{"id":28925,"date":"2023-11-02T09:52:12","date_gmt":"2023-11-02T09:52:12","guid":{"rendered":"https:\/\/skyplanner.ai\/middelen\/salaris-productieplanner-in-tsjechie-2023\/"},"modified":"2026-06-19T21:02:16","modified_gmt":"2026-06-19T21:02:16","slug":"salaris-productieplanner-in-tsjechie-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/","title":{"rendered":"Salaris Productieplanner in Tsjechi\u00eb 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>In 2026 kan een Productieplanner in Tsjechi\u00eb rekenen op een gemiddeld salaris van ongeveer CZK 730 229 per jaar, oftewel rond de CZK 60,852 per maand v\u00f3\u00f3r belastingen. Het is echter belangrijk op te merken dat dit salaris kan fluctueren afhankelijk van verschillende factoren, waaronder de stad van tewerkstelling, het aantal jaren ervaring in het vakgebied en de specifieke branche binnen de productiesector.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>De productiesector van Tsjechi\u00eb, die uitblinkt op gebieden zoals automotive en elektronica, laat in 2026 een indrukwekkende groei zien. Dit plaatst het land als een sterke speler op het Europese industri\u00eble toneel. In deze bloeiende omgeving zijn productieplanners cruciaal voor het optimaliseren van uiteenlopende productieprocessen. Daarom rijzen er enkele essenti\u00eble vragen: wat verdient een productieplanner in Tsjechi\u00eb in 2026, en wat be\u00efnvloedt het salaris?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Het financi\u00eble aspect: Salaris Productieplanner  <\/h2>\n\n\n\n<p>Als je het financi\u00eble landschap in Tsjechi\u00eb bekijkt, is het nationale gemiddelde salaris ongeveer <strong>54.550 CZK per maand<\/strong> v\u00f3\u00f3r belastingen. Dit biedt een basis voor het begrijpen van de inkomensdynamiek in het land.  <\/p>\n\n\n\n<p>Daarentegen ligt het gemiddelde salaris voor een productieplanner in 2026 aanzienlijk hoger. Deze professionals kunnen rekenen op een verdienste van ongeveer <strong>CZK <strong>730 229<\/strong><\/strong> per jaar, wat neerkomt op zo&#039;n <strong>CZK <strong>60,852<\/strong><\/strong> per maand. Dit aanzienlijke verschil onderstreept de gespecialiseerde vaardigheden en expertise die productieplanners in hun functies inbrengen, waardoor ze een waardevolle aanwinst vormen in de productiesector.<\/p>\n\n\n\n<p>Toch is het belangrijk om te onthouden dat factoren zoals de locatie van de stad, ervaring en specifieke kenmerken van de sector deze cijfers kunnen be\u00efnvloeden, wat de gespecialiseerde aard van hun rol weerspiegelt.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vergelijkende analyse: Tsjechi\u00eb vs Buurlanden<\/h2>\n\n\n\n<p>In de context van Centraal-Europa laat Tsjechi\u00eb zich gelden met concurrerende salarissen voor productieplanners. In vergelijking met de buurlanden is het scenario veelzeggend. <a href=\"\/nl\/middelen\/salaris-productieplanner-in-hongarije-2026\/\">Het salaris van een productieplanner in Hongarije<\/a> is lager dan dat van hun Tsjechische tegenhangers, wat de verschillende economische sterktes en industri\u00eble ontwikkelingen van de twee naties weerspiegelt. Ook <a href=\"\/nl\/middelen\/salaris-productieplanner-in-polen-2026\/\">het salaris van een productieplanner in Polen <\/a>is over het algemeen lager dan in Tsjechi\u00eb. <a href=\"\/nl\/middelen\/salaris-productieplanner-in-slowakije-2026\/\">Het salaris van een productieplanner in Slowakije<\/a> ligt dichter bij de concurrentie, maar het salaris is nog steeds iets lager dan wat productieplanners in Tsjechi\u00eb verdienen.    <\/p>\n\n\n\n<p>Deze algemene vergelijking benadrukt niet alleen de robuuste productiesector van Tsjechi\u00eb, maar ook de aantrekkelijkheid ervan als carri\u00e8rehub voor geschoolde productieplanners in de regio.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Factoren die van invloed zijn op het salaris van productieplanners in Tsjechi\u00eb<\/h2>\n\n\n\n<p>Het salaris van een productieplanner in Tsjechi\u00eb wordt door verschillende factoren be\u00efnvloed. Deze factoren zijn onder andere opleiding, ervaring, vaardigheden, locatie, bedrijfsgrootte en het soort bedrijf. Elk speelt een unieke rol bij het bepalen van de compensatie.