{"id":29258,"date":"2023-11-03T15:19:45","date_gmt":"2023-11-03T15:19:45","guid":{"rendered":"https:\/\/skyplanner.ai\/middelen\/productie-planner-salaris-in-nederland-2023\/"},"modified":"2026-06-19T21:06:56","modified_gmt":"2026-06-19T21:06:56","slug":"productie-planner-salaris-in-nederland-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/","title":{"rendered":"Salaris van een productieplanner in Nederland 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-planner-salary-in-the-netherlands-2026\">Salaris van een productieplanner in Nederland 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen. Het is echter belangrijk om op te merken dat dit salaris kan vari\u00ebren op basis van factoren zoals opleidingsachtergrond, geografische locatie binnen het land en de specifieke sector van het werkgevende bedrijf. <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Nederland, befaamd om zijn innovatieve productiesectoren die vari\u00ebren van hightechsystemen tot duurzame energieoplossingen, biedt een levendig landschap voor productieplanners. Naarmate sectoren zoals agrifood, chemische productie en waterbeheer blijven floreren, wordt de rol van bekwame productieplanners steeds belangrijker. Zij zijn de dirigenten die complexe processen orkestreren en zorgen voor effici\u00ebntie en tijdigheid in productielijnen. <\/p>\n\n\n\n<p>Deze bloeiende omgeving onderstreept niet alleen de Nederlandse productiekracht, maar wijst ook op een veelbelovende toekomst voor wie in de productieplanning werkt. Voor wie ge\u00efnteresseerd is om dit loopbaanpad verder te verkennen, zijn het verdiepen in de vereiste vaardigheden, het begrijpen van factoren die het salaris be\u00efnvloeden en het meer te weten komen over kansen voor professionele groei in deze dynamische en technologisch geavanceerde omgeving essenti\u00eble stappen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-the-average-production-planner-salary-in-the-netherlands-in-2026\">Het gemiddelde salaris van een productieplanner in Nederland in 2026<\/h2>\n\n\n\n<p>In 2026 verdient een productieplanner in Nederland doorgaans een <strong>jaarlijks<\/strong> bedrag van ongeveer<strong> \u20ac<strong>50,686<\/strong><\/strong>, wat neerkomt op ongeveer <strong>\u20ac<strong>4,224<\/strong> per maand<\/strong> v\u00f3\u00f3r eventuele inhoudingen. Dit salarisniveau overstijgt aanzienlijk het gemiddelde loon van het land, dat dicht bij <strong>\u20ac44,000 per jaar<\/strong> ligt.<\/p>\n\n\n\n<p> Niettemin kunnen mogelijke variaties in dit salaris worden be\u00efnvloed door aspecten zoals iemands academische kwalificaties, de woonplaats binnen Nederland en de specifieke sector van de werkgever. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vergelijkende analyse met buurlanden<\/h2>\n\n\n\n<p>In vergelijking met buurlanden biedt Nederland een concurrerend salaris voor productieplanners. <a href=\"\/nl\/middelen\/salaris-productieplanner-in-spanje-2026\/\">Het salaris van een productieplanner in Spanje<\/a> ligt bijvoorbeeld over het algemeen lager voor deze functie. Daarentegen zijn de cijfers voor <a href=\"\/nl\/middelen\/salaris-productieplanner-in-frankrijk-2026\/\">het salaris van een productieplanner in Frankrijk<\/a> vergelijkbaar. <a href=\"\/nl\/middelen\/salaris-productieplanner-in-groot-brittannie-2026\/\">Het salaris van een productieplanner in het Verenigd Koninkrijk <\/a>is concurrerend maar iets lager. De Nederlandse levensstandaard, bekend om zijn kwaliteit, gaat gepaard met hogere kosten, vergelijkbaar met landen als Frankrijk en het Verenigd Koninkrijk. Het beoordelen van de algehele financi\u00eble aantrekkelijkheid van de functie van productieplanner vereist daarom een afweging van zowel het salaris als de kosten van levensonderhoud in deze landen.