{"id":111699,"date":"2026-10-28T03:02:21","date_gmt":"2026-10-28T03:02:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111699"},"modified":"2026-10-28T03:03:23","modified_gmt":"2026-10-28T03:03:23","slug":"tweebakkensysteem","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/","title":{"rendered":"Tweebakkensysteem: houd kleine onderdelen klaar voor productie"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tweebakkensysteem: houd kleine onderdelen klaar voor productie<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/nl\/\">Home<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/\">Bronnen<\/a> &raquo; Tweebakkensysteem: houd kleine onderdelen klaar voor productie<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Geschatte leestijd: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minuten<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Bij een montagestation raakt een klein onderdeel op. Er ligt nog voorraad ergens in de fabriek, maar iemand moet die zoeken, om aanvulling vragen en de onderdelen naar de operator brengen. Door een goedkoop onderdeel gaat zo kostbare productietijd verloren.<\/p>\n\n\n<p>Een tweebakkensysteem maakt de behoefte aan aanvulling zichtbaar voordat het werkcentrum zonder onderdelen zit. Operators pakken onderdelen uit \u00e9\u00e9n bak, terwijl de andere als reserve klaarstaat. Zodra de eerste bak leeg is, wordt de aanvulling in gang gezet. De tweede bak voorziet de productie van onderdelen totdat de aanvulling er is.<\/p>\n\n\n<p>De belangrijkste vraag is niet of u twee bakken hebt, maar of de aanvulling terug kan zijn voordat de reserve op is. Maakt u onderdelen op machines die ook voor ander werk worden gebruikt? Dan helpt SkyPlanner APS die vraag te beantwoorden door geaccepteerde aanvulorders samen met klantorders in te plannen, in plaats van ze op een aparte aanvullijst te laten staan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wat is een tweebakkensysteem?<\/h2>\n\n\n<p>Een <strong>tweebakkensysteem<\/strong> is een visuele aanvulmethode waarbij twee vastgelegde hoeveelheden van hetzelfde artikel worden gebruikt in een terugkerende cyclus van verbruik en aanvulling. E\u00e9n bak levert de onderdelen op de plek waar ze worden gebruikt. Zodra die leeg is, wordt via een kaart, de lege bak of een ander afgesproken signaal om aanvulling gevraagd. Vanaf dat moment worden onderdelen uit de tweede bak gepakt.<\/p>\n\n\n<p>De tweede bak bevat de voorraad die nodig is tijdens het wachten op aanvulling. Het voordeel is eenvoudig: de operator hoeft niet steeds de resterende onderdelen te tellen om te weten wanneer aanvulling nodig is. De wissel van bak maakt die behoefte direct zichtbaar.<\/p>\n\n\n<p>In de productie is deze methode vooral nuttig voor bevestigingsmiddelen, koppelingen en andere kleine onderdelen die regelmatig worden gebruikt. Aanvulling kan vanuit een centraal magazijn, door een externe leverancier of via een intern productieproces plaatsvinden. De herkomst bepaalt welk werk na het signaal nodig is, maar in alle gevallen moet de aanvulling betrouwbaar verlopen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zo werkt de cyclus met gelijke hoeveelheden<\/h3>\n\n\n<p>Gebruik voor een eenvoudige proef twee bakken met dezelfde standaardhoeveelheid:<\/p>\n\n\n<p>1. <strong>Pak onderdelen uit slechts \u00e9\u00e9n bak.<\/strong> Geef duidelijk aan dat de tweede bak de reserve is en geen alternatieve paklocatie.<\/p>\n\n\n<p>2. <strong>Geef een signaal zodra de actieve bak leeg is.<\/strong> Breng de lege bak of de bijbehorende kaart naar het afgesproken verzamelpunt, of registreer de afgesproken elektronische aanvraag.<\/p>\n\n\n<p>3. <strong>Schakel over op de volle reservebak.<\/strong> De productie gaat door terwijl de verantwoordelijke voor de aanvulling nieuwe onderdelen regelt.<\/p>\n\n\n<p>4. <strong>Bevestig dat de aanvulling in behandeling is.<\/strong> De verantwoordelijke die het signaal ontvangt, bevestigt de ontvangst en stelt vast wanneer de bruikbare onderdelen terug moeten zijn.<\/p>\n\n\n<p>5. <strong>Zet de bijgevulde bak terug als reserve.