{"id":105721,"date":"2026-10-22T05:45:06","date_gmt":"2026-10-22T05:45:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105721"},"modified":"2026-10-22T05:47:39","modified_gmt":"2026-10-22T05:47:39","slug":"vrakprosent-i-produksjon","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/","title":{"rendered":"Vrakprosent i produksjon: Beregn det reelle tapet"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Vrakprosent i produksjon: Beregn det reelle tapet<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/no\/\">Hjem<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/\">Ressurser<\/a> &raquo; Vrakprosent i produksjon: Beregn det reelle tapet<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Estimert lesetid: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minutter<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Partiet er ferdig, men ordren er ikke det. Kontrollen har avdekket deler som m\u00e5 vrakes, materialene er allerede brukt, og kunden forventer fortsatt hele antallet p\u00e5 fredag.<\/p>\n\n\n<p><strong>Vrakprosent i produksjon er prosentandelen av en definert produksjonsmengde som vrakes endelig, i stedet for \u00e5 godkjennes for tiltenkt bruk.<\/strong> For en avgrenset gruppe sammenlignbare enheter der alle er ferdigbehandlet, beregnes den slik:<\/p>\n\n\n<p><strong>Vrakprosent (%) = Antall endelig vrakede enheter \u00f7 Totalt antall enheter i samme produksjonsgruppe \u00d7 100<\/strong><\/p>\n\n\n<p>Nevneren omfatter b\u00e5de godkjente og vrakede enheter. Deler som blir godkjent etter omarbeiding, regnes som godkjent produksjon, ikke som endelig vrak.<\/p>\n\n\n<p>En p\u00e5litelig prosentverdi hjelper deg med \u00e5 finne tilbakevendende tap. For \u00e5 h\u00e5ndtere tapet m\u00e5 du ogs\u00e5 korrigere materialoversikten og finne plass til eventuell erstatningsproduksjon. SkyPlanner st\u00f8tter vrakrapportering gjennom registrering av feilaktige deler og tar hensyn til materialforbruket deres n\u00e5r materialsporing er konfigurert. Deretter hjelper KI-basert finplanlegging deg med \u00e5 f\u00e5 godkjente operasjoner for erstatningsproduksjon inn i samme plan som ordrene du allerede har lovet \u00e5 levere.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Beregn vrakprosenten ut fra endelige utfall, ikke hver gang en del ikke best\u00e5r kontrollen<\/h2>\n\n\n<p>Tenk deg et parti med 1 000 maskinerte deler. Du f\u00f8lger de opprinnelige delene gjennom kontroll og eventuell tillatt omarbeiding til hver del har f\u00e5tt et endelig utfall:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Utfall for det opprinnelige partiet<\/th><th>Antall deler<\/th><th>Hvordan de inng\u00e5r i endelig vrakprosent<\/th><\/tr><\/thead><tbody><tr><td>Godkjent ved f\u00f8rste fors\u00f8k<\/td><td>920<\/td><td>Godkjent produksjon<\/td><\/tr><tr><td>Godkjent etter omarbeiding<\/td><td>30<\/td><td>Godkjent produksjon, med ekstraarbeid registrert separat<\/td><\/tr><tr><td>Endelig vraket<\/td><td>50<\/td><td>Teller i vrakberegningen<\/td><\/tr><tr><td>Totalt antall opprinnelige enheter<\/td><td>1 000<\/td><td>Nevner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Den endelige vrakprosenten er <strong>50 \u00f7 1 000 \u00d7 100 = 5 %<\/strong>. Med 950 godkjente deler er den endelige godkjentandelen 95 %.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/first-pass-yield\/\">First pass yield<\/a> svarer p\u00e5 et annet sp\u00f8rsm\u00e5l. Bare de 920 delene som ble godkjent uten korrigering, gikk gjennom p\u00e5 f\u00f8rste fors\u00f8k. Det gir <strong>92 % FPY<\/strong>. De resterende 8 % var ikke bare vrak: 30 deler ble godkjent etter omarbeiding. Omarbeiding tar tid, men krever ikke n\u00f8dvendigvis et nytt, helt emne eller at den opprinnelige delen \u00f8delegges.