{"id":113076,"date":"2026-10-30T01:32:22","date_gmt":"2026-10-30T01:32:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113076"},"modified":"2026-10-30T01:33:23","modified_gmt":"2026-10-30T01:33:23","slug":"ingangscontrole","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/","title":{"rendered":"Ingangscontrole: van ontvangst tot vrijgave voor productie"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ingangscontrole: van ontvangst tot vrijgave voor productie<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/nl\/\">Home<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/\">Bronnen<\/a> &raquo; Ingangscontrole: van ontvangst tot vrijgave voor productie<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Geschatte leestijd: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Bij de <strong>ingangscontrole<\/strong> wordt gecontroleerd of ingekochte materialen, onderdelen of componenten aan de vastgestelde eisen voldoen voordat ze voor gebruik worden vrijgegeven. Deze controle, ook wel ontvangstcontrole genoemd, legt de verbinding tussen wat uw leverancier heeft geleverd en wat uw fabriek veilig in productie kan nemen.<\/p>\n\n\n<p>Bij een drukke goederenontvangst is dat onderscheid belangrijk. Een levering kan fysiek aanwezig, geteld en in de voorraad geboekt zijn, terwijl er nog een maatcontrole moet plaatsvinden of een vereist certificaat ontbreekt. Als de productie die ontvangst als beschikbaar materiaal beschouwt, kan de werkvolgorde voor de volgende machine al op een verkeerde aanname berusten.<\/p>\n\n\n<p>Een bruikbaar proces voor ingangscontrole eindigt daarom met een duidelijke beslissing: welk materiaal is vrijgegeven, hoeveel is inzetbaar en wat blijft geblokkeerd? Verwerk die beslissing in de productieplanning, zodat u op een tekort kunt reageren voordat een ploeg stil komt te staan of een levering te laat komt. SkyPlanner APS helpt om de bijgewerkte materiaalbeschikbaarheid te vertalen naar een uitvoerbare planning voor de orders en productiemiddelen die om dat materiaal concurreren.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wat moet u bij de ingangscontrole controleren?<\/h2>\n\n\n<p>Neem de eisen voor het artikel als uitgangspunt, niet een algemene checklist die voor alles hetzelfde is. Voor een ingekocht verspaand onderdeel, een elektronische component en een temperatuurgevoelige grondstof zijn verschillende controles en bewijsstukken nodig.<\/p>\n\n\n<p>Bepaal voor elke ontvangst welke controles nodig zijn:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Identiteit:<\/strong> de juiste leverancier, het juiste onderdeelnummer, de juiste revisie en materiaalkwaliteit, met waar vereist een partij-, smelt- of serienummer.<\/li><li><strong>Hoeveelheid:<\/strong> de geleverde hoeveelheid en maateenheden in vergelijking met de inkooporder en leveringsdocumenten.<\/li><li><strong>Conditie:<\/strong> beschadiging, verontreiniging, intacte verpakking en eventuele voorgeschreven transport- of opslagcondities.<\/li><li><strong>Documenten:<\/strong> de vereiste certificaten, testrapporten of andere bewijsstukken, gekoppeld aan het daadwerkelijk ontvangen materiaal.<\/li><li><strong>Productkenmerken:<\/strong> de afmetingen, het uiterlijk, de samenstelling, de werking of andere eigenschappen die in het keuringsplan zijn vastgelegd.<\/li><\/ul>\n\n\n<p>Een certificaat is alleen bruikbaar als het betrekking heeft op het juiste materiaal en aantoont wat volgens uw eisen moet worden aangetoond. Een kloppend onderdeelnummer maakt een verkeerde revisie niet goed, en een intacte doos bewijst niet dat een kritische maat binnen de tolerantie valt.<\/p>\n\n\n<p>Maak onderscheid met de <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/eerste-artikelinspectie\/\">eerste artikelinspectie<\/a>. Ingangscontrole heeft betrekking op een ontvangen partij. Bij een eerste artikelinspectie wordt een eerste geproduceerd artikel getoetst aan de geldende eisen en worden de bijbehorende bewijsstukken vastgelegd. Goedkeuring van een eerste artikel betekent op zichzelf niet dat elke volgende levering ook wordt geaccepteerd.