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Onderwijs<\/h4>\n\n\n\n<p>Hogere opleidingskwalificaties leiden meestal tot betere salarisvooruitzichten voor productieplanners. Een diploma op het gebied van industri\u00eble engineering, bedrijfskunde of supply chain management is een voordeel. Geavanceerde diploma&#8217;s of gespecialiseerde certificeringen kunnen het verdienpotentieel verder vergroten.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Ervaring<\/h4>\n\n\n\n<p>Ervaring is een cruciale factor bij het bepalen van het salaris. Beginnende productieplanners verdienen minder dan degenen met meerdere jaren ervaring in het vak. Senior planners met uitgebreide ervaring kunnen hogere salarissen verdienen vanwege hun expertise in het beheren van complexe productieprocessen.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vaardigheden<\/h4>\n\n\n\n<p>Naast algemene managementvaardigheden verhoogt de vaardigheid in specifieke softwaretools de waarde van een productieplanner. Ervaring met <a href=\"\/nl\/middelen\/wat-is-erp\/\">planning van bedrijfsresources (ERP)<\/a> en geavanceerde planning en roostering (APS) systemen is bijzonder nuttig. Deze tools helpen bij het optimaliseren van productieschema&#8217;s en -middelen, waardoor ervaren planners onmisbaar zijn.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Locatie<\/h4>\n\n\n\n<p>Salarissen kunnen aanzienlijk verschillen tussen verschillende regio&#8217;s. In Praag bijvoorbeeld, de hoofdstad en het economische centrum van Tsjechi\u00eb, verdienen productieplanners vaak meer door de hogere kosten van levensonderhoud en de concentratie van grote bedrijven. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Grootte van het bedrijf<\/h4>\n\n\n\n<p>Doorgaans bieden grotere bedrijven hogere salarissen dan kleinere bedrijven. Deze trend wordt toegeschreven aan de grotere operationele schaal en complexere productieprocedures in vooraanstaande bedrijven, die meer ervaren planners vereisen. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Type bedrijf<\/h4>\n\n\n\n<p>Het bedrijfstype heeft ook invloed op de lonen. Bedrijven in hoogwaardige sectoren zoals de auto- of elektronicaproductie betalen meestal hogere lonen dan bedrijven in minder gespecialiseerde sectoren. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Rol en taken van een productieplanner<\/h2>\n\n\n\n<p>In de productiesector is een productieplanner van cruciaal belang om effici\u00ebnte productieprocessen in goede banen te leiden. Deze functie is veelzijdig en omvat strategische planning, een nauwgezette organisatie en het proactief oplossen van problemen om een naadloze werking te garanderen. <\/p>\n\n\n\n<p><strong>Gedetailleerde verantwoordelijkheden van een productieplanner:<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Vraagvoorspelling<\/strong>: Productieplanners gebruiken gegevensanalyse om de productbehoeften te voorspellen door inzicht te krijgen in markttrends en de vraag van klanten, zodat ze op \u00e9\u00e9n lijn liggen met de marktvereisten.<\/li>\n\n\n\n<li><strong>Toewijzing van middelen<\/strong>: Ze beheren middelen zoals materialen, arbeid en machines om de doelen effici\u00ebnt te bereiken, waarbij ze de beschikbaarheid in evenwicht brengen met de productiebehoeften voor een optimale productiviteit.<\/li>\n\n\n\n<li><strong>Planning<\/strong>: Planners maken gedetailleerde tijdlijnen voor de productie en wijzen taken en verantwoordelijkheden toe die cruciaal zijn voor een gesynchroniseerde en tijdige voltooiing van het project.<\/li>\n\n\n\n<li><strong>Voorraadbeheer<\/strong>: Toezicht houden op de voorraadniveaus houdt in dat materialen worden bijgehouden en voorraden worden besteld om te grote voorraden of tekorten te voorkomen, wat cruciaal is voor kostenbeheer.<\/li>\n\n\n\n<li><strong>Kwaliteitscontrole<\/strong>: In samenwerking met kwaliteitsborgingsteams helpen planners de productienormen te handhaven en proactief kwaliteitsproblemen aan te pakken.<\/li>\n\n\n\n<li><strong>Kostenbeheer<\/strong>: Ze ontwikkelen strategie\u00ebn om de productieuitgaven te optimaliseren, waarbij de nadruk ligt op het verminderen van verspilling en het verbeteren van de effici\u00ebntie.<\/li>\n\n\n\n<li><strong>Problemen oplossen<\/strong>: Productieplanners pakken problemen snel op, zorgen voor minimale verstoring en houden de productieschema&#8217;s in stand.