<\/p>\n\n\n<p>Deler du de 50 vrakede delene p\u00e5 de 950 godkjente delene, f\u00e5r du omtrent 5,26 %, ikke de 5 % av den opprinnelige produksjonen som gikk tapt. Forholdet mellom vrak og godkjent produksjon kan v\u00e6re nyttig i en egen kostnadsberegning, men m\u00e5 merkes som nettopp det. Ikke sammenlign det med vrak som prosentandel av total produksjon.<\/p>\n\n\n<p>N\u00e5r erstatningsdelene produseres, m\u00e5 denne produksjonen kunne identifiseres separat. Dette er nye enheter, ikke flere kontrollfors\u00f8k p\u00e5 det opprinnelige partiet. Hvis du rapporterer et samlet resultat som inkluderer dem, m\u00e5 b\u00e5de godkjente erstatningsdeler og eventuelt ytterligere vrak inng\u00e5 i det samme beregningsgrunnlaget.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fastsett telleregler som teamet kan bruke konsekvent<\/h2>\n\n\n<p>En tydelig m\u00e5ledefinisjon hindrer at tallet endrer seg bare fordi ett skift registrerer feil annerledes enn et annet. Bli enige om produktgruppe, avgrensning av prosessen, rapporteringsgrunnlag og regler for endelig klassifisering f\u00f8r dere tolker en trend.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Knytt vraket til produksjonen det stammer fra<\/h3>\n\n\n<p>Start med et sporbart parti eller et avgrenset antall enheter fra en ordre der de endelige utfallene kan avstemmes. Hvis kontroll eller omarbeiding tar flere dager, kan du blande ulike grupper ved \u00e5 dele antallet deler som besluttes vraket i dag, p\u00e5 antallet enheter som settes i produksjon i dag.<\/p>\n\n\n<p>For fast perioderapportering m\u00e5 dere definere hvilken periode sene beslutninger skal tilordnes, og hvordan uavklarte antall skal vises. Hvis 20 deler fortsatt venter p\u00e5 en avgj\u00f8relse, er de verken bekreftet godkjente eller endelig vraket. Vis dem som uavklarte, og fastsett det endelige resultatet n\u00e5r hele gruppen er avklart. Ikke fjern dem i det stille for \u00e5 f\u00e5 prosenttallet til \u00e5 se bedre ut.<\/p>\n\n\n<p>Tell hver opprinnelige enhet \u00e9n gang innenfor den valgte avgrensningen. En del som vrakes ved maskinering og nevnes igjen i sluttkontrollrapporten, er ikke to vrakede deler. Flere feil p\u00e5 samme del utgj\u00f8r ogs\u00e5 bare \u00e9n tapt enhet, selv om hver feil kan v\u00e6re relevant for unders\u00f8kelsen.<\/p>\n\n\n<p>Resultater for enkeltoperasjoner og for hele produksjonsruten m\u00e5 defineres hver for seg. Vrakprosenten ved maskinering beregnes ut fra enhetene som g\u00e5r inn i den operasjonen, mens en samlet vrakprosent f\u00f8lger den opprinnelige produksjonsgruppen gjennom hele ruten. \u00c5 legge sammen prosentene for enkeltoperasjonene gir ikke en p\u00e5litelig vrakprosent for hele fabrikken.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skill mellom endelig vrak, omarbeiding og materialsvinn<\/h3>\n\n\n<p>N\u00e5r en del ikke best\u00e5r kontrollen, m\u00e5 det avgj\u00f8res hva som skal skje videre. Delen kan omarbeides, holdes tilbake for unders\u00f8kelse eller vrakes endelig. Bevar dette skillet i registreringene som ligger til grunn for n\u00f8kkeltallet.<\/p>\n\n\n<p>Skill ogs\u00e5 mellom underkjente produkter og forventet prosessavfall. Spon, skj\u00e6reavkapp og materialer brukt ved oppstart kan h\u00f8re hjemme i et m\u00e5l for materialtap selv om alle ferdige deler best\u00e5r kontrollen. Hvis dette blandes inn i en stykkbasert telling av underkjente deler, blir resultatet vanskelig \u00e5 tolke.<\/p>\n\n\n<p>Hvis du m\u00e5ler materialvrak etter vekt, m\u00e5 du bruke vekt p\u00e5 begge sider av beregningen. Tenk deg for eksempel en avsluttet skj\u00e6reserie med 500 kg tilf\u00f8rt materiale, der 40 kg er klassifisert som vrak og de resterende 460 kg er registrert som nyttig utbytte. Andelen materialvrak er <strong>40 \u00f7 500 \u00d7 100 = 8 %<\/strong>. Oppgi om vraket omfatter normalt avkapp, unormale vrakdeler eller begge deler, og f\u00f8r gjenbrukbare rester og materialer som fortsatt er i arbeid, separat.