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Een praktisch proces voor ingangscontrole<\/h2>\n\n\n<p>De onderstaande werkwijze geeft goederenontvangst, kwaliteit, inkoop en productie een gezamenlijk proces van aankomst tot gebruik. Wijs de verantwoordelijkheden toe aan duidelijk benoemde rollen binnen uw bedrijf. In een kleine fabriek kan \u00e9\u00e9n persoon meerdere rollen vervullen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Leg de eisen vast voordat de levering aankomt<\/h3>\n\n\n<p>Zorg dat de medewerkers die het werk uitvoeren beschikken over de actuele tekening of specificatie, de inkoopeisen en de keuringsinstructies. Leg vast wat moet worden gecontroleerd, welke acceptatiecriteria gelden, welke steekproefmethode eventueel wordt gebruikt en wie bevoegd is om het materiaal vrij te geven.<\/p>\n\n\n<p>Bepaal ook welke bewijsstukken met de zending moeten meekomen. Pas om een ontbrekend materiaalcertificaat vragen nadat de machine al is gereserveerd, leidt tot vermijdbare vertraging. Inkoop kan deze eis v\u00f3\u00f3r verzending duidelijk aan de leverancier doorgeven.<\/p>\n\n\n<p>Stem de omvang van de controle af op de gevolgen van gebreken, de geldende eisen en de prestaties van de leverancier. Beperk een verplichte controle niet alleen omdat de levering spoed heeft. Zijn externe tests nodig, neem de doorlooptijd daarvan dan mee in het verwachte beschikbaarheidsmoment. Ga er niet van uit dat materiaal op de dag van ontvangst ook in productie kan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Ontvang, identificeer en beheer het materiaal<\/h3>\n\n\n<p>Registreer de ontvangst en controleer de identiteit, het aantal en eventuele zichtbare transportschade. Houd het fysieke materiaal gekoppeld aan de partij van de leverancier en de bijbehorende documenten. Vermeng een nog niet gecontroleerde levering niet met vrijgegeven voorraad als dat onderscheid daardoor verloren gaat.<\/p>\n\n\n<p>Gebruik een aangewezen blokkeerlocatie, een duidelijke statusaanduiding en passende blokkeringen in het systeem. Zo voorkomt u dat materiaal waarover nog geen beslissing is genomen, als vrijgegeven voorraad wordt gepickt. Ook grote artikelen die niet op een blokkeerlocatie passen, moeten een ondubbelzinnige status hebben.<\/p>\n\n\n<p>De ontvangstregistratie bevestigt wat er is aangekomen. De kwaliteitsvrijgave bevestigt wat mag worden gebruikt. Die momenten kunnen kort na elkaar liggen, maar moeten van elkaar te onderscheiden blijven, ook al hebben ze allebei gevolgen voor de voorraadregistratie.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Voer de controle uit en leg het resultaat vast<\/h3>\n\n\n<p>Voer de voorgeschreven controles uit met geschikte apparatuur en de actuele instructies. Als er moet worden gemeten, gebruik dan meetmiddelen waarvan de geschiktheid en kalibratiestatus voldoen aan uw kwaliteitsprocedure.<\/p>\n\n\n<p>Leg voldoende bewijs vast om de beslissing later te kunnen onderbouwen: wat is gecontroleerd, welke eis gold, wat was het resultaat, om welk materiaal ging het en wie heeft de controle wanneer uitgevoerd? Bij een maatcontrole is een meetwaarde met de bijbehorende tolerantie bruikbaarder dan een vinkje zonder toelichting.<\/p>\n\n\n<p>Leg expliciet vast wanneer vereiste bewijsstukken ontbreken. Een ontbrekend rapport is een ander probleem dan een gemeten afwijking, ook als beide voorlopig de vrijgave verhinderen. Dat onderscheid helpt inkoop om de leverancier om de juiste reactie te vragen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Beslis wat er met de partij gebeurt<\/h3>\n\n\n<p>De bevoegde persoon beslist of het materiaal aan de vrijgave-eisen voldoet. Geaccepteerd materiaal krijgt duidelijk de status vrijgegeven. Materiaal waarvoor nog bewijs ontbreekt, blijft geblokkeerd, met een aangewezen verantwoordelijke en een vastgelegde vervolgactie.