<\/strong> Controleer het artikel en de hoeveelheid, breng de identificatie weer op orde en sluit de aanvulregistratie af. Blijf onderdelen uit de huidige actieve bak pakken totdat die leeg is.<\/p>\n\n\n<p>Daarna wisselen de bakken opnieuw van rol. Vul de actieve bak niet voortdurend bij: daardoor kan onzichtbaar blijven dat de bak leegraakt, terwijl juist dat de aanvulling in gang moet zetten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kies onderdelen waarvan vraag en aanvoer bij de methode passen<\/h2>\n\n\n<p>Begin met onderdelen die regelmatig worden verbruikt, duidelijk te identificeren zijn en een betrouwbare aanvoerbron hebben. Het meest geschikt zijn onderdelen die eenvoudig in een standaardhoeveelheid te hanteren zijn en waarvan de specificaties niet per taak veranderen.<\/p>\n\n\n<p>Een goedkoop onderdeel kan een goede kandidaat zijn, ook als het ontbreken ervan een dure bewerking stillegt. De inkoopprijs zegt niets over de kosten van een tekort. Omgekeerd kan het vullen van twee grote bakken met een duur, zelden gebruikt artikel geld vastleggen zonder een terugkerend aanvoerprobleem op te lossen.<\/p>\n\n\n<p>Wees voorzichtiger als het verbruik onregelmatig is of vooral door incidentele grote orders wordt bepaald. E\u00e9n uitname kan de reserve al uitputten lang voordat de gebruikelijke aanvulling terug kan zijn. Ook bij orderspecifieke onderdelen, frequente technische revisies, korte houdbaarheid of strenge eisen aan partijbeheer is meer nodig dan een handig stel bakken. Houd de vereiste maatregelen voor identificatie, voorraadrotatie en traceerbaarheid in stand.<\/p>\n\n\n<p>Aanvullen met twee bakken is <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/kanban-in-productie\/\">verwant aan kanban<\/a>, maar <strong>twee bakken zijn niet hetzelfde als twee kanbankaarten<\/strong>. Een productiekringloop met twee kaarten maakt onderscheid tussen toestemming om te produceren en toestemming om materiaal te verplaatsen. Het tweebakkensysteem in dit artikel gaat over de fysieke voorraad en de actie die volgt zodra \u00e9\u00e9n van de twee hoeveelheden op is.<\/p>\n\n\n<p>Het is ook een andere keuze dan een <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/min-max-voorraadbeheer\/\">min-maxbeleid<\/a>. Min-max werkt met een bestelpunt en een streefniveau tot waar wordt aangevuld. Twee bakken maken een bepaalde verbruiksgrens zichtbaar op de plek waar de onderdelen worden gebruikt. Via een ophaal- en bevoorradingsroute kunnen lege en volle bakken worden vervoerd, maar een route op zich bevestigt geen aanvulaanvraag en rondt de aanvulling ook niet af.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stem de reserve af op de volledige aanvultijd<\/h2>\n\n\n<p>Meet de tijd vanaf <strong>het verbruikssignaal totdat bruikbare vervangende onderdelen bij het aangewezen werkcentrum beschikbaar zijn<\/strong>. Stop de meting niet zodra een inkooporder is verstuurd, een machine klaar is met verspanen of een levering de fabriekspoort bereikt.<\/p>\n\n\n<p>Die tijd kan bestaan uit wachten tot het signaal wordt opgehaald, de aanvraag controleren en vrijgeven, orderpicken of produceren, inspectie, transport en het terugzetten van de onderdelen op de juiste locatie. Bij intern gemaakte onderdelen kan het wachten op een gedeelde machine zwaarder wegen dan de bewerkingstijd zelf.<\/p>\n\n\n<p>Vermenigvuldig als eerste berekening het verwachte verbruik per bedrijfsperiode met het aantal bedrijfsperioden dat tijdens de aanvultijd moet worden overbrugd. Zorg vervolgens voor extra voorraad om de variatie in vraag en aanvultijd op te vangen waartegen uw proces bestand moet zijn. Veiligheidsvoorraad is die extra bescherming binnen de totale hoeveelheid, niet noodzakelijk de hele tweede bak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Een rekenvoorbeeld met twee bakken<\/h3>\n\n\n<p>Stel dat een montagestation 40 clips per productiedienst verbruikt. Elke bak bevat 240 bruikbare clips. Zodra \u00e9\u00e9n bak leeg is en de operator naar de andere overschakelt, biedt de volle bak bij dat verbruik voldoende voorraad voor zes productiediensten.