{"id":112379,"date":"2026-10-29T07:21:41","date_gmt":"2026-10-29T07:21:41","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112379"},"modified":"2026-10-29T07:22:36","modified_gmt":"2026-10-29T07:22:36","slug":"a3-probleemoplossing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/","title":{"rendered":"A3-probleemoplossing in de productie: verandering die werkt"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">A3-probleemoplossing in de productie: verandering die werkt<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/nl\/\">Home<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/\">Bronnen<\/a> &raquo; A3-probleemoplossing in de productie: verandering die werkt<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Geschatte leestijd: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>De corrigerende maatregel is afgevinkt. De opspanmal is aangepast, het team is nog eens op de procedure gewezen en de productie draait weer. De week erop keert hetzelfde defect terug.<\/p>\n\n\n<p>De actie is uitgevoerd. Maar daarmee is het probleem niet per se opgelost.<\/p>\n\n\n<p>A3-probleemoplossing helpt een productieteam om verband te leggen tussen het waargenomen probleem, het bewijs voor de oorzaak, de verandering die het wil testen en de resultaten die rechtvaardigen dat die verandering behouden blijft. Het doel is niet om een fraai rapport af te leveren, maar om samen een betere beslissing over de productie te nemen.<\/p>\n\n\n<p>Voor die beslissing is ook tijd op de productievloer nodig. SkyPlanner APS neemt een goedgekeurde productieproef op in dezelfde planning als klantorders. Daardoor kost het minder werk om verbeteractiviteiten af te stemmen op de afzonderlijke wachtrijen per machine. Uw team kan het probleem onderzoeken, een tegenmaatregel afspreken en de proef een realistische plek in de planning geven.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wat is A3-probleemoplossing?<\/h2>\n\n\n<p>A3-probleemoplossing is een gestructureerde aanpak waarbij mensen samen een probleem doorgronden, tegenmaatregelen testen en nagaan of die effectief zijn. De aanpak is ontwikkeld bij Toyota en gebruikt een beknopt rapport, meestal van \u00e9\u00e9n pagina, om de redenering inzichtelijk te maken. Dat ondersteunt het gesprek tussen de probleemeigenaar, een coach en de betrokkenen.<\/p>\n\n\n<p>De naam verwijst naar A3-papier, met afmetingen van 297 \u00d7 420 mm. Dit formaat stimuleert een helder, visueel verhaal, maar de denkwijze is belangrijker dan de afmetingen. Op een digitale pagina kan dezelfde redenering worden vastgelegd.<\/p>\n\n\n<p>Drie elementen horen bij elkaar:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A3-denken: onderzoek voordat u beslist en toets uw verklaring aan wat er daadwerkelijk gebeurt.<\/li><li>Het A3-proces: betrek de juiste mensen, beoordeel samen het bewijs en stel uw inzicht bij op basis van wat u leert.<\/li><li>Het A3-rapport: vat die redenering samen, zodat een ander er kritische vragen over kan stellen en kan helpen het werk verder te brengen.<\/li><\/ul>\n\n\n<p>Een afgerond rapport bewijst niet dat de redenering deugde. Ook bewijst een ingevoerde tegenmaatregel niet dat die heeft gewerkt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hoe verhoudt A3 zich tot PDCA en oorzaakanalyse?<\/h3>\n\n\n<p>A3 volgt de leercyclus van Plan\u2013Do\u2013Check\u2013Act (PDCA): doorgrond de situatie en plan een verandering, probeer die uit, bekijk het resultaat en beslis vervolgens wat u overneemt of verder onderzoekt.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/oorzaakanalyse\/\">Oorzaakanalyse<\/a> ondersteunt het onderzoek binnen die cyclus. Een visgraatdiagram of een gesprek volgens de 5 \u00d7 waarom-methode kan helpen om mogelijke verklaringen te formuleren, maar geen van beide vervangt bewijs. A3 trekt het verhaal verder door: waarom deze tegenmaatregel, wie gaat die testen, hoe verloopt de proef en welk resultaat zou een aanpassing van de gebruikelijke werkwijze rechtvaardigen?