<\/p>\n\n\n<p>Stel bij een afwijking vast welk materiaal het betreft, registreer de afwijking en voorkom onbedoeld gebruik. Afhankelijk van het goedgekeurde besluit kan de volgende stap bestaan uit retourneren aan de leverancier, vervangen, sorteren, nabewerken of afkeuren. Voor gebruik onder concessie is de goedkeuring nodig die de geldende procedure voorschrijft; een productiedeadline vervangt die goedkeuring niet.<\/p>\n\n\n<p>Leg een gedeeltelijke vrijgave nauwkeurig vast. Als een afzonderlijk ge\u00efdentificeerd deel terecht kan worden geaccepteerd, registreer dan precies welke hoeveelheid en welk materiaal worden vrijgegeven en wat geblokkeerd blijft. Een onduidelijke opmerking over de levering als geheel mag geen toestemming worden om alle verpakkingen te gebruiken.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Werk de beschikbaarheid en de productieplanning bij<\/h3>\n\n\n<p>Geef de vrijgegeven hoeveelheid direct door. Blijft materiaal geblokkeerd, geef de planning dan de best onderbouwde verwachting van het beschikbaarheidsmoment, het nog openstaande probleem en de naam van degene die de volgende update verzorgt. De toezegging van een leverancier om morgen te reageren is niet hetzelfde als een bevestigde vrijgave voor morgen.<\/p>\n\n\n<p>Werk naast de kwaliteitsregistratie ook de planningsgegevens bij. Anders kan het materiaal in het magazijn terecht als geblokkeerd staan, terwijl de planning nog steeds uitgaat van het gebruik ervan. Wat de planning nodig heeft, is <strong>de bruikbare hoeveelheid \u00e9n een realistisch beschikbaarheidsmoment<\/strong>, gekoppeld aan de orders die het materiaal nodig hebben.<\/p>\n\n\n<p>Bekijk vervolgens de gevolgen voor de productie. Welke taken kunnen doorgaan? Voor welke is een vervangende partij nodig? Kan ander werk de beschikbare capaciteit benutten terwijl het probleem wordt opgelost? Zo blijft de controle geen losse taak bij de goederenontvangst, maar helpt ze om leverafspraken na te komen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Elk artikel controleren of steekproeven nemen?<\/h2>\n\n\n<p>Er is geen vast controlepercentage dat voor alle inkomende materialen geschikt is. De keuze hangt af van de eisen, de gevolgen van het accepteren van een defect, de controlemethode en de situatie bij de leverancier. Ook destructieve tests bepalen mede wat praktisch haalbaar is.<\/p>\n\n\n<p>Bij een acceptatiesteekproef worden de resultaten van een willekeurig gekozen steekproef gebruikt om over een afgebakende partij te beslissen. Daarmee is niet aangetoond dat elk afzonderlijk artikel goed is. Het steekproefplan moet vooraf de steekproefomvang en beslisregels vastleggen; zomaar een handvol artikelen boven uit een doos pakken volstaat niet.<\/p>\n\n\n<p>Als de uitkomst aanleiding geeft tot afkeur, volg dan de vastgelegde procedure voor de afhandeling van de partij. Door de defecte exemplaren uit de steekproef te verwijderen, wordt de niet-ge\u00efnspecteerde rest niet automatisch aanvaardbaar. Aanvullende inspectie of sortering kan deel uitmaken van een goedgekeurde aanpak, maar daarvoor is een afzonderlijk besluit nodig.<\/p>\n\n\n<p>Voor de statistische achtergrond legt <a href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section2\/pmc21.htm\">de NIST-handleiding over acceptatiesteekproeven voor partijen<\/a> het verschil uit tussen het beoordelen van een partij en het beheersen van het proces van de leverancier. Gebruik het steekproefschema dat voor uw toepassing vereist is, in plaats van een algemeen voorbeeld als acceptatienorm te hanteren.<\/p>\n\n\n<h2 class=\"wp-block-heading\">De overdracht bij vrijgave: een korte checklist<\/h2>\n\n\n<p>Zorg er v\u00f3\u00f3r het afronden van een ingangscontrole voor dat de volgende collega deze vragen kan beantwoorden zonder nog te hoeven bellen:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Om welk materiaal gaat het?<\/strong> Leverancier, artikel en revisie, met de bijbehorende ontvangst- en partijreferenties.<\/li><li><strong>Wat is er besloten?<\/strong> Vrijgegeven, nog geblokkeerd of afgekeurd, met de onderliggende inspectiegegevens en het besluit van de bevoegde persoon.<\/li><li><strong>Hoeveel mag er worden gebruikt?<\/strong> De exacte vrijgegeven hoeveelheid met de bijbehorende eenheden, apart vermeld van de geblokkeerde of afgekeurde hoeveelheid.