<\/p>\n\n\n<p>Als het volledige aanvulproces vier productiediensten duurt, verbruikt het station tijdens het wachten 160 clips. Wanneer de aanvulling terugkomt, liggen er nog 80 clips in de actieve bak. Die resterende hoeveelheid biedt in dit voorbeeld bescherming tegen variatie; het is geen aanbevolen buffer voor elke fabriek.<\/p>\n\n\n<p>Stel nu dat de clips zelf snel te maken zijn, maar dat de wachtrij bij de producerende machine ervoor zorgt dat ze pas na meer dan zes productiediensten terugkomen. Dan schiet het systeem tekort, ondanks de juiste bakken en een zichtbaar signaal. U moet het aanvulproces verbeteren, meer bescherming inbouwen of een andere manier van aanvullen kiezen.<\/p>\n\n\n<p>Hanteer de werkroosters consequent in de berekening. Als de montage tijdens een nachtdienst onderdelen verbruikt, terwijl het magazijn, de leverancier of het aanvulproces dan niet werkt, wordt in die periode nog steeds een beroep gedaan op de buffer. Baseer de berekening op het werkelijke verbruik gedurende de tijd dat aanvulling niet beschikbaar is, niet op een onduidelijke combinatie van kalenderdagen en werkuren.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Moeten beide bakken dezelfde hoeveelheid bevatten?<\/h3>\n\n\n<p>Nee. Bij een ongelijke verdeling kunt u een grotere werkvoorraad gebruiken en een kleinere reserve die voldoende is om de aanvultijd te overbruggen. Leg hiervoor wel een andere regel vast voor het terugzetten: vul bij ontvangst eerst de reserve aan tot de vastgelegde hoeveelheid en doe de rest in de werkbak.<\/p>\n\n\n<p>Wissel bakken met ongelijke hoeveelheden niet af alsof ze elk dezelfde bescherming bieden. Bij een eerste invoering maken gelijke hoeveelheden het wisselen makkelijker te begrijpen en te controleren. Kies alleen voor ongelijke hoeveelheden als de winst in voorraad of ruimte opweegt tegen de extra discipline die dit vraagt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Wijs een verantwoordelijke aan voor elk signaal dat een bak leeg is<\/h2>\n\n\n<p>Een kaart in een verzamelbakje is een aanvraag, geen bewijs dat iemand ermee aan de slag is gegaan. Spreek v\u00f3\u00f3r de proef af wie het signaal ontvangt, hoe snel die persoon de ontvangst bevestigt en wie actie onderneemt als de aanvulling te laat zal zijn. Regel die verantwoordelijkheid over de diensten heen en wijs ook een vervanger aan voor wanneer de vaste verantwoordelijke afwezig is.<\/p>\n\n\n<p>Zorg dat het signaal voldoende informatie bevat om zonder telefoontje te kunnen handelen. Vermeld het onderdeel en waar relevant de revisie, de standaardaanvulhoeveelheid, de herkomst, de retourlocatie en de identificatie van de bak of kaart. Degene die de aanvulling verzorgt, moet deze aanvraag kunnen onderscheiden van een aanvraag die al in behandeling is.<\/p>\n\n\n<p>Werk bijvoorbeeld met afgesproken statussen zoals aangevraagd, geaccepteerd en teruggebracht. Een papieren signaal kan prima werken, mits de ontvangende verantwoordelijke de ontvangst bevestigt en openstaande aanvragen zichtbaar blijven. Wordt dezelfde aanvraag ook elektronisch vastgelegd, koppel dan de twee registraties aan elkaar in plaats van een tweede aanvulling te starten.<\/p>\n\n\n<p>De fysieke kringloop en de voorraadadministratie moeten met elkaar overeenkomen. Een bak verplaatsen leidt op zichzelf niet tot een elektronische voorraadboeking of het aanmaken van een productieorder. Leg vast op welk moment uw werkwijze het verbruik, de interne verplaatsing, de ontvangst en een eventueel productieverzoek registreert. Is de voorraad al afgeboekt via de productieregistratie, boek die dan niet nogmaals af alleen omdat de lege bak wordt opgehaald.<\/p>\n\n\n<p>Controleer bij terugkomst de bruikbare hoeveelheid, de identiteit van de onderdelen en de locatie voordat u het verzoek afsluit. Beschadigde onderdelen in een ogenschijnlijk volle bak bieden niet de beoogde bescherming. Een aanvulling is pas afgerond wanneer de juiste, bruikbare onderdelen beschikbaar zijn op de plek waar ze worden verbruikt, niet zodra iemand een voorafgaande taak als voltooid markeert.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Verbruik van de reserve is normaal, een te late aanvulling is een uitzondering<\/h3>\n\n\n<p>Het is de bedoeling dat de tweede bak wordt gebruikt. Dat die leeg raakt zonder dat er aanvulling is, is niet de bedoeling.