<\/p>\n\n\n<p>Gebruik A3 wanneer een terugkerend of belangrijk probleem onderzoek en afstemming vraagt. De aanpak is vooral nuttig als productie, kwaliteit, engineering en planning elk een ander deel van hetzelfde probleem zien. Bij een klein probleem waarvan de oorzaak bekend is, kan een directe correctie volstaan in plaats van een formeel A3-traject. Bij een acuut veiligheids- of kwaliteitsrisico blijven directe beheersmaatregelen volgens uw bestaande procedures nodig; wacht niet op het rapport.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wat hoort er in een A3-rapport?<\/h2>\n\n\n<p>Met een bruikbaar A3-rapport kan iemand de redenering volgen zonder bij elk overleg aanwezig te zijn geweest. De indeling en het aantal stappen kunnen verschillen. Kies koppen waarmee de volgende vragen eenvoudig te beantwoorden zijn, in plaats van \u00e9\u00e9n sjabloon als universele standaard te beschouwen.<\/p>\n\n\n<p><figure class=\"wp-block-table\"><table><thead><tr><th>Onderdeel van het verhaal<\/th><th>Wat de lezer moet begrijpen<\/th><\/tr><\/thead><tbody><tr><td>Achtergrond en probleem<\/td><td>Waarom dit belangrijk is, waar het probleem optreedt en welk verschil met de gewenste situatie moet worden overbrugd<\/td><\/tr><tr><td>Huidige situatie<\/td><td>Wat er nu gebeurt, onderbouwd met waarnemingen en een vastgelegde nulmeting<\/td><\/tr><tr><td>Doelsituatie<\/td><td>Wat er moet veranderen, wanneer dat bereikt moet zijn en hoe succes wordt gemeten<\/td><\/tr><tr><td>Oorzaakanalyse<\/td><td>Welke verklaring door het bewijs wordt ondersteund en wat nog onzeker is<\/td><\/tr><tr><td>Tegenmaatregel en proef<\/td><td>Met welke verandering de verklaring wordt getoetst en waarom die verandering is gekozen<\/td><\/tr><tr><td>Uitvoering<\/td><td>Wie verantwoordelijk is voor elke actie, welke productiemiddelen nodig zijn en wanneer het werk wordt uitgevoerd<\/td><\/tr><tr><td>Opvolging en leren<\/td><td>Hoe het resultaat zich tot het doel verhoudt, wat behouden blijft en wat verder onderzocht moet worden<\/td><\/tr><\/tbody><\/table><\/figure><\/p>\n\n\n<p>Een veelgebruikte indeling zet het probleem en de analyse links, en de voorgestelde verandering en opvolging rechts. Gebruik een eenvoudige processchets, een foto van het defect of een trendgrafiek van v\u00f3\u00f3r en na de verandering als die meer duidelijk maakt dan een alinea. Houd onderliggende gegevens beschikbaar zonder elke waarneming op de pagina te willen persen.<\/p>\n\n\n<p>Het A3-rapport hoort mee te veranderen naarmate het onderzoek vordert. Als een proef de veronderstelde oorzaak weerlegt, stel dan de verklaring bij. Pas niet het oorspronkelijke doel aan om het resultaat als een succes te kunnen presenteren.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zorg voor een eigenaar, niet alleen voor een handtekening ter goedkeuring<\/h3>\n\n\n<p>Wijs \u00e9\u00e9n persoon aan die verantwoordelijk is voor de voortgang van het A3-traject. Die persoon verzamelt bewijs, betrekt collega&#8217;s en volgt besluiten op, maar hoeft niet elke actie zelf uit te voeren of leiding te geven aan alle betrokken afdelingen.<\/p>\n\n\n<p>Een coach of leidinggevende helpt door de redenering kritisch te toetsen. Nuttige vragen zijn: Wat hebt u zelf waargenomen? Wat zou dit patroon nog meer kunnen verklaren? Waarom zou deze verandering invloed hebben op het probleem? Wat zou voor u aanleiding zijn om uw verklaring te verwerpen?<\/p>\n\n\n<p>Bespreek het werk tijdens het traject met operators en andere betrokkenen. Een rapport dat pas wordt voorgelegd nadat de oplossing is gekozen, nodigt uit tot ondertekenen, niet tot leren. Vroegtijdig overleg kan een praktisch obstakel aan het licht brengen voordat het tot een kostbare proef leidt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Een productievoorbeeld: terugkerende defecten na een omstelling<\/h2>\n\n\n<p>Stel u een verspaningsteam voor dat na omstelling naar \u00e9\u00e9n bepaalde productfamilie telkens een maat buiten de tolerantie aantreft bij de eerste werkstukken. De gebruikelijke reactie is de instelling aan te passen en de operator eraan te herinneren die te controleren. Het team wil een A3-traject starten omdat het probleem blijft terugkeren en het werk op een gedeelde machine onderbreekt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Beschrijf het probleem zonder er al een oplossing in te verwerken<\/h3>\n\n\n<p>\u2018Operators hebben meer training nodig\u2019 is een veronderstelde verklaring met een voorgestelde aanpak, geen probleemomschrijving. \u2018De kwaliteit van de verspaning is slecht\u2019 is te breed om richting te geven aan een onderzoek.