<\/li><li><strong>Wat staat er nog open?<\/strong> Ontbrekende bewijsstukken, aanvullende tests, een reactie van de leverancier of goedgekeurde herstelwerkzaamheden, met een verantwoordelijke en een tijdstip voor de volgende update.<\/li><li><strong>Wat weet productie nu?<\/strong> De bijgewerkte beschikbaarheid van bruikbaar materiaal en de betrokken taken of toezeggingen die opnieuw moeten worden beoordeeld.<\/li><\/ul>\n\n\n<p>Controleer regelmatig welke partijen al langere tijd geblokkeerd zijn. Als niemand verantwoordelijk is voor de opvolging, kan de planning er ongemerkt van uitgaan dat het materiaal bruikbaar is, zeker wanneer de goederen al dagen in het gebouw staan. Koppel terugkerende gebreken en documentatieproblemen ook terug naar leveranciersmanagement, zodat hetzelfde probleem niet bij elke levering opnieuw wordt ontdekt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vertaal materiaalvrijgave naar een haalbare planning met SkyPlanner<\/h2>\n\n\n<p>Stel: er komen 1.000 componenten binnen in twee afzonderlijk ge\u00efdentificeerde deelpartijen. Voor de deelpartij van 600 zijn de vereiste controles afgerond en wordt het materiaal vrijgegeven. De overige 400 blijven geblokkeerd omdat vereiste bewijsstukken ontbreken.<\/p>\n\n\n<p>Twee productieorders hebben respectievelijk 400 en 350 componenten nodig. De 600 vrijgegeven componenten zijn niet genoeg voor beide orders. Krijgt de eerste order voorrang, dan blijven er 200 over voor de tweede: niet genoeg voor de volledige behoefte. Door de hele levering als bruikbaar te tellen, zou het tekort verborgen blijven. De vrijgave van 600 componenten betekent niet dat de overige 400 daarmee ook beschikbaar zijn.<\/p>\n\n\n<p>Ook nadat de materiaaltoewijzing is geregeld, kunnen beide orders hetzelfde assemblagestation en later dezelfde testcapaciteit nodig hebben. Het verschuiven van \u00e9\u00e9n taak heeft gevolgen voor de beschikbare capaciteit voor ander werk. Een goederenontvangstlijst kan de juiste materiaalstatus tonen, maar laat niet zien hoe al die bewerkingen nu samen kunnen worden ingepland.<\/p>\n\n\n<p><strong>SkyPlanner APS neemt <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/wat-is-productieplanning\/\">materiaalbeschikbaarheid en productiecapaciteit<\/a> samen mee in de berekening van de planning.<\/strong> Als plannen op basis van materiaalbeschikbaarheid is ingeschakeld, gebruikt de AI-engine Arcturus de bijgehouden materiaalhoeveelheden naast werkstations, ploegendiensten, afhankelijkheden tussen bewerkingen en uw planningsprioriteiten. De Gantt-tijdlijn toont de werkvolgorde en de einddatums die daaruit volgen. U besteedt minder tijd aan het afstemmen van een materiaallijst op afzonderlijke wachtrijen per machine en houdt meer tijd over om te bepalen hoe u belangrijke leveringen veiligstelt.<\/p>\n\n\n<p>SkyPlanner kan via zijn open REST API met elk ERP- of MES-systeem worden ge\u00efntegreerd. Materiaalvoorraden kunnen via de integratie actueel worden gehouden of met voorraadmutaties in de magazijnmodule van SkyPlanner worden beheerd. Spreek tijdens de implementatie af hoe de planningsgegevens op basis van kwaliteitsbesluiten aangeven welk materiaal beschikbaar is voor gebruik. Neem daarin ook gedeeltelijke vrijgaven en gewijzigde verwachtingen voor geblokkeerd materiaal mee.<\/p>\n\n\n<p>Die overdracht is belangrijk, want een ontvangstbevestiging is geen kwaliteitsgoedkeuring. In SkyPlanner staat de leverdatum van een inkooporder voor de verwachte beschikbaarheid. Door de order als Geleverd te markeren, wordt de voorraad bijgewerkt. Zorg dat de afgesproken gegevensstroom weergeeft wat productie daadwerkelijk mag gebruiken; de inspectie en het vrijgavebesluit horen bij uw kwaliteitsproces.