<\/p>\n\n\n<p>Spreek een escalatiemoment af dat vroeg genoeg ligt om in te grijpen zolang er nog voorraad is. Kan de verantwoordelijke voor de aanvulling niet bevestigen dat deze terug is voordat de resterende voorraad opraakt, schakel dan degene in die de aanvoer- of productiebeslissing kan aanpassen. Een spoedverplaatsing kan een passende oplossing zijn, maar registreer die en herstel daarna de afgesproken hoeveelheden in beide bakken. Zonder registratie onderdelen lenen bij een ander station verplaatst alleen het tekort.<\/p>\n\n\n<p>Bekijk tijdens de proef welke ontvangstbevestigingen uitblijven, hoelang het werkelijk duurt van signaal tot terugkomst, hoeveel reserve er bij terugkomst over is en welke noodmaatregelen nodig waren. Gebruik die bevindingen om het ophalen en aanvullen te verbeteren voordat u de voorraad verlaagt. Beoordeel de hoeveelheden opnieuw wanneer de vraag, het ploegenrooster, de leveranciersprestaties of de productieroute verandert.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Plan interne aanvullingen samen met het werk dat dezelfde capaciteit nodig heeft<\/h2>\n\n\n<p>Bij ingekochte bevestigingsmiddelen kan de aanvulling vooral bestaan uit orderpicken, levering door de leverancier en intern transport. Voor een clip, beugel of afstandsstuk dat u zelf maakt, zijn ook machines en tijd nodig die voor klantorders worden gebruikt. Een aanvullijst die geen rekening houdt met die verplichtingen, biedt geen geloofwaardige toezegging over de terugkomst.<\/p>\n\n\n<p><strong>Kies SkyPlanner als uw aanvullingen die gedeelde productiecapaciteit nodig hebben.<\/strong> Zodra een aanvulling als productieorder is geaccepteerd, <a href=\"https:\/\/skyplanner.ai\/nl\/middelen\/wat-is-productieplanning\/\">plant Arcturus, de plannings-AI van SkyPlanner, de bijbehorende bewerkingen samen met het overige werk<\/a>. Daarbij houdt het rekening met de ingestelde werkcentra, capaciteit, ploegen, afhankelijkheden tussen bewerkingen en prioriteiten. Het Gantt-diagram toont de resulterende volgorde en de geplande afronding.<\/p>\n\n\n<p>Zo hoeft u niet langer aparte wachtrijen voor klantorders en aanvulbatches bij te houden en die vervolgens handmatig op elkaar af te stemmen. U ziet of de aanvulling in de planning past voordat de reserve naar verwachting opraakt, en welke gevolgen een gewijzigde prioriteit heeft voor andere toezeggingen.<\/p>\n\n\n<p>Neem opnieuw het voorbeeld van de clip. Voor de planning is de vraag of de geaccepteerde aanvulbatch alle bewerkingen op tijd kan doorlopen, zodat er nog tijd is voor inspectie en teruglevering aan de assemblage. Is de gedeelde machine al voor ander werk ingepland, dan kunt u dat conflict aanpakken voordat de voorraad bij de assemblage op is. U bepaalt de prioriteiten; Arcturus berekent op basis daarvan de planning.<\/p>\n\n\n<p>Als plannen op basis van materiaalbeschikbaarheid is ingeschakeld en de voorraadgegevens actueel worden gehouden, houdt SkyPlanner ook rekening met de materialen die nodig zijn voor de aanvulling. Een beschikbare machine is niet genoeg als de grondstof voor de batch ontbreekt. Bij ingekochte onderdelen kan de planning van het werk waarvoor ze nodig zijn rekening houden met de bijgehouden aankomstdatums van inkooporders. Bereken de planning opnieuw als die datums veranderen.<\/p>\n\n\n<p>SkyPlanner kan via zijn open REST API met elk ERP- of MES-systeem worden ge\u00efntegreerd. Zo kunt u bestaande order- en voorraadgegevens koppelen aan de productieplanning, in plaats van aanvullingen los daarvan te plannen. Houd het signaal van de bak bij het werkcentrum eenvoudig en plan het werk achter dat signaal met oog voor de rest van de fabriek.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Wat inzicht in materiaalbeschikbaarheid bij Eskomatic veranderde<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/nl\/klantverhalen\/eskomatic\/\">Eskomatic, een Fins bedrijf dat verspaningswerk in opdracht uitvoert<\/a>, bepaalde de werkvolgorde voorheen grotendeels handmatig. Door het beperkte inzicht in de materiaalbeschikbaarheid kwamen tekorten soms pas vlak voor de geplande start van een taak aan het licht.