<\/li>\n<\/ol>\n\n\n\n<p>De rol van een productieplanner is veelomvattend en vereist een combinatie van analytische vaardigheden, strategisch denken en praktisch probleemoplossend vermogen. Hun werk is een integraal onderdeel van het succes van productieprocessen en heeft invloed op alles van productbeschikbaarheid tot productie-effici\u00ebntie en algemene kwaliteit. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vaardigheden voor een productieplanner<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analytische vaardigheden<\/strong>: Essentieel voor het beoordelen van complexe productieprocessen en het nemen van datagestuurde beslissingen.<\/li>\n\n\n\n<li><strong>Probleemoplossend vermogen<\/strong>: Essentieel voor het identificeren en oplossen van problemen die zich tijdens de productie kunnen voordoen.<\/li>\n\n\n\n<li><strong>Organisatorische vaardigheden<\/strong>: Cruciaal voor het effici\u00ebnt beheren van meerdere taken en planningen.<\/li>\n\n\n\n<li><strong>Communicatieve vaardigheden<\/strong>: Belangrijk voor het co\u00f6rdineren met verschillende afdelingen en het duidelijk overbrengen van informatie.<\/li>\n\n\n\n<li><strong>Technische vaardigheid<\/strong>: Kennis van ERP- en APS-systemen en andere relevante software is zeer nuttig.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">AI-verbeterde APS-systemen verbeteren productieplanning<\/h2>\n\n\n\n<p>Geavanceerde plannings- en planningsystemen ge\u00efntegreerd met kunstmatige intelligentie (AI) zoals <a href=\"\/nl\/\">Skyplanner<\/a> zorgen voor een revolutie in de productieplanning. Hier volgt een kort overzicht:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Vraagvoorspelling<\/strong>: AI in APS-systemen voorspelt nauwkeurig de vraag naar producten door historische en actuele gegevens te analyseren, zodat planners weloverwogen beslissingen kunnen nemen.<\/li>\n\n\n\n<li><strong>Toewijzing van middelen<\/strong>: Deze systemen optimaliseren het gebruik van materialen, arbeid en machines door real-time gegevens te analyseren, waardoor de productiviteit toeneemt.<\/li>\n\n\n\n<li><strong>Dynamische planning<\/strong>: AI-algoritmen passen productieschema&#8217;s snel aan als reactie op verschuivingen in de vraag of verstoringen in de toeleveringsketen, waardoor de effici\u00ebntie behouden blijft.<\/li>\n\n\n\n<li><strong>Voorraadbeheer<\/strong>: Het AI-gestuurde APS voorspelt de exacte voorraadbehoeften, voorkomt te grote voorraden of tekorten en zorgt voor kosteneffectieve beschikbaarheid van materiaal.<\/li>\n\n\n\n<li><strong>Kwaliteitscontrole<\/strong>: Door AI te integreren met kwaliteitsmanagementsystemen kunnen potenti\u00eble kwaliteitsproblemen vroegtijdig worden opgespoord, waardoor hoge productienormen worden ondersteund.<\/li>\n\n\n\n<li><strong>Kostenbeheer<\/strong>: AI identificeert manieren om de productiekosten te verlagen door patronen en resourcegebruik te analyseren zonder aan kwaliteit in te boeten.<\/li>\n<\/ul>\n\n\n\n<p>Een APS met AI is niet alleen een aanvulling op de rol van een productieplanner, maar vergroot ook hun vermogen om nauwkeurigere, effici\u00ebntere en strategischere beslissingen te nemen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Industrie\u00ebn die Productieplanners inhuren in Tsjechi\u00eb<\/h2>\n\n\n\n<p>Verschillende industrie\u00ebn in Tsjechi\u00eb erkennen het belang van productieplanners voor een effici\u00ebnte bedrijfsvoering. Tot de belangrijkste sectoren behoren: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Auto-industrie<\/strong>: Als belangrijke speler in de Europese automobielsector biedt Tsjechi\u00eb tal van mogelijkheden voor productieplanners. Ze zijn van cruciaal belang voor het beheer van de complexe assemblagelijnen en toeleveringsketens die gepaard gaan met de productie van voertuigen. <\/li>\n\n\n\n<li><strong>Productie van elektronica<\/strong>: De elektronica-industrie van het land, die bekend staat om de productie van hoogwaardige componenten, vertrouwt op productieplanners om productieprocessen te stroomlijnen en ingewikkelde toeleveringsnetwerken te beheren.<\/li>\n\n\n\n<li><strong>Productie van machines en apparatuur<\/strong>: Deze sector, die zich bezighoudt met de productie van industri\u00eble machines en apparatuur, vraagt om bekwame productieplanners om de productieworkflows te optimaliseren en de tijdige levering van producten te garanderen.