<\/p>\n\n\n<p>Disse 8 % kan ikke sammenlignes direkte med partiets vrakprosent p\u00e5 5 % m\u00e5lt i antall deler. De beskriver ulike tap. Et tungt, vraket st\u00f8pestykke kan ha langt st\u00f8rre betydning for materialforbruket enn en liten, vraket kobling.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Summer mengder, ikke prosenttall med ulikt grunnlag<\/h3>\n\n\n<p>For sammenlignbare produkter som m\u00e5les p\u00e5 samme grunnlag, summerer du vrakmengdene og totalmengdene f\u00f8r du dividerer. Ikke bruk et enkelt gjennomsnitt av partienes vrakprosenter n\u00e5r partist\u00f8rrelsene er forskjellige.<\/p>\n\n\n<p>Hold ulike produkter synlige hver for seg n\u00e5r materialverdi, produksjonsruter eller konsekvenser er forskjellige. Fabrikkens gjennomsnitt kan synke bare fordi det ble produsert mer av et enkelt produkt. Se vrakprosenten sammen med de underliggende mengdene, produktmiksen og tapskostnaden f\u00f8r du konkluderer med at prosessen er blitt bedre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sett en verdi p\u00e5 tapet<\/h2>\n\n\n<p>Vrakprosenten beskriver mengden, ikke hele den \u00f8konomiske konsekvensen. En del som vrakes etter flere operasjoner, har krevd mer arbeid enn en som vrakes f\u00f8r maskineringen starter.<\/p>\n\n\n<p>La oss g\u00e5 tilbake til eksempelet med 50 vrakede deler. Anta at hver del inneholder materialer for $12, og at det har p\u00e5l\u00f8pt $8 i bearbeidingskostnader per del n\u00e5r den vrakes. Materialtapet er <strong>$600<\/strong>, og de p\u00e5l\u00f8pte bearbeidingskostnadene er <strong>$400<\/strong>. Hvis gjenvinning av vrakmaterialet gir $2 per vraket del, blir det registrerte nettotapet etter denne forenklede beregningen:<\/p>\n\n\n<p><strong>50 \u00d7 ($12 + $8 \u2212 $2) = $900<\/strong><\/p>\n\n\n<p>Bruk egne kalkyleregler for kostnadene som har p\u00e5l\u00f8pt frem til vrakingen. Gjenvinningsverdien kan redusere det \u00f8konomiske nettotapet, men gj\u00f8r ikke vrakdelene leveringsklare igjen og gir heller ikke tilbake produksjonstiden som er brukt.<\/p>\n\n\n<p>Hold tapet som allerede har oppst\u00e5tt, atskilt fra fremtidige kostnader ved \u00e5 dekke mangelen. Produksjon av erstatningsdeler krever nye materialer og operasjoner. Ikke tell dette fremtidige arbeidet dobbelt ved \u00e5 inkludere det b\u00e5de i et tapstall med alle kostnader innregnet og i et separat anslag for erstatningsproduksjonen uten \u00e5 forklare avgrensningen.<\/p>\n\n\n<p>For beslutningen som m\u00e5 tas n\u00e5, m\u00e5 du identifisere hva som faktisk endres: for eksempel ekstra materialinnkj\u00f8p, overtid, ekstern bearbeiding eller ekspressfrakt. Frigjort maskintid kan v\u00e6re verdifull selv om den ikke umiddelbart reduserer l\u00f8nns- eller utstyrskostnadene. \u00c5 regne hver unng\u00e5tte dollar i vrakkostnader som en umiddelbar kontantbesparelse overdriver effekten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lag en produksjonsplan som dekker mangelen og fortsatt gj\u00f8r levering mulig<\/h2>\n\n\n<p>I eksempelet har 1 000 opprinnelige enheter gitt bare 950 godkjente deler. Hvis kunden trenger 1 000 og det ikke finnes egnede deler p\u00e5 lager, gjenst\u00e5r det \u00e5 levere 50 godkjente deler. Dette krever en beslutning om levering, ikke bare en registrering av kvalitetsresultatet.<\/p>\n\n\n<p>Avklar f\u00f8rst hvilke materialer som faktisk er tilgjengelige for arbeidet. Godkjenn deretter produksjonsruten, antallet og n\u00f8dvendige kontroller for erstatningsproduksjonen. Bruk realistiske operasjonstider, og ta h\u00f8yde for omstillinger. Hvis det forventes flere vrakdeler, m\u00e5 det planlagte tilleggsantallet oppgis tydelig i stedet for \u00e5 anta at alle erstatningsdelene blir godkjent.