<\/p>\n\n\n<p>Door SkyPlanner aan het bestaande ERP-systeem te koppelen, kreeg het bedrijf een duidelijker visueel overzicht van het uit te voeren werk en werd de capaciteitsbelasting automatisch ingepland. Eskomatic meldt nauwkeurigere leverdatums en minder productiestilstand door materiaaltekorten.<\/p>\n\n\n<p>Die ervaring laat zien wat het oplevert om materiaalbeschikbaarheid te koppelen aan de dagelijkse planning: planners kunnen eerder reageren, in plaats van problemen te moeten oplossen wanneer het werk al had moeten beginnen. Als de aanvulling voor een tweebakkensysteem op gedeelde machines wordt geproduceerd, geldt dezelfde praktische behoefte: de verwachte beschikbaarheid op de verbruiksplek moet worden onderbouwd door de daadwerkelijke productieplanning.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Begin met \u00e9\u00e9n onderdeel en toets de volledige kringloop<\/h2>\n\n\n<p>Voer een proef uit met \u00e9\u00e9n terugkerend onderdeel op \u00e9\u00e9n verbruiksplek. Controleer de beginhoeveelheid in beide bakken, controleer eventuele al openstaande aanvullingen en stem die af, label de locaties en oefen het omwisselen van de lege bak met de operators en de verantwoordelijken voor de aanvulling. Volg meerdere volledige cycli, inclusief ploegoverdrachten, voordat u de werkwijze uitbreidt.<\/p>\n\n\n<p>Behoud wat het tweebakkensysteem waardevol maakt: een duidelijk signaal en een eenvoudige routine voor de operator. Richt de planningsinspanning op wat ertoe doet: zorgen dat het proces achter dat signaal de aanvulling ook echt kan leveren.<\/p>\n\n\n<p>Wilt u zien hoe SkyPlanner uw intern geproduceerde aanvullingen zou inplannen? <a href=\"https:\/\/skyplanner.ai\/nl\/contact-verkoop\/\">Boek een demo<\/a> en neem \u00e9\u00e9n terugkerend onderdeel als voorbeeld, met de dekking van de reservevoorraad en een klanttaak die hetzelfde productiemiddel nodig heeft. U kunt bekijken waar de aanvulling in de gezamenlijke planning terechtkomt en wat het effect op ander werk is. Of <a href=\"https:\/\/skyplanner.ai\/nl\/proef\/\">probeer SkyPlanner met demogegevens<\/a>. Wilt u liever begeleiding bij de introductie, gebruik dan de AI-ondersteunde functie \u2018Aan de slag\u2019 van de Assistant.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tweebakkensysteem: houd kleine onderdelen klaar voor productie Home &raquo; Bronnen &raquo; Tweebakkensysteem: houd kleine onderdelen klaar voor productie Bij een montagestation raakt een klein onderdeel op. Er ligt nog voorraad ergens in de fabriek, maar iemand moet die zoeken, om aanvulling vragen en de onderdelen naar de operator brengen. Door een goedkoop onderdeel gaat zo &#8230; <a title=\"Tweebakkensysteem: houd kleine onderdelen klaar voor productie\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/\" aria-label=\"Lees meer over Tweebakkensysteem: houd kleine onderdelen klaar voor productie\">Lees meer<\/a><\/p>\n","protected":false},"author":3,"featured_media":111722,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[309,2548],"tags":[],"class_list":["post-111699","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-middelen","category-productie-efficientie","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tweebakkensysteem: kleine onderdelen beschikbaar voor productie<\/title>\n<meta name=\"description\" content=\"Een lege bak vraagt om aanvulling, niet om stilstand. Richt een betrouwbaar tweebakkensysteem in en plan intern te maken onderdelen met SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tweebakkensysteem: houd kleine onderdelen klaar voor productie\" \/>\n<meta property=\"og:description\" content=\"Een lege bak vraagt om aanvulling, niet om stilstand. Richt een betrouwbaar tweebakkensysteem in en plan intern te maken onderdelen met SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T03:02:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T03:03:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschreven door\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tweebakkensysteem: houd kleine onderdelen klaar voor