00e5 nytt selv om varene allerede er p\u00e5 vei.<\/p>\n\n\n<p>Bestilte materialer er imidlertid ikke tilgjengelige for bruk enn\u00e5. En innkj\u00f8psordre kan holde lagerposisjonen over bestillingspunktet selv om forventet mottak er for sent til \u00e5 dekke en kundeordre. Mengde og ankomsttidspunkt m\u00e5 derfor vurderes sammen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hva om du produserer p\u00e5fyllingspartiet selv?<\/h2>\n\n\n<p>Bruk <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/okonomisk-produksjonskvantum\/\">\u00f8konomisk produksjonskvantum<\/a> (EPQ) n\u00e5r lageret fylles opp gradvis samtidig som forbruket fortsetter, for eksempel n\u00e5r en komponent produseres gjentatte ganger og frigj\u00f8res til lager litt etter litt. EPQ tar hensyn til forholdet mellom produksjons- og forbruksraten. Den grunnleggende EOQ-modellen forutsetter at hele partiet blir tilgjengelig samlet.<\/p>\n\n\n<p>Det avgj\u00f8rende er hvordan beholdningen blir tilgjengelig for bruk, ikke bare om ordren kalles intern eller ekstern. Delleveranser fra en leverand\u00f8r eller et produksjonsparti som holdes tilbake til endelig kvalitetsgodkjenning, kan kreve en annen modell enn ordretypen umiddelbart skulle tilsi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Knytt det planlagte varemottaket til produksjonen med SkyPlanner<\/h2>\n\n\n<p>Tenk deg at de 600 lagrene er ventet p\u00e5 mandag. To kundeordrer trenger dem, og begge konkurrerer med andre oppdrag om kapasitet til maskinering og montering. Leverand\u00f8ren flytter leveringen til torsdag. Bestillingsmengden er uendret, men produksjonsplanen for mandag er ikke lenger realistisk.<\/p>\n\n\n<p>Hvis du bare oppdaterer innkj\u00f8pslisten, vil maskink\u00f8ene og de lovede leveringsdatoene fortsatt v\u00e6re ute av takt. SkyPlanner samler disse sammenhengene i en <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">felles produksjonsplan<\/a>.<\/p>\n\n\n<p>Innkj\u00f8psordrene inneholder materialmengder og leveringsdatoer. Leveringsdatoen angir n\u00e5r materialene forventes \u00e5 v\u00e6re tilgjengelige. N\u00e5r mottaket bekreftes som Levert, oppdateres lagerbeholdningen. N\u00e5r planlegging med hensyn til materialtilgang er aktivert, p\u00e5virker materialtilgangen hvordan Arcturus, SkyPlanners KI for finplanlegging, planlegger arbeidet ut fra konfigurert kapasitet, avhengigheter mellom operasjoner og prioriteringer.<\/p>\n\n\n<p>Registrer det nye mottakstidspunktet og beregn planen p\u00e5 nytt. De ber\u00f8rte arbeidsordrene kan da tilpasses leverand\u00f8rens dato, og Gantt-visningen viser tidspunktet for dem sammen med resten av produksjonen. I stedet for \u00e5 flytte hver avhengige operasjon mellom separate k\u00f8er kan planleggeren konsentrere seg om beslutningen: fremskynde komponentleveransen, endre prioriteringer, finne en alternativ leveransekilde eller justere en lovet leveringsdato.<\/p>\n\n\n<p>Derfor er SkyPlanner et nyttig supplement til innkj\u00f8psstrategien: <strong>mindre manuell samordning mellom materialplanen og produksjonsplanen, og tidligere oversikt over hva et endret ankomsttidspunkt betyr for kundeordrene.<\/strong> Innkj\u00f8p fastsetter en \u00f8konomisk partist\u00f8rrelse som oppfyller avtalevilk\u00e5rene. Den felles planen synliggj\u00f8r konsekvensene for produksjonen.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/eskomatic\/\">Eskomatics erfaringer med SkyPlanner<\/a> viser hvorfor denne oversikten er viktig. Bedriften utf\u00f8rer maskinering p\u00e5 oppdrag og baserte seg tidligere i stor grad p\u00e5 manuelle k\u00f8er. Materialmangel ble noen ganger oppdaget for tett opptil planlagt oppstart. Med ERP-tilknyttet Gantt-planlegging og bedre oversikt over materialtilgangen rapporterer bedriften om f\u00e6rre produksjonsstopp p\u00e5 grunn av manglende materialer og mer presis fastsettelse av leveringsdatoer. Bedre materialoversikt gir teamet et mer p\u00e5litelig grunnlag for den daglige planen.<\/p>\n\n\n<p>SkyPlanner kan integreres med ethvert ERP- eller MES-system gjennom sitt \u00e5pne REST API, slik at innkj\u00f8ps- og ordredata fra systemene du allerede bruker, kan danne grunnlag for den sammenkoblede planen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ta den valgte bestillingsmengden i bruk<\/h2>\n\n\n<p>N\u00e5r lageret skal fylles p\u00e5 gjennom innkj\u00f8p, begynner du med EOQ, sammenligner aktuelle bestillingsmengder hos leverand\u00f8ren og fastsetter bestillingspunktet separat. S\u00f8rg deretter for at varemottaket fortsatt er knyttet til ordrene som skal bruke materialene. <a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en demo av SkyPlanner<\/a> med \u00e9n innkj\u00f8pt komponent, forventet ankomst og to kundeordrer som er avhengige