<\/p>\n\n\n<p>Een bruikbaarder vertrekpunt is: \u2018Bij deze productfamilie op deze machine worden de eerste werkstukken na omstelling herhaaldelijk afgekeurd. Daardoor moet de instelling worden gecorrigeerd voordat de batch verder kan.\u2019 Vervolgens voegt het team op basis van de eigen registraties toe hoe vaak dit is waargenomen, over welke periode en hoeveel productietijd daardoor verloren is gegaan.<\/p>\n\n\n<p>Leg niet alleen de keuringsuitslag vast, maar ook het aantal vergelijkbare omstellingen: bij hoeveel daarvan werd het eerste werkstuk afgekeurd? Alleen het aantal defecten tellen is niet voldoende. Anders kan een rustigere productieweek op een verbetering lijken, simpelweg omdat er minder omstellingen waren.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Observeer de huidige werkwijze en toets de verklaring<\/h3>\n\n\n<p>De probleemeigenaar observeert samen met de operators en de kwaliteitsingenieur hoe de omstellingen verlopen. Het team vergelijkt de huidige instelinstructie met de daadwerkelijk gebruikte opspanmal en kijkt op welk moment elke controle plaatsvindt. Daarbij maakt het onderscheid tussen waarnemingen en hypotheses.<\/p>\n\n\n<p>Stel dat het onderzoek erop wijst dat een onduidelijke instructie voor het positioneren van de opspanmal ruimte laat voor twee verschillende opstellingen. Dat blijft een verklaring die moet worden getoetst. Het is nog geen vastgestelde grondoorzaak, ook niet als iedereen de verklaring aannemelijk vindt.<\/p>\n\n\n<p>Het team controleert of het veronderstelde verschil aanwezig is bij omstellingen met problemen en ontbreekt bij vergelijkbare, geslaagde omstellingen. Elke poging om het probleem onder gecontroleerde omstandigheden te reproduceren moet voldoen aan de veiligheids- en kwaliteitseisen van de fabriek. Ondersteunen de waarnemingen de verklaring niet, dan gaat het onderzoek verder in plaats van direct over te gaan tot bijscholing.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Spreek een tegenmaatregel en een zinvolle proef af<\/h3>\n\n\n<p>Als de bevindingen de verklaring over de positionering van de opspanmal ondersteunen, is een goedgekeurd positioneerhulpmiddel met een eenduidige instelcontrole een mogelijke tegenmaatregel. De teams voor kwaliteit en engineering bepalen of dit geschikt is en hoe het veilig kan worden beproefd.<\/p>\n\n\n<p>Het A3-rapport beschrijft v\u00f3\u00f3r de proef het verwachte effect: minder afkeur bij de eerste-stukcontrole na omstelling voor de afgebakende productfamilie, onder vergelijkbare omstandigheden. Ook de acceptatiecriteria, de observatieperiode en eventuele randvoorwaarden staan erin. Denk aan het blijven voldoen aan de maattoleranties zonder dat de insteltijd onaanvaardbaar lang wordt.<\/p>\n\n\n<p>Wijs iemand aan die verantwoordelijk is voor het voorbereiden van het hulpmiddel en iemand anders voor het verzamelen van de inspectieresultaten. Leg ook duidelijk vast wie beslist of de wijziging wordt geaccepteerd of afgewezen. Neem de benodigde machinetijd, mensen en inspectiecapaciteit op in het plan. \u2018Volgende week testen\u2019 is nog geen uitvoerbaar plan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Geef de goedgekeurde proef een plek in de productieplanning<\/h2>\n\n\n<p>Verbeterwerk concurreert vaak om capaciteit met juist de orders waarvoor het verbetering moet opleveren. In dit voorbeeld is voor het voorbereiden en testen van het positioneerhulpmiddel dezelfde verspaningscapaciteit nodig als voor klantorders die nog steeds geleverd moeten worden.<\/p>\n\n\n<p>Staat de proef op een aparte actielijst, dan moet de planner deze zelf afstemmen op de wachtrij voor de machine, de beschikbaarheid van operators en de daaropvolgende bewerkingen. Bij een spoedorder moet die afstemming opnieuw plaatsvinden. De proef wordt gemakkelijk uitgesteld doordat de benodigde capaciteit niet zichtbaar is in de productieplanning.