productie\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:03:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/\"},\"wordCount\":2427,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"articleSection\":[\"middelen\",\"Productie-effici\u00ebntie\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/\",\"name\":\"Tweebakkensysteem: kleine onderdelen beschikbaar voor productie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:03:23+00:00\",\"description\":\"Een lege bak vraagt om aanvulling, niet om stilstand. Richt een betrouwbaar tweebakkensysteem in en plan intern te maken onderdelen met SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/middelen\\\/tweebakkensysteem\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tweebakkensysteem: houd kleine onderdelen klaar voor productie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/nl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tweebakkensysteem: kleine onderdelen beschikbaar voor productie","description":"Een lege bak vraagt om aanvulling, niet om stilstand. Richt een betrouwbaar tweebakkensysteem in en plan intern te maken onderdelen met SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/","og_locale":"nl_NL","og_type":"article","og_title":"Tweebakkensysteem: houd kleine onderdelen klaar voor productie","og_description":"Een lege bak vraagt om aanvulling, niet om stilstand. Richt een betrouwbaar tweebakkensysteem in en plan intern te maken onderdelen met SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T03:02:21+00:00","article_modified_time":"2026-10-28T03:03:23+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Geschreven door":"Jussi M\u00e4ntyl\u00e4","Geschatte leestijd":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tweebakkensysteem: houd kleine onderdelen klaar voor productie","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:03:23+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/"},"wordCount":2427,"publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","articleSection":["middelen","Productie-effici\u00ebntie"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/","url":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/","name":"Tweebakkensysteem: kleine onderdelen beschikbaar voor productie","isPartOf":{"@id":"https:\/\/skyplanner.ai\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:03:23+00:00","description":"Een lege bak vraagt om aanvulling, niet om stilstand. Richt een betrouwbaar tweebakkensysteem in en plan intern te maken onderdelen met SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","width":1536,"height":864,"caption":"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/nl\/middelen\/tweebakkensysteem\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/nl\/"},{"@type":"ListItem","position":2,"name":"Tweebakkensysteem: houd kleine onderdelen klaar voor productie"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/nl\/#website","url":"https:\/\/skyplanner.ai\/nl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/nl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/nl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/nl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tweebakkensysteem: houd kleine onderdelen klaar voor productie Home &raquo; Bronnen &raquo; Tweebakkensysteem: houd kleine onderdelen klaar voor productie Bij een montagestation raakt een klein onderdeel op. Er ligt nog voorraad ergens in de fabriek, maar iemand moet die zoeken, om aanvulling vragen en de onderdelen naar de operator brengen. Door een goedkoop onderdeel gaat zo&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/111699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/comments?post=111699"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/111699\/revisions"}],"predecessor-version":[{"id":111762,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/posts\/111699\/revisions\/111762"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media\/111722"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/media?parent=111699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/categories?post=111699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/nl\/wp-json\/wp\/v2\/tags?post=111699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}