<\/p>\n\n\n<p>Tenk deg at den godkjente erstatningsproduksjonen krever seks minutter maskinering per del. I dette eksempelet forutsetter vi at ingen flere deler vrakes. De 50 delene krever <strong>300 minutter maskinering, eller fem timer<\/strong>, f\u00f8r ekstra tid til omstilling og kontroll. Hvis maskinen bare har tre ledige timer f\u00f8r neste operasjon m\u00e5 starte, er det ikke plass til erstatningsproduksjonen der som planlagt.<\/p>\n\n\n<p>\u00c5 legge arbeidet i en uoffisiell hastek\u00f8 skjuler konflikten, men skaper ikke kapasiteten som mangler. Du m\u00e5 vurdere om en annen egnet maskin kan bidra, om ekstra kapasitet kan forsvares, om en annen ordre kan flyttes, eller om en lovet leveringsdato m\u00e5 endres.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Knytt materialforbruk og erstatningsproduksjon sammen i SkyPlanner<\/h3>\n\n\n<p>I SkyPlanner kan operat\u00f8rer rapportere vrak som <strong>feilaktige deler n\u00e5r de stopper tidtakingen for jobben<\/strong>. N\u00e5r materialsporing er konfigurert, omfatter forbruket ogs\u00e5 materialene som er brukt til disse delene, og lagerbeholdningen oppdateres. Det bidrar til at neste jobb ikke baseres p\u00e5 emner som allerede er brukt til \u00e5 lage underkjente deler.<\/p>\n\n\n<p>Hvis det for eksempel brukes ti emner for \u00e5 f\u00e5 \u00e5tte godkjente deler fordi to deler vrakes, m\u00e5 materialregistreringen vise ti emner, ikke \u00e5tte. I dette tilfellet er de to feilaktige delene bekreftet som endelig vrak. N\u00e5r du avstemmer n\u00f8kkeltallet for endelig vrak, m\u00e5 deler som kan repareres, og deler med uavklart kvalitetsstatus kunne skilles ut. Et generelt antall deler som ikke har best\u00e5tt kvalitetskontrollen, fastsl\u00e5r ikke alene det endelige utfallet for hver del.<\/p>\n\n\n<p>Legg deretter de godkjente operasjonene for erstatningsproduksjon inn i SkyPlanners <a href=\"https:\/\/skyplanner.ai\/no\/ressurser\/hva-er-produksjonsplanlegging\/\">felles produksjonsplan<\/a>. <strong>Arcturus, SkyPlanners KI for finplanlegging, beregner plasseringen ut fra konfigurert kapasitet, avhengigheter mellom operasjoner og prioriteringer.<\/strong> Gantt-tidslinjen viser den beregnede rekkef\u00f8lgen og ferdigdatoene sammen med de andre ordrene som bruker de samme ressursene. N\u00e5r planlegging med hensyn til materialer er aktivert, p\u00e5virker ogs\u00e5 materialtilgangen beregningen.<\/p>\n\n\n<p>For erstatningsproduksjonen p\u00e5 fem timer kan du se hvordan de resterende operasjonene og andre kundeordrer p\u00e5virkes, f\u00f8r du lover en dato for n\u00e5r etterslepet skal v\u00e6re hentet inn. Du styrer prioriteringene og hvilke planleggingsbeslutninger som skal l\u00e5ses. Arcturus beregner den samlede planen, slik at du slipper \u00e5 bygge opp hver ber\u00f8rte maskink\u00f8 p\u00e5 nytt for h\u00e5nd.<\/p>\n\n\n<p>Derfor er SkyPlanner et nyttig neste steg n\u00e5r vrak stadig forstyrrer produksjonen: Registrerte tap, forbrukt materiale og gjenst\u00e5ende arbeid blir en del av grunnlaget for omplanleggingen, i stedet for separate tall som kvalitetsavdelingen, lageret og arbeidslederen m\u00e5 avstemme i etterkant. SkyPlanner kan integreres med ethvert ERP- eller MES-system gjennom sitt \u00e5pne REST API, slik at eksisterende ordre- og kvalitetsregistreringer fortsatt kan inng\u00e5 i den sammenhengende arbeidsflyten.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hva endret seg da Eskomatic fikk bedre materialoversikt?