<\/li>\n\n\n\n<li><strong>Voedingsmiddelen- en drankenindustrie<\/strong>: Productieplanners richten zich op het verbeteren van de effici\u00ebntie van de productie en distributie van voedingsmiddelen en dranken, rekening houdend met factoren zoals houdbaarheid, seizoensgebonden vraag en logistiek van de toeleveringsketen.<\/li>\n\n\n\n<li><strong>Farmaceutica<\/strong>: In de farmaceutische industrie, die zich richt op de productie van medicijnen en gezondheidsgerelateerde producten, moeten productieplanners zich strikt houden aan kwaliteits- en regelgevingsnormen.<\/li>\n\n\n\n<li><strong>Chemische industrie<\/strong>: Deze sector houdt zich bezig met de productie van chemicali\u00ebn voor verschillende toepassingen en vereist een nauwgezette planning om complexe processen te beheren en de veiligheid en naleving van milieuvoorschriften te garanderen.<\/li>\n<\/ol>\n\n\n\n<p>Elk van deze industrie\u00ebn biedt unieke uitdagingen en kansen, waardoor de rol van een productieplanner dynamisch en integraal is voor hun succes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Meer voordelen dan salaris voor productieplanners<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Professionele ontwikkeling<\/strong>: De groei van de Tsjechische productiesector, vooral in de automobiel- en elektronicasector, biedt enorme mogelijkheden voor het verbeteren van vaardigheden en loopbaanontwikkeling.<\/li>\n\n\n\n<li><strong>Geavanceerde technologie\u00ebn<\/strong>: Blootstelling aan innovatieve technologie\u00ebn, waaronder AI- en APS-systemen, rust productieplanners uit met baanbrekende kennis van de industrie.<\/li>\n\n\n\n<li><strong>Voordelen gezondheidszorg<\/strong>: Productieplanners genieten meestal van een uitgebreide ziektekostenverzekering, wat zorgt voor een gezond evenwicht tussen werk en priv\u00e9leven en gemoedsrust.<\/li>\n\n\n\n<li><strong>Pensioenregelingen<\/strong>: Solide pensioenregelingen maken vaak deel uit van het arbeidsvoorwaardenpakket en dragen bij aan de financi\u00eble zekerheid op lange termijn voor productieplanners.<\/li>\n\n\n\n<li><strong>Internationale blootstelling<\/strong>: De strategische ligging van Tsjechi\u00eb in Centraal-Europa biedt productieplanners de kans om kennis te maken met diverse productiepraktijken en wereldwijde normen.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Is Tsjechi\u00eb de ideale bestemming voor productieplanners?<\/h2>\n\n\n\n<p>Als we kijken naar meer dan alleen de financi\u00eble beloningen, dan biedt Tsjechi\u00eb een goed afgerond pakket voor professionals in dit vakgebied.  <\/p>\n\n\n\n<p>Afgezien van het aantrekkelijke salaris is Tsjechi\u00eb bovendien een aantrekkelijke keuze voor productieplanners over de hele wereld vanwege de focus op een evenwichtige werk\/priv\u00e9-cultuur, ultramoderne productieprocessen en mogelijkheden om voortdurend bij te leren.  <\/p>\n\n\n\n<p>De combinatie van traditionele industri\u00eble sterke punten en moderne technologische vooruitgang maakt de Tsjechische productiesector, en daarmee de rol van productieplanners daarin, zowel dynamisch als veelbelovend.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>In 2026 kan een Productieplanner in Tsjechi\u00eb rekenen op een gemiddeld salaris van ongeveer CZK 730 229 per jaar, oftewel rond de CZK 60,852 per maand v\u00f3\u00f3r belastingen. Het is echter belangrijk op te merken dat dit salaris kan fluctueren afhankelijk van verschillende factoren, waaronder de stad van tewerkstelling, het aantal jaren ervaring in het &#8230; <a title=\"Salaris Productieplanner in Tsjechi\u00eb 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/\" aria-label=\"Lees meer over Salaris Productieplanner in Tsjechi\u00eb 2026\">Lees meer<\/a><\/p>\n","protected":false},"author":6,"featured_media":28894,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2696,309],"tags":[],"class_list":["post-28925","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-loopbaan-en-salaris","category-middelen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Salaris Productieplanner in Tsjechi\u00eb 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"In 2026 kan een Productieplanner in Tsjechi\u00eb een gemiddeld salaris verwachten van ongeveer CZK 730 229 per jaar, of ongeveer CZK 60.852 per maand v\u00f3\u00f3r belastingen.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Salaris Productieplanner in Tsjechi\u00eb 2026\" \/>\n<meta property=\"og:description\" content=\"In 2026 kan een Productieplanner in Tsjechi\u00eb een gemiddeld salaris verwachten van ongeveer CZK 730 229 per jaar, of ongeveer CZK 60.852 per maand v\u00f3\u00f3r belastingen.