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Factoren die het salaris van een productieplanner in Nederland be\u00efnvloeden<\/h2>\n\n\n\n<p>Verschillende factoren hebben een aanzienlijke invloed op het salaris van een productieplanner in Nederland. Het begrijpen van deze elementen is van cruciaal belang voor wie een carri\u00e8re in dit vakgebied overweegt. Hier volgt een gedetailleerd overzicht van de belangrijkste factoren:<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Opleiding<\/h4>\n\n\n\n<p>De opleidingsachtergrond van een productieplanner speelt een doorslaggevende rol bij het bepalen van het salaris. Doorgaans kan een hoger opleidingsniveau, zoals een masterdiploma in supply chain management of een gerelateerd vakgebied, leiden tot een hogere beloning. Voortdurende professionele ontwikkeling, zoals gespecialiseerde certificeringen, vergroot eveneens het verdienpotentieel.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Ervaring<\/h4>\n\n\n\n<p>Ervaring heeft een aanzienlijke invloed op het salaris van een productieplanner. Startersfuncties beginnen mogelijk met een lager loon, maar naarmate men ervaring opdoet, met name in het beheren van complexe toeleveringsketens of het aansturen van grootschalige productieprocessen, kunnen de salarissen aanzienlijk stijgen.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vaardigheden<\/h4>\n\n\n\n<p>Een gevarieerd vaardighedenpakket is van onschatbare waarde voor een productieplanner. Expertise in APS-systemen (geavanceerde planning en inplanning) of <a href=\"\/nl\/middelen\/wat-is-erp\/\">ERP-systemen<\/a> is bijvoorbeeld zeer gewild. Andere cruciale vaardigheden zijn onder meer bedrevenheid in data-analyse, projectmanagement en probleemoplossend vermogen, die elk bijdragen aan betere salarisvooruitzichten.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Locatie<\/h4>\n\n\n\n<p>De geografische locatie binnen Nederland heeft invloed op de salarisniveaus. Zo kan een productieplanner die in Amsterdam werkt een hoger salaris vragen dan planners in kleinere steden, wat de hogere kosten van levensonderhoud in de hoofdstad en de concentratie van grotere bedrijven weerspiegelt.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Omvang van het bedrijf<\/h4>\n\n\n\n<p>De omvang van het bedrijf waar men werkt is een andere belangrijke factor. Grotere bedrijven hebben vaak complexere toeleveringsketens en aanzienlijke productievolumes, waarvoor bekwame planners nodig zijn. Daarom bieden dergelijke bedrijven doorgaans hogere salarissen dan kleinere ondernemingen.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Type bedrijf<\/h4>\n\n\n\n<p>De branche of sector waarin een bedrijf actief is, kan ook van invloed zijn op het salaris van een productieplanner. Sectoren met hogere productievereisten, zoals technologie of farmacie, kunnen hogere lonen bieden vanwege de gespecialiseerde vaardigheden en de grotere mate van verantwoordelijkheid die vereist zijn.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Rol en taken van een productieplanner<\/h2>\n\n\n\n<p>Een productieplanner speelt een cruciale rol in productie- en supply chain-activiteiten. Tot hun belangrijkste verantwoordelijkheden behoren:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Productieplanning:<\/strong>&nbsp;Het ontwikkelen, beoordelen en aanpassen van productieschema&#8217;s om optimale effici\u00ebntie te waarborgen.<\/li>\n\n\n\n<li><strong>Resourcebeheer:<\/strong>&nbsp;Het effectief toewijzen van resources, waaronder personeel en materialen, om productiedoelen te halen.<\/li>\n\n\n\n<li><strong>Co\u00f6rdinatie:<\/strong>&nbsp;Samenwerken met afdelingen zoals inkoop, logistiek en verkoop om de productie af te stemmen op andere bedrijfsprocessen.<\/li>\n\n\n\n<li><strong>Probleemoplossing:<\/strong>&nbsp;Het identificeren en oplossen van productie-uitdagingen, met minimale verstoringen.<\/li>\n\n\n\n<li><strong>Data-analyse:<\/strong>&nbsp;Het gebruiken van data om weloverwogen beslissingen te nemen over productieprocessen en verbeteringen.<\/li>\n\n\n\n<li><strong>Voorraadbeheer:<\/strong>&nbsp;Het toezien op voorraadniveaus en ervoor zorgen dat deze aansluiten op productieschema&#8217;s en vraag.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Essenti\u00eble vaardigheden voor een productieplanner<\/h2>\n\n\n\n<p>Om succesvol te zijn in deze functie heeft een productieplanner een specifieke set vaardigheden nodig:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analytische vaardigheden:<\/strong>&nbsp;Het vermogen om gegevens te analyseren en te gebruiken om productieprocessen te optimaliseren.