<\/p>\n\n\n<p>SkyPlanner maakt die afstemming eenvoudiger. Leg de goedgekeurde proef vast als productiewerk, met de benodigde processtappen, geschikte werkcentra, tijdsduren en afhankelijkheden. Arcturus, de planningsmotor van SkyPlanner, plant dit werk naast de taken voor klanten en houdt daarbij rekening met ploegendiensten, de capaciteit van werkcentra en de ingestelde planningsregels.<\/p>\n\n\n<p>De Gantt-tijdlijn laat zien waar de proef past en hoe de belasting van de gedeelde capaciteit de afronding van orders be\u00efnvloedt. In plaats van afzonderlijke machinewachtrijen handmatig aan te passen, werkt de planner met <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/wat-is-productieplanning\/\">\u00e9\u00e9n samenhangende planning<\/a>. Zo kunnen de gevolgen voor leveringen worden meegenomen in de beslissing.<\/p>\n\n\n<p>Uw team blijft beslissen of de proef doorgaat en welk werk voorrang krijgt. Prioriteiten, regels en vergrendelingen sturen de planningsberekening. Een proef op de tijdlijn zetten is geen goedkeuring op het gebied van veiligheid of kwaliteit.<\/p>\n\n\n<p>Zodra een succesvolle wijziging is goedgekeurd voor regulier gebruik, werkt u de relevante productiegegevens bij, zoals de afgesproken insteltijd of bewerkingsroute. SkyPlanner gebruikt die gegevens vervolgens om toekomstig werk in te plannen. Zo wordt de verbetering onderdeel van de dagelijkse planning en blijven de oude aannames niet in de planning staan.<\/p>\n\n\n<p>SkyPlanner kan via zijn open REST API met elk ERP- of MES-systeem worden gekoppeld. Deze manier van plannen kan dus naast uw bestaande bedrijfssystemen worden gebruikt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Controleer het effect, niet alleen of de actie is afgerond<\/h2>\n\n\n<p>Met de installatie van het positioneerhulpmiddel is een implementatietaak afgerond. Daarmee is het A3-traject nog niet afgesloten.<\/p>\n\n\n<p>Vergelijk de uitkomst van de proef met het oorspronkelijke doel en hanteer daarbij dezelfde definities als bij de nulmeting. Bekijk in het verspaningsvoorbeeld vergelijkbare omstellingen, de resultaten van de eerste-stukcontrole en de insteltijd. Leg veranderingen in de productmix of bedrijfsomstandigheden vast die het verschil kunnen verklaren. Dat een taak bij een eenvoudiger onderdeel sneller verloopt, toont niet aan dat de tegenmaatregel het oorspronkelijke probleem heeft opgelost.<\/p>\n\n\n<p>SkyPlanner biedt nuttige productiegegevens voor die beoordeling. Het taakrapport toont de werkelijk geregistreerde tijd voor een taak, wie eraan heeft gewerkt en welk werkcentrum is gebruikt. Het overzicht van alle tijdregistraties bevat gebeurtenissen met tijdstempels. Het orderregelrapport brengt per orderregel de tijdsduur, de geregistreerde tijd en het verschil tussen beide samen.<\/p>\n\n\n<p>Met deze registraties kan het team waarnemingen koppelen aan het werk dat daadwerkelijk is uitgevoerd, in plaats van totalen uit verschillende weken te vergelijken zonder te weten waarop ze betrekking hebben. Gebruik ze naast de inspectieresultaten en de directe proceswaarnemingen die voor het A3-rapport nodig zijn. Alleen geregistreerde tijd kan niet verklaren waarom een defect is ontstaan of bewijzen dat de tegenmaatregel een verbetering heeft veroorzaakt.<\/p>\n\n\n<p>Bewaar de oorspronkelijke nulmeting en de proefgegevens voordat u de aannames voor toekomstige planningen aanpast. Een herziene schatting is nuttig voor de volgende planning, maar mag niet in de plaats komen van de referentie waarmee de proef wordt beoordeeld.<\/p>\n\n\n<p>Levert de proef niet het beoogde resultaat op, kijk dan opnieuw naar de onderbouwing. Klopte de veronderstelde oorzaak niet, is de tegenmaatregel anders toegepast dan bedoeld of is er een andere omstandigheid veranderd? Leg vast wat u hebt geleerd en plan de volgende test. Sluit het rapport niet af alleen omdat de actielijst leeg is.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Maak de geaccepteerde wijziging onderdeel van het normale werk<\/h2>\n\n\n<p>Als de bevindingen de wijziging ondersteunen en het verantwoordelijke team ermee instemt, werkt u de relevante werkinstructies, instelcontroles en training bij. Controleer of de betrokken ploegen met de nieuwe methode kunnen werken en plan een vervolgmoment om <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/kaizen-in-de-productie\/\">te controleren of de verbetering standhoudt<\/a>. Deel de opgedane kennis zodat die waar relevant ook bij vergelijkbare processen kan worden toegepast, in plaats van aan te nemen dat dezelfde oplossing op elke machine past.