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/no\/kundehistorier\/eskomatic\/\">Eskomatic, som utf\u00f8rer maskinering p\u00e5 oppdrag<\/a>, organiserte tidligere jobbk\u00f8ene stort sett manuelt i et eldre system for ERP og produksjonsstyring. Begrenset oversikt over materialene gjorde at materialmangler kunne bli oppdaget for tett opp mot planlagt jobbstart.<\/p>\n\n\n<p>Da SkyPlanner ble koblet til bedriftens eksisterende ERP-system, fikk de en mer oversiktlig jobbk\u00f8 i Gantt, innsyn i materialmangler og automatisk planlegging av kapasitetsbelastningen. Eskomatic forteller at de n\u00e5 kan fastsette leveringsdatoer mer presist, og at de har f\u00e6rre produksjonsstopp som skyldes manglende materialer.<\/p>\n\n\n<p>Erfaringen deres viser den praktiske verdien av \u00e5 tilpasse arbeidsrekkef\u00f8lgen til n\u00e5r materialene er klare: f\u00e6rre overraskelser rett f\u00f8r produksjonsstart og et bedre grunnlag for leveringsdatoen kunden f\u00e5r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Reduser vrak ved \u00e5 utbedre en bekreftet \u00e5rsak<\/h2>\n\n\n<p>Det finnes ingen felles grense for akseptabel vrakprosent som passer alle produksjonsprosesser. En fast prosess for gjentakende produksjon, oppstart med et nytt produkt og en maskineringsrute for deler med h\u00f8y verdi har ulike tapsm\u00f8nstre. Sett et m\u00e5l ut fra sammenlignbar produksjon, kundekrav og konsekvensene av feil, ikke en universell akseptgrense som 5 %.<\/p>\n\n\n<p>Bruk registreringene bak vrakprosenten til \u00e5 velge hva som skal unders\u00f8kes. Grupper tapene etter produkt, operasjon, materialparti og bekreftet \u00e5rsak der opplysningene finnes. Prioriter problemene etter tapt mengde, kostnad og konsekvenser for levering. Den st\u00f8rste haugen med vrak er ikke automatisk det mest presserende produksjonsproblemet.<\/p>\n\n\n<p>La funnene styre tiltakene:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Gjentatte tilfeller av deler underkjent p\u00e5 grunn av m\u00e5lavvik:<\/strong> kontroller verkt\u00f8ytilstand, fiksturer, offsetverdier og prosessinnstillinger opp mot det konkrete kravet som ikke er oppfylt.<\/li><li><strong>Tap konsentrert i ett materialparti:<\/strong> unders\u00f8k det innkommende materialet og dokumentasjonen fra leverand\u00f8ren f\u00f8r du legger skylden p\u00e5 maskinen eller operat\u00f8ren.<\/li><li><strong>Avviste deler ved oppstart eller omstilling:<\/strong> kontroller oppsettet og godkjenningen av f\u00f8rste del f\u00f8r hele serien settes i gang.<\/li><li><strong>Skader mellom operasjoner:<\/strong> unders\u00f8k h\u00e5ndtering, lagring og beskyttelse der skaden oppst\u00e5r.<\/li><\/ul>\n\n\n<p>Utpek en ansvarlig for det korrigerende tiltaket, og kontroller senere, sammenlignbare partier etter de samme godkjenningskriteriene. Tidligere kontroll kan hindre at du legger mer arbeid og verdi i en del som allerede har feil, selv f\u00f8r \u00e5rsaken til feilen er fjernet. En lavere vrakprosent er ingen forbedring hvis den bare skyldes mindre streng kontroll eller at avviste deler ikke blir registrert.<\/p>\n\n\n<p>Kvalitetsforbedring forebygger neste tap. En realistisk material- og kapasitetsplan hjelper deg \u00e5 h\u00e5ndtere tapet som allerede har oppst\u00e5tt. N\u00e5r du f\u00f8lger opp begge deler, blir vrakprosenten et grunnlag for bedre produksjonsstyring.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se hva et avvist parti betyr for neste levering<\/h2>\n\n\n<p>Ta med et nylig tilfelle av endelig vraking til en SkyPlanner-demo: opprinnelig og godkjent antall, materialforbruket, godkjente operasjoner for erstatningsproduksjon og en kundeordre som blir ber\u00f8rt.<\/p>\n\n\n<p>Bruk situasjonen til \u00e5 utforske en konkret plan for \u00e5 hente inn etterslepet. Ta h\u00f8yde for manglende materialer, tilpass arbeidet til eksisterende forpliktelser og se hvilke beslutninger om levering som krever oppf\u00f8lging f\u00f8r kunden m\u00e5 sp\u00f8rre.