<\/li>\n\n\n\n<li><strong>Communicatievaardigheden:<\/strong>&nbsp;Effectieve communicatie met teamleden en andere afdelingen is essentieel.<\/li>\n\n\n\n<li><strong>Organisatorische vaardigheden:<\/strong>&nbsp;Het op \u00e9\u00e9n lijn houden van productieschema&#8217;s, middelen en personeel vereist sterke organisatorische capaciteiten.<\/li>\n\n\n\n<li><strong>Probleemoplossend vermogen:<\/strong>&nbsp;Het snel identificeren en oplossen van problemen om productievertragingen te voorkomen.<\/li>\n\n\n\n<li><strong>Technische bekwaamheid:<\/strong>&nbsp;Productieplanners moeten zich aanpassen aan nieuwe technologie\u00ebn zoals ERP, <a href=\"\/nl\/middelen\/mes-systeem-wat-is-het-en-wat-doet-het\/\">MES<\/a> of APS-systemen.<\/li>\n\n\n\n<li><strong>Tijdmanagement:<\/strong>&nbsp;Het effici\u00ebnt balanceren van meerdere taken en deadlines is cruciaal voor het behoud van de productiestroom.<\/li>\n<\/ul>\n\n\n\n<p>Dit uitgebreide inzicht in de factoren die de salarissen be\u00efnvloeden, samen met een helder begrip van de functie en de vereiste vaardigheden, geeft aspirerende productieplanners waardevolle inzichten in hun mogelijke carri\u00e8reverloop in Nederland.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">De rol van APS met AI bij het verbeteren van het werk van een productieplanner<\/h2>\n\n\n\n<p>geavanceerde planning en roostering (APS)-systemen die ge\u00efntegreerd zijn met kunstmatige intelligentie (AI) zoals <a href=\"\/nl\/\">SkyPlanner<\/a> kunnen de mogelijkheden van een productieplanner aanzienlijk vergroten. Hier zijn de belangrijkste manieren waarop AI-versterkte APS-systemen helpen:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Verbeterde nauwkeurigheid van prognoses:<\/strong>&nbsp;AI-algoritmen kunnen enorme datasets analyseren om de vraag nauwkeuriger te voorspellen, waardoor planners worden geholpen bij het opstellen van effici\u00ebntere productieschema&#8217;s.<\/li>\n\n\n\n<li><strong>Realtime aanpasbaarheid:<\/strong>&nbsp;AI stelt APS-systemen in staat zich snel aan te passen aan veranderingen, zoals verstoringen in de toeleveringsketen, door realtime oplossingen te bieden en zo de effici\u00ebntie van productieprocessen te behouden.<\/li>\n\n\n\n<li><strong>Optimalisatie van resources:<\/strong>&nbsp;AI-gestuurde APS-tools kunnen de toewijzing van resources, waaronder machines en arbeid, optimaliseren, zodat deze optimaal worden benut en verspilling wordt verminderd.<\/li>\n\n\n\n<li><strong>Verbeterde besluitvorming:<\/strong>&nbsp;Door datapatronen te analyseren kan AI inzichten bieden die productieplanners helpen weloverwogen beslissingen te nemen, waardoor de productie-effici\u00ebntie verbetert.<\/li>\n\n\n\n<li><strong>Voorspellend onderhoud:<\/strong>&nbsp;AI in APS-systemen kan onderhoudsbehoeften van machines voorspellen, waardoor onverwachte stilstand wordt voorkomen en een continue productiestroom wordt gewaarborgd.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Sectoren die productieplanners aannemen in Nederland<\/h2>\n\n\n\n<p>Nederland biedt met zijn diverse en robuuste productiesectoren een scala aan kansen voor productieplanners. Belangrijke sectoren zijn onder meer:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Hightechsystemen en -materialen:<\/strong>&nbsp;Deze sector omvat de productie van elektronica, machines en innovatieve materialen, wat een nauwkeurige en effici\u00ebnte productieplanning vereist.<\/li>\n\n\n\n<li><strong>Agrifood:<\/strong>&nbsp;Als een van &#8216;s werelds grootste exporteurs van landbouwproducten vereist deze sector planners die de complexe toeleveringsketen en productieprocessen beheren.<\/li>\n\n\n\n<li><strong>Chemische productie:<\/strong>&nbsp;De chemische industrie, met name de farmaceutische sector, vereist een zorgvuldige planning om te zorgen voor naleving van strenge wettelijke normen en effici\u00ebnte productiecycli.<\/li>\n\n\n\n<li><strong>Energie, inclusief hernieuwbare energie:<\/strong>&nbsp;Deze sector, vooral met de groeiende focus op duurzame energiebronnen, vereist planners die de productie van energie-apparatuur en -technologie\u00ebn beheren.<\/li>\n\n\n\n<li><strong>Waterbeheer en maritiem:<\/strong>&nbsp;Deze sector, die de productie van waterbeheersystemen en maritieme technologie\u00ebn omvat, zoekt bekwame planners voor het organiseren van grootschalige productie-inspanningen.