<\/p>\n\n\n<p>U kunt ook werken via uw eigen AI-assistent, zoals Claude, ChatGPT of Microsoft Copilot. De MCP-koppeling van SkyPlanner geeft een geautoriseerde assistent toegang tot de gegevens, productkennis en functies van SkyPlanner. Zo kunt u de planningsopdracht uitleggen in plaats van die op verschillende schermen te moeten samenstellen. Vraag bijvoorbeeld welke orders afhankelijk zijn van een geblokkeerd onderdeel en laat de assistent vervolgens helpen om de planning met de functies van SkyPlanner bij te werken, binnen uw toegangsrechten. Arcturus berekent de planning; u bepaalt de prioriteiten. De assistent vervangt niet het besluit van de bevoegde persoon om materiaal vrij te geven.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Waarom overstappen op \u00e9\u00e9n gedeelde planning loont<\/h3>\n\n\n<p>Bij UTU, fabrikant van elektrische apparatuur, was de productieplanning voorheen gebaseerd op spreadsheets per afdeling. Wijzigingen in de productievolgorde in het ERP-systeem bereikten de productievloer niet altijd. SkyPlanner bracht de lijnen en afdelingen van de fabriek samen in \u00e9\u00e9n planningssysteem, gekoppeld aan het ERP-systeem. Volgens UTU bereikt een bijgewerkte werklijst de monteurs binnen enkele seconden.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/klantverhalen\/utu\/\">De ervaring van UTU met SkyPlanner<\/a> laat zien wat het oplevert om niet langer met afzonderlijk bijgehouden planningen te werken. Voor het team dat inkomend materiaal beheert, geldt hetzelfde planningsprincipe: zodra de beschikbaarheid verandert, moet dat zichtbaar zijn in de productievolgorde op de plek waar het werk wordt toegewezen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bekijk het effect van een materiaalblokkade op uw eigen orders<\/h2>\n\n\n<p>Een goed ingericht proces voor ingangscontrole levert een besluit op waarop u kunt vertrouwen. SkyPlanner maakt dat besluit bruikbaar voor de planning: welk werk kan worden uitgevoerd, waar het in de planning past en wat de bijgewerkte planning betekent voor de levering.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/contact-verkoop\/\">Boek een SkyPlanner-demo<\/a> en neem \u00e9\u00e9n daadwerkelijk inkomend onderdeel als uitgangspunt, met de vrijgegeven of naar verwachting bruikbare hoeveelheid en de orders die aanspraak maken op diezelfde hoeveelheid. Onderzoek aan de hand van die situatie hoe materiaalbeschikbaarheid en eindige capaciteit samen de planning veranderen.<\/p>\n\n\n<p>Wilt u eerst zelf op verkenning, <a href=\"https:\/\/skyplanner.ai\/nl\/proef\/\">probeer SkyPlanner dan met demogegevens<\/a> of gebruik de AI-ondersteunde functie \u2018Aan de slag\u2019 in SkyPlanner Assistant. Zo ziet u hoe de planning werkt voordat u voor uw eigen proces in kaart brengt hoe inspectieresultaten worden vertaald naar beschikbaarheid.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ingangscontrole: van ontvangst tot vrijgave voor productie Home &raquo; Bronnen &raquo; Ingangscontrole: van ontvangst tot vrijgave voor productie Bij de ingangscontrole wordt gecontroleerd of ingekochte materialen, onderdelen of componenten aan de vastgestelde eisen voldoen voordat ze voor gebruik worden vrijgegeven. Deze controle, ook wel ontvangstcontrole genoemd, legt de verbinding tussen wat uw leverancier heeft geleverd &#8230; <a title=\"Ingangscontrole: van ontvangst tot vrijgave voor productie\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/\" aria-label=\"Lees meer over Ingangscontrole: van ontvangst tot vrijgave voor productie\">Lees meer<\/a><\/p>\n","protected":false},"author":3,"featured_media":113099,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2520,309],"tags":[],"class_list":["post-113076","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-en-planning","category-middelen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ingangscontrole: van ontvangst tot vrijgave voor productie<\/title>\n<meta name=\"description\" content=\"Ontvangen materiaal is niet altijd inzetbaar. Richt uw ingangscontrole zo in dat u materiaalvrijgave beheerst en de productie een uitvoerbare planning krijgt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ingangscontrole: van ontvangst tot vrijgave voor productie\" \/>\n<meta property=\"og:description\" content=\"Ontvangen materiaal is niet altijd inzetbaar. Richt uw ingangscontrole