<\/p>\n\n\n<p><strong><a href=\"https:\/\/skyplanner.ai\/no\/kontakt-salg\/\">Bestill en SkyPlanner-demo<\/a><\/strong> for \u00e5 diskutere produksjonen din, eller <strong><a href=\"https:\/\/skyplanner.ai\/no\/prove\/\">pr\u00f8v SkyPlanner med demodata<\/a><\/strong> hvis du vil utforske selv f\u00f8rst.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Vrakprosent i produksjon: Beregn det reelle tapet Hjem &raquo; Ressurser &raquo; Vrakprosent i produksjon: Beregn det reelle tapet Partiet er ferdig, men ordren er ikke det. Kontrollen har avdekket deler som m\u00e5 vrakes, materialene er allerede brukt, og kunden forventer fortsatt hele antallet p\u00e5 fredag. Vrakprosent i produksjon er prosentandelen av en definert produksjonsmengde som &#8230; <a title=\"Vrakprosent i produksjon: Beregn det reelle tapet\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/\" aria-label=\"Read more about Vrakprosent i produksjon: Beregn det reelle tapet\">Les mer<\/a><\/p>\n","protected":false},"author":3,"featured_media":105729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2561,505],"tags":[],"class_list":["post-105721","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-effektiv-produksjon","category-ressurser","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vrakprosent i produksjon: Beregn det reelle tapet<\/title>\n<meta name=\"description\" content=\"Vrak koster mer enn materialer. Beregn riktig vrakprosent, ta h\u00f8yde for tapt lagerbeholdning og f\u00e5 erstatningsproduksjonen inn i en realistisk leveringsplan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/\" \/>\n<meta property=\"og:locale\" content=\"nb_NO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vrakprosent i produksjon: Beregn det reelle tapet\" \/>\n<meta property=\"og:description\" content=\"Vrak koster mer enn materialer. Beregn riktig vrakprosent, ta h\u00f8yde for tapt lagerbeholdning og f\u00e5 erstatningsproduksjonen inn i en realistisk leveringsplan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T05:45:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:47:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Skrevet av\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Ansl. lesetid\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutter\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Vrakprosent i produksjon: Beregn det reelle tapet\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:47:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/\"},\"wordCount\":2255,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"articleSection\":[\"Effektiv produksjon\",\"Ressurser\"],\"inLanguage\":\"nb-NO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/\",\"name\":\"Vrakprosent i produksjon: Beregn det reelle tapet\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:47:39+00:00\",\"description\":\"Vrak koster mer enn materialer. Beregn riktig vrakprosent, ta h\u00f8yde for tapt lagerbeholdning og f\u00e5 erstatningsproduksjonen inn i en realistisk leveringsplan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#breadcrumb\"},\"inLanguage\":\"nb-NO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/ressurser\\\/vrakprosent-i-produksjon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vrakprosent i produksjon: Beregn det reelle tapet\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nb-NO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/no\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nb-NO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vrakprosent i produksjon: Beregn det reelle tapet","description":"Vrak koster mer enn materialer. Beregn