<\/li>\n\n\n\n<li><strong>Logistiek en distributie:<\/strong>&nbsp;Deze sector, die cruciaal is in een knooppunt als Nederland, vertrouwt op productieplanners voor het soepel functioneren van logistieke en distributiecentra.<\/li>\n<\/ol>\n\n\n\n<p>Elk van deze sectoren in Nederland biedt unieke uitdagingen en kansen, waardoor de rol van een productieplanner dynamisch en essentieel is voor het succes van het productieproces.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aanvullende voordelen voor productieplanners in Nederland<\/h2>\n\n\n\n<p>Hoewel het salaris een belangrijke factor is, biedt Nederland een reeks andere voordelen voor productieplanners, waardoor het een aantrekkelijke carri\u00e8rebestemming is:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Uitgebreid zorgstelsel:<\/strong>&nbsp;Nederland beschikt over een hoogwaardig zorgstelsel dat breed toegankelijk is voor inwoners, inclusief expats. Productieplanners profiteren van dit stelsel, waardoor hun welzijn en gezondheid een prioriteit zijn.<\/li>\n\n\n\n<li><strong>Robuuste pensioenregelingen:<\/strong>&nbsp;Het land biedt rijke pensioenregelingen, die bijdragen aan langetermijn financi\u00eble zekerheid voor productieplanners. Deze eigenschap spreekt vooral aan voor wie een langetermijncarri\u00e8re in Nederland overweegt.<\/li>\n\n\n\n<li><strong>Balans tussen werk en priv\u00e9:<\/strong>&nbsp;De Nederlandse cultuur hecht sterk aan de balans tussen werk en priv\u00e9 en biedt productieplanners een gezonde mix van professionele betrokkenheid en persoonlijke tijd. Deze balans is essentieel voor het behoud van langdurige werktevredenheid en mentaal welzijn.<\/li>\n\n\n\n<li><strong>Mogelijkheden voor professionele ontwikkeling:<\/strong>&nbsp;Nederland, dat vooroploopt in productie-innovatie, biedt ruime mogelijkheden voor continu leren en professionele groei.<\/li>\n\n\n\n<li><strong>Culturele en sociale integratie:<\/strong>&nbsp;Het land staat bekend om zijn open en tolerante samenleving, waardoor het voor expats, inclusief productieplanners, gemakkelijker wordt om sociaal en cultureel te integreren, wat hun leefervaring in Nederland verrijkt.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-is-the-netherlands-the-right-place-for-production-planners-in-2026\">Is Nederland de juiste plek voor productieplanners in 2026?<\/h2>\n\n\n\n<p>Wanneer je het volledige pakket buiten het financi\u00eble aspect in overweging neemt, is Nederland een uitstekende keuze voor productieplanners. De combinatie van een concurrerend salaris, uitgebreide gezondheidszorg, robuuste pensioenregelingen en een nadruk op de balans tussen werk en priv\u00e9 maakt het een aantrekkelijke bestemming.<\/p>\n\n\n\n<p>Bovendien is de mogelijkheid voor professionele ontwikkeling, met name in een land dat een knooppunt is voor productie-innovatie en technologische vooruitgang, een onschatbaar aspect van een carri\u00e8re in Nederland.&nbsp;<\/p>\n\n\n\n<p>Daarnaast draagt de cultureel inclusieve en sociaal levendige omgeving van Nederland bij aan de aantrekkingskracht, waardoor professionals niet alleen groeien in hun carri\u00e8re, maar ook genieten van een hoge levenskwaliteit. Voor productieplanners die op zoek zijn naar een uitdagend maar lonend carri\u00e8repad, springt Nederland eruit als een topkeuze.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Salaris van een productieplanner in Nederland 2026 Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen. Het is echter belangrijk om op te merken dat dit salaris kan vari\u00ebren op basis van factoren zoals opleidingsachtergrond, geografische locatie binnen het land en de &#8230; <a title=\"Salaris van een productieplanner in Nederland 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/\" aria-label=\"Lees meer over Salaris van een productieplanner in Nederland 2026\">Lees meer<\/a><\/p>\n","protected":false},"author":6,"featured_media":28826,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2696,309],"tags":[],"class_list":["post-29258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-loopbaan-en-salaris","category-middelen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Salaris