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-02T09:52:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:02:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Salaris Productieplanner in Tsjechi\u00eb 2026\",\"datePublished\":\"2023-11-02T09:52:12+00:00\",\"dateModified\":\"2026-06-19T21:02:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/\"},\"wordCount\":1658,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"articleSection\":[\"Loopbaan en salaris\",\"middelen\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/\",\"name\":\"Salaris Productieplanner in Tsjechi\u00eb 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"datePublished\":\"2023-11-02T09:52:12+00:00\",\"dateModified\":\"2026-06-19T21:02:16+00:00\",\"description\":\"In 2026 kan een Productieplanner in Tsjechi\u00eb een gemiddeld salaris verwachten van ongeveer CZK 730 229 per jaar, of ongeveer CZK 60.852 per maand v\u00f3\u00f3r belastingen.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner the Czech Republic\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/salaris-productieplanner-in-tsjechie-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Salaris Productieplanner in Tsjechi\u00eb 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Salaris Productieplanner in Tsjechi\u00eb 2026 \u2013 SkyPlanner","description":"In 2026 kan een Productieplanner in Tsjechi\u00eb een gemiddeld salaris verwachten van ongeveer CZK 730 229 per jaar, of ongeveer CZK 60.852 per maand v\u00f3\u00f3r belastingen.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/","og_locale":"nl_NL","og_type":"article","og_title":"Salaris Productieplanner in Tsjechi\u00eb 2026","og_description":"In 2026 kan een Productieplanner in Tsjechi\u00eb een gemiddeld salaris verwachten van ongeveer CZK 730 229 per jaar, of ongeveer CZK 60.852 per maand v\u00f3\u00f3r belastingen.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-02T09:52:12+00:00","article_modified_time":"2026-06-19T21:02:16+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"SkyPlanner","Geschatte leestijd":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Salaris Productieplanner in Tsjechi\u00eb 2026","datePublished":"2023-11-02T09:52:12+00:00","dateModified":"2026-06-19T21:02:16+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/"},"wordCount":1658,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","articleSection":["Loopbaan en salaris","middelen"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/","name":"Salaris Productieplanner in Tsjechi\u00eb 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","datePublished":"2023-11-02T09:52:12+00:00","dateModified":"2026-06-19T21:02:16+00:00","description":"In 2026 kan een Productieplanner in Tsjechi\u00eb een gemiddeld salaris verwachten van ongeveer CZK 730 229 per jaar, of ongeveer CZK 60.852 per maand v\u00f3\u00f3r belastingen.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","width":4990,"height":3327,"caption":"Production Planner the Czech Republic"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/salaris-productieplanner-in-tsjechie-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Salaris Productieplanner in Tsjechi\u00eb 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/nl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"In 2026 kan een Productieplanner in Tsjechi\u00eb rekenen op een gemiddeld salaris van ongeveer CZK 730 229 per jaar, oftewel rond de CZK 60,852 per maand v\u00f3\u00f3r belastingen. Het is echter belangrijk op te merken dat dit salaris kan fluctueren afhankelijk van verschillende factoren, waaronder de stad van tewerkstelling, het aantal jaren ervaring in het&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/28925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=28925"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/28925\/revisions"}],"predecessor-version":[{"id":94330,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/28925\/revisions\/94330"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/28894"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=28925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=28925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=28925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}