riktig vrakprosent, ta h\u00f8yde for tapt lagerbeholdning og f\u00e5 erstatningsproduksjonen inn i en realistisk leveringsplan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/","og_locale":"nb_NO","og_type":"article","og_title":"Vrakprosent i produksjon: Beregn det reelle tapet","og_description":"Vrak koster mer enn materialer. Beregn riktig vrakprosent, ta h\u00f8yde for tapt lagerbeholdning og f\u00e5 erstatningsproduksjonen inn i en realistisk leveringsplan.","og_url":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T05:45:06+00:00","article_modified_time":"2026-10-22T05:47:39+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Skrevet av":"Jussi M\u00e4ntyl\u00e4","Ansl. lesetid":"11 minutter"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Vrakprosent i produksjon: Beregn det reelle tapet","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:47:39+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/"},"wordCount":2255,"publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","articleSection":["Effektiv produksjon","Ressurser"],"inLanguage":"nb-NO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/","url":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/","name":"Vrakprosent i produksjon: Beregn det reelle tapet","isPartOf":{"@id":"https:\/\/skyplanner.ai\/no\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:47:39+00:00","description":"Vrak koster mer enn materialer. Beregn riktig vrakprosent, ta h\u00f8yde for tapt lagerbeholdning og f\u00e5 erstatningsproduksjonen inn i en realistisk leveringsplan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#breadcrumb"},"inLanguage":"nb-NO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/"]}]},{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","width":1776,"height":999,"caption":"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/no\/ressurser\/vrakprosent-i-produksjon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/no\/"},{"@type":"ListItem","position":2,"name":"Vrakprosent i produksjon: Beregn det reelle tapet"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/no\/#website","url":"https:\/\/skyplanner.ai\/no\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/no\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/no\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nb-NO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/no\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/no\/","logo":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/no\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nb-NO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/no\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Vrakprosent i produksjon: Beregn det reelle tapet Hjem &raquo; Ressurser &raquo; Vrakprosent i produksjon: Beregn det reelle tapet Partiet er ferdig, men ordren er ikke det. Kontrollen har avdekket deler som m\u00e5 vrakes, materialene er allerede brukt, og kunden forventer fortsatt hele antallet p\u00e5 fredag. Vrakprosent i produksjon er prosentandelen av en definert produksjonsmengde som&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/105721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/comments?post=105721"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/105721\/revisions"}],"predecessor-version":[{"id":105783,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/posts\/105721\/revisions\/105783"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media\/105729"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/media?parent=105721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/categories?post=105721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/no\/wp-json\/wp\/v2\/tags?post=105721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}