<\/p>\n\n\n<p>Ook de overdracht vanuit de planning is belangrijk. Een nieuwe methode kan niet consequent resultaat opleveren als de productie een verouderde werkvolgorde blijft volgen.<\/p>\n\n\n<p>Bij <a href=\"https:\/\/skyplanner.ai\/nl\/klantverhalen\/utu\/\">UTU, fabrikant van elektrische apparatuur<\/a>, maakten aparte spreadsheets per afdeling het vroeger lastig om wijzigingen in de productievolgorde door te geven aan de productievloer. In het klantverhaal over SkyPlanner beschrijft UTU hoe de hele fabriek met een gedeeld planningsoverzicht werkt en bijgewerkte werklijsten binnen enkele seconden de productielijn bereiken. Die ervaring laat zien hoe een gewijzigde planning in de dagelijkse uitvoering kan landen, zonder dat medewerkers afzonderlijke lijsten op elkaar hoeven af te stemmen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Begin met \u00e9\u00e9n probleem dat steeds terugkomt<\/h2>\n\n\n<p>Kies een terugkerende afwijking in de productie, baken die duidelijk af en wijs een verantwoordelijke aan. Observeer het werk samen met de mensen die het uitvoeren, leg een nulmeting vast waarmee u later kunt vergelijken en gebruik het A3-rapport om de voorgestelde verklaring kritisch te laten toetsen. Spreek af hoe de proef wordt uitgevoerd en welke gegevens bepalen of de wijziging behouden blijft.<\/p>\n\n\n<p>Gebruik SkyPlanner om het afgesproken productiewerk realistisch in te plannen naast de klantorders. Zo hoeft u een verbeterlijst niet steeds opnieuw af te stemmen op afzonderlijke machinewachtrijen. Het team kan bovendien zien wat de proef voor de productie betekent voordat het zich eraan verbindt.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/contact-verkoop\/\">Boek een demo<\/a> en neem \u00e9\u00e9n goedgekeurde proef als uitgangspunt, met het gedeelde productiemiddel dat daarvoor nodig is en de taken voor klanten die dezelfde capaciteit vragen. Bekijk hoe SkyPlanner ze samenbrengt in \u00e9\u00e9n samenhangende planning. Of <a href=\"https:\/\/skyplanner.ai\/nl\/proef\/\">start een proefperiode<\/a> met demogegevens of de AI-ondersteunde functie Getting Started in SkyPlanner Assistant om de planningswerkwijze zelf te verkennen.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A3-probleemoplossing in de productie: verandering die werkt Home &raquo; Bronnen &raquo; A3-probleemoplossing in de productie: verandering die werkt De corrigerende maatregel is afgevinkt. De opspanmal is aangepast, het team is nog eens op de procedure gewezen en de productie draait weer. De week erop keert hetzelfde defect terug. De actie is uitgevoerd. Maar daarmee is &#8230; <a title=\"A3-probleemoplossing in de productie: verandering die werkt\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/\" aria-label=\"Lees meer over A3-probleemoplossing in de productie: verandering die werkt\">Lees meer<\/a><\/p>\n","protected":false},"author":3,"featured_media":112402,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2520,309],"tags":[],"class_list":["post-112379","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-en-planning","category-middelen","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>A3-probleemoplossing in de productie: verandering die werkt<\/title>\n<meta name=\"description\" content=\"Actie afgerond, maar het defect keert terug. A3 verbindt bewijs, een haalbare productieproef en opvolging die laat zien of de verandering werkt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A3-probleemoplossing in de productie: verandering die werkt\" \/>\n<meta property=\"og:description\" content=\"Actie afgerond, maar het defect keert terug. A3 verbindt bewijs, een haalbare productieproef en opvolging die laat zien of de verandering werkt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T07:21:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T07:22:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"A3-probleemoplossing