av den, for \u00e5 se hvordan denne koblingen endrer produksjonsplanen. Vil du heller utforske selv f\u00f8rst, kan du <a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8ve SkyPlanner med demodata<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde Hjem &raquo; Ressurser &raquo; Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde Optimal bestillingsmengde (EOQ) er mengden som ved hver lagerp\u00e5fylling gir lavest samlede bestillings- og lagerholdskostnader i den grunnleggende EOQ-modellen. For en produsent som kj\u00f8per inn en komponent regelmessig, besvarer modellen sp\u00f8rsm\u00e5let: Hvor mye b\u00f8r vi bestille hver gang, gitt &#8230; <a title=\"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/\" aria-label=\"Read more about Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":107916,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2561,505],"tags":[],"class_list":["post-107910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produksjon","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde<\/title>\n<meta name=\"description\" content=\"Finn optimal bestillingsmengde for en komponent som kj\u00f8pes jevnlig, sjekk leverand\u00f8rkrav og knytt ankomsten til produksjonsordrene som trenger den.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde\" \/>\n<meta property=\"og:description\" content=\"Finn optimal bestillingsmengde for en komponent som kj\u00f8pes jevnlig, sjekk leverand\u00f8rkrav og knytt ankomsten til produksjonsordrene som trenger den.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T19:50:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T19:52:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:52:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/\"},\"wordCount\":2046,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"articleSection\":[\"Effektiv produksjon\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/\",\"name\":\"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:52:15+00:00\",\"description\":\"Finn optimal bestillingsmengde for en komponent som kj\u00f8pes jevnlig, sjekk leverand\u00f8rkrav og knytt ankomsten til produksjonsordrene som trenger den.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/optimal-bestillingsmengde\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde","description":"Finn optimal bestillingsmengde for en komponent som kj\u00f8pes jevnlig, sjekk leverand\u00f8rkrav og knytt ankomsten til produksjonsordrene som trenger den.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/","og_locale":"nb_NO","og_type":"article","og_title":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde","og_description":"Finn optimal bestillingsmengde for en komponent som kj\u00f8pes jevnlig, sjekk leverand\u00f8rkrav og knytt ankomsten til produksjonsordrene som trenger den.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T19:50:04+00:00","article_modified_time":"2026-10-23T19:52:15+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"10 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:52:15+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/"},"wordCount":2046,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","articleSection":["Effektiv produksjon","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/","name":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:52:15+00:00","description":"Finn optimal bestillingsmengde for en komponent som kj\u00f8pes jevnlig, sjekk leverand\u00f8rkrav og knytt ankomsten til produksjonsordrene som trenger den.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","width":1776,"height":999,"caption":"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/optimal-bestillingsmengde\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde Hjem &raquo; Ressurser &raquo; Optimal bestillingsmengde: Beregn en bedre innkj\u00f8psmengde Optimal bestillingsmengde (EOQ) er mengden som ved hver lagerp\u00e5fylling gir lavest samlede bestillings- og lagerholdskostnader i den grunnleggende EOQ-modellen. For en produsent som kj\u00f8per inn en komponent regelmessig, besvarer modellen sp\u00f8rsm\u00e5let: Hvor mye b\u00f8r vi bestille hver gang, gitt&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/107910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=107910"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/107910\/revisions"}],"predecessor-version":[{"id":107973,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/107910\/revisions\/107973"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/107916"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=107910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=107910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=107910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}