zo in dat u materiaalvrijgave beheerst en de productie een uitvoerbare planning krijgt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T01:32:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T01:33:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ingangscontrole: van ontvangst tot vrijgave voor productie\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:33:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/\"},\"wordCount\":2255,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"articleSection\":[\"APS en planning\",\"middelen\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/\",\"name\":\"Ingangscontrole: van ontvangst tot vrijgave voor productie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:33:23+00:00\",\"description\":\"Ontvangen materiaal is niet altijd inzetbaar. Richt uw ingangscontrole zo in dat u materiaalvrijgave beheerst en de productie een uitvoerbare planning krijgt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/ingangscontrole\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ingangscontrole: van ontvangst tot vrijgave voor productie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ingangscontrole: van ontvangst tot vrijgave voor productie","description":"Ontvangen materiaal is niet altijd inzetbaar. Richt uw ingangscontrole zo in dat u materiaalvrijgave beheerst en de productie een uitvoerbare planning krijgt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/","og_locale":"nl_NL","og_type":"article","og_title":"Ingangscontrole: van ontvangst tot vrijgave voor productie","og_description":"Ontvangen materiaal is niet altijd inzetbaar. Richt uw ingangscontrole zo in dat u materiaalvrijgave beheerst en de productie een uitvoerbare planning krijgt.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T01:32:22+00:00","article_modified_time":"2026-10-30T01:33:23+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"Jussi M\u00e4ntyl\u00e4","Geschatte leestijd":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ingangscontrole: van ontvangst tot vrijgave voor productie","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:33:23+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/"},"wordCount":2255,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","articleSection":["APS en planning","middelen"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/","name":"Ingangscontrole: van ontvangst tot vrijgave voor productie","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:33:23+00:00","description":"Ontvangen materiaal is niet altijd inzetbaar. Richt uw ingangscontrole zo in dat u materiaalvrijgave beheerst en de productie een uitvoerbare planning krijgt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","width":1672,"height":941,"caption":"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/ingangscontrole\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Ingangscontrole: van ontvangst tot vrijgave voor productie"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/nl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ingangscontrole: van ontvangst tot vrijgave voor productie Home &raquo; Bronnen &raquo; Ingangscontrole: van ontvangst tot vrijgave voor productie Bij de ingangscontrole wordt gecontroleerd of ingekochte materialen, onderdelen of componenten aan de vastgestelde eisen voldoen voordat ze voor gebruik worden vrijgegeven. Deze controle, ook wel ontvangstcontrole genoemd, legt de verbinding tussen wat uw leverancier heeft geleverd&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/113076","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=113076"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/113076\/revisions"}],"predecessor-version":[{"id":113139,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/113076\/revisions\/113139"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/113099"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=113076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=113076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=113076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}