in de productie: verandering die werkt\",\"datePublished\":\"2026-10-29T07:21:41+00:00\",\"dateModified\":\"2026-10-29T07:22:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/\"},\"wordCount\":2426,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"articleSection\":[\"APS en planning\",\"middelen\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/\",\"name\":\"A3-probleemoplossing in de productie: verandering die werkt\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"datePublished\":\"2026-10-29T07:21:41+00:00\",\"dateModified\":\"2026-10-29T07:22:36+00:00\",\"description\":\"Actie afgerond, maar het defect keert terug. A3 verbindt bewijs, een haalbare productieproef en opvolging die laat zien of de verandering werkt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Hands compare a machined part and locating fixture beside sketches during an A3 improvement discussion.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/a3-probleemoplossing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A3-probleemoplossing in de productie: verandering die werkt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"A3-probleemoplossing in de productie: verandering die werkt","description":"Actie afgerond, maar het defect keert terug. A3 verbindt bewijs, een haalbare productieproef en opvolging die laat zien of de verandering werkt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/","og_locale":"nl_NL","og_type":"article","og_title":"A3-probleemoplossing in de productie: verandering die werkt","og_description":"Actie afgerond, maar het defect keert terug. A3 verbindt bewijs, een haalbare productieproef en opvolging die laat zien of de verandering werkt.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T07:21:41+00:00","article_modified_time":"2026-10-29T07:22:36+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"Jussi M\u00e4ntyl\u00e4","Geschatte leestijd":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"A3-probleemoplossing in de productie: verandering die werkt","datePublished":"2026-10-29T07:21:41+00:00","dateModified":"2026-10-29T07:22:36+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/"},"wordCount":2426,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","articleSection":["APS en planning","middelen"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/","name":"A3-probleemoplossing in de productie: verandering die werkt","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","datePublished":"2026-10-29T07:21:41+00:00","dateModified":"2026-10-29T07:22:36+00:00","description":"Actie afgerond, maar het defect keert terug. A3 verbindt bewijs, een haalbare productieproef en opvolging die laat zien of de verandering werkt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","width":1672,"height":941,"caption":"Hands compare a machined part and locating fixture beside sketches during an A3 improvement discussion."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/a3-probleemoplossing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"A3-probleemoplossing in de productie: verandering die werkt"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/nl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"A3-probleemoplossing in de productie: verandering die werkt Home &raquo; Bronnen &raquo; A3-probleemoplossing in de productie: verandering die werkt De corrigerende maatregel is afgevinkt. De opspanmal is aangepast, het team is nog eens op de procedure gewezen en de productie draait weer. De week erop keert hetzelfde defect terug. De actie is uitgevoerd. Maar daarmee is&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/112379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=112379"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/112379\/revisions"}],"predecessor-version":[{"id":112442,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/112379\/revisions\/112442"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/112402"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=112379"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=112379"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=112379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}