van een productieplanner in Nederland 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Productie Planner Salaris in Nederland 2026\" \/>\n<meta property=\"og:description\" content=\"Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-03T15:19:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:06:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Productie Planner Salaris in Nederland 2026\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Salaris van een productieplanner in Nederland 2026\",\"datePublished\":\"2023-11-03T15:19:45+00:00\",\"dateModified\":\"2026-06-19T21:06:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/\"},\"wordCount\":1657,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Netherlands.png\",\"articleSection\":[\"Loopbaan en salaris\",\"middelen\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/\",\"name\":\"Salaris van een productieplanner in Nederland 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Netherlands.png\",\"datePublished\":\"2023-11-03T15:19:45+00:00\",\"dateModified\":\"2026-06-19T21:06:56+00:00\",\"description\":\"Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Netherlands.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Netherlands.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Netherlands\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/productie-planner-salaris-in-nederland-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Salaris van een productieplanner in Nederland 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Salaris van een productieplanner in Nederland 2026 \u2013 SkyPlanner","description":"Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/","og_locale":"nl_NL","og_type":"article","og_title":"Productie Planner Salaris in Nederland 2026","og_description":"Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-03T15:19:45+00:00","article_modified_time":"2026-06-19T21:06:56+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_title":"Productie Planner Salaris in Nederland 2026","twitter_misc":{"Geschreven door":"SkyPlanner","Geschatte leestijd":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Salaris van een productieplanner in Nederland 2026","datePublished":"2023-11-03T15:19:45+00:00","dateModified":"2026-06-19T21:06:56+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/"},"wordCount":1657,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands.png","articleSection":["Loopbaan en salaris","middelen"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/","name":"Salaris van een productieplanner in Nederland 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands.png","datePublished":"2023-11-03T15:19:45+00:00","dateModified":"2026-06-19T21:06:56+00:00","description":"Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands.png","width":4990,"height":3327,"caption":"Production Planner Netherlands"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/productie-planner-salaris-in-nederland-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Salaris van een productieplanner in Nederland 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Netherlands.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/nl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Salaris van een productieplanner in Nederland 2026 Het gemiddelde salaris van een productieplanner in Nederland bedraagt ongeveer \u20ac50,686 per jaar, wat neerkomt op ongeveer \u20ac4,224 per maand v\u00f3\u00f3r belastingen. Het is echter belangrijk om op te merken dat dit salaris kan vari\u00ebren op basis van factoren zoals opleidingsachtergrond, geografische locatie binnen het land en de&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/29258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=29258"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/29258\/revisions"}],"predecessor-version":[{"id":94415,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/29258\/revisions\/94415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/28826"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=29258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=29258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=29258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}